Flood Risk Assessment in Portsmouth
Contact Us
A flood risk assessment in Portsmouth begins with the sea. Most of the city stands on Portsea Island, with Portsmouth Harbour to the west, Langstone Harbour to the east and the Solent to the south, so every site here is judged first against the tide. We prepare flood risk assessments in Portsmouth for planning, property purchase, mortgage and insurance, alongside sequential and exception tests and surface water drainage strategies for schemes across the city.
Here, Portsmouth means the city's built-up area: Old Portsmouth and the centre, Southsea, Fratton, North End, Copnor, Milton, Eastney, Stamshaw, Tipner and Hilsea on the island, and Cosham, Paulsgrove, Drayton and Farlington on the mainland below Portsdown Hill, across the PO1, PO2, PO3, PO4, PO5 and PO6 postcode districts. Portsmouth City Council is both the planning authority and the Lead Local Flood Authority for the whole city. The county picture, from the New Forest to the north Hampshire chalk, is on our Hampshire page.
In April 2024, with Storm Pierrick on a spring tide, the sea at Portsmouth reached 5.8 m above Chart Datum, the highest level since the tide gauge began recording in the 1960s, and residential streets in Old Portsmouth flooded.
To talk through a site anywhere in Portsmouth, call our flood risk consultants on 01293 214444 or email enquiries@unda.co.uk. Reports for sites in Portsmouth come from Unda Consulting Limited, a CIWEM Business Partner.
Why Portsmouth floods: the sea, the rain and the water table
The sea comes first. The city's Strategic Flood Risk Assessment (SFRA), prepared by AECOM in November 2023 for the Partnership for South Hampshire, calls flooding from the sea "the main source of flood risk to the area" and puts about 47 per cent of Portsmouth in Flood Zones 2 and 3. Most of the city lies between 1 m and 4 m above Ordnance Datum, rising to about 8 m in the middle of the island, so rain, groundwater and the sewers add to the risk wherever the ground is low.
| Source | Where it bites in Portsmouth | What the record shows |
|---|---|---|
| The sea: the Solent, Portsmouth Harbour and Langstone Harbour | The Southsea and Eastney seafront, Old Portsmouth, Eastern Road, Tipner, Hilsea and the Farlington shore | Waves over the defences at Eastern Road on 1 January 2014 and at the Pyramids in 2014 and 2016; streets in Old Portsmouth under water in April 2024 |
| Heavy rain on combined sewers | The low ground of the old Great Morass in Southsea, Pier Road, Hambrook Street, Stamshaw and Cosham north of the railway | 257 homes, 15 commercial properties and two schools flooded in Southsea on 15 September 2000 when Eastney pumping station failed |
| Tide-locked outfalls | Surface water outfalls into the harbours and the Solent | Flap valves close at high tide, and rain then backs up and surfaces through manholes and gullies |
| Groundwater | Anchorage Park, Great Salterns, Tamworth Park, Stanley Avenue, Lakeside and Farlington Marshes | Water table within 5 m of the ground across much of the city; groundwater added to external flooding in Baffins in winter 2023 to 2024 |
| Main rivers | Great Salterns Drain and Farlington Marshes Gutter, the city's only two designated main rivers | The Gutter drains to Langstone Harbour through the tidal Broom Channel; flooding at Great Salterns golf course has eased since works in 2015 |
| Reservoirs | Portsmouth Water's Farlington reservoirs, above the marshes | The SFRA judges a failure that would reach Farlington Marshes unlikely |
Portsmouth has no river gauge of its own: the nearest, on the Hermitage Stream and the Lavant at Havant and the Wallington at North Fareham, are on our live river levels map, while tide warnings for the city come through the Environment Agency service in the contacts table below. Our guides to tidal flooding and how a storm surge builds explain why a deep depression arriving on a spring tide does the damage here, as Storm Pierrick did in 2024.
Portsmouth on the flood risk map: Portsea Island to Farlington
Enter a Portsmouth postcode in the tool below to screen it against Environment Agency data for rivers and the sea, surface water and reservoirs, or open our full flood risk map. The planning flood zones are drawn as if the sea walls were not there, so most of the seafront and the north and east of the island show as Flood Zone 3 even where a new wall now stands between the street and the water.
Flooding in Portsmouth: from the 1989 surge to Storm Pierrick
Portsmouth's worst floods have come from two directions: the sea driven over the walls by a surge, and rain that the drains could not clear. The SFRA, the council's 2025 surface water plan and the records of Coastal Partners, the five-council coastal team that runs the city's defences, give the dates below.
