Flood Risk Assessment in Kent

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

A flood risk assessment in Kent can turn on any of five kinds of water: the Medway and Stour rivers, the tidal Thames, the Medway estuary and the Swale, the sea along Romney Marsh and the Channel coast, groundwater in the chalk, or rain that overwhelms town drains. We prepare flood risk assessments across the county for planning, property purchase and insurance, alongside sequential and exception tests and surface water drainage strategies.

This page covers Kent and Medway together. That means the twelve districts where Kent County Council is the Lead Local Flood Authority (Ashford, Canterbury, Dartford, Dover, Folkestone and Hythe, Gravesham, Maidstone, Sevenoaks, Swale, Thanet, Tonbridge and Malling, and Tunbridge Wells) and the Medway unitary authority, which carries out its own flood duties. Between them they take in the CT, ME, TN and DA postcode areas, the Weald, the North Downs and Romney Marsh. The towns with pages of their own are listed further down.

In the winter of 2013/14, 929 homes and businesses flooded across Kent, 436 of them in Tonbridge and Malling, as the Medway and its tributaries rose over Christmas.

To talk a site through with one of our flood risk consultants, call 01293 214444 or email enquiries@unda.co.uk.

Where does flood risk in Kent come from?

From rivers, the sea, the chalk and the drains, and often from more than one of them on the same plot. The west of the county drains to the Medway, the east to the Great Stour and the north-west to the Darent and Cray. The north coast faces the tidal Thames, the Medway estuary and the Swale, Romney Marsh lies below high tide behind sea defences, and the chalk of the North Downs stores groundwater that rises after a wet winter.

Kent's main flood sources and what the record shows
AreaMain sourceWhat the record shows
The Medway valley and the Weald, from Tonbridge through Yalding to MaidstoneRiver flooding from the Medway, Beult, Teise and EdenYalding alone had 197 properties flooded when the river peaked on 24 December 2013, against 119 in 2000
The Great Stour and East Stour through Ashford, Canterbury and SandwichRiver flooding, and the tide near SandwichCanterbury's January 2026 SFRA finds the upstream storage at Hothfield and Aldington protects most of the city to about a 1 in 100 year single event, but two smaller storms in a row can overwhelm it
The Darent and Cray, from Westerham to DartfordRiver flooding, then the tide at Dartford CreekSevenoaks' January 2026 SFRA lists the district's major floods in 1958, 1960, 1968, 2000, 2002/03 and winter 2013/14; the Dartford Creek Barrier keeps the tide out of the lower Darent and Cray
The Thames frontage at Dartford, Gravesham and the Hoo PeninsulaTidal floodingThe Thames Estuary 2100 plan keeps most of the North Kent Marshes defences at their present height, so the risk behind them will grow
The Medway estuary and the Swale, including Sittingbourne, Faversham and SheppeyTidal floodingAbout 18,000 properties face a greater tidal risk over the next 100 years under the estuary strategy approved in 2019
Romney Marsh, from Hythe to Cliff EndTidal and coastal flooding on drained marsh14,500 homes and 700 businesses sit behind the defences, on land largely below present high tide
The north and east coast, Whitstable to DealTidal flooding and wave overtoppingThe 5 to 6 December 2013 surge peaked at 4.7 m at Dover, the highest level recorded there since 1905
The chalk of the North Downs, especially the Nailbourne and Elham valleysGroundwaterIn February 2014 groundwater rose more than 1 m above previously recorded levels in some places
Towns and villages across the countySurface water and sewersKent County Council lists 20 Section 19 flood investigations since 2012, the latest after storms on 4 to 5 November 2023

The rivers each have a page of their own: the River Medway and its tributary the River Teise, the River Darent, the tidal River Thames and the River Rother, which marks the county's southern edge near Rye. For how a river and the sea differ as sources of flooding, see our explainers on fluvial flood risk and tidal flooding.

Two lead local flood authorities: which one reviews a Kent site?

Kent County Council is the Lead Local Flood Authority for the twelve districts, and Medway Council for the Medway towns and the Hoo Peninsula. The Environment Agency sits alongside both on rivers and the sea, and the internal drainage boards run their own districts. Which body comments on a scheme depends on where the site is and how big it is, and our guide to the Lead Local Flood Authority sets out the general role.

