Flood Risk & Drainage Requirements for Wealden District Council
Contact Us
Wealden District Council has had no flood risk policy of its own since 2007. Its 2013 Core Strategy leaves flood risk to national policy, so applications are judged on Chapter 18 of the NPPF, three saved policies from the 1998 Wealden Local Plan and the council's validation list of 1 October 2025. That list holds most of the local detail. It asks for a surface water drainage strategy on any application that adds or changes drainage, sized on major sites for the 1 in 100 year storm plus 40%, and major sites in the south of the district also need winter groundwater readings.
This page sets out what Wealden District Council, East Sussex County Council as Lead Local Flood Authority, the Environment Agency and the two drainage boards ask of an application, with the source and date for each. It also says what our reports give them, and covers the proposed Local Plan to 2042, whose Policies CC7 and CC8 finished their Regulation 19 consultation on 2 November 2026. To talk through a site, call 01293 214444 or email enquiries@unda.co.uk.
Wealden District Council, the National Park and East Sussex County Council: who decides what
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Wealden District Council | Planning authority for all of Wealden outside the National Park boundary | Validates applications against its Local List Planning Validation Guide (October 2025) and decides them under the statutory development plan: the 2013 Core Strategy and the saved 1998 policies |
| South Downs National Park Authority | Local planning authority inside the National Park, including the Wealden villages and downland within it | Decides applications under the South Downs Local Plan (adopted 2 July 2019), Policies SD49 Flood Risk Management and SD50 Sustainable Drainage Systems |
| East Sussex County Council | Lead Local Flood Authority | Statutory consultee on flood risk and surface water drainage for major applications; publishes the county's drainage requirements; consents works on ordinary watercourses outside drainage board districts |
| Environment Agency | Main rivers and the sea | Advises on development in Flood Zones 2 and 3 and next to main rivers such as the Uck, the Cuckmere and the Medway; manages main river and sea defences and issues flood warnings |
| Southern Water | Sewerage undertaker for the whole district | Advises on foul and surface water sewer capacity and adopts sewers; South East Water supplies drinking water |
| Pevensey and Cuckmere Water Level Management Board | Drainage board for the Pevensey Levels and the Cuckmere | Gives consent under its byelaws for works near its watercourses and for surface water discharged into its district |
| Upper Medway Internal Drainage Board | Drainage board for part of the Medway catchment in north Wealden | Non-statutory consultee in its district; gives byelaw and Land Drainage Act consent |
The National Park boundary decides where an application goes. Most of the district, including Uckfield, Hailsham, Crowborough, Heathfield and Polegate, sits outside it and goes to Wealden District Council. Land inside the Park goes to the National Park Authority, whose Local Plan review finished its Regulation 19 consultation on 23 June 2026; the Authority decides on 8 December 2026 whether to submit it. Everything below is for applications to Wealden District Council.
Two drainage boards cover parts of the district. The Pevensey and Cuckmere board, run by the Water Management Alliance, manages the ditches, sluices and pumping stations of the Levels. Its development and consent page says works typically within 9 m of a board watercourse need consent. It also charges a development contribution when it consents a surface water discharge. The Upper Medway board's district reaches into north Wealden, and the council pays it a special levy for 2026/27. Our guide to internal drainage boards explains how their consents sit alongside planning permission.
A site that crosses into a neighbouring district needs the same application made to each council. The Upper Medway board's district also takes in land in Mid Sussex, which pays the board a levy too.
