Flood Risk & Drainage Requirements for Lewes District Council
Contact Us
Lewes District Council decides planning applications only in the part of its district outside the South Downs National Park: Newhaven, Seaford, Peacehaven, Telscombe and the Low Weald villages such as Ringmer, Newick, Barcombe Cross and Plumpton Green. Its flood and drainage rules come from Core Policy 12 of the 2016 Core Strategy, Policy DM22 of the 2020 site allocations plan and a validation list dated April 2021. East Sussex County Council checks drainage on major schemes. A new Local Plan was paused before Regulation 19 in October 2026, so its draft flood policy W1 carries little weight.
Below are the flood risk and drainage requirements of Lewes District Council, policy by policy. Each is quoted, dated and linked to the council's own document, with what our reports contain to meet it. Lewes town itself is not on this list: it lies inside the National Park, where the South Downs National Park Authority decides applications under its own plan. The council's evidence comes from its December 2024 strategic flood risk assessment and the Level 2 study published in December 2025.
Who decides what on a flood or drainage question in Lewes District
Five public bodies appear in the table, and the boundary of the National Park decides which planning authority is in charge. For a site on the edge of the park, check the boundary on the council's policies map before anything else, because the two authorities apply different plans and a different validation list.
| Body | Area or role | What it decides or is consulted on |
|---|---|---|
| Lewes District Council | Planning authority for the district outside the National Park | Decides applications under the Core Strategy (2016), the Local Plan Part 2 (2020) and made neighbourhood plans; validates them against its April 2021 validation list |
| South Downs National Park Authority | Planning authority inside the park, including Lewes town, Kingston near Lewes and Glynde | Decides applications under the South Downs Local Plan (2019); since 1 April 2026 it runs that planning work itself rather than through the district council (SDNPA notice) |
| East Sussex County Council | Lead local flood authority for the whole district | Statutory consultee on surface water for major applications (county guidance for developers); consents works to ordinary watercourses |
| Environment Agency | Main rivers, including the Ouse (tidal up to Barcombe), and the sea | Consulted on flood risk in Flood Zones 2 and 3; runs the Newhaven defences and flood warnings; issues flood risk activity permits for works near a main river or sea defence |
| Southern Water | Public sewers and wastewater treatment | Consulted where a scheme connects to the public sewer; LPP2 allocations require connection at the nearest point of adequate capacity |
No internal drainage board was found covering the council's planning area. The 2024 Level 1 SFRA names none among the bodies it consulted, and ditches and streams outside the main rivers fall to the county council. Where a site straddles the park boundary, the same application goes to both planning authorities. Our local planning authorities explainer covers how the two roles split elsewhere, and the lead local flood authority guide sets out the county's part.
Lewes District Council's flood and drainage policies: Core Policy 12, DM22 and the Newhaven allocations
The council's adopted plan is in two parts. The Joint Core Strategy, adopted on 11 May 2016, holds the one policy written for flooding, Core Policy 12. The Local Plan Part 2, adopted on 24 February 2020, adds no flood policy of its own. It does carry Policy DM22 on groundwater and water quality, and its Newhaven allocations set flood and drainage conditions site by site. The table lists each policy with the source document and its date.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| CP12 | Flood Risk, Coastal Erosion, Sustainable Drainage and Slope Stability | Development steered away from flood risk where possible; national sequential and exception tests where relevant; safe development and access; no increase in surface water runoff; SuDS unless shown not technically appropriate; no development on unstable or eroding coast | Show the site and its access are safe, that runoff does not rise, and how SuDS work or why they cannot | A flood risk assessment and a drainage strategy that answer parts 1, 2, 3 and 5 in turn | Joint Core Strategy, Core Policy 12; adopted 11 May 2016 |
| CP10 | Natural Environment and Landscape Character (part 4) | Water quality improved or maintained, including during construction; watercourses and groundwater flows protected from encroachment | Keep development back from watercourses and show pollution control through construction | SuDS treatment stages, buffers to watercourses and a construction-phase drainage note | Joint Core Strategy, Core Policy 10; adopted 11 May 2016 |
| DM22 | Water Resources and Water Quality | No unacceptable risk to surface water or groundwater quality and quantity; no harmful change to water levels; work beneath the water table only with an agreed groundwater management scheme | Where foundations, basements or soakaways reach the water table, a groundwater management scheme | Groundwater monitoring results and a dewatering and management plan inside the FRA or drainage strategy | Local Plan Part 2, Policy DM22; adopted 24 February 2020 |
