Flood Risk Assessment in East Sussex
Contact Us
A flood risk assessment in East Sussex starts with the ground under the site, because East Sussex County Council sorts the whole county into four drainage risk areas: steep sandstone and chalk where water runs off fast, Wealden clay that will not soak it away, and coastal marsh and river floodplain where the water table sits close to the surface. Across the county we write flood risk assessments for planning applications, house purchases, mortgages and insurance, together with sequential and exception tests and surface water drainage strategies.
East Sussex here means the ceremonial county: Eastbourne, Hastings, Lewes district, Rother and Wealden, under the county council, plus the City of Brighton and Hove. Seven planning authorities decide applications across it, so a scheme at Hailsham, Seaford, Crowborough or Rye can meet different flood and drainage policies from one a few miles away. The ten towns and coastal places with their own pages are linked further down.
Seventy-eight Environment Agency flood warning and alert areas cover East Sussex, from the groundwater alerts at Patcham in Brighton to Rye Harbour, and they are split between two of the Agency's area teams.
To talk an East Sussex site through with one of our consultants, call 01293 214444 or email enquiries@unda.co.uk. Reports for sites in East Sussex come from Unda Consulting Limited, a CIWEM Business Partner.
Which drainage risk area is your East Sussex site in?
The county council's Local Flood Risk Management Strategy maps four drainage risk areas, drawn from surface water risk, groundwater, water table depth and how freely the ground drains. Each comes with standing advice that the lead local flood authority uses when it reads a drainage strategy, so knowing the area is the quickest way to know what a site will be asked for. The 2016-2026 strategy still applies while the council reviews responses to its draft strategy for 2027 to 2037, consulted on until 18 October 2026.
| Area | Ground and water table | Typical places | What the county expects |
|---|---|---|---|
| Drainage risk area 1 | High Weald sandstones and South Downs chalk; deeper water table; infiltration likely to work | Crowborough, Heathfield, Forest Row; the dry valleys under Seaford and Peacehaven | Runoff better than greenfield, evidence of the effect on the wider catchment, planned maintenance against fine sediment, and a full treatment train before water enters the chalk |
| Drainage risk area 2 | Wadhurst, Weald and Gault clays on the lower slopes of the central belt | Battle, much of Hailsham, Barcombe, Icklesham | Infiltration only with rigorous site testing; runoff controlled at source; an outfall and downstream capacity secured before the layout is fixed |
| Drainage risk area 3 | Low Weald clay, coastal marsh and river sediments; shallow water table | Rye, Pevensey Bay, Eastbourne, Ditchling, Northiam, Newick | Soakaways likely to be ruled out across most of the Low Weald and the marshes; swales and basins instead; any watercourse or culvert crossing the site traced and its condition known |
| Drainage risk area 4 | Alluvium, storm beach and tidal mudflat; the water table rises with the tide | Eastbourne, Rye and Camber seafronts; Lewes, Ringmer and Alfriston on the floodplains | Robust proof before any infiltration, underground storage built to resist groundwater, and attenuation half empty 24 hours after a storm |
These are strategic zones. The council still expects site surveys to confirm what will work on a given plot. Hastings is mapped ward by ward because its faulted clays and sandstones change within a street. Our ground conditions and soakaway map gives an early view of the geology under a postcode before any trial pit is dug.
Checking a postcode against the flood zones in East Sussex
The map below outlines the county. Put in a postcode to see the Environment Agency's river and sea, surface water and reservoir mapping and the planning flood zones, or use our full flood risk map for the same layers with climate change projections.
Flood Zones 2 and 3 cover the Ouse and Uck valleys, the Cuckmere, the Rother levels, the Pevensey Levels and the low coastal frontage; the High Weald ridges are largely Flood Zone 1. The national map ignores groundwater and leaves out the defences, so a Zone 1 result on the clay or a Zone 3 result behind a sea wall still needs reading against the site's levels.