Wealden's flood and drainage policies: saved CS2, CS3 and EN5, proposed CC7 and CC8
Three policies saved from the 1998 Wealden Local Plan are the council's own adopted drainage and water policies. The 2013 Core Strategy adds none: paragraph 7.30 says guidance on development in flood risk areas "will not be duplicated in the Core Strategy or any other DPD", and its objective SPO10 steers growth away from medium and high flood risk. The proposed Local Plan would replace all of them.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| CS2 (saved) | Drainage | Surface and foul water drainage to the council's standards, judged against the systems it will feed, with no added flood risk from surcharged mains or extra runoff to watercourses | Show where foul and surface water go, that the receiving sewer or watercourse can take them, and that runoff does not rise | A drainage strategy with existing and proposed rates and volumes, the outfall and its capacity, and the foul connection | Wealden Local Plan, December 1998, Chapter 12; saved 27 September 2007 |
| CS3 (saved) | Willingdon Levels drainage catchment area | Adequate drainage in the catchment shown on the Proposals Map, with no loss of flood storage and no extra runoff without compensation | Inside the catchment, show storage is kept and runoff is not increased | Storage and runoff calculations before and after development, with compensation where storage is lost | Wealden Local Plan, December 1998, Chapter 12; saved 27 September 2007 |
| EN5 (saved) | Water Resources | Development only where water resources are adequate and not put at unacceptable risk | Show drainage and construction will not pollute or deplete groundwater or surface water | Treatment stages in the SuDS and a groundwater risk section where infiltration is proposed | Wealden Local Plan, December 1998, Chapter 4; saved 27 September 2007 |
| CC7 (proposed, Regulation 19) | Managing Flood Risk | Sequential test, exception test where national policy requires it, FRAs in Flood Zones 2 and 3, critical drainage areas and surface water risk areas, compensatory storage, no culverting, early talks with the drainage board | Weighed as an emerging policy until the plan is examined and adopted | A flood risk assessment that already works to CC7's list: climate change, safe access, storage, groundwater and surface water | Proposed Submission Local Plan, Regulation 19, 21 September to 2 November 2026 |
| CC8 (proposed, Regulation 19) | Sustainable Drainage (SuDS) | SuDS on all development, the discharge hierarchy, a defined outfall, discharge rates agreed with the LLFA and the drainage board, two treatment stages where the site lies outside the Pevensey Levels catchment and does not drain to it, three in or next to it | Weighed as an emerging policy until the plan is examined and adopted | A surface water drainage strategy that sets out treatment stages, rates agreed in principle and a maintenance plan | Proposed Submission Local Plan, Regulation 19, 21 September to 2 November 2026 |
Requirements checked November 2026.
Policy CS2 (Drainage): the saved test every Wealden application meets
Saved Policy CS2 is the drainage policy officers apply to every application, and the validation list cites it as the policy behind its surface water and SuDS requirements. It reads: "Planning applications will be permitted only where adequate provision is made for surface and foul water drainage to meet Local Authority standards, taking into consideration the adequacy or otherwise of the existing systems it will feed, to avoid increasing the risk of flooding by surcharging mains or increasing surface water run-off to watercourses." (Wealden Local Plan, Chapter 12)
The policy is short and sets no discharge rate. What it puts at the centre is the receiving system. In much of rural Wealden there is no public surface water sewer. The 1998 plan expected runoff to go to private sewers, watercourses or soakaways, and where a watercourse could not take more water it asked for storage on site or work to the watercourse. Today the council's "Local Authority standards" are the checklists in its validation list and East Sussex County Council's requirements, set out further down.
Our surface water drainage strategy for a Wealden site shows the existing runoff, the proposed rate and volume, the route to an outfall with evidence it can take the flow, and the foul connection. Where a ditch or culvert downstream is undersized, the strategy says so and sizes the storage to suit.
Policy CS3 (Willingdon Levels drainage catchment area): storage on the Eastbourne side
Saved Policy CS3 applies to the Wealden part of the Willingdon Levels catchment, next to Eastbourne, as drawn on the 1998 Proposals Map. It asks that development "ensure that no overall reduction in flood storage capacity or increased surface water run-off occurs without adequate compensatory measures." The catchment drains towards Eastbourne Park, where the 1998 plan expected Eastbourne Borough Council to build a scheme of storage lakes. The joint Eastbourne and Southern Wealden SFRA (March 2025) maps that area in detail, and our Eastbourne page covers the borough side.
For a site in the catchment we set out the storage the site holds now, the storage after development and any compensation, alongside the runoff calculations, so officers can see CS3 tested directly.
Policy EN5 (Water Resources): treatment before infiltration
Saved Policy EN5 permits development only "where adequate water resources are available and where it would not present an unacceptable risk to such resources." (Wealden Local Plan, Chapter 4) On a drainage strategy that means treatment upstream of any soakaway. Where infiltration is proposed over an aquifer, it also means a groundwater risk section, which East Sussex County Council asks for anyway on deep-bored soakaways.
