Flood Risk & Drainage Requirements for North Somerset Council

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

North Somerset Council tests flood risk against Policy CS3 of its Core Strategy, adopted April 2012, and drainage against Policy DM1 of its Development Management Policies, adopted July 2016. The figures that change a layout sit in the Level 1 SFRA, Revision E of July 2026: ground raised 600 mm above the defended tidal design flood where that is practicable, no ground-floor bedrooms where the defended tidal depth inside would exceed 150 mm, and seven local drainage standards on top of the 2025 National Standards. Proposed Policies DP9, DP10 and DP11 of the North Somerset Local Plan 2041 are at examination, and the hearings opened on 10 November 2026.

This page sets out what North Somerset Council, as planning authority and Lead Local Flood Authority, asks an application to show on flood risk and drainage, which other bodies have a say, and how our reports answer each policy. Reports for applications to North Somerset Council come from Unda Consulting Limited, a CIWEM Business Partner, and are prepared by chartered consultants. Our reports have gone in with applications to North Somerset Council before. To discuss a site, call 01293 214444 or email enquiries@unda.co.uk.

North Somerset's flood policies in November 2026: CS3 and DM1 in force, DP9 to DP11 at examination

Until the new plan is adopted, decisions rest on the Core Strategy, the Sites and Policies Plan Part 1 and the Site Allocations Plan of April 2018, with any made neighbourhood plan where one covers the site. The council's Local Development Scheme of December 2025 lists eight made neighbourhood plans, from Backwell and Long Ashton (2015) to Wraxall and Failand (2024). The table sets the two adopted flood policies beside the four submitted policies that would replace or add to them, with what each asks of an applicant and how our reports respond.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
Policy CS3Environmental impacts and flood risk assessmentDevelopment in Flood Zones 2 and 3 only where it passes the sequential test and, where applicable, the exception test; search area North Somerset-wide unless a specific local need is shown or the site is inside the settlement boundary of Weston, Clevedon, Nailsea or PortisheadShow no reasonably available lower-risk site exists in the right search areaA separate sequential test report stating the search area, the evidence for it and every alternative site with the reason it was ruled in or outCore Strategy, adopted April 2012
Policy DM1Flooding and drainageAll sources of flooding and climate change considered 100 years ahead for residential or mixed use, 60 years for non-residential; SuDS expected on major development; proof of sewer capacity before any surface water discharge to a public sewer; drainage works complete before first occupation of new housingAssess every source over the right lifetime and show where surface water goesA flood risk assessment covering every source over the DM1 lifetime, and a drainage strategy with calculations, outfall evidence and a phasing noteSites and Policies Plan Part 1, adopted July 2016
Proposed Policy DP9 (emerging)Flood riskLifetimes of 100 years (residential and mixed use) and 75 years (non-residential); FRA triggers; sequential test search areas by settlement and scheme size (as changed by PC36); ground-floor accommodation from conversion in Flood Zones 2 and 3 to meet SFRA requirementsExpect the 75-year non-residential lifetime and the PC36 search areas if the plan is adopted before your decisionAssessments run to the DM1 and proposed DP9 lifetimes, so the evidence still holds if the plan is adopted mid-applicationPre-submission Plan, October 2025; proposed change PC36, May 2026; stage: examination hearings from 10 November 2026
Proposed Policy DP10 (emerging)Sustainable drainageSurface water managed at source and on the surface where reasonably practicable; drainage set within green infrastructure; treatment to CIRIA C753; permeable surfaces where practical; drainage works before first occupation; space for maintenance accessShow surface SuDS were considered first and that every feature can be reached for maintenanceA drainage strategy that follows the hierarchy, shows treatment stages and maintenance access, and records why any below-ground storage is usedPre-submission Plan, October 2025; stage: examination hearings from 10 November 2026
Proposed Policy DP11 (emerging)Rivers, watercourses, and springsProposals affecting watercourses to enhance their setting and quality, take chances to remove culverts, and leave buffer strips for maintenance; spring flows managed so flood risk and water quality are not harmedKeep rhynes and springs open, buffered and flowingWatercourses, culverts and springs mapped in the assessment, with buffer widths carried into the drainage layoutPre-submission Plan, October 2025; proposed changes PC37 and PC38, May 2026; stage: examination
Proposed Policy LP21 (emerging)Coastal Change Management AreasNo new residential development, change of use included, inside a CCMA shown on the Policies Map; a coastal vulnerability assessment for any development inside one; an erosion risk assessment near cliff edges or defences outsideCheck whether the site lies in or near a proposed CCMA before committing to a schemeA flood risk assessment that records the site's position against the proposed CCMA boundary and the defence it relies onPre-submission Plan, October 2025; stage: examination hearings from 10 November 2026