Seven planning authorities, two lead local flood authorities
East Sussex County Council is the lead local flood authority for its five districts and reviews surface water on major applications; Brighton and Hove City Council does the same job for the city. Planning decisions sit with the district or borough council, or with the South Downs National Park Authority inside the park, which covers about 14% of the county council's area. Since 1 April 2026 the park authority handles all planning for the park parts of Lewes and Eastbourne itself, Lewes town included.
| Planning authority | Where | Plan in force and its flood policy | New plan, October 2026 | SFRA |
|---|---|---|---|---|
| Wealden District Council | Uckfield, Hailsham, Crowborough, Heathfield, Polegate, Pevensey Bay | Core Strategy 2013 (no separate flood policy) and saved 1998 Local Plan policies | Proposed submission plan to 2042, comments closing 2 November 2026; proposes CC7 Managing Flood Risk and CC8 Sustainable Drainage | North Wealden Level 1 (March 2026), the Eastbourne and southern Wealden Level 1, and a Level 2 (July 2026) |
| Rother District Council | Bexhill, Rye, Battle, Robertsbridge, Camber, Winchelsea Beach | Core Strategy 2014 EN6 and EN7; Development and Site Allocations Plan 2019 DEN5 Sustainable Drainage | Proposed submission plan 2025-2042, comments 12 October to 24 November 2026 | Level 1 and Level 2, JBA, 2026 |
| Hastings Borough Council | Hastings and St Leonards-on-Sea | Planning Strategy 2014, Policy SC7 Flood Risk | Proposed submission plan 2023-2041, comments 1 October to 12 November 2026 | Level 1, AECOM, September 2026 |
| Eastbourne Borough Council | Eastbourne, Langney, Sovereign Harbour | Core Strategy 2013, D9 Natural Environment and D11 Eastbourne Park (the flood storage lakes), with saved Borough Plan policies | Proposed submission plan 2025-2042, comments 2 October to 13 November 2026 | Level 1 for Eastbourne and southern Wealden, JBA, March 2025 |
| Lewes District Council | Newhaven, Seaford, Peacehaven, Telscombe, Ringmer | Joint Core Strategy 2016, Core Policy 12, and the Part 2 plan of 2020 | New Lewes Local Plan at its second draft stage, consultation closed February 2026 | Level 1, AECOM, December 2024, and Level 2, December 2025 |
| South Downs National Park Authority | Lewes town, Alfriston, Glynde, the downland between Brighton and Eastbourne | South Downs Local Plan 2019, SD49 Flood Risk Management and SD50 Sustainable Drainage Systems | Review plan consulted May to June 2026; decision on submission due 8 December 2026 | Level 1, JBA, January 2025 |
| Brighton and Hove City Council (also LLFA) | Brighton, Hove, Portslade, Rottingdean, Saltdean | City Plan Part One 2016, CP11 Managing Flood Risk; Part Two 2022, DM43 Sustainable Urban Drainage | New City Plan at its scoping stage, autumn 2026 | Level 1 and 2, JBA, 2018, with a 2021 addendum |
Four of those authorities have plans out for their final round of comment this autumn, and each proposes new flood and drainage wording, so an application decided in 2027 may be judged against policies that do not yet carry full weight today. National policy is chapter 18 of the NPPF, explained in our NPPF flood risk guidance.
In July 2026 the Government chose to replace the two-tier system with two unitary councils, moving Peacehaven, Telscombe and East Saltdean into an enlarged Brighton and Hove, but on 7 September it paused that decision for review. Until anything changes, the county council and the districts above remain the flood and planning authorities.
The county council's drainage rules for East Sussex sites
Since June 2025 the county council has expected every application to show how it meets the national standards for sustainable drainage, ideally with a one-page summary taking each standard in turn. Its local requirements then go further than the national standards in five ways.
- Five metres from any watercourse. No development within 5 m of the top of bank of an ordinary watercourse or the edge of a culvert, and the wider buffer where another policy asks for more.
- A winter of groundwater readings. Monitoring over six winter months, October to March by preference or November to April, at the places the drainage will actually go.
- Deep-bored soakaways last. Only where the ground suits, no deeper than soakage needs, with two SuDS treatment stages upstream and at least 10 m between the base and the highest recorded winter groundwater.
- Greenfield or better on steep ground. In drainage risk area 1 the council expects runoff to improve on the greenfield rate, because water off the High Weald and the Downs reaches the towns below quickly.