  • Kent County Council. The statutory consultee on surface water for major development in all twelve districts since 15 April 2015. Minor applications are left to the district, although the county may still advise where drainage problems are known.
  • Medway Council. A unitary authority that is both the planning authority and the Lead Local Flood Authority. It publishes its own SuDS technical guidance for applications and condition discharge, separate from the county's.
  • The Environment Agency. Leads on main rivers and the sea, is consulted on development in Flood Zones 2 and 3, and runs the flood warning service.
  • The district councils. Decide planning applications and hold the Strategic Flood Risk Assessment and the local plan policies for their area.
  • Internal drainage boards. Maintain watercourses and give consent for works inside their own districts. Elsewhere, Kent County Council issues land drainage consent for works to an ordinary watercourse, at £50 per structure.

Four boards cover Kent's low ground, and our note on why internal drainage boards matter for planning explains what each can ask of a developer. The North Kent Marshes Water Level Management Board took over the Lower Medway district on 1 April 2026; the others are the Upper Medway, River Stour (Kent) and Romney Marshes Area boards.

Which district plan and SFRA apply to a site in Kent?

Every district has its own local plan and its own Strategic Flood Risk Assessment. Several are part way through new plans in 2026. A report written for Thanet has to answer different policy wording from one for Tunbridge Wells. So the first step on any Kent site is to fix which plan and which SFRA the officer will read it against.

Local plan flood policies and SFRAs by planning authority, October 2026
Planning authorityPlan in forceFlood and drainage policiesLatest SFRA
AshfordAshford Local Plan 2030, adopted February 2019ENV6 Flood Risk; ENV9 Sustainable DrainageJuly 2014, the latest found for this page
CanterburyCanterbury District Local Plan, adopted July 2017; its draft replacement to 2042/43 finished Regulation 19 consultation in May 2026Policy CC4 and the rest of chapter 7 (climate change, flooding, coastal change and water resources)Level 1, January 2026; Level 2, February 2026
DartfordThe Dartford Plan to 2037, adopted April 2024S3 Climate Change Strategy; M4 Flood Risk and Riverside DesignLevels 1 and 2, February 2021
DoverDover District Local Plan to 2040, adopted October 2024CC5 Flood Risk; CC6 Surface Water ManagementLevel 1, March 2019; Level 2, December 2021
Folkestone and HytheCore Strategy Review, March 2022, and Places and Policies Local Plan, September 2020SS3 in the Core Strategy Review; CC3 Sustainable Drainage SystemsDistrict SFRA with tidal hazard mapping for 2015, 2075 and 2115
GraveshamLocal Plan Core Strategy, adopted September 2014; a Local Plan 2042 has reached Regulation 19CS18 Climate Change, covering flood risk and SuDSKent Thameside SFRA, 2005, updated 2009 (prepared with Dartford); no replacement in the Regulation 19 evidence
MaidstoneLocal Plan Review 2021 to 2038, adopted March 2024LPRSP14(C) requires an assessment in Flood Zones 2 and 3 and on sites over one hectareLevel 1 update and Level 2, August 2020
SevenoaksCore Strategy, February 2011, with the Allocations and Development Management Plan; a new plan finished its Regulation 19 publication, the last consultation before submission, on 17 September 2026Policy numbers not confirmed for this page; the new plan will replace themLevel 1, January 2026; Level 2, July 2026
SwaleBearing Fruits 2031, adopted July 2017; a Local Plan Review is under wayEmerging policy C7 on contributions to the estuary strategy, and a July 2026 advice note on the sequential and exception testsLevel 1, 2026
ThanetThanet Local Plan, adopted July 2020CC01 Fluvial and Tidal Flooding; CC02 Surface Water Management; CC03 Coastal DevelopmentMarch 2022
Tonbridge and MallingCore Strategy, adopted September 2007; a Local Plan 2024 to 2042 is in preparationCP10 Flood ProtectionLevel 1, October 2025
Tunbridge WellsLocal Plan 2020 to 2038, adopted December 2025EN 25 Flood Risk; EN 26 Sustainable DrainageLevels 1 and 2, 2019
MedwayMedway Local Plan 2003 (saved policies); the Medway Local Plan 2041 is under examinationCF13 Tidal Flood Risk Areas; draft DM1 Flood and Water ManagementLevels 1 and 2, November 2025