| NH02 | Land at The Marina (West Quay, Newhaven) | An appropriate standard of flood protection, including safe access, and provision for future maintenance, to be agreed with the Environment Agency | Agree defence levels, access and maintenance with the Environment Agency | A site-specific FRA with breach and overtopping levels, safe access and a maintenance plan | Local Plan Part 2, Policy NH02; adopted 24 February 2020 |
| NH01 | South of Valley Road, Newhaven | Surface water drainage mitigation agreed with the relevant body and the council; sewer connection at the nearest point of adequate capacity | Deal with the overland flow route on the northern boundary | Flow-route mapping, a layout that keeps the route open and a surface water drainage strategy | Local Plan Part 2, Policy NH01; adopted 24 February 2020 |
| W1 (proposed, Regulation 18) | Flood Risk and Flood Management | Preference for land at no flood risk; safe development with resilience and safe access; sequential and exception tests; SuDS on all new development to ESCC guidance | Weighed as a draft policy of a plan paused before Regulation 19 in October 2026 | Reports already work to W1's points, which add little beyond CP12 and NPPF Chapter 18 | Regulation 18 Phase 1 consultation document, January to February 2025 |
| CC7 and CC8 (proposed, Regulation 18) | Coastal Change Management Areas; Coastal Vulnerability Areas | No new homes in a coastal change management area; development in a vulnerability area only with a coastal change vulnerability assessment and possibly a temporary permission | Areas not yet mapped; weighed as draft policies of a paused plan | Flood risk assessment of tidal and wave overtopping risk on the coast | Regulation 18 Phase 1 consultation document, January to February 2025 |
Requirements checked November 2026.
Policy CP12 (Flood Risk, Coastal Erosion, Sustainable Drainage and Slope Stability): how the council applies it
Core Policy 12 is the flood and drainage test for every application to Lewes District Council, and the 2021 validation list cites it for flood risk assessments, sequential tests and drainage strategies. Its first part reads: "Steering development away from areas of flood risk (as identified in the latest Environment Agency and SFRA flood risk and climate change maps) where possible. Development in areas of flood risk will be required to meet the national Sequential and Exception tests, where relevant." (Joint Core Strategy, p.124)
Part 2 asks applicants, where a site-specific assessment is needed, to "demonstrate that the development and its means of access will be safe from flooding without increasing the risk of flooding elsewhere". Part 3 asks for protection, resilience, resistance and mitigation suited to the site. Part 5 is the drainage test: "ensuring there is no increase in surface water run-off from new developments. This will include requiring new development to incorporate Sustainable Drainage Systems (SuDS), unless it is demonstrated that SuDS are not technically appropriate." Parts 6 and 7 deal with the coast. Development stays off undeveloped coastline unless it needs a rural coastal location, passes the sequential test and has no other adverse impacts, and off unstable coast and land at risk of erosion or slope failure.
Because the policy points to "the latest" SFRA maps, the December 2024 Level 1 study now sets the flood extents it refers to, including the climate change extents and the functional floodplain. The supporting text (paragraph 7.111) adds that drainage must follow the national hierarchy of options. It also needs a maintenance schedule naming who maintains it and how that is funded, secured by condition or legal agreement.
Our flood risk assessments for the district take CP12 in order. They start with the flood zone and the SFRA's climate change extent, move to safe access along the route out and the resistance and resilience measures, and end with the effect on others. The drainage strategy then shows runoff before and after, the SuDS chosen and the maintenance body, so part 5 and the supporting text are answered in one place.
Policy DM22 (Water Resources and Water Quality): groundwater under the chalk and the Low Weald
Policy DM22 bars development that would cause "unacceptable risk to the quality and quantity of surface and groundwater (including reservoirs)" or harmful changes to water levels, and it adds: "Work beneath the water table will not be permitted unless there is a comprehensive groundwater management scheme agreed for the construction, operation, restoration and on-going management of the proposal." (Local Plan Part 2, p.95)
The policy matters most in two places. One is the chalk behind Newhaven, Seaford and Peacehaven, where public water is drawn from the aquifer. The other is the Low Weald villages, where groundwater can reach the surface around the Bevern and Longford Streams. Supporting paragraph 4.67 asks applicants to consider effects on groundwater recharge, flows and levels and to discuss works that may reach the winter water table with the Environment Agency. The 2021 validation list cites DM22 alongside CP12 as a policy behind its drainage strategy requirement.