- Ordinary watercourse consent. Works in or over an ordinary watercourse outside a drainage board district need the county's consent, applied for separately from planning.
The winter window sets the programme. A site surveyed in spring may wait until the following autumn for its first reading, as our note on groundwater monitoring for planning explains. Inside the Pevensey Levels catchment, Rother and Wealden's draft plans both go further and ask for three treatment stages rather than two.
Planning a site on East Sussex clay or chalk?
Send us the address and the layout. We will say which drainage risk area applies, whether a winter of groundwater monitoring is needed, and quote a fixed fee, free and with no obligation; one of our experienced flood risk consultants will reply within 60 minutes.
Start a QuoteHailsham, Polegate and the culverts of the Low Weald
Hailsham has its own area page, and the county strategy names it as a focus for growth and lists it with Eastbourne and Hastings for surface water risk. Most of the town is drainage risk area 2 or 3: clay that will not take a soakaway, and old watercourses piped under twentieth-century estates.
Heavy rain on 8 January and through August 2015 flooded four homes inside and the gardens of seven more in the north-east of the town. The county's Section 19 investigation for Hailsham traced one cluster to a blocked culvert entrance that riparian owners were meant to keep clear, and the other to a watercourse culverted and piped over the twentieth century with too little capacity at key points.
Our 130-home scheme on clay farmland near Hailsham shows what this means in practice: soakage tests failed, groundwater was struck 0.73 m below ground, and the county withdrew its objection once groundwater modelling had set a wet-winter water table for the storage. Polegate, Willingdon and Stone Cross share the same clay, with the Polegate and Wannock streams and Langney Haven carrying their own Environment Agency warnings, and the Pevensey Levels beyond have a page of their own.
Seaford, Peacehaven and the dry valleys of the Downs
On the chalk west of Beachy Head, Seaford, Peacehaven and Telscombe were built along dry valleys that still carry storm water. The strategy puts them in drainage risk area 1, where the ground drains well but the slopes send overland flow down the old valley floors into the streets.
Brooklyn Road in Seaford shows what that means. Floods there in May and August 2006, August 2015 and July 2019 led to a Section 19 investigation of Brooklyn Road, which counted 34 properties flooded inside or in their curtilage. The Lynn Brook that once drained the valley has been lost under housing, the railway embankment dams the flow path short of the sea, and a 1-in-6-year storm overwhelmed the pumping station in 2019.
Seaford also faces the sea: the town and seafront each have an Environment Agency warning area, and the shoreline plan holds the line there in every epoch. Peacehaven is held until 2055, while the cliffs at Telscombe are left to natural processes. Newhaven, between them, has its own page.
Rivers, the sea and the two Environment Agency teams
The Environment Agency covers East Sussex from two area offices, and which one a site falls under decides whose model data and whose officers an assessment deals with. Of the 78 warning and alert areas touching the county, 58 belong to Solent and South Downs and 20 to Kent, South London and East Sussex.
- Solent and South Downs. The Sussex Ouse and the River Uck, the Cuckmere and Bull River at Hellingly, Langney Haven, the Combe Haven and Hastings' streams, every seafront from Brighton Marina to Hastings and Bulverhythe, the Pevensey Levels, and groundwater at Patcham and Denton.
- Kent, South London and East Sussex. The Eastern Rother, which rises near Mayfield, at Etchingham and Robertsbridge, the Brede and Tillingham, Rye and Rye Harbour, Winchelsea Beach and Pett Level, the coast from Fairlight to Dungeness, and the Medway headwaters at Forest Row.
- Three drainage boards. The Pevensey and Cuckmere Water Level Management Board on the Levels and the Cuckmere, the Romney Marshes Area Internal Drainage Board from Cliff End east into Kent, and the Upper Medway board in the north of Wealden. Each has its own consent and its own discharge limits, set out in our guide to why drainage boards matter for planning.
Gauges on the Ouse at Lewes, the Uck at Uckfield and the Rother at Robertsbridge show how fast these clay rivers rise; our live river levels map shows the current readings and any warnings in force. Below Barcombe Mills the Ouse is tidal, and below Scots Float Sluice so is the Rother, so a riverside site near the coast can flood from the river and the sea together.