The 1998 plan formerly had a flood policy too. Policy EN4 resisted development in river floodplains and areas of deep tidal flooding; it was not saved in 2007, and national policy replaced it. Core Strategy paragraph 7.30 chose not to repeat national guidance locally. Seven neighbourhood plans, made between July 2019 and October 2024, form part of the development plan in their parishes; check the parish plan for a site-specific flood or drainage clause.
Proposed Policy CC7 (Managing Flood Risk): what the Regulation 19 plan adds
Proposed Policy CC7 would give Wealden its first flood policy since 2007. It is still a draft. Part 4 of the Regulation 19 text reads: "A site-specific FRA is required for all development located in areas of Flood Zones 2 and 3, critical drainage areas, or areas at risk of surface-water flooding." Part 5 asks those assessments to use the latest climate change allowances, show safe access and egress, and assess flood storage, displacement, groundwater and surface water interactions. (Proposed Submission Local Plan)
The proposed policy also asks for level-for-level, volume-for-volume compensation where storage or Flood Zone 3b is lost, and rules out culverting "unless there is no practical alternative and it is essential for access or public safety". Part 13 expects early talks with the Pevensey and Cuckmere board for schemes in the Pevensey Levels or Cuckmere catchments. Supporting paragraph 5.91 asks for residual risk, including a defence breach, to be assessed. Until the plan is examined and adopted it carries limited weight, and NPPF F4 to F7 decide the tests.
Proposed Policy CC8 (Sustainable Drainage (SuDS)): treatment stages and the Pevensey Levels
Proposed Policy CC8 would require SuDS on all development, discharge rates agreed with the Lead Local Flood Authority and, where relevant, the Pevensey and Cuckmere board, the national discharge hierarchy, and a defined outfall agreed in consultation with the county council. Outside the Pevensey Levels hydrological catchment, where no part of the site drains to it, surface water passes through at least two treatment stages. Inside or next to it, schemes must "Ensure any SuDS scheme involves a minimum of three treatment stages and where necessary, include additional treatment stages to avoid harm to the SAC/Ramsar site", and must give drainage detail at outline stage where a Habitats Regulations Assessment is triggered with hydrology as an impact pathway. (Proposed Submission Local Plan, Policy CC8 parts d(i) and d(iv))
Supporting paragraph 5.103 adds that "Lack of infiltration potential does not remove the requirement to reduce surface-water runoff volume", and 5.105 asks for a SuDS management and maintenance plan on every scheme with SuDS. The same Regulation 19 plan proposes Policy NE13 (Water Environment and Water Infrastructure), whose part 6 would bar work below the water table without an agreed groundwater management scheme. We already write Wealden strategies with the treatment train counted against the SuDS Manual's pollution indices, because the validation list asks for that method on major sites now.
The Wealden Local Plan to 2042: submission due by December 2026
The Proposed Submission Wealden Local Plan, covering the district outside the National Park to 2042, was open for representations under Regulation 19 from 21 September to 2 November 2026. The council's Local Development Scheme of September 2026 programmes submission for examination in December 2026, the Inspector's report in April to June 2027 and adoption in July to September 2027. No submission had been announced by 13 November 2026. On adoption the plan replaces the Core Strategy, the saved 1998 policies and the 2016 affordable housing plan.
The plan follows the old plan-making system, so it is prepared and examined under the earlier, December 2024 version of the NPPF (Annex A). Applications decided now are judged against the August 2026 Framework, and the proposed policies count only as emerging policy with weight that grows as the examination moves on. An earlier replacement plan was withdrawn on 19 February 2020 after its examination, which is why the 1998 policies are still in use.
Local government in East Sussex was due to be reorganised, but the Government paused the process on 7 September 2026. Wealden District Council says it will continue to operate as usual, so it remains the planning authority and East Sussex County Council the Lead Local Flood Authority.
Wealden application stuck on its drainage?