Where a soakaway, basement or deep foundation is planned, our report gives the groundwater evidence, winter monitoring results where the county asks for them, and the dewatering and long-term management that DM22 calls a groundwater management scheme.
Policy CP10 (Natural Environment and Landscape Character): the watercourse clause in part 4
Part 4 of Core Policy 10 asks that "watercourses (including groundwater flows) are protected from encroachment and adverse impacts" and that water quality is kept or improved during construction (Joint Core Strategy, p.119). It sits beside East Sussex County Council's 5 m buffer from the top of bank of an ordinary watercourse. Our drainage strategies show the buffer on the layout, the treatment stages before any discharge, and the measures that keep silt out of the stream while the site is built.
Policy NH02 (Land at The Marina) and Policy NH01 (South of Valley Road): the Newhaven allocations
Policy NH02 allocates 4.5 ha at The Marina, also called West Quay, for about 300 homes, and criterion d) reads: "New development must include an appropriate standard of flood protection (including safe access to the site), and provision for future maintenance, to be agreed with the Environment Agency". Paragraph 2.32 adds that the site is at risk of flooding. Policy NH01 allocates 0.72 ha south of Valley Road for about 24 homes; it is in Flood Zone 1, but paragraph 2.29 notes "a major overland flow route, along the site's northern boundary", and criterion c) asks for surface water drainage mitigation agreed with the relevant body and the council (Local Plan Part 2, pp.20-22).
For The Marina, the assessment work goes into the defence standard, residual risk behind the Environment Agency's defences, finished floor levels and the route out. At Valley Road it goes into keeping the flow route open through the layout.
Neighbourhood plans add their own clauses. The Newhaven Neighbourhood Plan (made in 2019) asks that housing sites at Eastside within Flood Zones 2 and 3 "include a site Flood Risk assessment with each planning application and consider the Neighbourhood Plan sequential test" (Policy H3, criterion 8), and that the Robinson Road depot assessment attends to "floor levels, access, egress, safe refuge and flood protection scheme" (Policy H4). The council's February 2026 Local Development Scheme lists eight made plans, and the Peacehaven and Telscombe plan was made on 26 May 2026. Check the plan for your parish before a scheme is drawn up.
The new Lewes Local Plan: draft W1, CC7 and CC8, paused before Regulation 19
The council is preparing a new Local Plan for its area outside the National Park. It has consulted under Regulation 18 four times since 2021. The two most recent were on draft policies in January and February 2025, and on a spatial strategy and site allocations from 18 December 2025 to 28 February 2026 (Phase 2 consultation). Its February 2026 Local Development Scheme set Regulation 19 for summer 2026 and submission in winter 2026. That did not happen. On 1 October 2026 the council's Cabinet paused progress to Regulation 19 for a time-limited review against the August 2026 NPPF and local government reorganisation, with a further report promised (Cabinet decision, effective 7 October 2026).
Until the plan is examined and adopted, Core Policy 12, DM22 and the Part 2 allocations remain the adopted policies. A draft that has not reached Regulation 19 carries limited weight, and no Regulation 19 consultation or notice of a plan under the 2026 plan-making regulations had been published by 19 November 2026.
Proposed Policy W1 (Flood Risk and Flood Management): what the Regulation 18 draft would add
Draft Policy W1, from the January 2025 Regulation 18 document, would require that "All new developments must provide Sustainable Drainage Systems (SuDS) suitable to the proposal and its location, unless there is clear evidence that this would be inappropriate. SuDS must be designed with reference to the latest East Sussex County Council's guidance." It would also make flood resilience and resistance strategies a requirement in areas at risk, with safe access and escape routes "where appropriate" (Regulation 18 Phase 1 document, p.82).
The draft lists Core Policy 12 as the existing policy it builds on. The Phase 2 site allocations of December 2025 refer back to draft W1 for their assessment and drainage requirements. On the Newhaven sites these include floor levels above the design flood event plus a minimum 300 mm freeboard. If the plan returns after the review, draft W1 is the policy to watch. For now an application answers CP12, and a report written to CP12 and NPPF Chapter 18 already covers what the draft asks.