Behind all of these sits the national policy on flood risk in chapter 18 of the NPPF, policies F1 to F9, revised in August 2026; our summary of the August 2026 changes covers what moved. An SFRA maps the district's flood zones, surface water and defences, and our explainer on what an SFRA is for shows how a site report draws on it. Where an SFRA is several years old, the Environment Agency's current mapping and any newer modelling usually carry more weight.

Kent County Council's drainage rules for major schemes

In the twelve districts, the county reviews drainage on major applications against its Drainage and Planning Policy of December 2019 and, since June 2025, against the national standards for sustainable drainage, which supersede parts of it. The council has published a comparison of the two and an interim position, and a copy of the current policy can be requested through its policy statement page. The figures most reviews turn on:

  • Design storms. No flooding on site in the 1 in 30 year storm, and no flooding of buildings in the 1 in 100 year storm with climate change added.
  • Climate change. Since 10 May 2022 the county has asked for the upper end allowance for both the 3.3% and 1% annual chance storms; our note on climate change allowances explains the bands.
  • Brownfield sites. At least a 50% cut in peak runoff, and never more than the site discharges before redevelopment.
  • Small outfalls. 2 litres per second is the minimum on small sites unless the county agrees otherwise, and long-term storage on clay soils such as the Weald Clay drains at no more than 2 litres per second per hectare.
  • Everyday rain. The first 5 mm of rainfall is held on site, a rule the national standards now make mandatory, with a 10% allowance for urban creep where gardens and other private permeable ground could later be paved.
  • Discharge to ground. Only into clean, competent natural ground with enough unsaturated depth, never into made ground, and with early Environment Agency advice inside a Source Protection Zone 1.

Two councils differ. Ashford's policy ENV9 caps greenfield runoff at 4 litres per second per hectare, or 10% below the 1 in 100 year greenfield rate if that is lower, and the borough's guidance sets 2 litres per second as the limit on sites under 0.25 hectares. Medway uses its own 2025 guidance in place of the county's. The national SuDS standards apply in every district.

Is your Kent scheme a major development?

If it is, the drainage strategy goes to Kent County Council in the twelve districts or to Medway Council in Medway, alongside the flood risk assessment. Get a free, no-obligation quote: one of our experienced flood risk consultants will get back to you within 60 minutes.

Start a Quote

Screen a postcode anywhere in Kent or Medway

Type a postcode below for the Environment Agency's flood zones, surface water and reservoir mapping at that spot, or open our full flood risk map for anywhere in England. Plenty of people looking for a Kent flood map, or a flood risk map of Kent, want exactly this first check. It shows the modelled picture around a postcode. Floor levels, a defence failing and the local policy a planning officer will apply are not on it.

Kent is shown outlined in coral: the Kent County Council area and the Medway unitary authority together. Results are an indicative screening based on Environment Agency open data — not a Flood Risk Assessment.
Loading flood map…
Rivers & Sea
—
Surface Water
—
Reservoirs
—
Flood Zone (for planning)
—
Climate change (2070–2125)
—
Historic flooding
—
Flood warning area
—
Live flood warnings (nearby)
—
Important: This tool gives an indicative screening only, based on modelled Environment Agency datasets (Flood Map for Planning Flood Zones 2 & 3, Flood Zones plus Climate Change 2070–2125, Risk of Flooding from Rivers and Sea, Risk of Flooding from Surface Water, reservoir, historic, flood warning area, flood storage area, flood defence and main river data) under the Open Government Licence. It reflects the area around the postcode, not the exact property, and does not account for finished floor levels, ground levels or groundwater. It is not a Flood Risk Assessment and must not be relied on for planning, conveyancing, insurance or design decisions. Data © Environment Agency copyright and/or database right; contains Ordnance Survey data © Crown copyright and database right. The Kent boundary shown combines the Kent County Council and Medway Council areas, from the Office for National Statistics (Counties and Unitary Authorities December 2025; Open Government Licence; contains OS data © Crown copyright and database right).