Requirements checked November 2026.

Policy CS3 (Environmental impacts and flood risk assessment): the sequential test and how far it searches

North Somerset Policy CS3 allows development in Flood Zones 2 and 3 only where it passes the sequential test and, where applicable, the exception test. In the policy's words, development there "will only be permitted where it is demonstrated that it complies with the sequential test set out in the National Planning Policy Framework and associated technical guidance and, where applicable, the Exception Test" (Core Strategy, Policy CS3). Two exceptions follow: a category for which national policy makes its own provision, and development "of the same or a similar character and scale as that for which the site is allocated", which must still be safe without raising flood risk elsewhere.

The policy then fixes the search. By default it covers all of North Somerset, unless there is evidence of a specific need in a specific area or the site lies inside the settlement boundary of Weston (including its new development areas), Clevedon, Nailsea or Portishead, where the search stops at that town. CS3 also defines a reasonably available site as one the applicant owns, one for sale at a fair market value, or surplus public land.

That definition is narrower than national guidance, and the council says so. Appendix B of the 2026 SFRA quotes the Planning Practice Guidance, under which lower-risk sites "do not need to be owned by the applicant to be considered reasonably available", and notes that greater weight has gone to the guidance in recent decisions and judgments. National policy has moved too. Policy F5 of the August 2026 Framework says the search area should not be greater than the anticipated catchment of the development. Annex A gives very limited weight to plan policies, or parts of them, that are materially inconsistent with the Framework's decision-making policies. An applicant should therefore expect the sequential test to be judged against F5 and the guidance's definition, read with CS3's search areas, and should confirm the area with the case officer where it is in doubt. Read that way, CS3's district-wide search is the most that can be asked for, and the development's anticipated catchment sets the area actually searched.

Appendix B names the sources a search can draw on (vacant premises, allocations, permissions, SHLAA sites and sites promoted for the new plan) and says the search should not be restricted to sites the same size as the application site. Our sequential and exception test reports state the search area and the evidence for it, list each candidate site, and give the reason each is or is not reasonably available. The justification to Policy DM1 records that CS3 superseded Replacement Local Plan Policy GDP/2 when the Core Strategy was adopted in April 2012.

Policy DM1 (Flooding and drainage): lifetimes, sewers and the Weston flood solution land

North Somerset Policy DM1 sets how far ahead an assessment looks and what the drainage must prove. It opens: "All development must consider its vulnerability to flooding, taking account of all sources of flood risk and the impacts of climate change, up to 100 years ahead on residential or mixed use sites and 60 years ahead on non-residential sites" (Sites and Policies Plan Part 1, Policy DM1).

Sustainable drainage is expected on all major development. Alternatives are allowed only where SuDS are impractical or would compromise viability. Any scheme that would increase the rate of surface water leaving the site must consider the effect on the wider area. Where a public sewer is proposed, the applicant must show capacity exists or explain how excess water will be managed in the long term. For housing, essential flood prevention and drainage works must be finished before the first home is occupied, unless a phasing arrangement is agreed. DM1 also safeguards land for the Weston strategic flood solution at the former airfield, south of the Cross Rhyne and along the River Banwell.

