Flood Risk Assessment in Whaley Bridge

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

On 1 August 2019, the spillway at Toddbrook Reservoir began to fail after days of heavy rain, and around 1,500 people below the dam in Whaley Bridge, Furness Vale and New Mills were evacuated while fire crews and the RAF worked to lower the water level before the wall gave way. No home in Whaley Bridge itself flooded that week, but the town came closer to a catastrophic dam failure than almost anywhere else in England has in living memory, and the reservoir above it is still being brought back into service today. That history matters for a flood risk assessment in Whaley Bridge, because a site here can sit safely in Flood Zone 1 on the Environment Agency's maps and still need to account for the River Goyt, Todd Brook, surface water running off the surrounding hills, and a large raised reservoir governed by its own safety legislation.

Unda prepares flood risk assessments and drainage strategies for residential and commercial sites across Whaley Bridge and the wider flood risk assessments we prepare across Derbyshire, working directly with the Environment Agency and Derbyshire County Council as the Lead Local Flood Authority. Whether you need to work out when a flood risk assessment is required for planning, for a property purchase, for a mortgage or insurance, for BREEAM, a sequential or exception test, or a surface-water drainage strategy, contact one of our experienced flood risk consultants on 01293 214444 or start a quote and we will come back to you within 60 minutes.

Toddbrook Reservoir sits directly above Whaley Bridge, and the 2019 near-failure means reservoir flood risk has to be assessed here in a way most English towns never have to consider.

  • Main watercourses: the River Goyt and Black Brook (both main rivers), joined in the town by Todd Brook and the Peak Forest Canal
  • Dominant risk types: reservoir (Toddbrook), fluvial (the Goyt and Black Brook), and surface water off the steep Peak District catchment
  • Lead Local Flood Authority: Derbyshire County Council
  • Local Planning Authority: High Peak Borough Council — Local Plan Policy EQ11 (Flood Risk Management), adopted 2016; Level 1 Strategic Flood Risk Assessment, March 2024
  • 2019: around 1,500 residents evacuated after the Toddbrook Reservoir spillway failed; no homes in Whaley Bridge flooded during the dam incident itself
  • 2026: Toddbrook Reservoir is in an active, monitored refill following completion of its permanent, roughly £50 million spillway repair

Check flood risk anywhere in Whaley Bridge

Whaley Bridge is outlined below. Screen any postcode in the town against Environment Agency data for rivers and the sea, surface water and the planning flood zones, with a climate change outlook to 2125. As our explainer on whether flood maps are accurate sets out, national mapping is built for area-wide screening rather than a single building, so treat this as an indicative first pass, not a substitute for a site-specific flood risk assessment — for that, start a quote and one of our experienced flood risk consultants will respond within 60 minutes.

Flood risk tool · Whaley Bridge

Whaley Bridge Flood Risk Checker

Whaley Bridge is outlined on the map below. Enter any postcode in the town to zoom in and see the Environment Agency flood risk for that location — rivers & sea, surface water, reservoirs and climate projections to 2125 — plus live flood warnings.

Whaley Bridge is shown outlined in coral. Results are an indicative screening based on Environment Agency open data — not a Flood Risk Assessment.
Loading flood map…
Rivers & Sea
Surface Water
Reservoirs
Flood Zone (for planning)
Climate change (2070–2125)
Historic flooding
Flood warning area
Live flood warnings (nearby)
Important: This tool gives an indicative screening only, based on modelled Environment Agency datasets (Flood Map for Planning Flood Zones 2 & 3, Flood Zones plus Climate Change 2070–2125, Risk of Flooding from Rivers and Sea, Risk of Flooding from Surface Water, reservoir, historic, flood warning area, flood storage area, flood defence and main river data) under the Open Government Licence. It reflects the area around the postcode, not the exact property, and does not account for finished floor levels, ground levels or groundwater. It is not a Flood Risk Assessment and must not be relied on for planning, conveyancing, insurance or design decisions. Data © Environment Agency copyright and/or database right; contains Ordnance Survey data © Crown copyright and database right. The High Peak district boundary shown (covering Whaley Bridge) is from the Office for National Statistics (Open Government Licence; contains OS data © Crown copyright and database right).

