River Thames Flooding & Flood Risk
Contact Us
River Thames flooding comes in two forms, and the line between them is Teddington Lock. Above it the Thames is a slow lowland river that fills over days and then spreads across a broad floodplain from Cricklade and Oxford down through Reading, Maidenhead, Staines and Walton. Below it the river is tidal, and London and the estuary towns flood when a North Sea surge meets a high tide and a full river, which is the risk the Thames Barrier holds back. This is England's Thames, rising at Thames Head in Gloucestershire, not the Thames River in Ontario. We prepare flood risk assessments, sequential tests and drainage strategies for sites on both reaches.
The highest flow measured on the Thames in 143 years of records at Kingston is 806 cubic metres a second, on 18 November 1894, and the snowmelt flood of March 1947 comes second at 714.
For a site anywhere between Thames Head and Southend, call 01293 214444 or email enquiries@unda.co.uk.
How does the River Thames flood above and below Teddington?
The non-tidal Thames floods because a large, gently sloping catchment drains into one channel. Above the gauge at Kingston the river collects water from 9,948 square kilometres, and the National River Flow Archive puts the average rainfall there at about 706 millimetres a year (1961 to 1990). Much of it soaks into permeable rock before it reaches the river, so the Thames climbs over several days, holds high for a week or more and floods the same meadows and riverside streets winter after winter.
- Slow to rise, slow to fall. The archive's base flow index of 0.64 means close to two thirds of the flow at Kingston arrives slowly, as water released from the ground. Floods on the fluvial Thames build over days rather than hours, and once the river is out of bank it stays out.
- Tributaries arriving together. The Cherwell joins at Oxford, the Kennet at Reading, the Colne (with its Wraysbury River branch) at Staines, the Chertsey Bourne at Chertsey, the Wey at Weybridge, the Mole at East Molesey and the Hogsmill at Kingston. When the whole basin is saturated their peaks stack on the main river, and the lower non-tidal reach between Datchet and Teddington, below most of those confluences, floods worst.
- Tide below Teddington. From Teddington Weir to the sea, through the stretch known as the Tideway and on into the estuary, the water level is set by the tide. A surge driven down the North Sea and squeezed into the funnel of the estuary lifts it well above the predicted tide, and a high river flow coming over the weir adds to it. In the winter of 2013 to 2014 the peak tide at Southend reached 4.10 metres above Ordnance Datum. The Wandle, the Lea and the Darent all reach the Thames on this tidal stretch, at Wandsworth, Leamouth and Dartford Creek.
- Both at once. The two regimes meet in west London. In the winter of 2013 to 2014 the Thames Barrier closed 50 times, and the Environment Agency says 41 of those closures were made because of the volume of river water coming down from upstream, not the tide alone.
See the Thames and its live gauges on the map
This Thames flood map traces the river in coral from Thames Head near Kemble to the mouth of the estuary off Southend, with the Environment Agency's gauges on the non-tidal river from Ewen to Kingston. Type a postcode to screen a site against the Agency's flood data, check its flood zone on our flood risk map, or open the live river levels map to follow the Thames alongside the Kennet, Wey, Mole and Colne.
Levels at different gauges cannot be compared with one another, because each is measured from its own local zero. The table gives the highest level shown on each station page, with the largest flow at Kingston for scale.
| Gauge | Record | When | Context |
|---|---|---|---|
| Cricklade | 1.03 m | 26 November 2024 | Storm Bert, on the headwaters |
| Sutton Courtenay | 4.44 m | 26 July 2007 | Summer floods below Abingdon |
| Reading | 7.54 m | 7 January 2024 | Storm Henk |
| Maidenhead | 3.87 m | 4 January 2003 | Above the Jubilee River intake |
| Staines | 4.96 m | 11 February 2014 | Winter 2013 to 2014 |
| Walton | 4.40 m | 10 February 2014 | Winter 2013 to 2014 |
| Kingston | 5.71 m | 31 October 2000 | Lowest gauge on the non-tidal river |
| Kingston, peak flow | 806 m³/s | 18 November 1894 | Highest in the record from 1883 |
When has the River Thames flooded?
The Thames's large floods fall into two families: long river floods after weeks of rain, and tidal floods when a surge reaches London and the estuary. The National River Flow Archive's annual peaks at Kingston rank 1894, 1947, 1968, 1915 and 1974 highest; February 2014 comes twelfth.
- November 1894. Weeks of rain sent the river out of bank from the Cotswolds to Kingston. The peak of 806 cubic metres a second on 18 November is still the largest flow in the Kingston record.
- January 1928. A North Sea surge on a high tide met a river swollen by Cotswold snowmelt. The embankment failed at Westminster, the Tate Gallery flooded, and 14 people drowned in basement homes in London (SurgeWatch event record).