An assessment that stops short of the 100-year lifetime for a house, or a strategy that assumes a sewer connection without a capacity response from Wessex Water, leaves DM1 unmet. Our flood risk assessment for planning states the lifetime it has used, and the drainage strategy includes the outfall evidence and the occupation trigger the council can attach as a condition.

Proposed Policy DP9 (Flood risk): what the Local Plan 2041 would change

Proposed Policy DP9 of the submitted Local Plan 2041 would replace CS3 and DM1 as the main flood policy. Most of its tests carry over; the lifetime for non-residential schemes and the sequential test search areas change. Assessments would look 75 years ahead for non-residential schemes, up from DM1's 60, and at least 100 years for residential or mixed use (Pre-submission Plan, proposed Policy DP9).

The submitted wording requires proposals to demonstrate "that there are no reasonably available alternative sites that could accommodate the proposed development at a lower risk of flooding". The council's proposed change PC36 of May 2026 would then set the housing search areas: inside a main town, that town's settlement boundary; under 10 homes in a defined settlement, that settlement; 10 homes or more outside a main town, the whole of North Somerset. In all cases a more focused area may be justified by the catchment or spatial requirements of the development. Proposed DP9 adds that, where the tests are not passed, "permission will not be granted unless the overall planning balance indicates otherwise", and asks change-of-use and conversion schemes creating ground-floor accommodation in Flood Zones 2 and 3 to meet the SFRA's requirements.

None of this is settled. The Inspectors' Matters, Issues and Questions ask whether the proposed DP9 search areas are consistent with the Framework and guidance, and whether the planning-balance wording is consistent with national policy, so the text may still change. Our reports cite DM1 and CS3 now and test the site against the proposed DP9 wording as well.

Proposed Policies DP10 (Sustainable drainage) and DP11 (Rivers, watercourses, and springs): drainage on the Levels

Proposed Policy DP10 would turn DM1's drainage clauses into a fuller SuDS policy. It opens "New development should not increase the risk of flooding elsewhere" and then lists what proposals must demonstrate: surface water managed close to its source and on the surface where reasonably practicable, drainage built into green infrastructure, treatment to the CIRIA SuDS Manual (C753), permeable hard surfaces where reasonably practical, and room for maintenance access for the lifetime of the development (Pre-submission Plan, proposed Policy DP10). The Inspectors have asked whether proposed DP10 is flexible enough for engineering, groundwater and contamination constraints.

Proposed Policy DP11 is about the rhynes, rivers and springs of the North Somerset Levels and Moors. It would ask development affecting a watercourse to enhance its setting and quality, consider removing culverts and provide "suitable buffer strips for maintenance activities", and it would require spring flows to be managed so that flood risk does not rise and water quality is protected. The council's proposed changes PC37 and PC38 add the maintenance roles of the Environment Agency, the drainage board and riparian owners, and a note on Environment Agency permits (Schedule of proposed changes, May 2026). Our drainage strategies map every rhyne, culvert and spring on and next to the site and carry the buffer widths into the layout before the scheme is fixed.

Proposed Policy LP21 (Coastal Change Management Areas): homes ruled out on the changing coast

Proposed Policy LP21 would bar new homes, conversions included, from the Coastal Change Management Areas drawn on the submitted Policies Map: "New residential development, including change of use will not be permitted within a CCMA" (Pre-submission Plan, proposed Policy LP21). The proposed wording leaves no route round it for housing. Other development inside a CCMA would need a coastal vulnerability assessment, and proposals close to cliff edges or existing defences outside one would need a coastal erosion risk assessment. The Inspectors raised no questions on proposed LP21 in their September 2026 list.

We do not prepare coastal vulnerability assessments. For sites on or near the coast we prepare the flood risk assessment and, for buyers and lenders, commercial due diligence on the tidal position. The supporting text to proposed LP21 asks developers to agree the scope of any coastal vulnerability assessment with the council in advance.