Flood risk assessment in Whaley Bridge: rivers, reservoir and surface water

Whaley Bridge sits where the River Goyt, Todd Brook and the Peak Forest Canal converge in a narrow Pennine valley, directly below Toddbrook Reservoir. A flood risk assessment in Whaley Bridge has to read all of this together: the Goyt's fluvial risk, the reservoir's residual risk, surface water shedding off steep ground on both sides of the valley, and the canal's own place in the drainage picture.

The River Goyt is a main river, rising on the moors above Errwood and Fernilee reservoirs before running down through the Goyt Valley into the town, where it is joined by Todd Brook. Todd Brook itself rises near Shining Tor, feeds Toddbrook Reservoir, and continues down through the town centre to meet the Goyt. Black Brook, also a main river, drains a separate catchment through Chinley, Whitehough and Buxworth (passing Bugsworth Basin, the historic terminus of the Peak Forest Canal) before joining the Goyt near Bridgemont, just outside Whaley Bridge. The canal itself runs close to the town centre, with its short Whaley Bridge Branch ending at Whaley Bridge Wharf; as a raised, artificial watercourse it interacts with the town's drainage and needs its own consideration on sites nearby.

Because Whaley Bridge sits in a steep-sided valley bottom, rainfall on the surrounding gritstone and shale slopes reaches the town quickly. Surface water here behaves differently from the slower build-up of a lowland river flood: it responds to short, intense rainfall and can affect a site with little warning, which is why a flood risk assessment in Whaley Bridge has to model surface water separately from the river catchments rather than treating fluvial risk as the whole picture. Research into climate whiplash across UK river catchments points to exactly this kind of fast-responding, Pennine-fed river becoming more volatile as the climate warms, which is a reasonable factor to note in a scheme's climate change allowance. Groundwater is a smaller factor in this part of Derbyshire than in the chalk catchments of southern England — the geology here is gritstone, shale and coal measures rather than a principal aquifer — but every flood risk assessment still screens it as a matter of course, because assessing groundwater is part of doing the assessment properly rather than a separate report.

Anyone who owns land next to the Goyt, Todd Brook or Black Brook should also be aware of their riparian ownership rights and responsibilities, since maintaining the bed and banks of a watercourse and letting water pass freely are legal duties that sit alongside, not instead of, a site's own flood risk assessment.

Watercourses and flood sources around Whaley Bridge
SourceTypeWhat it means for a site here
River GoytMain river (fluvial)Confirmed main river through the town centre; carries an Environment Agency flood warning area
Todd BrookWatercourse feeding Toddbrook ReservoirRises at Shining Tor, fills the reservoir, then flows through the town to join the Goyt
Black BrookMain river (fluvial)Separate catchment via Chinley and Buxworth, joining the Goyt near Bridgemont
Toddbrook ReservoirLarge raised reservoir (Reservoirs Act 1975)Owned by Canal & River Trust; subject to statutory safety inspection; residual failure risk assessed, not assumed away
Peak Forest CanalCanal / artificial watercourseRaised in places through the town; relevant to drainage and flood risk on adjacent sites
Surface waterPluvialFast-responding steep catchment; can affect a site independently of the rivers
GroundwaterMinor at most sitesGritstone, shale and coal-measure geology rather than a principal aquifer; still screened in every assessment

A history of flooding in Whaley Bridge: 1872, 1998 and 2019

Whaley Bridge's dated flood history runs from a sharp rise on the Goyt in 1872, through the flooding of the town's water treatment works in 1998, to the summer of 2019, when heavy rain flooded homes and businesses before the Toddbrook Reservoir spillway itself began to fail.

The earliest recorded flood dates to 19 June 1872, when regional thunderstorms sent the Goyt an estimated 12 to 14 feet above its normal level. Contemporary newspaper accounts, held in the Newcastle University flood chronologies archive, describe houses near the river at Whaley Bridge as completely flooded, with people taken into the chapel and local inns for shelter. No casualty figures survive for the town specifically. Whaley Bridge's water treatment works flooded again in October 1998, an event recorded in High Peak Borough Council's Strategic Flood Risk Assessment alongside the more recent events below.

