Flood Risk & Drainage Requirements for Brighton & Hove City Council
Contact Us
Brighton & Hove City Council can ask for a flood risk assessment on a site the Environment Agency shows in Flood Zone 1. Its 2018 strategic flood risk assessment maps local Surface Water Flood Zones across the city and asks for an assessment for any development or change of use inside them, and City Plan Part Two (October 2022) adds Policy DM43, which bars basements wherever groundwater has broken out before.
These are the flood risk assessment requirements of Brighton & Hove City Council in one place. They cover the City Plan policies that apply today (CP11 from March 2016, DM42 and DM43 from October 2022), the Shoreham Harbour plan's Policy SH6, the 2019 drainage SPD, the council's application checklists and the city's checks as its own Lead Local Flood Authority. For each, we say what it asks of an application and what our reports put in front of the case officer. A new City Plan is being prepared, with adoption planned for March 2029, so these policies are the ones applied in the meantime.
Who decides flood and drainage questions in Brighton & Hove
There is no county tier inside the city. Brighton & Hove City Council is a unitary authority, so the planning officer and the drainage team sit in the same council and read the same file. The exceptions are the downland inside the South Downs National Park, where the National Park Authority is the planning authority, and the sea, where the Environment Agency leads.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Brighton & Hove City Council (planning) | Local planning authority outside the National Park | Decides the application against City Plan Parts One and Two, the Shoreham Harbour plan, any made neighbourhood plan and the NPPF; registers it against its planning application checklists |
| Brighton & Hove City Council (drainage) | Lead Local Flood Authority | Statutory consultee on major development; comments on surface water, groundwater and SuDS, using SPD16 Sustainable Drainage |
| South Downs National Park Authority | Planning authority inside the Park (Stanmer and the downland fringe) | Decides applications there under the South Downs Local Plan (July 2019), Policies SD49 and SD50; the city council stays the flood authority |
| Environment Agency | Tidal and coastal flood risk | Consulted where tidal Flood Zone 2 or 3 applies; runs the warning areas for Brighton Marina, Shoreham Harbour and the Patcham groundwater |
| Southern Water | Sewerage and water supply | Confirms sewer capacity under Policy DM42 and agrees connections to its sewers, combined sewers included |
| Internal drainage board | None | No internal drainage board covers any part of the city |
A site that straddles the city boundary needs the same application made to each council for its part. In July 2026 the Government agreed to bring East Saltdean, Telscombe and Peacehaven into a new authority with the city from April 2028, but the council's reorganisation page records that the plan is paused while the Government reviews the programme, so the present boundary applies. Our guide to the Lead Local Flood Authority explains what the drainage role covers.
Brighton & Hove City Council's Local Plan flood and drainage policies
The development plan for the city outside the National Park is City Plan Part One, City Plan Part Two, the Shoreham Harbour Joint Area Action Plan and five neighbourhood plans, listed on the council's development plans page. The table sets each flood or drainage policy against what an application has to show and what our report supplies; the wording and how officers read it follow.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy CP11 | Managing Flood Risk | A site-specific FRA where a risk is identified; mitigation where the site has flooded before; SuDS | Show the risk from every source and how it is mitigated, and account for any past local flooding | A flood risk assessment that tests all sources against the SFRA, with a drainage section showing SuDS | City Plan Part One, adopted 24 March 2016 |
| Policy DM43 | Sustainable Drainage | SuDS on all new buildings, car parking and hard standing that reduce surface water leaving the site unless not reasonably practicable; no subterranean development where groundwater has emerged (or other sources of flooding) | Submit SuDS details with a lifetime management plan; keep basements out of groundwater areas | A surface water drainage strategy sized to SPD16, and a groundwater check before any basement is drawn | City Plan Part Two, adopted 20 October 2022 |
| Policy DM42 | Protecting the Water Environment | Protect groundwater and the sea; show sewer capacity or phasing to avoid sewer flooding | Evidence from Southern Water on capacity | Drainage and foul reports that record the capacity evidence and treatment train | City Plan Part Two, adopted 20 October 2022 |