A coastline managed under two shoreline plans
Beachy Head divides the county's coast between two shoreline management plans. SMP12 runs west through Cuckmere Haven, Seaford, Newhaven, Peacehaven and Brighton and Hove; SMP11 runs east past Eastbourne, Pevensey Bay, Bexhill, Hastings and Rye towards Kent. Each frontage has a policy for the next century, explained in our note on shoreline management plans.
- Held by defences. Seaford, the Brighton and Hove frontage from the Marina to Portslade, Sovereign Harbour, the Pevensey shingle, Bexhill and Hastings are all to be held in every epoch to 2105.
- Left to natural processes. No active intervention at Telscombe Cliffs or on the cliffs between Fairlight Cove and Hastings.
- Proposed coastal change areas. Rother's proposed submission plan would designate its whole coastline as a Coastal Change Management Area, and Hastings' plan proposes one from Fairlight to Glyne Gap. Wealden's plan does not propose one for the Pevensey Bay frontage.
On the coast we prepare flood risk assessments and due diligence reports: the tide levels, sea level rise to 2125, overtopping and what happens if a defence is breached. A site inside one of the proposed coastal change areas should be checked against the draft policy early, because it may limit what can be built at all.
East Sussex flooding recorded since 2000
Most of the dated record comes from the county council's own reports. Towns with their own pages hold their own figures, so this list keeps to the county picture and the places without a page.
- October 2000. Rain over the Weald flooded Lewes and Uckfield on 12 October and almost 100 properties in Robertsbridge, and damage across Sussex was put at about £40 million in Parliament that month. Our article on the Lewes floods 25 years on covers the aftermath.
- November 2000. Groundwater flooding at Patcham, on the chalk north of Brighton; the Brighton and Hove page covers the event.
- May and August 2006. The first recorded floods on Brooklyn Road in Seaford.
- Winters of 2013/14 and 2015/16. Widespread flooding to homes and businesses, and disruption of essential infrastructure, by the county strategy's account.
- January and August 2015. Four homes flooded inside and seven gardens in north-east Hailsham; on 13 August intense rain also flooded properties in Eastbourne.
- July 2019. A storm of about a 1-in-6-year chance overwhelmed the Brooklyn Road pumping station in Seaford.
- 16 January and 28 October 2023. A culverted stream flooded shops and homes in Hastings town centre twice in one year, and the county investigated both.
Apart from October 2000 and the wet winters, every flood on this list came from surface water, groundwater or a blocked or undersized culvert. The planning flood zones show none of those, which is why a Flood Zone 1 site in East Sussex can still need a full assessment of its drainage and groundwater.
Does a flood risk assessment in East Sussex apply to your scheme?
Nationally, a site-specific assessment is needed in Flood Zones 2 and 3, on sites of a hectare or more in Flood Zone 1, on land at surface water risk, and where a change of use makes a building more vulnerable. East Sussex adds local reasons on top.
- Major schemes. Ten homes or more, or 1,000 m2 of new floorspace, bring the county council in as statutory consultee on surface water.
- Watercourses on site. The 5 m buffer and the consent regime apply to every ordinary watercourse, including the field ditches across the Low Weald.
- The Pevensey Levels catchment. Runoff from sites in the Levels' catchment reaches a protected wetland, and inside the drainage board's district its consent is needed as well as planning permission.
- Wealden's draft policy. Proposed CC7 would require a site-specific assessment in Flood Zones 2 and 3, in critical drainage areas and on land at surface water risk.
If the site sits in Flood Zone 2 or 3 the planning authority will also apply the sequential test, and sometimes the exception test, before it looks at the engineering.
Reports we prepare for East Sussex sites, from the High Weald to the shingle
Each of these is a separate piece of work with its own question, and a planning submission often needs two or three of them together.
- Every source together. On a single East Sussex plot a river, the tide, a buried culvert and a high water table can all play a part, and a flood risk assessment weighs them against the site's levels.
- Planning applications. From a Rye barn conversion to a Wealden allocation, a flood risk assessment for planning answers the district's policy and chapter 18 of the NPPF.