- March 1947. A thaw after a frozen winter, with heavy rain on top, gave 714 cubic metres a second at Kingston on 20 March and flooded much of the lower valley around Datchet, Wraysbury and Staines.
- January 1953. The great North Sea surge overwhelmed the estuary defences on the night of 31 January, and 58 people died on Canvey Island; our account of the 1953 North Sea flood covers the night and what followed.
- 2000 to 2007. Kingston's gauge reached its highest recorded level, 5.71 metres, on 31 October 2000; Maidenhead set its record in January 2003, and the July 2007 storms put Sutton Courtenay below Abingdon at 4.44 metres.
- Winter 2013 to 2014. Staines and Walton set their records on 10 and 11 February. Surrey County Council's Section 19 investigation counted about 1,170 incidents of internal property flooding in Runnymede alone, with the Thames the main source of river flooding there.
- 2024. Storm Henk took Reading to a record 7.54 metres on 7 January, and Storm Bert gave Cricklade its highest level on 26 November.
Which places does the River Thames flood, from Thames Head to Southend?
Every town on the non-tidal Thames faces the same mechanism, a slow river spreading across its floodplain, while every place below Teddington faces the tide. The Environment Agency's flood-monitoring service lists 122 flood warning and alert areas against the River Thames and 13 more on the Thames Estuary. The table names the main settlements and the warning area that covers each.
| Settlement | Reach | Dominant risk | EA warning or alert area |
|---|---|---|---|
| Ewen, Somerford Keynes and Cricklade | Headwaters, Gloucestershire and Wiltshire | River flooding; Cricklade's record level came in November 2024 | River Thames at Ewen; Somerford Keynes to Cricklade |
| Lechlade | Upper Thames, head of navigation | River flooding across meadows | Calcutt to Lechlade, including Hannington Wick |
| Oxford | Upper Thames, called the Isis through the city, with the Cherwell | Wide floodplain flooding at Botley, Osney and the Hinkseys | Binsey, Osney and Osney Island; New Botley, Hinksey and Grandpont |
| Abingdon | Upper Thames, with the Ock | River flooding | River Thames in Abingdon |
| Wallingford | Days Lock to South Stoke | River flooding | River Thames from Days Lock down to South Stoke |
| Goring, Streatley and Pangbourne | Goring Gap | River flooding | Goring and Streatley; Pangbourne and Whitchurch |
| Reading and Caversham | Middle Thames, where the Kennet joins | River flooding; record level in January 2024 | Reading and Caversham |
| Henley-on-Thames | Middle Thames | River flooding | Henley, Remenham and Medmenham |
| Marlow | Middle Thames | River flooding | Bisham village and Marlow town |
| Cookham and Bourne End | Middle Thames | River flooding | River Thames at Cookham; at Bourne End |
| Maidenhead and Taplow | Above the Jubilee River | River flooding, reduced since 2002 by the Jubilee River | Maidenhead to Windsor and Eton |
| Windsor and Eton | Middle Thames | River flooding, reduced by the Jubilee River | Maidenhead to Windsor and Eton |
| Datchet | Where the Jubilee River returns | River flooding | River Thames at Datchet |
| Wraysbury and Old Windsor | Lower non-tidal Thames | River flooding; badly hit in 1947 and 2014 | River Thames at Wraysbury; at Old Windsor |
| Staines and Egham | Lower non-tidal Thames | River flooding; record level in February 2014 | Staines and Egham |
| Laleham and Chertsey | Lower, with the Chertsey Bourne | River flooding | River Thames at Laleham; at Chertsey |
| Shepperton and Weybridge | Lower, where the Wey joins | River flooding | Shepperton and Lower Halliford; Hamm Court |
| Walton-on-Thames and Sunbury | Lower non-tidal Thames | River flooding; record level in February 2014 | River Thames at Walton; at Sunbury |
| Molesey, Thames Ditton and Hampton | Where the Mole and Ember join | River flooding | East and West Molesey; Thames Ditton; Hampton and Hampton Wick |
| Kingston upon Thames and Teddington | The tidal limit | River flooding above the weir, tide below it | River Thames at Kingston-upon-Thames; at Teddington |
| Richmond and Twickenham | Upper tidal Thames | High tides with high river flow | Tidal Thames from Richmond Bridge to Teddington Weir |
| Chiswick, Putney, Fulham and Battersea | West London tidal reach | Tidal, behind river walls | Putney Bridge to Teddington Weir alert; local warning areas |
| Westminster, the City and Southwark | Central London | Tidal, defended by the Barrier and the river walls | Tidal Thames at Westminster; London Bridge to Hungerford Bridge |
| Greenwich and Woolwich | Either side of the Thames Barrier | Tidal | Tidal Thames from Woolwich Arsenal to Deptford Creek |
| Thamesmead and Erith | Below the Barrier | Tidal; low former marshland behind embankments | Tidal Thames from Erith High Street East to Woolwich Arsenal |
| Dartford | Outer tidal Thames, at the Darent | Tidal | Dartford, Crayford and Greenhithe |
| Grays and Tilbury | Essex shore of the estuary | Tidal and surge | Grays to Purfleet; Shellhaven to Tilbury |
| Gravesend | Kent shore of the estuary | Tidal and surge | Gravesend and Northfleet |
| Canvey Island | Thames Estuary | Tidal and surge; 58 deaths in 1953 | Canvey Island north; Canvey Island south |
| Southend-on-Sea | Mouth of the estuary | Tide, surge and waves | Leigh-on-Sea; Southend seafront; Shoeburyness |
Our county pages for Oxfordshire, Berkshire, Surrey and Essex set the Thames beside the other rivers in each county, and the Runnymede page covers the borough worst hit in 2014. Every tributary with its own page is listed on our rivers hub.