Then came 2019. Heavy rain fell from 27 July, intensifying through 30 and 31 July, and the same rainfall flooded 17 residential and 11 commercial properties in Whaley Bridge before the reservoir crisis even began — a fact recorded in the council's 2024 Strategic Flood Risk Assessment and often overlooked in the coverage of the dam itself. The reservoir peaked on 31 July, and on 1 August engineers found that concrete slabs on Toddbrook's auxiliary spillway, built in 1970, had been dislodged by floodwater overtopping it. With the spillway compromised and the dam wall at risk, Derbyshire Constabulary evacuated around 1,500 residents from Whaley Bridge, Furness Vale and New Mills that evening. Fire crews ran high-volume pumps around the clock, pushing more than a billion litres of water into the River Goyt over the following days, and an RAF Chinook helicopter dropped bags of aggregate onto the damaged spillway to help stabilise it. Water levels in the reservoir fell by more than ten metres over the course of the week, and residents were allowed home on 6 and 7 August once police and engineers judged the dam safe. The then Prime Minister, Boris Johnson, visited the town on 2 August and described the dam as "dodgy but stable."

The government commissioned an independent review of the incident, led by Professor David Balmforth and published in February 2020; its 22 recommendations were formally accepted in March 2020 and have shaped reservoir safety practice nationally since. For anyone assessing flood risk on a site in Whaley Bridge today, the lesson of 2019 is not that the town floods often; the dam had operated without a comparable failure since it was built in the 1830s. It is that residual risk behind ageing infrastructure has to be assessed properly rather than assumed away, a point we return to in our wider explainer on residual flood risk.

Reservoir risk and the Toddbrook Reservoir restoration: what it means for your flood risk assessment

Toddbrook Reservoir is classed as a large raised reservoir under the Reservoirs Act 1975, which means it is subject to statutory annual supervising-engineer reports and a full independent inspection at least once a decade, regardless of who owns it. As of mid-2026, the reservoir is in an active, monitored refill from Todd Brook following completion of a new permanent spillway, and any flood risk assessment for a site near or below it still has to treat reservoir failure as a residual risk to be assessed properly, not a problem that ended in 2019.

The 2010 reform of reservoir safety regulation, brought in under Schedule 4 of the Flood and Water Management Act 2010, introduced the risk-based inspection regime that governs reservoirs like Toddbrook today. Canal & River Trust, which owns the reservoir as a feeder for the Peak Forest and Macclesfield canals, appointed Kier as contractor and Mott MacDonald as engineer to design and build a new spillway, weir, tumble bay and stepped stilling-basin arrangement at the dam's northern end, replacing the flawed 1970 structure that failed in 2019. That work was substantially complete by December 2025, taking the total cost of the incident and its repair to around £50 million, and a sixteen-week monitored natural refill using Todd Brook's own flow was planned through spring and summer 2026, with full canal-supply function expected by late summer 2026 and restoration of the surrounding Memorial Park, playground and sailing club continuing into the autumn.

None of this removes reservoir risk from a site near Whaley Bridge; it manages it. Environment Agency reservoir inundation mapping models what an extremely unlikely full breach could look like, and that mapping is a genuine input to a flood risk assessment here, used in context rather than as a standalone constraint. A 2016 flood risk assessment for a 125-dwelling outline scheme on land south of Whaley Bridge, prepared by AAH Planning Consultants, is a useful local precedent: the site itself sat entirely within Flood Zone 1, and a small eastern portion was screened for theoretical risk from a hypothetical failure of Combs Reservoir, roughly 2.5 kilometres away, which the assessment judged extremely unlikely and proportionate to note rather than a reason to redesign the scheme. Ageing, man-made water bodies raise the same kind of question wherever they sit — our review of the 2025 Whitchurch canal breach in Shropshire makes a similar point about residual risk from infrastructure that has stood for generations before a specific, local failure.

Talk to us about your site in Whaley Bridge

Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.

Start a Quote

Planning policy and your Lead Local Flood Authority in Whaley Bridge

Derbyshire County Council is the Lead Local Flood Authority for Whaley Bridge, responsible for surface water, groundwater and ordinary watercourses, while High Peak Borough Council is the local planning authority whose adopted Local Plan and 2024 Strategic Flood Risk Assessment set the framework a flood risk assessment in Whaley Bridge has to satisfy. Where a main river or a reservoir is involved, the Environment Agency is consulted as well, and its advice on higher-risk schemes carries real weight with the council.