Current flood alerts and warnings for the county are on the Environment Agency's Check for flooding page for Kent.

From the Thames to Romney Marsh: Kent's tidal frontage

Much of north and south-east Kent depends on sea walls, embankments and shingle. Three Environment Agency strategies set out what happens to those defences over the next century. A site behind them is defended, which is not the same as low risk: the assessment still has to show what happens if a wall is overtopped or breached, and how the level of the tide changes over the life of the building.

Tidal strategies covering the Kent coast
StrategyFrontageWhat it sets out
Thames Estuary 2100Dartford, Swanscombe and Northfleet, the North Kent Marshes and the Isle of GrainMost of the North Kent Marshes unit holds defences at today's height (policy P3), with Gravesend's east end and Dartford set to keep pace with climate change (P4); councils to agree riverside strategies by 2030 and defence owners to raise defences where needed by 2040
Medway Estuary and Swale StrategyThe Medway estuary, the Swale and SheppeyApproved in 2019; about 18,000 properties at rising tidal risk over 100 years; early schemes at Sheerness and Queenborough and in south Sheppey, with six realignment schemes in its first ten years
Folkestone to Cliff End StrategyRomney Marsh and its coastApproved in 2010 to bring the risk down to a 0.5% annual chance; about £155 million of schemes finished, including the Dymchurch sea wall (2011) and the Hythe Ranges defences (2020/21), with Lydd Ranges and the Rother tidal walls under construction

The hold-the-line and realignment language comes from the shoreline management plans, which our guide to shoreline management plans explains. Swale's emerging plan goes a step further and expects development to contribute to the estuary strategy.

Romney Marsh and the Channel coast

Romney Marsh is reclaimed land. It is kept drained by the Romney Marshes Area Internal Drainage Board through about 350 km of ditches between Hythe, Tenterden and Cliff End near Pett. Because so much of it sits below high tide, a new home there is judged on what the water would do if the defences failed, how deep it would be and how people would get out, which is the residual flood risk a planning officer will ask about.

Further round the coast the pattern changes. Whitstable and Herne Bay are defended to a 1 in 200 year standard, but Canterbury's SFRA warns that a breach or overtopping would flood both town centres widely. Thanet's policy CC03 asks for a flood risk assessment on development within 40 m of the coast, to deal with erosion and wave overtopping. Our article on sea level rise in the UK sets out the allowances these sites are tested against.

Flood storage on the Medway and the Stour

Both of Kent's big rivers are held back by storage upstream of their towns, and both stores are designed for a particular size of flood. The Leigh Flood Storage Area was built after the 1968 floods to protect Tonbridge and Hildenborough, and it is now being enlarged. On the Stour, flood storage at Hothfield and Aldington, upstream of Ashford, shields Canterbury.

The Leigh expansion and Hildenborough embankment scheme raises the top water level from 28.05 m to 28.6 m above Ordnance Datum (AOD), adding about 25% to give more than 7 million cubic metres of storage. It cuts the risk to more than 1,800 homes and 575 other properties. The estimated cost is £36.14 million. The last of the new gates went in during November 2025, and the Environment Agency expects full operation during 2026. The Upper Medway Internal Drainage Board looks after watercourses in a district that takes in Edenbridge, Paddock Wood, Headcorn and Staplehurst, and a trial extension of its work around Marden has been put to Kent County Council.

Canterbury's January 2026 SFRA spells out the Stour's limit: the upstream reservoirs cope with a single 1 in 100 year storm, but a second, smaller storm soon afterwards can exceed them. The River Stour (Kent) Internal Drainage Board manages 211 km of watercourses from Lenham Heath to Richborough and Deal, including parts of Ashford, Canterbury and Sandwich. Our live river levels map shows the Medway, Stour and Darent gauges as they stand today.

