Flood Risk Assessment in Hayling Island
Contact Us
A flood risk assessment in Hayling Island is about the sea. The island sits between Langstone and Chichester harbours, with the Solent along its southern beaches, and Havant Borough Council's flood evidence treats the sea as the main source of flooding on every shore. On Hayling we prepare flood risk assessments for planning applications and for buyers, mortgage lenders and insurers, as well as sequential and exception tests and surface water drainage strategies for schemes on the island.
Hayling, as most people call it, takes in Northney and Stoke in the north and Mengham, Gable Head, Sinah and Eastoke in the south. The Office for National Statistics splits it into two built-up areas, North Hayling and South Hayling. About 17,800 people live on the island, all in the PO11 postcode district and all within Havant borough. The coastline, harbour shores included, is about 38 km long.
The A3023 over Langstone Bridge is the only road on or off the island, and the borough's flood evidence shows the hazard on its approaches rising from low or medium today to extreme on both sides of the bridge by 2122.
For an address anywhere on the island, call 01293 214444 or email enquiries@unda.co.uk with the postcode and a line about the plans, and one of our consultants will tell you which reports it needs. Reports for sites in Hayling Island come from Unda Consulting Limited, a CIWEM Business Partner.
Is Hayling Island in a flood zone? Shore by shore
Large parts of it are. The coastal management strategy adopted by Havant Borough Council in December 2024 counts more than 3,000 properties on the island at risk of flooding, and the council's 2025 review of possible housing sites concluded that no site on Hayling can be considered low risk from the tide. How exposed a plot is depends on which shore it faces:
| Shore | Places named by the Environment Agency | What the evidence shows |
|---|---|---|
| South-east: the Eastoke peninsula | Eastoke, Eastoke Marina, Eastoke Avenue, Sandy Point | Flooded in 1978, 1979, 1985, 1989 and 2005, and more than 15 homes inside in winter 2013/14; up to 1,472 properties at flood risk without the beach |
| South: the open beaches | West Beach, Hayling Beach, Sea View, Westfield, Mengham | Waves from the open sea hit this shore hardest; the shingle beach is recycled every year to hold it |
| East: the Chichester Harbour shore | Selsmore, Tye, Fishery Creek | 35 properties at Selsmore reported flooding in April 2024; up to 302 properties at flood risk in the Selsmore and Mengham strategy frontage |
| North: Northney and the bridge | Northney, Tye, the A3023 approaches | 10 to 15 properties in North Hayling in April 2024; significant flooding in February 2014; road closures at high tide |
| West: the Langstone Harbour shore | Ferry Point, The Kench, Sinah Warren, Stoke | A warning area of its own; the SFRA expects flooding at Stoke Common to spread by 2055 |
Our guide to flood zones in England explains what Zones 2 and 3 mean. On Hayling the zones are drawn as if the beach and walls were not there, which is why a defended street can still sit in Zone 3, and why the borough's future flood maps for 2055 and 2122 count as much as the present ones.
Looking up a PO11 postcode on the map
Enter a Hayling postcode below to see sea, surface water and reservoir flood extents around it, or use our full flood risk map for anywhere in England. The coral line traces the island's shoreline, from Northney round to Sandy Point.
Eastoke: a shingle bank in place of a sea wall
Eastoke is the lowest and most built-up corner of the island. Houses went up along the front after the war, a concrete seawall followed in the 1950s and 1960s, and waves breaking at its foot kept stripping the beach. After repeated storms, a shingle recharge in 1985 buried the wall under a high beach crest. Coastal Partners, the council's coastal team, has managed the frontage that way since, without new hard defences:
- 1978 to 1989. Coastal floods at Eastoke in 1978, 1979, 1985 and 1989, recorded in the borough's 2024 SFRA. The storms of these years led to the 1985 recharge.
- 2005 and winter 2013/14. The sea came over again in 2005, and in the storms of 2013/14 more than 15 properties flooded inside.
- Beach management now. An Environment Agency grant of £5.1 million pays for a beach management plan, running to 2029, that moves shingle back along the front each year and aims at a 1 in 200 year standard.