Where the Local Plan 2041 examination stands

The North Somerset Local Plan 2041 was submitted for examination on 22 May 2026 after its Regulation 19 consultation from 30 October to 12 December 2025. Three Inspectors, H Hockenhull, E Brownless and D Board, are examining it, and the hearings opened on Tuesday 10 November 2026. Under Draft Timetable version 4 of 9 November 2026, the flood, drainage and watercourse policies come up under Matter 15 on the afternoon of 9 December 2026 and proposed Policy LP21 under Matter 16 on 10 December, with a reserve week from 18 January 2027 (examination page).

There is no Inspectors' report and no main modifications consultation yet. The council's Local Development Scheme of December 2025 aimed for adoption in December 2026; the hearing programme now runs into December with a reserve week in January 2027. In July 2026 the council proposed a main modification adding a list of superseded policies that names CS3 and DM1 among the policies the new plan would replace on adoption. Until then, CS3 and DM1 are the adopted policies, and the weight given to the submitted policies is for the decision-maker.

Building in Weston, Clevedon or Portishead while the Local Plan 2041 is at examination?

A tidal site in these towns has to meet CS3's town search area, the SFRA's 600 mm and 150 mm floor-level steps, and the proposed DP9 wording at examination, all at once. Send us the address and the scheme and we will tell you which reports the application needs. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Start a Quote

North Somerset Council, the drainage boards and the Environment Agency: who decides what

North Somerset is a unitary authority, so one council determines the application and acts as Lead Local Flood Authority for surface water, groundwater and ordinary watercourses. It sits in the ceremonial county of Somerset but is a separate council from Somerset Council, whose drainage standards do not apply here.

BodyRoleWhat it decides or is consulted on
North Somerset Council (planning)Local planning authorityDecides the application against CS3, DM1, the NPPF and, as they gain weight, the submitted Local Plan 2041 policies; applies the sequential and exception tests
North Somerset Council (LLFA)Lead Local Flood AuthorityAdvises on surface water drainage against the SFRA's local SuDS standards and the National Standards; consents works on ordinary watercourses outside drainage board districts
Environment Agency (Wessex area)Main rivers, the sea and tidal defencesStatutory consultee on flood risk from rivers and the sea; holds defence condition data the SFRA tells applicants to use; permits for flood risk activities on main rivers
North Somerset Levels and Axe Brue drainage boardsInternal drainage boards (Somerset Drainage Boards Consortium)Advise North Somerset Council on applications; land drainage consent for works in or within 9 m of a watercourse in their districts
Wessex WaterSewerage undertakerCapacity for foul and any surface water connection to the public sewer, which DM1 asks applicants to prove
Planning InspectorateExamining Inspectors and appealsExamining the Local Plan 2041; decides appeals, as in the Mead and Yatton cases

Both drainage boards are run by the Somerset Drainage Boards Consortium, which lists North Somerset Council among the councils it advises and says its byelaws regulate development within 9 metres of any watercourse. The Level 1 SFRA confirms that the North Somerset Levels and the Axe Brue boards both fall within North Somerset. Our guide to why internal drainage boards matter for planning covers the consents in more detail.

Which North Somerset applications trigger an assessment, a sequential test or a drainage strategy

The council's local validation list, the Local List of Planning Application Requirements, was adopted on 12 December 2023 and reviewed in December 2025, when the council decided no change was required. The table joins the list to Chapter 18 of the Framework, the SFRA and the council's drainage pages.