Proposed Policies CC7 and CC8 (coastal change): the Regulation 18 drafts for Peacehaven and Seaford
The same Regulation 18 draft proposed coastal change management areas (draft CC7), in which "New residential development will not be permitted", and wider coastal vulnerability areas (draft CC8), where development would need an assessment of coastal change and might be limited to temporary permissions. The council said further evidence "may be required" before defining either area, and none has been adopted. On the coast today, Core Policy 12 parts 6 and 7 and NPPF F9 apply.
Local government in East Sussex may also change. On 29 October 2026 the Government said it is minded to implement the East Sussex councils' joint proposal, with Brighton and Hove's boundary changes moving East Saltdean, Telscombe Cliffs and Peacehaven into the city. It called this a provisional view, not a final decision (council update). Lewes District Council remains the planning authority in the meantime, and our Brighton and Hove page covers the city's own requirements.
Applying to Lewes District Council near the Ouse or the coast?
Send us the address and what you plan to build. We will check which side of the National Park boundary the site sits, which parts of Core Policy 12 apply and what East Sussex County Council will want to see on drainage. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.
Start a QuoteLewes District's April 2021 validation list and NPPF Chapter 18: the triggers for each report
The council's local validation list is dated 28 April 2021 and was approved for use by Cabinet on 10 June 2021. It is still the list linked from the council's apply for planning permission page. At more than two years old, its local items count as the council's published guidance, not requirements it can enforce at registration. NPPF Chapter 18 also sets several triggers more widely than the list does, as the table shows.
| Trigger | What is needed | Source |
|---|---|---|
| Site in Flood Zone 2 or 3 (any size) | Site-specific flood risk assessment | Validation list (April 2021); NPPF F4(1); CP12 part 2 |
| Site over 1 ha in Flood Zone 1 (the list); a hectare or more under NPPF F4(2)(a) | Site-specific flood risk assessment | Validation list; NPPF F4(2)(a) |
| Flood Zone 1 land with critical drainage problems identified by the Environment Agency, or land an SFRA or the Flood Map for Planning shows at risk from any source now or in the future | Site-specific flood risk assessment (the validation list does not name these; NPPF F4(2)(b) and (c) do) | NPPF Chapter 18, F4 |
| Major schemes in Flood Zones 2 and 3, the list's own threshold | Sequential test (validation list item) | Validation list; CP12 part 1 |
| Any development in an area at risk from any source now or in the future, unless exempt | Sequential test under F5; exempt are plan allocations tested at plan-making, sites where the FRA shows no built development (including access or escape routes, land raising or other potentially vulnerable elements) on land at risk from any source now and in the future, surface-water-only sites where occupiers stay safe without increasing flood risk elsewhere, householder development, small non-residential extensions under 250 m², and changes of use other than to caravan, camping, chalet, mobile home or park home sites | NPPF F5(2) |
| Flood Zone 2, 3a or 3b where Annex F table 3 requires it | Exception test (not where the sequential test is not required, nor on a site allocated after the exception test was applied at plan-making, "unless there has been a significant increase in the risk of flooding to the site subsequently, or the nature of the development itself has changed significantly from that which was allocated so as to introduce a more vulnerable use") | NPPF F6; CP12 part 1 |
| Major development, Local Plan allocations, and any application with a net gain in hard surface or building coverage | Surface water drainage strategy (with the ESCC SuDS tool output where hard surface increases) | Validation list; CP12 part 5; DM22 |
| All major development | Foul sewerage and utilities assessment | Validation list; CP12; DM22 |
| Major development (surface water) | East Sussex County Council consulted; summary page against the National Standards recommended | ESCC National Standards page |
| Works to an ordinary watercourse, or development within 5 m of its top of bank or a culvert | Ordinary watercourse consent from ESCC; 5 m no-development buffer | ESCC policies and guidance |
| Works near a main river, flood defence or the sea | Flood risk activity permit from the Environment Agency (separate from planning) | GOV.UK permit guidance |
| Work beneath the water table | Agreed groundwater management scheme | Local Plan Part 2, DM22 |
The list's sequential test row covers only major development in Flood Zones 2 and 3. That is narrower than NPPF F5, which applies to all development in areas at risk now or in the future unless an exemption above applies. The validation list is not development plan policy. Under the opening provision of NPPF Annex A, the Framework's policies "are material considerations which must be taken into account in decision-making from the day of its publication", so F5 applies to a smaller scheme in Flood Zone 2 or 3 as well. Confirm the area of search with the case officer.