- From the 2024 strategy. An Eastoke flood and coastal scheme, at £3.9 million for options and outline design alone, is one of three Hayling projects the council is bidding for. Without it, up to 1,472 properties face flood risk and 1,253 erosion risk.
For a plot at Eastoke, an assessment has to look past today's beach. The SFRA notes that its still-water tide model leaves out waves, which matter on a frontage this exposed, and that future Flood Zone 3 takes in all of Eastoke and Selsmore. Our explainers on sea defences and residual flood risk cover what a beach like this can and cannot promise.
April 2024 on the harbour shores
The harbour sides of the island flood as well, with water rising out of Chichester and Langstone harbours instead of breaking over a beach. When Storm Pierrick met spring tides in April 2024, Hampshire County Council's investigation recorded 35 properties flooded at Selsmore and 10 to 15 in North Hayling. Northney had already flooded badly in February 2014.
Two things make these shores awkward for a builder. The defences along them vary in age, standard and condition, and the coastal strategy finds many near the end of their life. And at high tide the outfalls that drain rain off the island are tide-locked, so surface water backs up behind them. The SFRA expects the flooded area to grow at Selsmore, Westmore, Stoke Common and along Eastoke Avenue by 2055. Our note on how a storm surge forms explains why a deep low on a spring tide does the damage.
One bridge, five warning areas
Getting off Hayling in a flood is the question every larger scheme has to answer. The Environment Agency runs an island-wide flood alert and five tidal flood warning areas: the west from Ferry Point to Stoke, the north and east from Northney to Selsmore, North Eastoke, the southern seafront, and the streets inland of it at Sinah Common, Westfield, Sea View and Mengham.
- The road. The borough's emergency planning framework of October 2025 calls the A3023 the only highway link onto the island. The road and bridge have closed at very high tides several times in the last 20 years, before new defences went in at Northney.
- The forecast. The SFRA rates the flood hazard on the bridge approaches low to medium today, significant on one section by 2055 and extreme on both sides by 2122.
- The council's view. Its 2025 site review says that during a flood no one could move on or off the island by choice and emergency vehicles could not get through by road.
- Where people go. The prepared rest centre is the Hayling Island Community Centre on Station Road.
Hayling has no river gauge of its own; the nearest, on the streams at Havant, are on our live river levels map. For the tide, the warnings themselves are what count, and the Environment Agency's alert for the island shows when one is in force.
Which island schemes need a flood risk assessment in Hayling Island?
Most near the shore, and some well away from it. Havant decides applications under its Core Strategy of 2011, where Policy CS15 deals with flood and erosion risk and Policy DM9 with development in the coastal zone, and national policy in chapter 18 of the NPPF applies alongside. Under policy F4 an assessment is needed in Flood Zones 2 and 3, on sites of a hectare or more, and where other sources put a site at risk.
| Proposal | Assessment needed? | Where it applies on Hayling |
|---|---|---|
| Extension or replacement house in Flood Zone 2 or 3 | Yes, sized to the scheme | Eastoke, Selsmore, Northney, Stoke and the low streets behind the seafront |
| New dwelling, however small | Yes, with the sequential test | Anywhere at tidal risk now or by 2122, which on Hayling is most of the island |
| Change of use to a dwelling in Flood Zone 2 or 3 | Yes | Seafront and harbour-side buildings |
| Site of one hectare or more in Flood Zone 1 | Yes | Higher ground in the middle of the island |
| Basement, soakaway or low floor in Flood Zone 1 | Advisable | Most of the island, where the gravels hold groundwater |
New homes in Zones 2 and 3 face the sequential test, and on Hayling it bites hard because the council says no site on the island is low risk from the sea. Our guide to the September 2025 sequential test update sets out how the area of search is now defined, and our explainer on climate change allowances covers the sea level rise figures a Hayling assessment must use.
Planning an extension in Eastoke or a new house near the harbour?
Send us the address and a short description. One of our experienced flood risk consultants will check it against Havant's tide maps and come back with a free, no-obligation fixed-fee quote within 60 minutes.