- 13 to 17 December 1989. A storm surge brought eight extreme high waters in a row to the Solent. A University of Southampton study of Solent floods since 1935 ranks it the most severe in its record, and names parts of Portsmouth among the places most exposed to coastal flooding.
- 15 September 2000. About a month's rain fell in a day, roughly a 1 in 108 year storm, and Eastney pumping station failed. 257 homes, 15 commercial properties and two schools flooded in Southsea, more than a metre deep in places. Southern Water has since upgraded the station and added a back-up.
- March 2008. Two tidal floods reached the south-west corner of Portsea Island.
- 2014 to 2016. Waves over the sea wall flooded Eastern Road, the A2030, to about 300 mm on 1 January 2014. Overtopping at the Pyramids in Southsea flooded low ground and plant rooms on 14 February 2014 and again on 20 November 2016.
- Winter 2023 to 2024. The wettest winter in the council's groundwater monitoring. Groundwater added to external flooding in Baffins ward.
- April 2024. Storm Pierrick arrived on a spring tide and the Portsmouth gauge recorded 5.8 m above Chart Datum, about 3 m above Ordnance Datum, put at roughly a 1 in 75 year still water level. Residential streets in Old Portsmouth flooded in the early hours. Coastal Partners expects a tide of that height to become the normal highest astronomical tide within about 70 years.
The Environment Agency warns for the city's shores through six tidal warning areas, listed in the contacts table below. When one is issued for Old Portsmouth, the council puts up its floodgates and flood boards there.
Portsmouth's sea defences: Southsea and North Portsea Island
Almost the whole island shore is being rebuilt in two schemes that Coastal Partners delivers for the city council. The North Portsea Island scheme, grant funded by the Environment Agency, runs 8.4 km from Tipner to Milton, built to a 1 in 500 year standard for 100 years, for more than 4,200 homes and 500 businesses. The Southsea Coastal Scheme covers 4.5 km from Old Portsmouth to Eastney, is worth more than £185 million and protects more than 10,000 homes and 704 commercial properties.
| Frontage | Scheme | Dates and status |
|---|---|---|
| Anchorage Park | North Portsea Island | 2015 to 2016, complete |
| Milton Common | North Portsea Island | 2016, complete |
| Tipner Lake | North Portsea Island | 2017 to 2019, complete |
| Kendall's Wharf and Eastern Road | North Portsea Island | 2019 to 2024, complete |
| Ports Creek, by Hilsea | North Portsea Island | Started September 2024; due in 2026 |
| Long Curtain Moat, Old Portsmouth | Southsea Coastal Scheme | September 2020 to February 2023, complete |
| Southsea Castle | Southsea Coastal Scheme | 2022 to 2024, complete |
| Pyramids to Speakers' Corner | Southsea Coastal Scheme | 2023 to 2024, complete |
| Southsea Common | Southsea Coastal Scheme | 2024 to 2026, listed as complete |
| Speakers' Corner to South Parade Pier | Southsea Coastal Scheme | 2025 to 2027, under way |
| Clarence Pier | Southsea Coastal Scheme | 2027 to 2028, still to start |
| South Parade Pier to Eastney | Southsea Coastal Scheme | 2027 to 2028, still to start |
Progress is posted on the Southsea Coastal Scheme and North Portsea Coastal Scheme sites. The North Solent Shoreline Management Plan holds the line around Portsea Island; at Farlington Marshes, where the SFRA describes 3.5 km of seawall in poor to fair condition, holding the line is preferred until at least 2060, with the longer term left to further study, and that frontage is the one place in the city where the SFRA says a Coastal Change Management Area could be drawn. Our guide to shoreline management plans explains the policy choices.
A finished wall lowers the chance of flooding; the flood zone stays where it was. An assessment behind these frontages still has to show what happens if a wall is overtopped or breached. Our guides to residual flood risk and why a site stays in a flood zone after new defences are built explain the method, and our explainer on sea walls, rock armour and beach recharge covers the structures.
Portsmouth in 2122: what the climate change runs show
The SFRA runs a 1 in 200 year tide against today's defences for 2022, 2055 and 2122. Little changes by 2055. By 2122 the flooded area reaches well inland and all three roads off the island are affected.