Send us the address and the scheme, and we will tell you which of the validation list's drainage items apply, whether winter groundwater readings are needed and what East Sussex County Council will look for. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteWealden's October 2025 validation list: the triggers for each report
The Local List Planning Validation Guide applies to applications submitted on or after 1 October 2025, after a consultation from 24 February to 8 April 2025 that drew no comments. It is under two years old, so its local items can be enforced at validation, and the council warns that an application found to lack required information after validation may be made invalid. Its flood rows still cite "NPPF: Section 14" and a 2022 SFRA; the current references are Chapter 18 and the 2025 and 2026 SFRAs below.
| Trigger | What Wealden asks for | Source |
|---|---|---|
| Any development in Flood Zone 2 or 3, minor development and changes of use included | Site-specific flood risk assessment | NPPF F4; validation list, October 2025 |
| A site of 1 ha or more in Flood Zone 1 | Site-specific flood risk assessment | NPPF F4; validation list |
| Land in Flood Zone 1 shown at risk from any source, now or in future, in an SFRA or the Flood Map for Planning | Site-specific flood risk assessment (the list asks for one on any Flood Zone 1 site under 1 ha, changes of use to a more vulnerable class included, that could be affected by flooding from sources other than rivers and the sea) | NPPF F4; validation list |
| Land with critical drainage problems, or engineering operations that raise land levels or significantly increase runoff to watercourses, soakaways or other non-mains systems | Site-specific flood risk assessment | Validation list; NPPF F4 |
| Householder or minor full application in Flood Zone 2 or 3, or within 20 m of a watercourse | The council's Basic Flood Risk Assessment template: resilience measures, or floors 300 mm above the 1% river or 0.5% sea level | Validation list, Appendix D |
| New development in Flood Zone 2 or 3, or at risk from another source | Sequential test, unless an F5 exemption applies (allocated sites, householder work, non-residential extensions under 250 m2, most changes of use) | NPPF F5; validation list |
| Development in Flood Zone 2, 3a or 3b where Annex F table 3 calls for it, after the sequential test | Exception test (never in Flood Zone 1) | NPPF F6; validation list |
| All major development, and any application with new or changed foul or surface water drainage | Surface water drainage strategy; majors use Checklist 1 (outline) or Checklist 2 (detailed) | Validation list, Appendices E and F |
| Minor development, or householder work in urban areas, adding floorspace or hard surfacing in Flood Zone 2 or 3 or a groundwater or surface water risk area | East Sussex SuDS Decision Support Tool report | Validation list; ESCC tool |
| Infiltration proposed, or a major site in the south of the district | Winter groundwater monitoring and BRE 365 soakage tests | Validation list; East Sussex County Council |
| Works within about 9 m of a board watercourse, or a discharge into a board district | Drainage board consent (Pevensey and Cuckmere, or Upper Medway) | Water Management Alliance; Upper Medway IDB |
| Works on an ordinary watercourse outside a board district, or building within 5 m of one | Ordinary watercourse consent from East Sussex County Council; the county's 5 m buffer | East Sussex County Council |
Two rows need care. In Flood Zone 1 the list asks for an assessment on sites over 1 ha and on smaller sites that could be affected by surface water, drains, reservoirs or other sources besides rivers and the sea; NPPF F4 sets the threshold at one hectare or more and adds land an SFRA or the Flood Map for Planning shows at risk from any source. And the list asks for sequential test evidence for all development in Flood Zones 2 and 3, while F5 exempts householder work, small non-residential extensions and most changes of use; for those, the flood risk assessment states the exemption. Our note on why applications are invalidated over flood risk and drainage covers the commonest gaps.
Surface water on a Wealden scheme: the council's checklists and East Sussex County Council's rules
Drainage is checked twice on a Wealden application. The council checks it against its validation list and saved Policy CS2; on major schemes, so does East Sussex County Council, which says it is a statutory consultee "in relation to flood risk and rainwater/ surface water drainage for major planning applications across the county". The county publishes no discharge-rate figure of its own; the requirements below come from the two sources.
- The storm. Major drainage strategies attenuate flows "up to and including the 1 in 100 year plus 40% rainfall event (and an allowance for urban creep)" (validation list); check the figure against the Environment Agency's peak rainfall allowances, last updated May 2022, for the site's catchment.