Groundwater in the chalk downs

Groundwater is the flood source that Kent's river maps miss. After a wet winter the chalk of the North Downs fills until springs break out and dry valleys run, and the water can stay for weeks. Kent County Council's flood records name the Nailbourne, the Petham and Alkham bournes and the Darent valley, and the groundwater flooding they bring reaches cellars and low ground whatever the flood zone says.

  • February 2014. Groundwater rose more than a metre above any earlier record in places, and homes in Bridge, Patrixbourne, Bishopsbourne and Barham, along the Nailbourne, flooded internally.
  • An intermittent river. The Nailbourne flowed in 2000/01, 2003, 2010, 2012/13 and each winter from 2013/14 to 2015/16, and is said locally to run for about six months in every seven years.
  • Infiltration. A soakaway on chalk needs to show an unsaturated zone above the highest groundwater, and inside a Source Protection Zone the Environment Agency may limit what can go into the ground.

Our ground conditions and soakaway checker and BRE 365 infiltration rate calculator give a first read before any trial pits are dug, and our guide to groundwater in planning applications covers what an officer will expect.

Kent's recorded floods, 1953 to 2023

Kent's flood history is a mixture of tidal surges on the north coast, river floods in the Medway and Stour valleys, groundwater on the chalk and short summer storms in the towns. Each event below is drawn from Kent County Council or Environment Agency records.

  1. 31 January 1953. The North Sea surge overtopped defences at Sheerness, along western Sheppey, up Faversham Creek and Milton Creek, and at Warden and the Isle of Harty. The wider disaster along the east coast is told in our piece on the 1953 North Sea flood.
  2. 1968. Severe flooding of Tonbridge and Hildenborough led to the Leigh barrier being built upstream on the Medway.
  3. January 1978. Another surge overtopped the western Swale marshes and breached the defences on the Isle of Harty.
  4. Autumn 2000. The Medway and its tributaries flooded the Weald, with 119 properties flooded in Yalding, and Herne Bay flooded seriously the same year.
  5. 5 to 6 December 2013. The biggest tidal event in Kent since 1953 peaked at 4.7 m at Dover. At Sandwich the Environment Agency judged it equal to a 1 in 200 year event; 58 properties flooded across the county and 41,000 were protected by defences.
  6. 23 to 27 December 2013. Rain on saturated ground in the upper Medway flooded Tonbridge, East Peckham, Yalding, Collier Street, Laddingford, Maidstone and Edenbridge. By May 2014 the county had counted 929 flooded properties, 731 homes and 198 businesses, and 28,500 properties lost power on Christmas Eve.
  7. February 2014. Chalk groundwater flooded the Elham and Nailbourne valleys.
  8. July and August 2021. Summer storms led to Section 19 investigations at Swanley, Yalding, Bethersden, Horsmonden and Ulcombe.
  9. 4 to 5 November 2023. Flooding at Capel-le-Ferne and at Uden Road, Dymchurch, the most recent events Kent County Council has investigated.

The county's Section 19 investigations are public, and our article on why some floods get investigated explains the duty behind them.

When does a site in Kent need a flood risk assessment?

Most sites in Flood Zones 2 and 3 need one, as does any site of a hectare or more in Flood Zone 1. Several Kent councils add triggers of their own. The flood zones come from the Environment Agency; the local triggers come from the district plans and validation lists.

Kent sites and when a flood risk assessment is needed
SiteUsually needed?Why
In Flood Zone 2 or 3 anywhere in the countyYesNational policy in chapter 18 of the NPPF, repeated in district policies such as Thanet's CC01, Dover's CC5 and Tunbridge Wells' EN 25
A hectare or more in Flood Zone 1YesNational policy, and most such schemes are major development that Kent County Council or Medway Council reviews for drainage
Flood Zone 1 in a critical drainage area, or where the SFRA shows risk rising over the building's lifetimeYes, in Swale and MaidstoneBoth councils' shared validation list asks for one in these cases
Within 40 m of the Thanet coastYesThanet's coastal development policy CC03, which covers erosion and wave overtopping
Behind defences on Romney Marsh, the estuary marshes or SheppeyYesBreach and overtopping have to be assessed, not just the defended flood zone
A house extension in Flood Zone 2 or 3Usually, kept shortA proportionate report on floor levels and resilience is normally enough
Buying a house or commercial unitNot for planning, but worth havingLenders and insurers ask about recorded flooding such as winter 2013/14

New homes in Flood Zones 2 and 3 also face the sequential test, which asks whether lower-risk land is reasonably available before the site's own evidence is weighed. Swale published its own advice note on the sequential and exception tests in July 2026, and our review of a Faversham appeal for 250 homes shows how the test was handled in one Kent case.