| Policy DM39 | Development on the Seafront | Where a proposal generates a need for enhanced coastal defences: regard to the Shoreline Management Plan and Coastal Strategy Study and, where appropriate, access and escape routes in a tidal flood | Where enhanced coastal defences are needed, show the defence design and, where appropriate, escape in a tidal flood | Tidal levels, defence condition and access and escape set out in the FRA | City Plan Part Two, adopted 20 October 2022 |
| Policy DA2 | Brighton Marina, Gas Works and Black Rock Area | An FRA in line with the SFRA and the Shoreline Management Plan for the Marina area | Assess tidal, surface water and overtopping risk at the Marina | A tidal FRA using the 2021 SFRA addendum levels | City Plan Part One, adopted 24 March 2016 |
| Policy SH6 | Flood risk and sustainable drainage | Follow the Shoreham Harbour Flood Risk Management Guide; 5.77 m AOD residential floors; defences to 5.4 m AOD where undefended land levels are below the 2115 1 in 200 year tidal flood event; emergency strategy | Meet the harbour levels and provide an emergency strategy | An FRA built on SPD13 levels, with a flood warning and evacuation plan where needed | Shoreham Harbour Joint Area Action Plan, adopted October 2019 |
| Policy BM5 | Natural Environment/ Marine Wildlife | Development safe for its lifetime; regard to the Marina sea defence plan, the SFRA and SPD16; SuDS | Show lifetime safety and no increase in risk elsewhere | A Marina FRA and drainage note reading BM5 alongside DA2 | Brighton Marina Neighbourhood Plan, referendums 13 February 2025 |
| Policy WS7 | Incorporating Sustainable Drainage and Water Efficiency Measures | SuDS; no surface water to the foul network; groundwater protection over source protection zones | Keep surface water out of the foul sewer; protect the aquifer | A drainage strategy with infiltration or attenuation and no foul connection | West Saltdean Neighbourhood Plan, made 5 December 2025 |
| Policy E4 | Mitigating and Adapting to Climate Change and Sustainable Development | Best practice in urban drainage, with DM43 and SPD16 (or SD50 in the Park) | Show SuDS to the city or Park standard | Drainage evidence written to DM43 and SPD16 | Coldean Neighbourhood Plan, made 25 September 2026 |
Requirements checked November 2026.
Policy CP11 (Managing Flood Risk): an assessment wherever a risk is identified
CP11 asks for a site-specific flood risk assessment once any flood risk is identified, from whatever source, and it treats past local flooding as a risk in its own right. Its key sentence reads: "Where a risk is identified then planning applications must be accompanied by a site specific flood risk assessment identifying how flood risk will be mitigated and minimised" (City Plan Part One, March 2016, page 184).
The policy names surface water and muddy floods, groundwater and sewer floods as the previous flooding an application must take into account, and it asks that any assessment follow the SFRA, national policy and Environment Agency advice and include sustainable drainage. The supporting text (paragraph 4.140) says the city has no surface watercourses, so river flooding plays almost no part; the risks it lists are the tide on the frontage, runoff from the Downs, groundwater in the chalk and sewers filling with groundwater.
Flood Zone 1 does not settle the question here. In practice the SFRA's surface water and groundwater mapping is the trigger, not the Flood Map for Planning. Our assessments for CP11 start from the SFRA layers, the council's flood records and the sewer records. They show the flow route across the site and set floor levels from it, so the officer can see the risk was looked for and answered.
Policy DM43 (Sustainable Drainage): SuDS on every new building and no basements where groundwater has emerged
DM43 applies to every new building, car park and area of hard standing, whatever the size of the scheme. It requires "appropriate Sustainable Drainage Systems (SuDS) capable of ensuring that there is a reduction in the level of surface water leaving the site unless it can be demonstrated not to be reasonably practicable", and asks for the SuDS details, with whole-life management and maintenance, to be submitted with the application (City Plan Part Two, October 2022, page 116).
Its second sentence decides whether a basement or tank can be built at all: "Subterranean development, for example, storage tanks, basements or subterranean car parks, will not be permitted in areas where there has been a history of groundwater emergence (or other sources of flooding)." The supporting text widens that to areas with a documented risk of groundwater emergence, which matters in Patcham, Preston Park and the other chalk valleys. A basement flat or an underground tank is therefore a question to settle before the drawings are fixed, and our basement conversion guide sets out how flood zones and groundwater bear on one.