- The National Standards. The county "requires evidence that all new applications have taken into consideration the National Standards" published by Defra on 19 June 2025, and recommends a summary page in the strategy showing how each of the seven standards is met (ESCC).
- Groundwater. Monitoring runs over a six-month winter period, October to March preferred and November to April accepted, read alongside the BGS depth-to-groundwater data. The validation list asks for winter monitoring reports on major sites in the south, where groundwater sits high.
- Soakage tests. Checklists 1 and 2 ask for BRE 365 tests at the location of each infiltration feature.
- Deep-bored soakaways. Only as a last resort, with two SuDS treatment stages upstream, an unsaturated zone below and at least 10 m between the base and the highest recorded winter groundwater.
- Watercourses. A 5 m no-build buffer from the top of bank or edge of culvert on every ordinary watercourse; the larger buffer applies where another policy sets one.
- Outfall. Both checklists ask for confirmation of the discharge point with agreement in principle from the body or landowner who controls it, and the outfall works inside the red line.
- Water quality. On major sites, the SuDS Manual's pollution hazard and mitigation indices, with the mitigation index meeting or beating the hazard for each contaminant.
- Small schemes. Minor and urban householder schemes in risk areas submit the East Sussex SuDS Decision Support Tool report, and its solutions must appear on the drawings.
The Pevensey Levels get their own note. The validation list already asks major sites in the catchment to show their surface water strategy controls the quality and volume of runoff enough to avoid harm to the Levels SAC and Ramsar site, alone and in combination. Proposed CC8 would turn that into three treatment stages and a discharge rate agreed with the Pevensey and Cuckmere board. Our explainers cover the 2025 National Standards, BRE 365 testing and winter groundwater monitoring; for a first look at a site, the BRE 365 calculator and the geology and soakaway map help.
East Sussex County Council's Local Flood Risk Management Strategy for 2016 to 2026 is being replaced: the draft 2027 to 2037 strategy was consulted on from 27 July to 18 October 2026 and the county is reviewing responses. Its drainage advice for the four drainage risk areas stays in force until the new strategy is published. Our Lead Local Flood Authority explainer sets out what the county can and cannot decide.
The North Wealden and Southern Wealden SFRAs, and the 2026 Level 2
Wealden has two Level 1 Strategic Flood Risk Assessments, both by JBA Consulting. The North Wealden Level 1 SFRA is the final report dated March 2026 (issued December 2025) and covers most of the district. The joint Eastbourne and Southern Wealden Level 1 SFRA, March 2025, covers the south with Eastbourne. A Level 2 SFRA, July 2026, screened 45 potential allocations and looked at 31 in detail. The council's Water and Coast page dates the northern report January 2026; the final document says March.
The northern SFRA defines Flood Zone 3b from the defended 3.3% annual chance river outputs and the 20% defended Eastbourne tidal model. The southern one uses the defended 3.3% model outputs where they exist and treats Flood Zone 3a as a cautious stand-in where they do not. The northern report also warns that the Flood Map for Planning is not drawn for watercourses with catchments under 3 km2. A site shown in Flood Zone 1 can still sit beside a small stream with no mapped zone.
Its cumulative impact assessment lists seven catchments at high risk from development: the Cuckmere between Arlington and Lower Horsebridge, the Langney Sewer, Pevensey Haven between Rickney and Pevensey, the Ouse from Isfield to the coast, the Uck at Uckfield, the Teise near Paddock Wood and the Wick Street Stream at Upper Dicker. For those catchments it recommends a surface water drainage strategy on every development, whatever the size. It also recommends that the Environment Agency, with the council, consider designating them Critical Drainage Areas, which would bring a flood risk assessment for every development there. Where a site sits behind defences whose standard of protection will not last the development's lifetime, the SFRA says developer contributions to improve them should be considered, and in the seven high-risk catchments it asks developers to contribute to community flood defences beyond the red line.
On the coast, the council's Coastal Change Management Area background paper (September 2026) concludes that the Pevensey Bay frontage does not need a Coastal Change Management Area, because the shoreline plan holds the line and the defences are maintained. Applications on that frontage still need a flood risk assessment under F4, and NPPF F9 still applies to land likely to face tidal inundation over the next century.