Get a Hayling Island quoteWhy Havant's new plan leaves Hayling's fields alone
The borough is writing a new local plan, the Building a Better Future Plan, which runs to 2043. Full Council approved it for submission in July 2026, consultation closed on 9 September, and the council expects to send it for examination before the end of 2026. Policy 1 sets a presumption against new housing in areas at risk of flooding now or in the future, and the plan states that greenfield land on Hayling is not being put forward for development, mainly because of flood risk and the single road off the island.
The council's 2025 site review shows how that played out. Six Hayling sites were tested, among them Rook Farm, Fathoms Reach and land between Manor Road and West Lane, and none was taken forward: even where a site itself could be made safe, the risk to the island's access was not outweighed. The flood, drainage and coastal policies of the new plan are Policies 27, 28 and 29. Until the new plan is adopted, the 2011 Core Strategy stays in force.
Defences are planned but not yet paid for. The new plan safeguards land for a scheme at Northney, and the Langstone works on the mainland side are meant to protect 120 homes and the A3023 where it reaches the bridge, to at least a 1 in 75 year standard. The coastal strategy's Selsmore and Mengham scheme (£1 million at the outline stage) and Northney Farm scheme (£1 million) sit beside Eastoke in the council's bids, and none is yet funded. Our explainer on shoreline management plans covers the North Solent plan the strategy carries out.
Draining a plot on gravel, clay and tide-locked outfalls
Most of Hayling sits on river terrace gravels, with blown sand and marine deposits along the shore and a band of London Clay to the south. The SFRA finds groundwater could rise to or below ground level across most of the island, which is why a soakaway that looks fine in August can stand full in February. Hampshire County Council, the lead local flood authority, judges drainage on major schemes against its own technical notes:
- Winter readings. Groundwater is monitored through the wet months, typically November to May, and the base of any soakaway must sit at least 1 m above the peak level found.
- Tested soakage. Infiltration is tested to BRE 365 at least three times near the proposed soakaway and at its likely depth.
- Tighter limits. Several Hayling sites lie in drainage priority areas, where Havant's evidence calls for stricter runoff limits.
- Sewers. Southern Water runs the sewers, and its records in the SFRA show eight sewer flooding events in the south of the island.
The 2025 National Standards for sustainable drainage now apply alongside the county's notes. Our ground conditions and soakaway checker gives a first view of a plot, and our guide to groundwater in planning applications explains what the county will want to see.
Reports for PO11 sites, from Northney to Sandy Point
What a Hayling site needs depends on which shore it is near and what is being built or bought:
- Every shore at once. A flood risk assessment for a Hayling Island address looks at the tide on both harbours and the open coast, the state of the nearest defence, groundwater in the gravels and the drains that back up when the outfalls are tide-locked.
- For Havant. A flood risk assessment for planning gives the borough council the tide levels, floor levels and access route it weighs under Policy CS15 now, and under Policy 27 once the new plan is adopted.
- Before exchange. In Eastoke, Selsmore or Northney a flood risk survey for property purchase looks at the house itself, its floor level against the tide and whether the street has flooded before.
- New homes on the island. Because the council treats no Hayling site as low risk from the sea, a new dwelling usually needs a sequential and exception test, starting with a search for sites elsewhere.
- Where the rain goes. A drainage strategy on Hayling starts with how high the groundwater stands in winter and where the water can go when the harbour outfalls are shut by the tide.
- Inside a drainage priority area. Where Havant asks for tighter runoff limits, a surface water drainage strategy sizes storage against those limits and Hampshire County Council's infiltration rules.
- After the decision notice. When a Havant permission comes with a drainage condition, the discharge of drainage conditions brings together the winter groundwater readings, soakage results and maintenance plan the council asks for.
- One road off the island. With the A3023 approaches to Langstone Bridge at risk and five warning areas on the island, a flood warning and evacuation plan sets out when occupants leave and where they go.
- High water in the gravels. Havant's SFRA finds that most of Hayling could see groundwater at or below ground level, so a groundwater flood risk assessment matters for basements, soakaways and low floors.