Reports we prepare for Kent sites, from the Weald to the coast

What a Kent site needs depends on which water reaches it, what is planned and who is asking. A senior consultant signs off every report, and Unda is a CIWEM Business Partner. We prepare each of these for sites anywhere in the county:

  • Planning applications. Any scheme in Flood Zone 2 or 3, on a hectare or more, or on the Thanet coastal strip needs a flood risk assessment for planning.
  • Several sources on one plot. A flood risk assessment in Kent often has to weigh a river, the tide, chalk groundwater and the sewers together.
  • Buying in a flooded valley. Homes in Yalding, East Peckham or along the Stour can prompt lender questions that a flood risk survey for property purchase answers before exchange.
  • Homes on the marshes. Housing on the estuary marshes or Romney Marsh meets the sequential and exception test before floor levels are discussed.
  • Runoff for major schemes. Kent County Council's 50% brownfield cut and Ashford's 4 litres per second per hectare are what our drainage strategy work is set up to show.
  • Clay or chalk. On the Weald Clay a surface water drainage strategy usually needs attenuation; on the chalk it has to prove the groundwater sits low enough.
  • After consent. Where a district attaches a drainage condition, we prepare the evidence for the discharge of drainage conditions.
  • Insurance after 2013/14. With 929 properties flooded that winter, a flood risk assessment for insurance gives an underwriter evidence about the building itself, at renewal or after a claim.
  • Commercial floorspace. Riverside schemes such as the Dartford Northern Gateway sit in the flood zone, and where they include commercial buildings a BREEAM flood risk assessment supports the Pol 03 credit.
  • Buying marshland sites. Industrial land on the Dartford and Crayford marshes relies on tidal defences, so flood risk due diligence belongs before the deal.
  • Keeping a business open. 198 commercial properties flooded in Kent in winter 2013/14, and a business continuity flood assessment helps an occupier plan for the next one.
  • Sewer capacity. Kent County Council's Section 19 investigation at Deal was followed by a complaint against Southern Water, which is why a foul drainage strategy confirms capacity early.
  • Water in the chalk. After the 2014 rise in the Elham valley, a groundwater flood risk assessment tests how high the water table can reach.
  • Defended rivers and coasts. Leigh, Hothfield and Aldington, and the estuary walls all leave a residual risk that flood modelling turns into depths and hazards.
  • Getting people out. Romney Marsh's 14,500 homes below high tide are why a flood warning and evacuation plan is often asked for there.
  • Strategic land. Allocations such as Paddock Wood and East Capel in the Tunbridge Wells plan need a flood risk feasibility study before the layout is fixed.
  • National policy. Our NPPF flood risk guidance explains how chapter 18 applies alongside the thirteen Kent plans.

Town pages across Kent

For a site in one of these towns, the town page goes into its streets, its own flood record and its council's policies in more detail:

The rest of England and Wales is on our list of the areas we cover.

Who to contact about flooding in Kent

If anyone's life is in danger, call 999. For a power cut, call 105. For everything else, the right contact depends on where the water comes from and which side of the Medway boundary you are on.