For DM43 we prepare a surface water drainage strategy that shows the runoff reduction, the route to an outfall and who maintains what. Where a basement or tank is proposed, the groundwater record for the street comes first.
Policy DM42 (Protecting the Water Environment): sewer capacity and the chalk aquifer
DM42 protects the city's drinking water and the sea, and it puts the sewer capacity question on the applicant. The policy says "Applicants will be required to demonstrate that capacity exists on and off-site in the sewerage network to serve the development or that occupation of the development will be phased to align with the delivery of sewerage infrastructure, in liaison with the service provider, to avoid sewer flooding" (City Plan Part Two, page 114). It also allows refusal where site investigations and risk assessments have not been done.
The city sits on a chalk aquifer that supplies its water, so infiltration has to be clean before it reaches the ground. Our drainage strategies show the treatment stages before any soakaway, record Southern Water's response on capacity and, where foul flows are the issue, carry a separate foul drainage strategy. Our note on groundwater source protection zones covers the aquifer side.
Policy DA2 (Brighton Marina, Gas Works and Black Rock Area) and Policy DM39 (Development on the Seafront)
Two policies govern building on the front. Item 11 of DA2 asks Marina proposals to "accord with the relevant Shoreline Management Plan and incorporate a site specific Flood Risk Assessment" in line with the SFRA, "to protect development from all types of flood risk" (City Plan Part One, page 41). DM39 applies where a proposal creates a need for enhanced coastal defences: it must have regard to the Shoreline Management Plan and coastal strategy and, "where appropriate, include access and escape routes in the event of tidal flooding" (City Plan Part Two, page 105).
City Plan Part One also records that, should a Coastal Change Management Area be needed for the cliffs east of the Marina, it would come in a later plan (paragraph 3.127); City Plan Part Two did not designate one. For sites on the front we prepare tidal flood risk assessments and due diligence reports that use the 2021 SFRA addendum's sea levels, the defence policy for that stretch and a safe route out, and our guide to shoreline management plans explains how those policies are set.
Shoreham Harbour Policy SH6 (Flood risk and sustainable drainage) at Aldrington Basin and South Portslade
SH6 sets fixed levels for the harbour. Part 4 reads "Residential development proposals must protect against a breach scenario through the application of an appropriate finished floor level of 5.77m AOD", part 6 asks for defences to 5.4 m AOD where undefended land lies below the 2115 1 in 200 year tide, and part 13 asks every proposal for "an emergency strategy to ensure the safety of residents at times of flooding" (Shoreham Harbour Joint Area Action Plan, October 2019, pages 50 to 51).
Part 1 ties every proposal to the Shoreham Harbour Flood Risk Management Guide (SPD13), in force since September 2015, and parts 10 to 12 require SuDS on hard landscaping and limit basement parking in the tidal zones. The plan's supporting text says no sequential test is needed inside its allocations unless a proposal departs significantly from them, and that a site outside them in Flood Zone 2 or 3 should search the character area it sits in for safer alternatives; NPPF F5 also keeps any search within the development's anticipated catchment. The harbour's Adur side is covered on our Adur & Worthing council page; on the city side our assessments take the SPD13 levels as the starting point and add the emergency strategy SH6 asks for.
Neighbourhood plans: Policy BM5 (Natural Environment/ Marine Wildlife), Policy WS7 (Incorporating Sustainable Drainage and Water Efficiency Measures) and Policy E4 (Mitigating and Adapting to Climate Change and Sustainable Development)
Three of the city's five made neighbourhood plans put flood or drainage tests into policy. In the Brighton Marina plan, Policy BM5 asks that new development "demonstrate that they will be safe for their lifetime", not increase flooding elsewhere, and have regard to the Marina's sea defence management plan, the SFRA and SPD16 (Brighton Marina Neighbourhood Plan). In West Saltdean, Policy WS7 states that "surface water will not be allowed to discharge to the wastewater drainage network" and asks for a hydrogeological risk assessment where needed over a source protection zone, while Policy WS1 asks schemes to keep existing flow routes and dry watercourses (West Saltdean Neighbourhood Plan).