NPPF Chapter 18 on an application to Wealden
Because Wealden's adopted plan has no flood policy, the August 2026 NPPF, Chapter 18 does most of the work. F4 requires a site-specific flood risk assessment for all development in Flood Zones 2, 3a and 3b. In Flood Zone 1 it requires one on sites of a hectare or more, on land the Environment Agency has identified with critical drainage problems, and on land an SFRA or the Flood Map for Planning shows at risk from any source now or in future. F5 sets the sequential test, with an area of search no greater than the development's anticipated catchment. The test does not apply to allocated sites already tested, to sites where no built development, access or escape route would be on land at risk, or to sites at risk from surface water only where the layout keeps occupiers safe. Householder development, non-residential extensions under 250 m2 and most changes of use are exempt too.
F6 applies the exception test only in Flood Zones 2, 3a and 3b, where Annex F table 3 calls for it, and never where the sequential test is not required. F7 asks that development be safe for its lifetime, with residual risk managed and safe access, and F8 asks for SuDS designed to the National Standards, with the Lead Local Flood Authority's advice on major development. Under Annex A, local policies materially inconsistent with these decision-making policies get very limited weight; the saved 1998 policies sit alongside them rather than against them. The Planning Practice Guidance, last updated 17 September 2025, gives the method, and our summary of the August 2026 changes explains what moved.
Rivers, levels and the shingle bank: flood risk across Wealden in brief
Surface water is the commonest source of flooding in the district, says the northern SFRA, following the steep High Weald valleys and dry valleys. Groundwater flooding is widespread in the south and around Uckfield, Lower Horsebridge and Hellingly. Sewer flooding is most often recorded at Heathfield, Uckfield, Forest Row and Herstmonceux. River flooding is worst on the Pevensey Levels and also affects Uckfield, Crowborough, Forest Row, Horam, Hailsham and Polegate.
In Uckfield the River Uck flooded the town centre in October 2000. An embankment, flood wall and flood gate now give the town a 1 in 25 year standard of protection, according to the SFRA. The Uck joins the Sussex Ouse below Isfield. The Cuckmere rises near Heathfield and runs past Hellingly and Arlington. In the north, the Medway passes Forest Row, the Eastern Rother rises near Rotherfield and part of the north-east drains to the Teise in Kent.
The coast is a different case. To the south, the Pevensey Levels are pumped and ditch-drained grazing marsh behind embankments, and Pevensey Bay sits behind a shingle bank the SFRA rates at a 1 in 400 year standard, though the SFRA notes a residual risk of overtopping or breach that grows with sea level rise. Our East Sussex page covers the county picture. A first screen of any address is on our flood risk map, and river gauges appear on the live river levels map.
Reports we prepare for applications to Wealden District Council
A flood risk assessment, a sequential test and a drainage strategy answer three separate questions for a Wealden scheme: whether the site is safe, whether a lower-risk site is available, and where the water goes. Each row below ties a service to a council, county or national requirement. Our consultants have written reports for applications decided by Wealden District Council, and every report comes from Unda Consulting Limited, a CIWEM Business Partner whose consultants are chartered.
- Every source of flooding. Wealden has no flood policy of its own, so NPPF F4 sets when an assessment is needed, and a flood risk assessment covers river, sea, surface water, groundwater, sewer and reservoir risk now and with climate change.
- Applications to the council. The October 2025 validation list asks for an assessment in Flood Zones 2 and 3, on sites over 1 ha and near watercourses, which a flood risk assessment for planning answers.
- Buying in the district. Where a search flags risk at Pevensey Bay, Uckfield or on the Levels, a flood risk survey for property purchase looks at the building itself before exchange.
- Sites in Flood Zones 2 and 3. The validation list asks for sequential test evidence, and F5 caps the search at the scheme's catchment, which our sequential and exception test reports work to.
- Saved Policy CS2. Foul and surface water to the council's standards, judged against the receiving system, is what a drainage strategy shows.
- Any new or changed drainage. The validation list asks for a surface water drainage strategy on every major scheme and every application that adds or alters drainage, sized for the 1 in 100 year plus 40% storm on majors.
- Drainage conditions. Where the council or the county leaves drainage detail to a condition, our discharge of drainage conditions work supplies Checklist 2's sections, calculations and maintenance plan.