What do the Barrier, the Jubilee River and the new schemes change for a site?
Defences on the Thames lower the chance of flooding without removing it, and a site behind one is still assessed for what happens if it is overtopped, breached or not yet built. The last case is a live one here: two of the Thames's largest schemes are still years from finished.
- The Thames Barrier. Operating since 1982, it had closed against flooding 221 times by 17 November 2025. The Environment Agency's Thames Estuary 2100 review says it protects central London against a storm tide with a 0.1 per cent chance in any year, and sets 2070 as the date by which it must be upgraded or replaced. Our article on the Thames Barrier explains how a closure is decided.
- Thames Estuary 2100. The Environment Agency's plan for the tidal river, from Teddington to Shoeburyness and Sheerness, covers defences that protect more than 1.4 million people and £321 billion of property. The Agency itself owns only 12 per cent of the estuary's defences; the rest belong to councils, ports and private owners.
- The Jubilee River. Opened in 2002, this 11.6-kilometre channel takes flood water off the Thames at Taplow and returns it at Datchet, and the Environment Agency credits it with protecting about 3,000 properties in Maidenhead, Windsor, Eton and Cookham. Whether it worsens flooding downstream is still disputed in Datchet and Wraysbury; our piece on the Jubilee River and downstream flood risk sets out the evidence.
- The River Thames Scheme. A new channel through Runnymede and Spelthorne, with more capacity at the Desborough Cut and at Sunbury, Molesey and Teddington weirs, aimed at around 11,000 homes and 1,600 businesses between Egham and Teddington. It still needs a development consent order, and a site there today is assessed against the river as it is; our note on the River Thames Scheme delays follows its progress.
- Oxford. The Oxford Flood Alleviation Scheme, a five-kilometre stream and wetland corridor west of the city from Botley Road to Kennington, had its contractor appointed in September 2026 with building due from 2027; see our update on the scheme's approval.
Behind any of these, an assessment allows for the standard of protection, the residual flood risk if the defence fails, and the climate change allowances over the development's lifetime.
Is the River Thames a Main River?
Yes. The Environment Agency regulates the Thames as a Main River from the Cotswolds to the sea, so the Agency, not the council, controls work in and beside the channel. Building within 8 metres of the bank on the non-tidal river, or within 16 metres on the tidal Thames, may need a flood risk activity permit from the Environment Agency as well as planning permission. The brooks and ditches that drain to it are mostly ordinary watercourses, looked after by their riparian owners and consented by the county or borough council.
- Flood zones decide the paperwork. Under chapter 18 of the National Planning Policy Framework, a site in Flood Zone 2 or 3, or a site of a hectare or more in Flood Zone 1, needs a site-specific flood risk assessment; our guide to flood zones 1, 2 and 3 explains each, and our NPPF policy notes cover the tests that follow.
- Two navigation authorities. The Environment Agency runs the non-tidal Thames as a navigation from Lechlade to Teddington, and the Port of London Authority the tidal river below. Moorings, landing stages and river walls may need their consent as well; GOV.UK keeps the river conditions and lock closures for boaters.
- Which side of the weir. Above Teddington the levels that matter are modelled river levels and floodplain storage; below it they are tide and surge levels, wall heights and the time a defence breach would take to fill a street.
Developing a site near the River Thames?
Get a free, no-obligation quote. One of our experienced flood risk consultants will get back to you within 60 minutes.
Start a QuoteFlood and drainage reports for sites on the fluvial and tidal Thames
Three questions come up on almost every Thames site, and each has its own report. A flood risk assessment shows the development is safe from the river and the tide and does not push water onto neighbours. A sequential test asks whether a site at lower risk was available. A drainage strategy works out where rain from new roofs and roads goes when the river is high or the tide holds the outfalls shut.
- Sites on the floodplain or behind the walls. Our flood risk assessment work starts from the Environment Agency's modelled levels for the reach, the gauge records at places like Staines and Reading, and the defences in front of the site.