Coldean's plan, made on 25 September 2026, asks in Policy E4(d) for development to "Adopt best practice in suitable urban drainage"; the policy names DM43 and points to SPD16, or South Downs Policy SD50 inside the Park (Coldean Neighbourhood Plan). The Rottingdean plan mentions sustainable drainage only in its design principles, and the Hove Station plan has no flood policy. We read the plan for the site's area before writing anything.
Policies replaced since 2016: SU4, SU7, SU5 and SU6
The 2005 Local Plan policies still turn up in old reports. Policy SU4 (Surface water run-off and flood risk) was replaced by CP11, with CP7 and CP8, when City Plan Part One was adopted on 24 March 2016, and Policy SU7 (Development within the coastal zone) was replaced at the same time by CP11, SA1, DA1, DA2, DA8 and CP7 (City Plan Part One Annex 4). Policies SU5 and SU6 were superseded when City Plan Part Two was adopted in October 2022. The council's own Flood risk page still lists SU4 and SU7, though both were replaced in 2016; the adopted plans are the ones applied.
The new Brighton & Hove City Plan: work started 28 October 2026, adoption planned for March 2029
The council is preparing a single new City Plan to 2044 under the 2026 plan-making system, to replace Parts One and Two outside the National Park. The scoping consultation ran from 14 July to 7 September 2026, the council published its Gateway 1 self-assessment on 28 October 2026, and its timetable puts the Proposed Plan content and evidence consultation at 12 July to 13 September 2027, submission at 25 October 2028 and adoption in March 2029. No draft flood or drainage policy has been published, and the Gateway 1 summary lists flood risk among the evidence still to be gathered. Until then CP11, DM42 and DM43 are the tests.
Is your Brighton & Hove site in a Surface Water Flood Zone?
Send the address and plans and we will tell you which of CP11, DM43 or SH6 applies and what the council will want to see. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes. Your fixed quote follows within the hour.
Start a QuoteWhich reports a Brighton & Hove application needs, and when
The national triggers in NPPF Chapter 18 sit underneath the city's own. Read across from the trigger that fits the site.
| Trigger | What is needed | Basis |
|---|---|---|
| Any site in Flood Zone 2, 3a or 3b (the tidal frontage, the Marina, parts of the harbour) | Flood risk assessment | NPPF F4; council checklists |
| Site in Flood Zone 1 covering a hectare or more | Flood risk assessment | NPPF F4 |
| Any development or change of use in a Surface Water Flood Zone (SWFZa or SWFZb) | Flood risk assessment, with floor levels in SWFZa | SFRA (2018) section 13.1.2; SPD16 section 4.3; NPPF F4 |
| A site that has flooded before from surface water, groundwater or sewers | Flood risk assessment showing the mitigation | Policy CP11 |
| New building, car park or hard standing of any size | SuDS details and maintenance arrangements | Policy DM43 |
| Major development (10 or more homes, a housing site of 0.5 hectares or more where numbers are unknown, 1,000 sq m of floorspace, or a site of 1 hectare or more) | Drainage strategy with a maintenance plan | Council SuDS page; checklists ("sustainable drainage report"); NPPF F8 |
| Basement, storage tank or underground car park | Not permitted where groundwater has emerged; otherwise groundwater evidence | Policy DM43; SPD16 LG16 and LG17 |
| Land at risk now or in future from any source, outside the F5 exemptions | Sequential test | NPPF F5 |
| Flood Zone 2 or 3 where Annex F table 3 requires it | Exception test (not required in Flood Zone 1) | NPPF F6 and Annex F |
| Residential scheme in the Shoreham Harbour plan area | Finished floors at 5.77 m AOD and an emergency strategy | Policy SH6 |
| Works affecting a watercourse or an internal drainage board | No internal drainage board in the city; surface watercourses absent | City Plan Part One paragraph 4.140 |
The sequential test exemptions in F5 matter here: householder development, non-residential extensions with a footprint under 250 square metres and most changes of use are exempt, as are sites where an assessment shows that nothing built would be at risk, and sites at risk from surface water only where the layout keeps people safe for the development's lifetime. That last exemption covers many of the city's flow-route sites; our article on the surface water exemption from the sequential test explains when it holds. Where the test does apply, our explainer on the sequential and exception tests sets out how alternatives are searched.