TriggerWhat is neededSource
Any development in Flood Zone 2 or 3, minor schemes and changes of use includedFlood risk assessmentLocal list item 15; NPPF policy F4
A hectare or more of land in Flood Zone 1, whatever the useFlood risk assessmentLocal list item 15; NPPF policy F4
Flood Zone 1 site with critical drainage problemsFlood risk assessment (no critical drainage areas are currently notified in North Somerset)Council flood risk assessment page
Flood Zone 1 land at risk from another source where the scheme introduces a more vulnerable use, or land the SFRA shows at greater risk in futureFlood risk assessmentLocal list item 15; NPPF F4(2)(c) covers land at risk from any source now or in the future
Flood Zones 2 and 3 (including land predicted to fall in them with climate change) and land at risk from other sources now or in the futureSequential test evidence; not for householder development, non-residential extensions under 250 m2, schemes that do not enlarge buildings, or changes of use other than to caravan, camping, chalet, mobile or park home sitesLocal list item 16; NPPF F5(2), which also exempts allocated sites tested at plan stage and sites where an FRA shows no built development at risk, or surface-water-only risk with occupiers safe
Highly vulnerable development in Flood Zone 2, essential infrastructure in Flood Zone 3a or 3b, more vulnerable development in Flood Zone 3aException test, after a passed sequential test; not required in Flood Zone 1, or where the sequential test is not requiredLocal list item 17; NPPF F6 and Annex F
Major development; minor development in an area liable to flood from any source; minor development likely to increase local flood risk; a made neighbourhood plan requiring SuDSSurface water drainage strategy (not householder development)Local list item 20; council surface water drainage strategy page
New buildings (except residential outbuildings), non-residential extensions or 20 m2 or more of new hard surfacing in Flood Zone 2, Flood Zone 3 or a surface water priority areaSustainable drainage strategy (not extensions to single dwellings)Council sustainable drainage strategy page
A site needing an FRA that is major, or houses vulnerable people, or has no internal access to a habitable upper floor, or is camping, caravan, hotel or hostel use; any hazardous substance consentFlood warning and evacuation planLocal list item 14
Works in, over or within 9 m of a watercourse in a drainage board districtLand drainage consent from the board (Land Drainage Act 1991 section 23 and byelaws)Somerset Drainage Boards consents page
Development inside a proposed Coastal Change Management AreaCoastal vulnerability assessment, under proposed Policy LP21 (at examination)Pre-submission Plan, proposed Policy LP21

Our article on planning applications invalidated over flood risk and drainage lists the gaps that hold applications at validation. On these triggers, a new home in Flood Zone 3 here needs an assessment, sequential test evidence and a surface water drainage strategy.

The 2026 SFRA: what North Somerset maps that the national maps do not

North Somerset revised its Strategic Flood Risk Assessment five times between 2024 and July 2026. Revision D was written in light of recent appeal decisions and judgments, and Revision E, also July 2026, clarified the sequential and exception tests, lifetime safety, residual risk and safe access. The council calls the SFRA a living document, updated when the Environment Agency's flood maps change. Our explainer on what strategic flood risk assessments are covers the general picture.

  • Level 1 SFRA, Revision E (July 2026). The Level 1 report maps current and future flood risk from every source and defines Flood Zone 3b as land flooding at 1 in 30 (3.3%) annual chance or greater with defences in place. Where no 1 in 30 outline exists, it treats Flood Zone 3a as the functional floodplain until the Environment Agency and the council accept otherwise, so a site-specific model can decide whether a site is in Flood Zone 3b.
  • Appendix B, Development Management Advice, Revision B (July 2026). Appendix B is the practical guide. It sets when the sequential test applies (including high-risk groundwater areas and material risk from reservoirs, sewers, culvert blockage or defence breach), the search areas, the meaning of reasonably available, and the floor-level steps. It expects breach or undefended modelling where a site relies on grass embankments, dunes or defences in poor or uncertain condition.
  • Floor levels behind the defences. For tidal sites, Appendix B and section 7.11 of the Level 1 report expect ground raised above the defended design flood, including climate change, plus 600 mm freeboard, unless that is impracticable. The depth left above finished floor level then decides the rest: up to 150 mm needs flood resilient construction and allows ground-floor sleeping; 150 to 600 mm rules ground-floor sleeping out; above 600 mm the scheme has to be discussed with the Environment Agency and the council. Between Kewstoke and Clevedon, behind grass embankments and dunes, the breach or undefended case with climate change normally controls.
  • Warning, evacuation and refuge. Appendix B treats a flood warning and evacuation plan as a way to manage residual flood risk, and will not normally accept one as the sole means of making a development safe where the only access is hazardous, warning time is short or occupants could need help. Safe refuge must hold every occupant lying down, with light, power and an opening for rescue at the same level.
  • Level 2 SFRA, Revision A (July 2026). The Level 2 report assesses the proposed allocations at tidal risk, mainly in Weston-super-Mare, Clevedon and Portishead. It sorts tidal sites into three approaches: outside settlement boundaries, allocated previously developed regeneration land in the three towns, and other land inside boundaries. Only the second may combine partial raising, resilient construction, refuge and emergency planning in one package, and even there homes should not rely on closure or evacuation during the design flood.