Appendix 1 of the list sets out what a flood risk assessment should contain. It asks for indicative breach flood levels, ground levels and floor levels (ground, first and second) in metres, the floor level for bedrooms and safe refuges, and "a flood plan, detailing evacuation, and flood response", which "must be prepared by a qualified emergency planner and must be maintained for the lifetime of the development" (validation list Appendix 1, item 8). On the tidal Ouse at Newhaven, breach levels come from the Environment Agency's model data, and our note on breach modelling data explains what to do when that data is slow to arrive. Applications that miss these items risk being held at validation, as our guide to invalidated applications describes.
Surface water and groundwater: what East Sussex County Council looks for on a Lewes District scheme
East Sussex County Council is a statutory consultee on surface water for major applications, and the council's validation list asks for the output of the county's SuDS Decision Support Tool with every application that makes a net gain in hard surface or building coverage. The county publishes no numeric discharge-rate rule of its own on its developer pages; the requirements below come from those pages, the 2025 National Standards and the council's SFRA.
- National Standards. The county "requires evidence that all new applications have taken into consideration the National Standards for Sustainable Drainage" and recommends a summary page in the drainage strategy showing how each standard is met (ESCC).
- Winter groundwater readings. Monitoring over a six-month winter period, October to March preferred and November to April accepted, placed where drainage or basements are proposed (ESCC policies and guidance); see our note on groundwater monitoring.
- Deep-bored soakaways. Discouraged and used only as a last resort, with no other surface water destination, two SuDS treatment stages upstream and at least 10 m between the base and the recorded maximum winter groundwater level.
- Ordinary watercourses. A minimum 5 m no-development buffer from the top of bank or edge of culvert, kept for maintenance access.
- Runoff rates. The 2024 SFRA says peak runoff from greenfield sites should never exceed greenfield rates for the 1 in 1 and 1% annual probability storms, including climate change allowances. On brownfield sites it should be as close to those greenfield rates as reasonably practicable, and should not exceed the site's runoff rates before redevelopment for the same two events. In areas corresponding to Drainage Risk Area 1 in the county's 2016 Local Flood Risk Management Strategy, the county expects peak runoff to improve on greenfield rates (Level 1 SFRA, section 9.8).
- Climate change. Peak rainfall allowances for the Adur and Ouse management catchment are 25% (central) and 45% (upper end) for the 1% storm in the 2070s epoch, from the Environment Agency allowances last updated on 27 May 2022, as tabled in the SFRA.
Infiltration is tested to BRE 365 before a soakaway is relied on; our BRE 365 infiltration rate calculator and geology and soakaway map give an early read, and the BRE 365 guide explains the test. Where the tests fail, as they can on the Low Weald clays around Ringmer, Barcombe Cross and Newick, the strategy turns to attenuation and a controlled outfall to a ditch or stream. The county's draft Local Flood Risk Management Strategy 2027 to 2037 was consulted on from 27 July to 18 October 2026 and has not yet replaced the 2016 to 2026 strategy (ESCC consultation).
The Lewes District SFRA: the December 2024 Level 1 and the 2025 Level 2
AECOM's Level 1 SFRA for the council's planning area is the final report of December 2024, its fourth revision, which added wave overtopping mapping and policy for Seaford. It re-ran the Environment Agency's Lower Ouse models, which include the Newhaven defences. That gave Flood Zone 3b as land flooding in a 3.33% (1 in 30) annual probability event, and climate change extents for both the central and higher central allowances for peak river flow.
The Level 2 SFRA, published with the December 2025 consultation, tests candidate sites against a combined river and tide event with climate change to the 2080s. It screened 55 sites. Where development falls inside that design extent it recommends residential floor levels "above the design flood event plus a minimum 300mm freeboard", level-for-level and volume-for-volume floodplain compensation, which may be required for any increase in building footprint depending on the source of flood risk, and no development on undeveloped land in the 3.33% extent, which should be kept for flood storage. Both reports are on the council's SFRA page, with a December 2025 paper applying the sequential and exception tests to the draft allocations.
For an applicant the Level 1 report does three jobs. It is the source of the "latest" flood and climate maps that CP12 refers to, it maps the functional floodplain, which the council's December 2025 tests paper describes along the Ouse between Barcombe Mills and Hamsey and in parts of Newhaven and Seaford, and it sets out recommendations for site assessments. One recommends that winter and spring groundwater monitoring be mandated for all assessments unless an applicant can justify an exemption. That is advice to the council, not an adopted rule, but it explains why groundwater questions come up so often here. Our guide to strategic flood risk assessments covers how an SFRA feeds a planning decision.