The 2018 SFRA, its Surface Water Flood Zones and the 2021 addendum
The council's Level 1 and Level 2 SFRA was prepared by JBA Consulting and finalised in October 2018 to support City Plan Part Two; it replaced the January 2012 SFRA. An addendum dated 31 March 2021 tested the tidal mapping against UKCP18 and the Environment Agency's July 2020 climate change guidance. No newer SFRA has been published, and the work for the new City Plan has not yet begun. Our SFRA explainer covers what these studies are for.
- Surface Water Flood Zone a (accumulation). Land where water ponds in a 1% annual chance storm. Basement dwellings are not normally permitted, and ground floors should normally sit at whichever is higher of 300 mm above general ground level or 600 mm above the 1% storm level with a 30% uplift (SFRA executive summary and section 13.1.2).
- Surface Water Flood Zone b (conveyance). Sloping ground where runoff flows across hard surfaces. Any type of development can be acceptable if an assessment shows it is safe for its lifetime and does not raise risk elsewhere.
- Detailed mapping on request. The SFRA tells applicants to ask the council's sustainable drainage team for the surface water mapping used in an assessment.
- Flood Zone 3b. Defined in the 2018 SFRA as land with a 5% (1 in 20) annual chance of flooding, taking account of defences. Annex F of the August 2026 NPPF now normally uses a 3.3% (1 in 30) threshold, so a site near the line is checked against both.
- Groundwater. Closest to the surface along small parts of the coast and in Aldrington, Patcham and Falmer, according to the SFRA.
- Tidal climate change. The 2021 addendum found no substantive change in Flood Zone 3a extents about a century ahead, because shingle beaches and cliffs protect most of the city, re-ran depths and hazard for the Marina, and tells developers to use the Environment Agency's latest guidance.
The council's own Flood risk page still links the March 2008 SFRA; the October 2018 report and its 2021 addendum are the current versions, and they are what our assessments cite.
The council's planning application checklists: last updated February 2022
The council's planning application checklists (its validation list) were first adopted on 1 March 2008, and the page records that "The latest update was undertaken on 18 February 2022". That is more than two years ago, so their local items are the council's published guidance rather than requirements it can refuse to register an application over. They remain what the validation team looks for, and the flood and drainage items are short:
- Full applications. A flood risk assessment if the site is in a flood risk area, and a sustainable drainage report for a major application (full application checklist).
- Householder applications. A flood risk assessment only within a flood risk zone, with the Environment Agency's standing advice as the reference (householder checklist).
- Outline, reserved matters and conditions. A flood risk assessment where the site is in a flood risk zone, or as the outline decision notice requires.
The checklists are narrower than the policies. They say nothing about the Surface Water Flood Zones, past local flooding or the SuDS details DM43 asks of minor schemes, yet the planning officer weighs all three. A minor application that arrives without them can be registered and then stall at the drainage stage. Our article on invalidated planning applications covers how flood and drainage gaps hold applications up.
What the city checks as Lead Local Flood Authority
The council's drainage rules sit in SPD16 Sustainable Drainage, in force since 26 September 2019, and on its sustainable drainage page. The SPD lists national standards (its NS items) alongside local guidance (its LG items); several of the local items are recommendations rather than rules, and the table keeps that distinction.