- After the 2014 and 2024 tides. For homes in Eastoke, Selsmore or North Hayling that took water inside, a flood risk assessment for insurance gives an insurer evidence about the building rather than the postcode.
- Boatyards, marinas and holiday sites. When a buyer takes on a boatyard on the harbour shore, a unit at Eastoke Marina or a holiday park near the beach, flood risk due diligence sets out the tidal and defence picture for a buyer or lender.
Who to call when the tide comes over on Hayling
Ring 999 if floodwater puts anyone on the island in danger, and 105 if a flood has cut the power. Who deals with the rest depends on whether the water came over the front, up through the ground or out of a drain:
| Organisation | What it does on Hayling | Contact |
|---|---|---|
| Environment Agency (Solent and South Downs area) | Tidal flood warnings for the five island warning areas and the island alert; flood mapping | Floodline 0345 988 1188, or register for tidal warnings online |
| Havant Borough Council and Coastal Partners | Planning authority; the coastal strategy, beach management at Eastoke and the island's emergency planning framework | Havant flood risk evidence; Hayling coastal strategy summary |
| Hampshire County Council | Lead local flood authority for surface water, groundwater and ordinary watercourses; highway drains; the April 2024 coastal flood investigation | Report flooding |
| Southern Water | Foul and surface water sewers on the island | Report sewer flooding through southernwater.co.uk |
| Southern Regional Flood and Coastal Committee | Approves flood and coastal investment, including bids for Hayling's schemes | Committee page |
| Hampshire and Isle of Wight Local Resilience Forum (HIOW Prepared) | Plans the joint response of councils, police, fire and utilities to a tidal flood on the island | Flooding advice |
Our Hampshire page sets Hayling beside the county's other coastal towns. Across Langstone Harbour, Portsmouth faces the same tides from Portsea Island; across Chichester Harbour, see Chichester; and further west along the Solent, Fareham. Our areas page lists the other towns and counties we write about.
What people ask before building or buying on Hayling
Why does a flood risk assessment in Hayling Island cost more for some streets than others?
It depends on the evidence the council will expect. A rear extension at Eastoke needs the beach, wave exposure and future tide levels covered, while a plot on higher ground in the middle of the island may need little beyond groundwater and drainage. Every Hayling quote is a fixed fee agreed up front, and the factors that change it are set out in our guide to flood risk assessment costs.
Does the Eastoke beach take my house out of Flood Zone 3?
No. Flood zones are drawn as if defences were absent, so a house behind the recharged beach usually stays in Zone 3. The assessment then shows how the beach performs and what happens if a storm lowers it, and lenders and the council read that part closely.
Can I still build a new house on Hayling Island?
It is harder than elsewhere in Havant. New homes in Zones 2 and 3 need the sequential test, the council treats no Hayling site as low risk from the sea, and its emerging plan presumes against new housing at flood risk. Extensions and like-for-like replacements are judged differently, so check the specific proposal first.
Will the bridge affect a planning application on the island?
For larger schemes and new homes, yes. The council expects to see how occupants would be warned and where they would go if the A3023 approaches flood, which normally means a flood warning and evacuation plan alongside the assessment.
Where can I see if a house on Hayling has flooded before?
Ask the seller, then check the Environment Agency's recorded flood outlines and whether the address falls in one of the island's five warning areas. Hampshire County Council's report on the April 2024 tide covers Selsmore and North Hayling, and Havant's SFRA lists the Eastoke floods back to 1978.
Exchanging on a Selsmore bungalow, or answering a Havant drainage condition?
Tell us the address and your deadline. One of our experienced flood risk consultants will reply within 60 minutes with a free fixed-fee quote, with no obligation to go ahead.
Start a QuoteWhether it is a rebuild at Eastoke, a purchase in Northney or a drainage condition near Mengham, call 01293 214444 or email enquiries@unda.co.uk. Our chartered consultants at Unda Consulting Limited will set out what the site needs, and a senior consultant signs off every report.