How NPPF Chapter 18 applies outside the National Park in Lewes District
The August 2026 NPPF puts flood risk in Chapter 18, policies F1 to F9, and Core Policy 12 hands the sequential and exception tests to national policy. F4 asks for a site-specific assessment for all development in Flood Zones 2, 3a and 3b. In Flood Zone 1 it adds sites of a hectare or more, land "identified by the Environment Agency as having critical drainage problems", and land "identified in a strategic flood risk assessment or the Flood Map for Planning as being at risk of flooding from any source, whether now or in the future".
F5 sets the sequential test: the area searched "should not be greater than the anticipated catchment of the development in terms of its likely occupiers or users", and the SFRA and the Flood Map for Planning provide the evidence. F6 adds the exception test where Annex F table 3 requires it. F7 asks for safe access and escape routes where appropriate as part of an agreed emergency plan, which is where the validation list's flood plan fits. F8 asks for SuDS designed to the National Standards, with the lead local flood authority's advice on major schemes.
On the coast, F9 covers coastal change management areas and other areas likely to be affected by coastal erosion or tidal inundation over the next century. New homes there are inappropriate unless they meet its tests. Read with CP12 parts 6 and 7, that governs the cliffs at Peacehaven and Telscombe until the council maps its own areas. The Planning Practice Guidance on flood risk and coastal change, last updated on 17 September 2025, gives the method. Our summary of the August 2026 NPPF changes and our NPPF guidance and advice page set out what changed for flood risk.
Tidal Ouse, chalk springs and a cliff coast: flood risk across Lewes District in brief
The River Ouse dominates. It is tidal up to Barcombe, and the council's draft plan notes that river flows can back up when high tides lock the outfall flaps. In October 2000 the Ouse and the River Uck, which joins it at the district's northern edge, overtopped from north of Spithurst to Southease; the worst damage was in Lewes town, recalled in our Lewes floods article. Our flood risk assessment in Lewes page covers the town, which the National Park Authority decides.
At Newhaven a North Sea surge in December 2013 affected 50 to 60 properties around Railway Road and closed the railway between Lewes and Seaford. The Environment Agency, with the council as a partner, then built over 4 km of defences on both banks. They have been fully working since summer 2021 and give a 1 in 200 year standard allowing for climate change (scheme page). Sites behind them stay in Flood Zone 3 on the Flood Map for Planning, so a residual risk and breach assessment still applies; our note on residual flood risk explains why.
Seaford's shingle beach is managed against the sea, and the SFRA maps wave overtopping between Seaford Beach and Steyne Road even in a 1 in 30 year event. Peacehaven's cliff-top streets are protected by defences at the foot of the chalk cliffs. The undeveloped cliffs at Telscombe and east towards Newhaven are left to natural processes for now (Core Strategy paragraph 7.114), with the shoreline management plan setting longer-term policy and our coastal erosion guide covering what that means for a site. The Cuckmere forms the district's eastern edge at Seaford. Inland, the council's December 2025 sequential test paper places parts of Plumpton Green inside the Longford Stream's flood zones. It also notes surface water along the Longford and Bevern Streams, and the potential for groundwater to reach the surface around Broyle Side, Plumpton, Barcombe Cross and Chailey.
Check any site on our flood risk map, follow the rivers on the live river levels map, and see the East Sussex and Sussex pages for the county picture. Neighbouring councils sharing the county's drainage rules or the Ouse catchment have their own pages: Wealden and Mid Sussex, with every council we cover listed under local authorities.
What we prepare for a planning application to Lewes District Council
A flood risk assessment asks whether the site is safe, a sequential test asks whether a lower-risk site is available, and a drainage strategy asks where the water goes. These are three separate reports, and each row below ties one to a requirement of the council, the county or national policy. Our consultants have written flood and drainage reports for schemes that went before Lewes District Council. Reports for the district come from Unda Consulting Limited, a CIWEM Business Partner, and our consultants are chartered.
- Every source, every site. Core Policy 12 needs evidence on river, sea, surface water, groundwater and sewer risk with climate change, which a flood risk assessment gathers for the site and its access.
- Applications to the council. Breach levels, floor levels, safe refuge and a flood plan are what the 2021 validation list asks of a flood risk assessment for planning, whatever the flood zone.