- Buying a home. Homes behind the Pevensey shingle, beside the Ouse at Barcombe or in the Rother valley can be flagged by a search or a lender, and a flood risk survey for property purchase explains the flag before exchange.
- Proving no safer site. Where a scheme in Flood Zone 2 or 3 must show that no lower-risk land is available within the district, a sequential and exception test report sets the search area and tests the alternatives.
- Drainage for planning. Where the clay or the water table rules out soakaways, a drainage strategy shows the county where the water will go instead.
- Major schemes. For ten homes or more, a surface water drainage strategy takes the county's national-standards summary, buffers and winter monitoring in turn.
- Conditions after consent. When a pre-commencement condition asks for detailed drainage, discharge of drainage conditions puts the calculations and maintenance plan in front of the council.
- Insurance. Repeated flooding on Brooklyn Road in Seaford and almost 100 properties in Robertsbridge in 2000 are the kind of record a flood risk assessment for insurance puts into context for a broker.
- The coast. Seafront property from Camber to Seaford sits in Environment Agency sea warning areas, and flood risk due diligence sets out the tidal and breach risk before a purchase or a loan.
- Businesses. Shops and offices flooded from a culvert in Hastings town centre in January 2023, and a business continuity flood risk assessment plans for the next time.
- No public sewer. Like the mill site in our case studies, many rural East Sussex plots have no usable public sewer, and a foul drainage strategy sets out treatment and an outfall the drainage board or the Environment Agency will accept.
- Groundwater. Chalk bournes at Lewes and Newhaven and groundwater alerts at Patcham and Denton are why a groundwater flood risk assessment section belongs in many reports here.
- Main rivers. On the tidal Ouse below Barcombe Mills or the Rother below Scots Float Sluice, flood modelling gives design levels where the national mapping is too coarse.
- Safe access. With 46 Environment Agency flood warning areas across the county, a flood warning and evacuation plan shows how occupants get out before the water arrives.
- Land and allocations. Wealden's Level 2 SFRA screened 45 possible allocations and examined 31 in detail, and a flood risk feasibility study tests a site before money is committed.
East Sussex towns and rivers with pages of their own
These pages go into each place's own rivers, events, policies and boundary. The county is part of our wider Sussex page, and the full list of places sits on our areas page.
- The Ouse valley. Lewes, Uckfield and Newhaven, with the River Ouse and River Uck pages.
- The city. Brighton and Hove, a unitary council and its own lead local flood authority.
- Eastbourne and the Levels. Eastbourne, Pevensey Bay and the Pevensey Levels.
- Hastings and Rother's coast. Hastings, Bexhill and Winchelsea Beach, with the Eastern Rother page.
- Over the county line. West Sussex, Haywards Heath and East Grinstead to the west, and Kent to the east.
Our East Sussex case studies include the Hailsham scheme above and 24 homes on clay with no public sewer on a former mill site, where the only outfall fed a protected wetland and both drainage conditions were discharged.
Flood contacts for East Sussex, from 999 to the drainage boards
In a flood that puts lives at risk, call 999. For everything else, the body depends on where the water comes from.
| Body | Covers | How to reach it |
|---|---|---|
| East Sussex County Council (lead local flood authority) | Surface water, groundwater and ordinary watercourses in the five districts; drainage on major applications; watercourse consent | Report flooding and find the flood team; FRM@eastsussex.gov.uk; 01273 481421 |
| Brighton and Hove City Council (lead local flood authority) | The same duties inside the city | City flood risk pages |
| Environment Agency | Main rivers and the sea; warnings for 78 areas in the county | Floodline 0345 988 1188; flood warnings sign-up; check for flooding in East Sussex |
| Southern Regional Flood and Coastal Committee | Flood and coastal investment from Kent to Hampshire and the Isle of Wight | Southern RFCC |
| Sussex Resilience Forum | Emergency planning by the police, fire, councils and health; its six high-risk areas include Seahaven, Lewes, Uckfield, Pevensey Bay, Hastings and Rye Bay | Sussex Resilience Forum |
| Southern Water | Public sewers and sewer flooding | Southern Water's 24-hour line, on its website |
| Drainage boards | The Pevensey Levels, the Cuckmere and the Rother levels | Pevensey and Cuckmere WLMB; Romney Marshes Area IDB |
| Power cuts | Electricity supply in a flood | 105 |
Signing up for warnings is free, and anyone on the Ouse, the Rother or the coast should do it before buying or building.