- Today. Flooding is confined mainly to the southern edge: Southsea, the holiday parks in the south-east, Eastern Road, the land south of Great Salterns Lake and west of Anchorage Park. Of the three routes off the island, the A3 London Road stays dry and the M275 and Eastern Road see low hazard only.
- 2055. The flooded area grows slightly, and the escape routes stay dry or low hazard.
- 2122. Southsea flooding reaches inland as far as Albert Road, the eastern edge floods up to the railway line and Hilsea is affected. All three routes are hit: the M275 has a section of significant hazard north of Rudmore Roundabout, and the A3 and Eastern Road reach extreme hazard.
- Groundwater rising with the sea. The council's groundwater study projects a mean sea level of 1.30 m above Ordnance Datum at Langstone Harbour by 2115, and its 2025 surface water plan expects the water table to rise with it, adding to the pumping that low-lying areas already need.
These outputs explain why Portsmouth asks for the cautious end of the national guidance: site assessments are expected to use the Upper End allowance, and new development needs a place of safety above the 1 in 1,000 year level with climate change. Our notes on climate change allowances and on planning for sea level rise beyond 2100 set out where those figures come from.
PCS12, PLP31 and PLP32: the policies behind a Portsmouth application
Portsmouth's planning rules are in transition. The adopted plan is still The Portsmouth Plan of 24 January 2012, whose flood policy is PCS12. Its replacement, the Portsmouth Local Plan to 2040, was submitted for examination on 18 March 2026 and three inspectors were holding hearings in October 2026, so its draft flooding and drainage policies, PLP31 and PLP32, already show what the council asks of a scheme.
- When an assessment is needed. For all development in Flood Zones 2 and 3. In Flood Zone 1, for sites of a hectare or more, land with critical drainage problems, land the SFRA shows at greater risk in future, a more vulnerable use on land at risk from another source, and schemes of ten or more units that change the building footprint.
- What PLP31 asks for. A development safe for its lifetime, with residual risk behind present and future defences taken into account, floor levels, escape routes and places of safety set by the SFRA, and land kept free for defences and their upkeep.
- Upper End climate change. Site assessments use the Upper End allowance unless another approach can be justified.
- No basement flats. Self-contained basement accommodation used as a habitable room will not be permitted, because of the residual risk.
- Access out of the flood. Robust evidence that every effort has been made to give a safe way in and out, and where that cannot be done, the duration, hazard and frequency of flooding over the development's lifetime.
- Floor levels and refuge. The council's flooding topic paper, drawing on the SFRA, sets floor levels above the 1 in 200 year level with climate change and freeboard, and a place of safety for the 1 in 1,000 year event with climate change.
- Sequential testing. The council has tested only the sites its plan allocates, so any other site at risk needs its own test. By agreement with the Environment Agency no land in the city is designated Flood Zone 3b, the functional floodplain.
National policy is chapter 18 of the August 2026 NPPF, where F4 decides when a Portsmouth scheme needs an assessment, F5 and F6 set out the sequential and exception tests, and F8 points drainage to the 2025 National Standards for sustainable drainage. Our summary of the August 2026 NPPF flood and drainage changes sets out what moved.
The evidence behind both plans is the PfSH Level 1 SFRA, whose Portsmouth report (Part 5) maps depth and hazard to 2122, with a Portsmouth Level 2 SFRA for the allocated sites. The SFRA also notes that a set-back of about 16 m from tidal defences is typically sought, to leave room for their upkeep. The council's drainage team, at drainageteam@portsmouthcc.gov.uk, answers surface water questions on applications.
Building or converting behind Portsmouth's sea walls?
Tell us where the site is and what you plan, from a flat conversion in Southsea to new homes at Tipner. Our experienced flood risk consultants will reply within 60 minutes with a free, no-obligation, fixed-fee quote.
Start a QuoteRain with nowhere to go: tide-locked drains and groundwater in Portsmouth
Inland flooding in Portsmouth comes from rain meeting sewers built for smaller storms, outfalls closed by the tide and a water table close to the surface. The council's surface water plan, updated by JBA in August 2025, names 14 local flood risk zones; six have stayed dry since Southern Water's sewer works of 2010 to 2015, and the five below are the ones still being watched or worked on.
- Southsea's Great Morass. A former inland water body with high groundwater, where hundreds of properties flooded internally in 2000. It is ranked high priority, but the plan proposes no new works, given Southern Water's improvements.
- Pier Road and Hambrook Street. The Little Morass is another filled-in water body; Hambrook Street has a possible high water table and poor drainage, and work on the Pier Road pumping station is under way.