| Topic | What the council expects | Source |
|---|---|---|
| Major schemes | A detailed drainage strategy, reference to the technical standards and a maintenance plan for the life of the development, unless agreed otherwise at pre-application stage | Council SuDS page |
| Minor schemes | No full drainage strategy, but applicants are encouraged to show the SuDS hierarchy was considered and that the development is not at risk of flooding up to the 1% annual chance storm with climate change | SPD16 section 5.4 (2019) |
| Small flows | Where the calculated peak runoff is under 5 l/s, discharge restricted as close to it as reasonably practical (LG6) | SPD16 (2019) |
| Brownfield sites | Peak runoff as close as reasonably practical to greenfield; "A reduction in peak runoff rate of at least 50% should normally be achievable" (LG14) | SPD16 (2019) |
| Climate change | SPD16 recommends at least 30% and ideally 40% on peak rainfall (LG10); the Environment Agency's climate change allowances (last updated 27 May 2022) are now the national reference | SPD16 (2019); GOV.UK |
| Infiltration | Base at least 1 m above the highest expected groundwater (LG11), treatment first (LG3), BRE 365 tests in superficial deposits (LG7) | SPD16 (2019) |
| Basements | None where groundwater has emerged (LG16); basement dwellings not normally permitted in Surface Water Flood Zone a (LG17) | SPD16 (2019) |
| Outfalls and third-party sewers | Treatment on new sea outfalls (LG1); evidence of Southern Water's agreement in principle to a sewer connection is strongly encouraged (LG5) | SPD16 (2019) |
| Maintenance | Named responsible parties and a maintenance schedule (LG23) | SPD16 (2019) |
Two points date the guidance. The council's SuDS page still refers to the non-statutory technical standards of 2015, whereas NPPF F8 now asks for SuDS designed to the National Standards for Sustainable Drainage Systems; we found no council statement on how it is applying them, so our strategies show compliance with both. And SPD16's 30% and 40% figures predate the current allowances, which is why our calculations use the Environment Agency's figures and report the SPD16 check alongside.
Infiltration is the first question on chalk. Our ground conditions and soakaway map shows the geology under a site, the BRE 365 infiltration rate calculator turns soakage test results into a design rate, and our note on when infiltration testing is needed covers timing. What changed nationally in 2025 is in our guide to the National Standards.
NPPF Chapter 18 as it applies in Brighton & Hove
National policy is in Chapter 18 of the August 2026 NPPF (policies F1 to F9), with the Planning Practice Guidance on flood risk and coastal change (last updated 17 September 2025). The policies that bear on a city application:
- F4: when an assessment is needed. All development in Flood Zones 2, 3a and 3b; in Flood Zone 1, sites of 1 hectare or more, land with critical drainage problems, and land the SFRA or the Flood Map for Planning shows at risk from any source now or in future. The 2018 SFRA's Surface Water Flood Zones fall under that last limb. F4 applies to householder schemes too.
- F5: the sequential test. Applies to land at risk from any source, with the search no wider than the development's anticipated catchment. Exempt: sites allocated after a sequential test, householder development, non-residential extensions with a footprint under 250 square metres, most changes of use, and the two site-specific exemptions described above.
- F6: the exception test. Only in Flood Zones 2, 3a and 3b, and only where Annex F table 3 calls for it; not needed where the sequential test is not required.
- F7: safe for its lifetime. Safe access and escape as part of an agreed emergency plan, resistance and resilience, and no increase in risk elsewhere.
- F8: sustainable drainage. SuDS designed to the 2025 National Standards, with lifetime maintenance and, for major development, account taken of the Lead Local Flood Authority's advice.
- F9: coastal change. Applies in a Coastal Change Management Area and in other areas likely to be affected by coastal erosion or tidal inundation over the next century. The city's plans designate no such area; on the cliff frontage we prepare flood risk assessments and due diligence reports.
Under NPPF Annex A, plan policies are not given less weight just because they predate the August 2026 Framework; only parts materially inconsistent with its national decision-making policies lose weight. CP11 and DM43 ask for more than Chapter 18 in places, not less, and our reports answer both. Our summary of the August 2026 NPPF changes and our NPPF guidance service cover the national side in more depth.
Groundwater, cloudbursts and the tide: the city's flood risk in brief
The policies above follow the city's ground. Rain runs fast off the Downs and down the dry valleys, groundwater rises through the chalk after long wet winters, and the shingle frontage, the Marina and the harbour face the tide. SPD16 places the city in the top ten Flood Risk Areas in England by the number of people at risk, and the council's notice of its updated local flood risk management strategy says more than 46,000 residents live in areas surface water flooding could affect. Consultation on that strategy closed on 27 September 2026, and the council's flood policy pages do not yet carry a final version.
The places, events and rules street by street are on our page on flood risk assessment in Brighton & Hove, with the wider county on our East Sussex and Sussex pages. No main river crosses the city, so the Environment Agency's zones show only the tidal risk; check a postcode on our flood risk map, and our guide to groundwater flood risk in planning applications covers the risk the map does not show.