- Buying at the harbour or on the coast. Before exchange on a home or unit near the tidal Ouse or Seaford seafront, a flood risk survey for property purchase looks at the building itself.
- Flood Zone 2 or 3 outside an allocation. CP12 part 1 and NPPF F5 send these schemes to a sequential and exception test, with the search kept to the scheme's catchment.
- Foul and surface water together. Part 2 allocations ask for sewer connection at the nearest point of adequate capacity alongside drainage mitigation, which a drainage strategy sets out.
- Runoff that must not rise. CP12 part 5 and the validation list's net-gain-in-hard-surface trigger call for a surface water drainage strategy with the county's tool output and a National Standards summary.
- Conditions after permission. Where the council leaves maintenance or detailed SuDS to a condition, our discharge of drainage conditions work supplies the calculations and the maintenance schedule CP12's supporting text asks for.
- National policy on a plan from 2016. With the new plan paused, NPPF guidance and advice on Chapter 18 fills the gaps the 2016 policy does not cover.
- Groundwater below the site. DM22's groundwater management scheme and the county's winter readings are part of a groundwater flood risk assessment on the chalk and the Low Weald.
- An emergency plan for the site. The validation list asks for a flood plan covering evacuation and response, prepared by a qualified emergency planner and maintained for the lifetime of the development, which our flood warning and evacuation plan provides for sites behind the Newhaven defences.
- Levels the national maps lack. Where breach or overtopping levels are not available from the Environment Agency, flood modelling supplies them for the assessment.
- Foul drainage off the mains. In villages where a sewer is not within reach, a foul drainage strategy covers package plants and whether an environmental permit is needed (Local Plan Part 2 makes one a requirement for non-mains drainage on the GT01 allocation, Land south of The Plough: "if non-mains drainage, an environmental permit will be required").
- Port and Enterprise Zone land. For commercial sites on the Newhaven floodplain, due diligence sets out the flood position before purchase or lending.
- Larger sites in the new plan. Promoters of sites screened in the Level 2 SFRA can test layouts early through a feasibility study.
Questions on Lewes District flood and drainage requirements
What does Lewes Policy CP12 (Core Policy 12) require from a planning application?
Core Policy 12 of the 2016 Core Strategy asks that development avoids flood risk where possible and meets the national sequential and exception tests where relevant. The site and its access must be safe without raising flood risk elsewhere, and surface water runoff must not increase, with SuDS unless shown not technically appropriate. Parts 6 and 7 restrict development on undeveloped and unstable coast.
Does Lewes District Council decide planning applications in Lewes town?
No. Lewes town, Kingston near Lewes and the rest of the district inside the South Downs National Park are decided by the National Park Authority under the South Downs Local Plan. Lewes District Council decides applications in Newhaven, Seaford, Peacehaven, Telscombe and the villages outside the park.
Do I need a flood risk assessment for Flood Zone 2 in Newhaven or Seaford?
Yes for almost any development, including a householder extension: NPPF F4 asks for a site-specific assessment for all development in Flood Zones 2 and 3, and the council's 2021 validation list lists Flood Zone 2 and 3 sites too. A householder extension escapes the sequential test under F5, but it still needs the assessment.
Can I write the flood risk assessment for a small scheme myself?
The validation list does not say who must write the assessment itself. For any flood risk assessment it asks for breach levels and floor levels in metres, which need survey levels and Environment Agency data, and a flood plan prepared by a qualified emergency planner and maintained for the lifetime of the development. Most applicants use a consultant for that reason.
Is draft Policy W1 a reason to change my drainage strategy now?
Rarely. Draft Policy W1 comes from a Regulation 18 consultation of January 2025, and the council paused the plan before Regulation 19 on 1 October 2026, so it carries limited weight. A strategy that meets Core Policy 12 part 5, East Sussex County Council's requirements and the National Standards already covers what draft W1 asks.
Who checks the drainage on a major scheme in the Lewes District planning area?
East Sussex County Council, as lead local flood authority, is consulted on surface water for major applications and expects evidence on the National Standards, winter groundwater readings and a 5 m buffer to ordinary watercourses. The district council makes the decision, weighing that advice.
Seaford, Peacehaven or a Low Weald village on your drawing board?
Tell us the site and your timetable, and we will set out which assessments, groundwater readings and drainage checks a Lewes District application needs before you submit. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.
Start a QuoteFor an application to Lewes District Council, call 01293 214444 or email enquiries@unda.co.uk with the address, the site plan and what you plan to build.