- Cosham. North of the railway, a flood hotspot with a high water table, targeted by the council and Southern Water in the 2025 to 2030 investment period.
- Farlington Marshes, Drayton and Farlington. High priority, with an Environment Agency scheme in development since 2019; prolonged rain has flooded several upstream properties since 2012.
- Anchorage Park and Stamshaw. Flood hotspots; Anchorage Park also has a high water table and is likely to need significant investment.
Below ground, the council's study of 47 boreholes between 2019 and 2024 found groundwater generally within 5 m of the surface, with coastal boreholes following the tide and water as salty as the sea reaching Tamworth Park, more than a kilometre inland. It advises against basements and infiltration drainage where groundwater can emerge, so soakaways need testing before a layout relies on them. Our guide to BRE 365 infiltration testing explains the test, and the ground conditions checker gives a first read for a postcode.
| Requirement | What applies in Portsmouth | Source |
|---|---|---|
| Runoff rate | No greater than the site's existing rate, with a reduction preferred | Draft policy PLP32 |
| Sites at surface water risk | Net runoff actively reduced below pre-development levels | Draft policy PLP32 |
| Where the water goes | To the sea, a watercourse or a surface water sewer; a combined sewer only when every other route is shown to be impossible, and never the foul system | Draft policy PLP32 |
| Greenfield land | No surface water into the combined or foul system | Draft policy PLP32 |
| Sewer capacity | Proportionate evidence the network can cope, with occupation phased to any reinforcement; Southern Water to confirm capacity before a connection | Draft policy PLP32; surface water plan 2025 |
| National standards | Sustainable drainage that meets the 2025 National Standards | NPPF policy F8 |
Which Portsmouth sites need a flood risk assessment, from Tipner to Southsea?
Most Portsmouth schemes are infill, conversion and regeneration on low ground, so the question usually turns on the flood zone, the use and what lies under the site. The table sets out the common cases.
| Proposal | Assessment needed? | What usually decides it |
|---|---|---|
| New homes or flats in Flood Zone 2 or 3, for example off Eastern Road in Milton or near the Southsea seafront | Yes, plus a sequential test if the site is not allocated | Floor levels above the 1 in 200 year level with climate change, a place of safety and the route off the island |
| Splitting a Southsea or Fratton house into flats | Yes in Flood Zone 2 or 3; in Flood Zone 1 where a more vulnerable use meets another flood source | Ground-floor bedrooms, no basement flat, and groundwater on the old Morass ground |
| A householder extension in Flood Zone 2 or 3, say in Hilsea | Usually covered by the Environment Agency's standing advice for minor extensions | Floor levels and flood-resistant construction |
| Tipner West and Tipner East | Yes, following the Level 2 SFRA's recommendations for each allocation | New defences and land raising delivered with the development |
| Lakeside North Harbour | Flood Zone 1 today, but much of it is expected to fall in Flood Zones 2 and 3a by 2122 | Future flood zones, groundwater emergence and SuDS agreed with the LLFA |
| Buying an existing house or flat | Not for planning, but often sensible | The 2000 and 2024 record for the street and the frontage works finished or still to come |
Our guides to converting a house into flats and the Environment Agency's standing advice cover two of the commonest Portsmouth cases, and a case study of an extension approved in tidal Flood Zone 3 shows how a defended coastal site is argued.
Reports for Portsmouth sites, from Old Portsmouth to Farlington
We work on Portsmouth sites for developers, housebuilders, architects, planning agents, landlords, homeowners and buyers. A flood risk assessment tests whether a site is safe, a sequential test whether it should be developed when lower-risk land exists, and a drainage strategy where the rain will go. On the island a single scheme often needs all three.
- The sea, the drains and the water table together. On an island where a high tide can lock the outfalls while groundwater sits within a few metres of the surface, a flood risk assessment has to deal with the Solent, the harbours, surface water and groundwater as one picture.
- Applications to Portsmouth City Council. From a change of use in Fratton to new homes at Tipner, a flood risk assessment for planning sets out the floor levels, place of safety, escape route and residual risk that PCS12 and draft policy PLP31 look for.
- Before exchange in Southsea or Old Portsmouth. Where a street flooded in September 2000 or April 2024, a flood risk survey for property purchase reads that record against the frontage works now finished or still to come.
- Windfall sites on the island. The council's own testing covers only the sites its plan allocates, so an unallocated site in Flood Zone 2 or 3 needs its own sequential and exception test, and on Portsea Island the search for lower-risk land is short.