High Peak's Local Plan was adopted in April 2016 and runs to 2031; its Policy EQ11, Flood Risk Management, is the policy a scheme here has to satisfy alongside the National Planning Policy Framework and its Planning Practice Guidance on flood risk. High Peak Borough Council's Level 1 Strategic Flood Risk Assessment, prepared by JBA Consulting and finalised in March 2024, names Whaley Bridge specifically and records the 1998 and 2019 flood events discussed above; it also confirms that no Surface Water Management Plan and no formally designated Critical Drainage Area currently cover the town, which is itself a useful starting point rather than evidence that surface water can be ignored.

Whaley Bridge sits just outside the Peak District National Park boundary. The wider Whaley Bridge and Furness Vale neighbourhood planning area, jointly adopted by High Peak Borough Council and the Peak District National Park Authority in January 2024, overlaps the Park in places, so which authority engages with a scheme can depend on exactly where a site sits. Sites in the town span the full range of the Environment Agency's Flood Zones, from land immediately alongside the Goyt in Flood Zone 2 or 3 to plots further up the valley sides in Flood Zone 1, which is why the Sequential and Exception Tests can still be relevant to a Whaley Bridge scheme even where reservoir risk is not the deciding factor.

Development and flood risk assessment in Whaley Bridge

Whaley Bridge's development story runs through canal-side regeneration and small-scale infill rather than large new estates, so most flood risk assessments here relate to sites on former industrial or agricultural land close to the Goyt, Todd Brook or the canal, where reservoir and fluvial risk both need to be screened alongside surface water.

A 2025 resident survey commissioned by High Peak Borough Council identified the canal basin, including the Grade II*-listed Transhipment Warehouse, as an under-used asset ripe for enhancement, and the emerging Whaley Bridge and Furness Vale neighbourhood plan is progressing toward adoption in autumn 2026 with regeneration of that area as a stated aim. Recent housing schemes illustrate the range of sites that come forward: an outline scheme for up to 107 dwellings off Linglongs Road and Macclesfield Road was permitted in 2015 and has since been built out; a 14-dwelling scheme on former light-industrial land at Bingswood Road, partly within Flood Zone 2, went to appeal; and a 42-home affordable housing scheme on Green Belt land west of Bridgemont was refused and dismissed at appeal in September 2024 on landscape grounds. The 2016 flood risk assessment for land south of Whaley Bridge, discussed above, remains a good local example of how a Flood Zone 1 site with a theoretical reservoir constraint nearby was assessed on its merits rather than assumed to be a problem.

Conversions of former mill and industrial buildings close to the canal are a recurring theme locally, and they often raise flood risk and drainage questions together: older buildings frequently predate any sustainable drainage provision, so a change of use or redevelopment can trigger both a flood risk assessment and a surface-water drainage strategy at once.

How Unda helps with flood risk assessment in Whaley Bridge

Unda has prepared more than 5,000 flood risk assessments across the UK since 2014, and our flood risk consultants bring that same rigour to sites in Whaley Bridge — reading the Goyt, Todd Brook, the reservoir above the town and the surrounding surface water catchment together, rather than relying on a single national dataset. We deal directly with the Environment Agency and Derbyshire County Council on your behalf, and every quote request gets a response from one of our experienced flood risk consultants within 60 minutes.

Amazing service provided by these guys, worked very hard to complete the short deadline I'd given them, rapid response and would recommend them to anyone.

Amaan Shad · Google review

A great company offering a wealth of knowledge, understanding and experience. A professional service and thorough throughout.

James Bucknall · Google review

Rated 5.0 on Google, we bring the same fixed-fee, clearly explained approach to a small Peak District town as we do to a city-centre scheme, and we tailor every report to the site in front of us rather than to a template.

Flood risk assessments for every situation in Whaley Bridge

We prepare flood risk assessments in Whaley Bridge for planning, property purchase, mortgage and insurance, and BREEAM, alongside sequential and exception tests and surface-water drainage strategies. A flood risk assessment, a sequential or exception test and a drainage strategy are three distinct reports. They often travel together in a planning submission, but they answer different questions: is the site safe, should the development be here, and where does the surface water go.