What clients ask about East Sussex sites
Do I need a flood risk assessment in East Sussex for an extension or a single new house?
Often, but not always. Nationally a small scheme in Flood Zone 1 with no surface water or other mapped risk needs none, and a minor extension in Zone 2 or 3 can follow the Environment Agency's standing advice. A new house in Zone 2 or 3, on land at surface water risk or close to an ordinary watercourse in East Sussex needs one. Send us the address and the plans and we will tell you which applies before you spend anything.
How do I find out which flood zone an East Sussex site or home is in?
Our flood risk map shows the Environment Agency's planning flood zones and surface water mapping for any East Sussex postcode, and the government's own service shows the long-term risk for an address. Both are screening tools: they leave out groundwater and the effect of defences, so the zone is the start of an assessment, not the answer.
Is my lead local flood authority East Sussex County Council or Brighton and Hove City Council?
It depends which side of the city boundary the site sits. Brighton and Hove City Council is the lead local flood authority inside the city, including Rottingdean and Portslade. East Sussex County Council covers everywhere else in the county, including Peacehaven and Telscombe. The South Downs National Park Authority plans for the park but is not a flood authority.
Why do soakaways fail on so many East Sussex sites?
Because much of the county is Wealden clay, and the marshes and floodplains have a water table close to the surface that rises with the tide. The county council asks for six months of winter groundwater monitoring and BRE 365 testing before it accepts infiltration, and sets a 10 m clearance under any deep-bored soakaway. On the High Weald sandstones and the chalk they can work well.
Will a tidal site in Rye cost more to assess than a Crowborough garden plot?
It will. The fee follows the flood sources at the site, the size of the scheme, and whether the work needs modelling, groundwater monitoring or a drainage strategy alongside, so a Flood Zone 1 surface water check in Crowborough is a smaller job than a tidal site behind the Rye defences. We quote a fixed fee for the whole piece of work, free and with no obligation.
Can you assess a site on the East Sussex coast behind the sea defences?
Yes. We assess present and future tide levels, sea level rise, wave overtopping and what happens if a defence fails, and we prepare due diligence reports for coastal property. If a site falls inside one of the coastal change areas now proposed by Rother or Hastings, check the draft policy first, because it may rule out new homes there.
How can I check an East Sussex home for flood risk before I buy it?
Start with the free map and the government's long-term flood risk service, then look at whether the house sits in an Environment Agency warning area. If a search or a lender flags a risk, a flood risk survey for property purchase looks at the actual building, its floor level and its history, and says whether the flag matters.
Which documents get a flood risk assessment in East Sussex under way?
The site address or a location plan, the proposed drawings, and the planning reference if there is one, along with any letter from the council, the Environment Agency or the lead local flood authority. Send them through the quote form and we will come back with a fixed fee and what the report will cover.
Can I write the flood risk assessment for my East Sussex application myself?
For a minor extension under standing advice, sometimes. Anything larger has to deal with modelled flood levels, climate change allowances and, in East Sussex, drainage evidence the county council reviews in detail. A thin report invites an objection, and answering one costs more time than getting the report right first.
Will local government reorganisation change who I deal with in East Sussex?
Not yet. The Government's plan for two unitary councils was paused in September 2026 for a review, so East Sussex County Council and the five district and borough councils remain the flood and planning authorities. If the structure changes, the adopted plans stay in force until replaced.
Which East Sussex authority will read your report?
Tell us the address and what is planned, and we will name the council, the plan and the drainage risk area that apply. The quote is a fixed fee, free and with no obligation, and one of our experienced flood risk consultants will get back to you within 60 minutes.
Start a QuoteFor a site anywhere between Forest Row and Camber, call 01293 214444 or email enquiries@unda.co.uk and one of our consultants will talk it through with you.