- National policy on a 1998-based plan. With no local flood policy adopted since 2007, our NPPF guidance and advice sets out how Chapter 18 applies to the scheme.
- High winter water tables. The county asks for six months of winter monitoring, and the validation list asks for it on major sites in the south, which our groundwater assessments plan and report.
- Small unmapped streams. The northern SFRA warns the Flood Map for Planning stops at catchments under 3 km2, and flood modelling gives levels where no model exists.
- Rural foul drainage. CS2 covers foul water as well as surface water, and proposed NE13 asks for a mains connection wherever feasible, so a foul drainage strategy answers off-mains sites.
- Safe access on the Levels and the Uck. The northern SFRA asks for emergency evacuation plans on major schemes, and a flood warning and evacuation plan sets out the warnings and routes.
- Land promoted for allocation. The Level 2 SFRA screened 45 potential allocations, and a flood risk feasibility study tests a site before money is committed.
East Sussex County Council has no council page on our site yet. Of the other East Sussex districts, Lewes has one. The full list is on our local authorities page, and our guide to what local planning authorities ask for on flood and SuDS covers the general picture.
Wealden flood and drainage questions
What does Wealden's saved Policy CS2 (Drainage) ask an application to show?
Saved Policy CS2 of the 1998 Wealden Local Plan permits development only where surface and foul water drainage meets the council's standards, taking account of the systems it will feed, without raising flood risk by surcharging mains or adding runoff to watercourses. In practice that means a drainage strategy showing the outfall, its capacity and the change in runoff, using the October 2025 validation list's checklists on major schemes.
Is the council's Basic Flood Risk Assessment template enough for a Wealden extension in Flood Zone 2?
For a householder or minor full application in Flood Zone 2 or 3, or within 20 m of a watercourse, the October 2025 validation list provides a Basic Flood Risk Assessment template. It offers two routes: resilience measures with floors no lower than existing, or floors 300 mm above the 1% river or 0.5% sea flood level, shown in Ordnance Datum. New homes and larger schemes in Flood Zone 2 need a full site-specific assessment under NPPF F4.
Can I fill in the Wealden flood risk paperwork myself for a small scheme?
The council's Basic Flood Risk Assessment template and the East Sussex SuDS Decision Support Tool are meant for small schemes, and the validation list does not say who must fill them in. Option B on the template needs a modelled flood level and floor levels in Ordnance Datum, which usually means a survey and Environment Agency data, and any scheme outside the template's scope needs a site-specific assessment.
When does a Wealden application need a surface water drainage strategy?
Under the October 2025 validation list: for all major development, and for any application that needs new or changed foul or surface water drainage, such as new buildings, extensions, more hard surfacing or changed levels. Major strategies attenuate the 1 in 100 year plus 40% storm with an allowance for urban creep, and follow Checklist 1 at outline or Checklist 2 at detailed stage.
What would proposed Policy CC8 change for drainage near the Pevensey Levels?
Proposed Policy CC8 in the Regulation 19 Local Plan (consulted 21 September to 2 November 2026) would require at least three SuDS treatment stages for schemes in or next to the Pevensey Levels hydrological catchment, against two for sites outside the catchment that do not drain to it. It would also require discharge rates agreed with East Sussex County Council and the Pevensey and Cuckmere Water Level Management Board, early contact with the board, and drainage detail at outline stage where a Habitats Regulations Assessment is triggered with hydrology as an impact pathway.
Which body checks the drainage on a major Wealden scheme?
East Sussex County Council, as Lead Local Flood Authority, is the statutory consultee on flood risk and surface water drainage for major applications and expects evidence that the 2025 National Standards have been considered. Wealden District Council makes the decision. On the Pevensey Levels and in the Cuckmere, the drainage board's consent is needed for discharges into its district; in north Wealden the Upper Medway board's may be.
Planning a site near the Pevensey Levels or the Uck?
Tell us the site and the programme, and we will set out the assessments, winter readings and drainage board consents a Wealden application needs, and when to start them. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteFor an application to Wealden District Council, call 01293 214444 or email enquiries@unda.co.uk with the site address and a short note of what is proposed.