North Somerset's drainage standards as Lead Local Flood Authority

North Somerset has no stand-alone SuDS guide. Its standards sit in section 7.5 of the Level 1 SFRA, which makes the CIRIA SuDS Manual (C753) the starting point and sets seven local standards "in addition to the minimum requirements set out in the National Standards for Sustainable Drainage Systems (SuDS) (DEFRA, June 2025)". The council's sustainable drainage strategy page still points outline schemes to sections 1 and 2 of the West of England SuDS Developer Guide. Somerset Council's local SuDS standards rank highly in searches but belong to a different authority.

StandardWhat North Somerset asks forSource
Cross Rhyne and Banwell catchmentRunoff limited to the 1 in 1 year greenfield rate for every event up to the 1 in 100 year event plus climate changeSFRA L1 Rev E, s7.5 standard 1 (July 2026)
Runoff volume in drainage board catchmentsLong-term storage, or attenuation to the greater of 2 l/s/ha or Qbars7.5 standard 2
Greenfield sitesNo underground storage; open water habitat required in all new developmentss7.5 standard 3
Design eventsNo part of the site floods in the 1 in 30 year event plus climate change; no property or primary access route floods in the 1 in 100 year event plus climate changes7.5 standard 4
Buffers5 m development-free buffer round ponds, basins and other surface features; in drainage board areas 9 m beside viewed rhynes and 6 m beside other watercourses, unless agreed otherwises7.5 standard 5; drainage board easements
OutfallsAbove normal summer water levels for ordinary rainfall, surcharging only in a 1 in 1 year event or greaters7.5 standard 6
MaintenanceA site-specific management and maintenance plan naming who maintains each feature; generic schedules copied from C753 are not accepteds7.5 standard 7
National baselineThe National Standards for Sustainable Drainage Systems (June 2025), which NPPF policy F8 now requires SuDS to followDefra, June 2025; NPPF F8
Climate changePeak river flow allowances by management catchment: most of the district in Avon Bristol and Somerset North Streams, Weston-super-Mare in Somerset South and West (for example 26% central and 71% upper end for the 2080s in the first; 37% and 82% in the second), from the Environment Agency allowances last updated 27 May 2022SFRA L1 Rev E, Table 5.5
Ground conditionsAn outline assessment of geology and ground conditions, with infiltration tests where possible, in the sustainable drainage strategyCouncil SuDS strategy page

Standard 1 has the largest effect on storage. The SFRA notes that the national standard allows greenfield-equivalent discharge, whereas the Cross Rhyne and Banwell rule holds every storm up to the 1 in 100 year event plus climate change to the 1 in 1 year greenfield rate, so attenuation volumes grow. We size storage against it from the outset, test infiltration where the ground allows it (our BRE 365 infiltration rate calculator and soakaway ground conditions map give a first read), and write the maintenance plan for the actual features. Our article on the 2025 National Standards explains the national layer beneath these rules.

National policy in North Somerset: Chapter 18, Annex A and two local judgments

Every North Somerset decision also applies Chapter 18 of the August 2026 National Planning Policy Framework, "Managing flood risk and coastal change", which runs from policy F1 to F9. F4 sets when a site-specific assessment is needed, F5 is the sequential test, F6 the exception test, F7 the safety tests, F8 sustainable drainage to the 2025 National Standards and F9 development in Coastal Change Management Areas. Beneath it, the Planning Practice Guidance on flood risk and coastal change took its latest changes, to the sequential test paragraphs, on 17 September 2025. Our NPPF guidance page and our article on the August 2026 NPPF changes cover the national picture.