- Combined sewers and outfalls that close at high tide. With much of the city on combined sewers and surface water outfalls shut by the tide, a drainage strategy has to show where the water goes and that the runoff is no greater than today's.
- No more runoff than before. A surface water drainage strategy shows a Portsmouth scheme keeping surface water out of the foul system and its runoff at or below the existing rate, and below it where the site is at surface water risk, as draft policy PLP32 sets out.
- After permission is granted. Where a Portsmouth consent leaves the drainage details to a condition, we prepare the information needed for the discharge of drainage conditions, including Southern Water's confirmation of sewer capacity where a connection is proposed.
- Waves the strategic maps leave out. The SFRA's 1 in 30 year tidal mapping leaves out wave action, which it says site assessments should consider, so a seafront plot in Southsea or Eastney may need modelling of tide levels and wave overtopping to set its floor levels.
- Three roads off the island. The M275, the A3 and Eastern Road are the only routes off Portsea Island, and all three are hit in the SFRA's 2122 run, so a flood warning and evacuation plan sets out when occupants leave and where they shelter.
- A water table that follows the tide. Boreholes near the coast rise and fall with the tide, and the council's study flags Anchorage Park, Great Salterns, Tamworth Park and Stanley Avenue for emergence, so a deep foundation or soakaway there may call for a groundwater flood risk assessment.
- Homes with a claim history. After 257 homes flooded in Southsea in 2000 and Old Portsmouth's streets went under in 2024, insurance flood risk assessments help owners answer an insurer's questions about one building.
- Land at Tipner and the docks. Where a buyer or lender is looking at land whose development depends on new defences, as at Tipner, or at premises by the Commercial Docks, due diligence flood risk assessments set out the defence works and land raising the site depends on.
- Seafront firms and the Eastern Road. The Southsea scheme counts 704 commercial properties behind its frontages, and Eastern Road has been overtopped more than once, so business continuity flood assessments plan how a firm keeps trading when the road or the ground floor is lost.
- Sewers with little room to spare. Draft policy PLP32 asks for proof that the wastewater network can take a scheme, phased to any reinforcement, and the Budds Farm system is at significant risk from rainfall, so a larger scheme may need a foul drainage strategy.
- Allocations still being examined. With Tipner West proposed for 814 to 1,250 homes and Lakeside North Harbour expected to fall into the flood zones by 2122, landowners and promoters use a flood risk feasibility study to test land before they commit.
Who to call when Portsmouth floods
In any flood that puts someone in danger, call 999, and call 105 if it has cut the power. Otherwise the right body depends on the water: the Environment Agency for the sea, the city council for streets and drains, and Southern Water for the sewers.
| Organisation | Its job in Portsmouth | Contact |
|---|---|---|
| Emergency services | Rescue where floodwater puts life at risk | 999 |
| Environment Agency (Solent and South Downs area) | The sea and main rivers, tidal flood warnings and the defence grant | Floodline 0345 988 1188; warnings in force around Portsmouth |
| Tidal warning areas | Old Portsmouth; Southsea; Eastern Portsmouth from Anchorage Park to Eastney; Hilsea; Tipner, Stamshaw and the Commercial Docks; Port Solent to Farlington Marshes | Old Portsmouth; Southsea; Eastern Portsmouth; Hilsea; Tipner and Stamshaw; Port Solent and Farlington; sign up for warnings |
| Portsmouth City Council | Lead Local Flood Authority for surface water, groundwater and ordinary watercourses; highway, planning and coast protection authority | Report road flooding or a blocked drain; city helpdesk 023 9283 4092 |
| Coastal Partners | Runs and rebuilds the city's sea defences for the council, alongside Havant, Gosport, Fareham and Chichester | Coastal Partners |
| Southern Water | Public sewers, pumping stations such as Eastney, and sewer flooding | Report a problem |
| Portsmouth Water | Water supply, burst mains and the Farlington reservoirs | Burst water mains |
| Southern Regional Flood and Coastal Committee | Approves flood and coastal schemes and spending along the south coast, from Hampshire and the Isle of Wight to Sussex and Kent | Southern RFCC |
| Hampshire and Isle of Wight Local Resilience Forum | The emergency services, councils and agencies planning together for major floods, published as HIOW Prepared | HIOW Prepared |
The council's Local Flood Risk Management Strategy sets out, ward by ward, how these bodies share the work, and is due for review in 2026 alongside the surface water management plan.