Who handles flooding in Kent and Medway, and how to reach them
BodyRoleContact
Kent County CouncilLead Local Flood Authority for the twelve districts: surface water, groundwater, ordinary watercourses and Section 19 investigationsReport flooding to Kent County Council; 03000 41 81 81, or 03000 41 91 91 out of hours, if a flood threatens a home
Medway CouncilPlanning authority and Lead Local Flood Authority for MedwayMedway Council's flood reporting page; 01634 333 333
Environment AgencyMain rivers, the sea, tidal defences and flood warningsFlood warning sign-up; Floodline 0345 988 1188
Southern Regional Flood and Coastal CommitteeApproves flood and coastal funding for Kent, Medway and the south coast countiesSouthern Regional Flood and Coastal Committee
Kent and Medway Resilience ForumThe Local Resilience Forum for emergency planning; it estimates around 75,000 properties in Kent and Medway are at risk from rivers and the seaKent Prepared: check your flood risk
Southern Water and Thames WaterPublic sewers: Southern Water across most of Kent, Thames Water in parts of the north-west around DartfordThrough the water company's sewer flooding service, or the council's reporting page
Internal drainage boardsWatercourses and consents inside their districtsNorth Kent Marshes Water Level Management Board; River Stour (Kent) Internal Drainage Board, 01227 462377; Romney Marshes Area and Upper Medway boards

Kent County Council's Local Flood Risk Management Strategy 2024 to 2034, adopted in August 2024, sets out how the county works with these bodies, and its preliminary flood risk assessment found Kent's local flood risk high overall but spread across the county rather than concentrated in one town.

What buyers, builders and landowners ask about Kent sites

Does every planning application in Kent need a flood risk assessment?

No. One is needed in Flood Zones 2 and 3, on sites of a hectare or more, near the Thanet coast, and in Swale and Maidstone on Zone 1 sites in critical drainage areas. A small Zone 1 scheme away from the coast often needs nothing, so send us the address and we will say whether yours does before you spend anything.

What decides the cost of a flood risk assessment in Kent?

The site and its sources. A Zone 1 plot with a surface water question is quick to assess; a defended estuary or Romney Marsh site that needs breach modelling, or a major scheme that needs a drainage strategy for Kent County Council, takes more work. We quote a fixed fee with no obligation, usually within 60 minutes, and our article on what drives the cost explains the factors.

Which areas of Kent are at the highest risk of flooding, and which flood zones cover them?

The Medway valley, where most of the 929 properties flooded in winter 2013/14 were; the estuary marshes and Sheppey, with 5,185 dwellings in Sheerness alone at medium to high risk in Kent County Council's 2017 figures; and Romney Marsh, with 14,500 homes behind its defences. Much of that ground lies in Flood Zones 2 and 3. A Zone 1 address can still flood from surface water or groundwater, which the flood zones do not show.

Will a house extension in Kent need its own flood risk assessment?

Usually only if the house is in Flood Zone 2 or 3, or the district's validation list asks for one. A short report on floor levels and flood resilience is normally enough, and householder extensions are exempt from the sequential test. Our guide to extensions in a flood zone covers the details.

How are Romney Marsh and other coastal sites in Kent assessed?

As defended sites rather than safe ones. The report tests what would happen if the sea wall or shingle bank were overtopped or breached, sets floor levels against the tide with climate change, and shows a safe way out. On coastal sites we prepare flood risk assessments and due diligence reports.

How can I check the flood risk for a property in Kent before buying?

Start with the postcode map on this page or the Environment Agency's service, which show the flood zone and the surface water map. For a decision about buying or insuring, a flood report for buyers reads those maps against the building's actual levels and the area's recorded floods.

Which parts of Kent are most exposed to rising sea levels?

The low ground behind the north Kent defences and Romney Marsh. The Medway estuary strategy expects about 18,000 properties to face greater tidal risk over the next century, and the Thames Estuary 2100 plan keeps most North Kent Marshes defences at today's height, so the risk behind them grows. We know of no official map showing parts of Kent under water by a particular year; the Environment Agency's allowances set how far ahead a site is tested.

How do I go about getting a flood risk assessment in Kent?

Send us the address, a site plan and a short description of the proposal. One of our consultants will confirm what the site needs and which council and plan it falls under, then quote a fixed fee, usually within 60 minutes.

Building, buying or insuring anywhere in Kent?

Send the address and a line on the plans, whether the site is in the Medway valley, on the estuary or out on the marsh. One of our experienced flood risk consultants will reply within 60 minutes with a free, no-obligation quote.

Start a Quote

From Dartford to Romney Marsh, Unda Consulting Limited prepares flood risk assessments, sequential and exception tests and drainage strategies. To discuss a Kent site, call 01293 214444 or email enquiries@unda.co.uk.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.