Several council documents still cite paragraph numbers from earlier Frameworks: the 2023 local list quotes paragraphs 161 to 186, and Appendix B of the 2026 SFRA cites the December 2024 numbering. The tests themselves carry across, but a report written today cites Chapter 18 and its policy letters.

Two leading cases on the sequential test arose from North Somerset applications. In Mead Realisations Ltd v SSHCLG [2025] EWCA Civ 32 the Court of Appeal upheld an inspector's dismissal of an appeal for up to 75 homes at Lynchmead Farm, Ebdon Road, Wick St Lawrence, a Flood Zone 3a site north-west of Weston-super-Mare. It held that the inspector was entitled to treat the reasonably available criteria in the second part of Policy CS3 as out of date, because they did not reflect the Framework's sequential test as explained by the Planning Practice Guidance; our guide to the sequential test after Mead explains the practical effect. In North Somerset District Council v SSHCLG [2026] EWHC 1430 (Admin), handed down on 12 June 2026, the High Court dismissed the council's challenge to outline permission for 190 homes at Rectory Farm (North), Chescombe Road, Yatton, finding that the inspector could weigh the substance of the exception test in the planning balance after a failed sequential test; our article on the Yatton judgment sets out the reasoning.

Tide, rhynes and rain across North Somerset

Tidal flooding from the Severn Estuary, which the Level 1 SFRA notes has the second largest tidal range in the world, drives the risk along the coast from Uphill to Portishead. The submitted plan puts about a third of the district at high risk from rivers and the sea. Inland, the Land Yeo, the River Kenn, the Congresbury Yeo and the River Banwell cross the Levels, the Banwell reaches the estuary through New Bow Sluice, and the Uphill Great Rhyne cannot drain by gravity for about four hours on each tide. The flood risk map shows the national flood zones for any address; the SFRA adds the climate change, surface water and breach mapping.

Storm Angus in November 2016 flooded 22 properties internally and 143 externally across the district, according to the SFRA's flood history, which starts in 1607. Our Weston-super-Mare area guide covers its sea defences, rhynes and flood history. The tidal River Avon (Bristol) runs along the district's north-eastern edge past Pill. Neighbouring councils publish different rules: see our pages for Bristol City Council and Somerset Council, and the full list of local authority pages. River levels at the nearest gauges are on our live river levels map.

Reports we prepare for applications to North Somerset Council

A flood risk assessment shows whether the site is safe for the DM1 lifetime and leaves no one else at greater risk. A sequential test report shows whether a lower-risk site was available in the CS3 search area, and a drainage strategy shows where the water goes and at what rate. Each answers its own policy, and a coastal housing scheme here will often need all three.

  • Planning applications. Local list item 15 asks for an assessment for any development in Flood Zone 2 or 3, changes of use included: flood risk assessment for planning.
  • Buying a property. Much of Weston, Clevedon and Portishead relies on sea walls and embankments, and the 2026 SFRA tests what happens to land behind them if they fail: flood risk survey for property purchase.
  • Sites outside the lowest-risk zone. CS3 and the 2026 SFRA set the search area and the meaning of reasonably available for each scheme: sequential and exception test.
  • Drainage for the application. DM1 expects SuDS on major development and asks for proof of any sewer capacity: drainage strategy.
  • Runoff rates on the Levels. The SFRA's local standards set the 1 in 1 year greenfield rate in the Cross Rhyne and Banwell catchment and 2 l/s/ha or Qbar in drainage board catchments: surface water drainage strategy.
  • After permission. Drainage conditions can ask for the final drainage scheme, the maintenance plan the SFRA requires and the before-occupation works DM1 names: discharge of drainage conditions.
  • National policy. Council documents still cite 2014 to 2024 Framework paragraphs, so reports map them to Chapter 18: NPPF guidance and advice.
  • Warning and evacuation. Local list item 14 asks for a plan on major sites, homes without internal access upstairs, care settings, hotels and caravan sites that need an FRA: flood warning and evacuation plan.
  • Breach and undefended modelling. Appendix B expects breach or undefended modelling behind grass embankments, dunes and defences in poor condition, and site modelling where data is too coarse: flood modelling.
  • Springs and high groundwater. Appendix B makes high-risk groundwater areas trigger the sequential test, and proposed Policy DP11 (at examination) protects spring flows: groundwater flood risk assessment.
  • Coastal land for purchase. Where proposed Policy LP21 (at examination) would bar new homes in a CCMA, buyers need the tidal and coastal position early: due diligence.