Screening tools that can help before you commission a full report: our Flood Risk Map for an indicative postcode check, our Live River Levels Map to see how the Goyt is running right now, our Geology and Ground Conditions Checker to get an early read on soakaway feasibility, and our Drainage Calculators and BRE 365 Infiltration Rate Calculator for a fast first pass at a drainage design.

Local flood risk management and emergency contacts in Whaley Bridge

If you need to report flooding or check live conditions in Whaley Bridge, Derbyshire County Council is the Lead Local Flood Authority for surface water, groundwater and ordinary watercourses, the Environment Agency manages the River Goyt flood warning area, and Canal & River Trust is responsible for Toddbrook Reservoir and the Peak Forest Canal.

Flood risk management bodies and emergency contacts for Whaley Bridge
BodyRoleContact
Derbyshire County CouncilLead Local Flood Authority — surface water, groundwater, ordinary watercoursesReport and find out about flooding
Environment AgencyRiver Goyt at Whaley Bridge flood warning area (ref. 013FWFD5); main rivers and reservoirsCheck the flood warning area; Floodline 0345 988 1188
Canal & River TrustOwner of Toddbrook Reservoir and the Peak Forest CanalRestoring Toddbrook Reservoir
High Peak Borough CouncilLocal planning authorityHigh Peak Local Plan
Emergency servicesDanger to life in a floodCall 999; call 105 to report a power cut

For a live read on how the Goyt is running before you visit a site, our Live River Levels Map pulls the Environment Agency's real-time gauge data — useful context, though never a substitute for a site-specific flood risk assessment.

Flood risk assessment in Whaley Bridge: your questions answered

Do I need a flood risk assessment in Whaley Bridge?

Most planning applications in Whaley Bridge that touch the River Goyt, Todd Brook, the Peak Forest Canal or land below Toddbrook Reservoir will need a flood risk assessment, and so will many sites in Flood Zone 1 where the council's Strategic Flood Risk Assessment or the Environment Agency's surface water mapping shows a risk. The safest approach is to check early, before a layout is fixed.

What happened at Toddbrook Reservoir in Whaley Bridge in 2019?

Heavy rain in late July 2019 damaged the reservoir's auxiliary spillway, and on 1 August around 1,500 residents of Whaley Bridge, Furness Vale and New Mills were evacuated while fire crews and an RAF Chinook helicopter helped lower the water level and stabilise the dam. No homes in Whaley Bridge flooded during the incident itself, and residents returned within a week once the dam was declared safe.

Is Toddbrook Reservoir safe now, in 2026?

Canal & River Trust's permanent repair, including a new spillway, was substantially complete by December 2025, and the reservoir has been in an active, monitored refill through 2026 with full function expected by late summer. It remains a large raised reservoir under the Reservoirs Act 1975, so it is subject to ongoing statutory safety inspection, and a nearby development still has to assess reservoir risk as part of its flood risk assessment.

What flood zone is Whaley Bridge in?

Whaley Bridge spans a range of Flood Zones on the Environment Agency's Flood Map for Planning: land close to the Goyt can fall within Flood Zone 2 or 3, while much of the town further up the valley sides sits in Flood Zone 1. The correct zone depends on the exact site, which is why a site-specific check is the first step.

Who is the Lead Local Flood Authority for Whaley Bridge?

Derbyshire County Council is the Lead Local Flood Authority for Whaley Bridge, responsible for surface water, groundwater and ordinary watercourse flood risk, while High Peak Borough Council is the local planning authority that determines planning applications.

Does a site in Flood Zone 1 in Whaley Bridge still need to consider reservoir flood risk?

It can, because reservoir risk is assessed separately from river Flood Zones. Environment Agency reservoir inundation mapping and, where relevant, the history of Toddbrook Reservoir are a proper input to a flood risk assessment even on a site that scores Flood Zone 1 for river and sea risk, as the 2016 assessment for land south of the town shows.

Get a free quote for Whaley Bridge

Get a no-obligation, free quote for a flood risk assessment or drainage strategy in Whaley Bridge. One of our experienced flood risk consultants will get back to you within 60 minutes. Phone 01293 214444 · Email enquiries@unda.co.uk

Start a Quote

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact Jackie Stone, one of our experienced Flood Risk Consultants.