Portsmouth flood questions from buyers, landlords and developers
Which Portsmouth applications have to include a flood risk assessment?
Any on a site in Flood Zone 2 or 3, which covers much of the seafront and the north and east of the island. In Flood Zone 1 the council also asks for one on sites of a hectare or more, schemes of ten or more units that change the footprint, and land at risk from another source or at greater risk in future. Send us the address and we will tell you which rule catches your site.
Which flood zone is Portsmouth in?
All three. The SFRA puts about 47 per cent of the city in Flood Zones 2 and 3, mostly tidal, because the Flood Map for Planning ignores the sea walls. The higher middle of the island and the slopes of Portsdown Hill are mostly Flood Zone 1. No land in Portsmouth is designated Flood Zone 3b. Our postcode tool screens a single address.
Does land behind Portsmouth's sea defences still need a flood risk assessment?
Yes. Draft policy PLP31 asks every assessment to take account of residual risk behind present and future defences, and the SFRA maps what a 1 in 200 year tide does to depth and hazard as sea level rises to 2122. A new wall at Southsea or Ports Creek lowers the chance of flooding but does not move the flood zone.
Does a flood risk assessment in Portsmouth cost more on the seafront?
The fee follows the work. A householder extension in Hilsea needs far less than new flats on the Southsea seafront, where wave overtopping, floor levels, a place of safety and the route off the island all have to be settled. Send the address and plans and we will price the job as a fixed fee, at no charge and with no commitment.
Is Portsmouth City Council the Lead Local Flood Authority as well as the planning authority?
Yes. As a unitary authority it is both the planning authority and the Lead Local Flood Authority, dealing with surface water, groundwater and ordinary watercourses, and it comments on drainage for major applications. The Environment Agency leads on the sea and the city's two main rivers.
How do I look up the flood risk for a house or flat in Portsmouth?
Start with our postcode tool on this page, then the government's long-term flood risk service and the Flood Map for Planning. The council's SFRA map shows recorded flood outlines, surface water and future tidal depths. Ask the seller about 2000 and 2024, and for a full picture of one building commission a flood risk survey.
Can I add a basement flat to a Portsmouth conversion?
Not as self-contained living space under draft policy PLP31, which rules it out because of the residual flood risk. The council's groundwater study also advises against impermeable underground structures where groundwater can emerge, such as Anchorage Park or Tamworth Park. Below-ground plant or storage may still be possible with a groundwater assessment.
Will the Southsea Coastal Scheme take my home out of Flood Zone 3?
No. The Flood Map for Planning shows land as if defences were absent, so a Southsea street stays in Flood Zone 3 after the new frontage is finished. What changes is the chance of flooding, which matters to buyers, lenders and insurers and which an assessment can set out for one property.
Which parts of Portsmouth could be under water by 2050?
With the defences in place, the SFRA's run for 2055 shows a 1 in 200 year tide reaching only slightly further than it does today, along the southern edge: Southsea, Eastern Road, the south-east holiday parks and the edges of Great Salterns and Anchorage Park. The bigger change comes later; by 2122 flooding reaches Albert Road in Southsea and all three roads off the island.
Can a Portsmouth homeowner prepare the flood information for an extension without a consultant?
For a minor householder extension in Flood Zone 2 or 3, the Environment Agency's standing advice lets you supply simple information yourself, mainly floor levels and flood-resistant construction. New homes, flats, changes of use and anything near a sea wall need a full site-specific assessment.
What details should I send to get a quote for a Portsmouth site?
A postcode or a red-line plan, a short description of the scheme or the property, and who the report is for, whether that is the council, a conveyancer, a lender or an insurer. A consultant will come back to you within 60 minutes with a fixed fee and a timetable for the work.
Exchange, validation or committee date coming up in Portsmouth?
Tell us about the site and the date you are working to, whether that is exchange on a Southsea flat or a validation check at Tipner. Our experienced flood risk consultants will send a free, fixed-fee quote within 60 minutes, with no obligation.
Start a QuoteTo discuss a site anywhere in Portsmouth, from Old Portsmouth to Farlington, call our chartered flood risk consultants on 01293 214444 or email enquiries@unda.co.uk. A senior consultant checks and signs off each report, and Unda Consulting Limited is a Business Partner of CIWEM. Along the coast we also cover Southampton, the Isle of Wight, Chichester and Selsey; see every area we cover.