Our related guides cover the sequential and exception tests, the surface water sequential test exemption, ordinary watercourse consent, main rivers and ordinary watercourses and what to do after an LLFA objection.

Questions about North Somerset's flood and drainage requirements

What does North Somerset Policy DM1 (Flooding and drainage) require?

Policy DM1 of the Sites and Policies Plan Part 1 (July 2016) asks every application to consider flooding from all sources with climate change, 100 years ahead for residential or mixed use and 60 years for non-residential sites. It expects SuDS on major development, proof of capacity before surface water goes to a public sewer, and drainage works finished before the first new home is occupied. It also safeguards land for the Weston strategic flood solution. Proposed Policy DP9, at examination, would lengthen the non-residential lifetime to 75 years.

How wide does a sequential test search have to be in North Somerset?

Policy CS3 makes the search North Somerset-wide unless a specific local need is shown or the site is inside the settlement boundary of Weston, Clevedon, Nailsea or Portishead, where it is that town. The 2026 SFRA's Appendix B adds that a narrower area may be justified by the development's catchment, and NPPF policy F5 says the area should not exceed the anticipated catchment of the development. The council's proposed change PC36 to proposed Policy DP9, at examination, sets town, settlement and district-wide search areas for housing by scheme size.

Do I need a flood risk assessment for a small scheme in Flood Zone 2 in North Somerset?

Yes. Item 15 of the council's local list (adopted 12 December 2023) asks for one for any development in Flood Zone 2 or 3, minor schemes and changes of use included, and NPPF policy F4 asks for one for all proposals in Flood Zones 2 and 3. Householder schemes and changes of use are exempt from the sequential and exception tests, but not from the assessment. Call 01293 214444 to scope one.

Do Somerset Council's SuDS standards apply to sites in North Somerset?

No. North Somerset Council is its own Lead Local Flood Authority. Its standards are the seven local standards in section 7.5 of its July 2026 Level 1 SFRA, applied on top of the National Standards for Sustainable Drainage Systems (June 2025), with the CIRIA SuDS Manual as the starting point. Somerset Council's guidance covers the Somerset Council area to the south.

Can new homes behind North Somerset's sea defences have bedrooms on the ground floor?

Only where the defended tidal flood depth inside, with climate change, would be no more than 150 mm, and then with flood resilient construction. The July 2026 SFRA expects ground raised 600 mm above the defended design flood first where that is practicable. Behind grass embankments and dunes between Kewstoke and Clevedon, the breach or undefended depth normally controls, and where the undefended depth would be 150 to 600 mm, only an existing building fitted with passive flood doors can keep ground-floor sleeping; above 600 mm none can.

When does North Somerset ask for a flood warning and evacuation plan?

Item 14 of the local list asks for one with hazardous substance consents and with sites that need a flood risk assessment and are major developments, house vulnerable people, have no internal access to a habitable upper floor, or are camping, caravan, gypsy and traveller, hotel or hostel sites. Appendix B of the 2026 SFRA treats such a plan as part of managing residual risk and will not normally accept it as the only means of making a development safe.

Need a North Somerset application to meet the July 2026 SFRA?

Revision E of the SFRA, published in July 2026, sets the floor-level steps and seven local drainage standards an assessment here has to meet, with proposed Policies DP9 and DP10 at examination behind them. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Get a Fixed Quote

Unda Consulting Limited prepares flood risk assessments, sequential and exception tests and drainage strategies for applications across England. To ask about a site in North Somerset, call 01293 214444 or email enquiries@unda.co.uk.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.