Reports we prepare for applications to Brighton & Hove City Council
An assessment of flood risk, a sequential test and a drainage strategy answer different questions, and a city application often needs more than one: CP11 asks whether the site is safe, F5 whether it should be there at all, and DM43 where its water goes. Unda Consulting Limited, a CIWEM Business Partner, prepares these reports for Brighton & Hove applications, and a chartered consultant writes each one.
- Starting point. With the SFRA's Surface Water Flood Zones spread across the valleys, many sites need a flood risk assessment even though the Flood Map for Planning shows Flood Zone 1.
- Planning applications. CP11, DA2 and SH6 all ask for a site-specific assessment, which is the flood risk assessment for planning we write to the 2018 SFRA.
- Buying in the valleys or on the front. A purchaser of a basement flat in Patcham or a Marina flat can commission a flood risk survey for property purchase that looks at the building itself.
- Sites on land at risk. Where F5 applies and no exemption fits, the sequential and exception test sets out the search and, in Flood Zones 2 and 3, the exception case.
- Major schemes. The council's SuDS page asks every major application for a detailed drainage strategy with a lifetime maintenance plan.
- DM43 on smaller schemes. Because DM43 covers every new building and area of hard standing, a surface water drainage strategy shows the runoff reduction SPD16 looks for.
- After permission. Where SuDS details are left to a condition, discharge of drainage conditions supplies the calculations and maintenance plan the council signs off.
- Basements and soakaways on chalk. DM43 and SPD16 LG11 and LG16 turn on groundwater levels, which a groundwater flood risk assessment sets for the site.
- Marina, seafront and harbour homes. SH6 asks for an emergency strategy and DM39, where a scheme needs enhanced coastal defences, for tidal escape routes where appropriate, which a flood warning and evacuation plan provides.
- Sewer capacity. DM42 asks applicants to show capacity or phasing with Southern Water, which a foul drainage strategy records.
Other councils' flood and drainage requirements are set out on our local authorities hub.
Questions about Brighton & Hove City Council's flood and drainage rules
Does a Flood Zone 1 site in Brighton & Hove need a flood risk assessment?
Often it does. The 2018 SFRA asks for an assessment for any development or change of use in its Surface Water Flood Zones, and NPPF F4 covers Flood Zone 1 land the SFRA shows at risk from any source, as well as sites of 1 hectare or more. Policy CP11 adds sites that have flooded before. Ring 01293 214444 with the address and we will say which applies.
What does Policy DM43 (Sustainable Drainage) require in Brighton & Hove?
DM43 in City Plan Part Two (October 2022) requires SuDS on all new buildings, car parking and hard standing that reduce the surface water leaving the site unless that is not reasonably practicable, with SuDS details and whole-life maintenance submitted with the application. It also refuses basements, tanks and underground car parks where groundwater has emerged before.
Can I build a basement in Patcham or Preston Park?
Possibly not. DM43 does not permit subterranean development where there is a history of groundwater emergence or other flooding, and SPD16 guidance LG17 says basement dwellings will not normally be permitted in Surface Water Flood Zone a. The groundwater record for the street has to be checked before the design is fixed.
Is the South Downs National Park Authority the planning authority for every Brighton & Hove site?
No. It decides applications only on land inside the National Park, such as Stanmer and the downland fringe, using South Downs Local Plan Policies SD49 and SD50. Everywhere else the city council decides, and the city council is the flood authority on both sides of the Park boundary.
Does a householder extension in Brighton & Hove need a drainage strategy?
Not a full one. SPD16 reserves the full drainage strategy for major schemes, and the householder checklist asks for a flood risk assessment only within a flood risk zone. DM43 still covers new buildings and hard standing, so plans that show where roof and paving water goes save questions later.
Is the 2018 SFRA still the current one?
Yes. The October 2018 Level 1 and Level 2 SFRA by JBA Consulting, with its addendum of 31 March 2021, is the latest the council has published. The council's Gateway 1 summary for the new City Plan lists flood risk among the evidence still to be gathered.
Applying to Brighton & Hove before the new City Plan?