- Planning applications. From Lechlade to Teddington the case officer will want modelled river levels and safe access; below Teddington, tide levels and breach depths. A flood risk assessment for planning covers whichever applies.
- Buying a riverside home. A flood risk survey for property purchase sets out for a buyer in Wraysbury, Shepperton or Osney how the area flooded in 2014 and 2024 and what the flood zone means for mortgage lending.
- New housing on the floodplain. Councils from Oxford to Spelthorne apply the sequential and exception test to new housing on the Thames floodplain, so the application has to show why this site and how it stays safe.
- Surface water. A drainage strategy shows how a riverside site discharges during a week-long river flood, when gravity outfalls to the Thames may not run.
- Runoff rates and SuDS. A surface water drainage strategy sets the discharge rate and storage the lead local flood authority will accept, including where an outfall is tide-locked below Teddington.
- Conditions after approval. Where a London borough or a Thames Valley council has granted permission subject to drainage conditions, our discharge of drainage conditions work supplies what is needed to clear them.
- Sites where national maps run out. Flood modelling gives a site its own levels where the Environment Agency's model is too coarse, for example close to a weir, a lock cut or a Jubilee River control structure.
- Homes that have flooded. After the 2014 and 2024 floods in Runnymede, Spelthorne and Reading, a flood risk assessment for insurance sets out the real risk to a house for its owner or insurer.
- Getting people out. Where a site on the tidal Thames is dry only while the walls hold, or a non-tidal site is cut off for days, a flood warning and evacuation plan sets out how occupants are warned and leave.
- Buying or lending on commercial riverside property. Wharves, offices and warehouses from Battersea to Tilbury sit inside the tidal defences, and a due diligence flood risk assessment puts the residual risk in front of a buyer or lender before completion.
- Keeping a business open. For occupiers on the floodplain at Reading, Staines or Thurrock, a business continuity flood assessment looks at how long a site could be shut and what keeps it trading.
Who manages flood risk on the River Thames?
The Environment Agency runs the river, the Barrier, the warnings and most of the main defences. Councils deal with surface water, groundwater and small watercourses as lead local flood authorities, from Gloucestershire and Oxfordshire through the Berkshire unitaries, Surrey and the London boroughs to Kent, Thurrock and Southend. Sewer flooding sits with the water company, and the planning detail for a borough sits on its own pages, such as Kingston upon Thames and West Oxfordshire.
- The river. The Environment Agency, under the Thames flood risk management plan for 2021 to 2027 and the Thames Estuary 2100 plan for the tidal river.
- Committees. The Thames Regional Flood and Coastal Committee covers the basin from Oxfordshire and Swindon to London and Essex; the Anglian (Eastern) committee takes in Southend-on-Sea and Thurrock, and the Southern committee the Kent shore.
- Emergency planning. Local Resilience Forums for Gloucestershire, the Thames Valley, Surrey, Kent and Essex, and the London Resilience Partnership in the capital.
- Sewers. Thames Water serves most of the basin; for an address on the Kent or Essex shore, check which company holds the sewers. Our pieces on the Thames Tideway Tunnel and the Thames Water crisis cover capacity.
- Warnings. Sign up free with the Environment Agency or ring Floodline on 0345 988 1188. Each warning area has its own page, such as the Putney Bridge to Teddington Weir alert area.
- In an emergency. Call 999 if life is at risk, and 105 for a power cut.
Questions about River Thames flooding
How likely is the River Thames to flood?
Out-of-bank floods on the lower river are less frequent than they were. Kingston's annual peak has passed 450 cubic metres a second, the flow the National River Flow Archive gives as bankfull there, in 19 of 143 years, but only three times since 1975: in 2000, 2003 and 2014. Behind the tidal defences in London the chance is much lower, because the Barrier is built for a storm tide with a 0.1 per cent chance in any year.
When was the last time the Thames flooded?
Storm Bert in November 2024 brought the highest level ever recorded at Cricklade, and Storm Henk in January 2024 set a record at Reading of 7.54 metres. The most widespread recent flooding of homes came in the winter of 2013 to 2014, when Staines and Walton recorded their highest levels.
What is the current river level on the River Thames?
Click a gauge pin on the map above for its latest reading; the gauges run from Ewen near the source to Kingston. GOV.UK's check for flooding service shows the same stations, and the Port of London Authority publishes tide gauges for the tidal river below Teddington.
Why does the River Thames flood?
Prolonged rain over a large, slowly draining basin brings the main river and its tributaries up together, and the water spreads over a wide floodplain for days. Below Teddington a North Sea surge on a high tide, combined with a high river flow, is what threatens London and the estuary.
Is the River Thames tidal, and where is the tidal limit?
Yes, below Teddington Lock in south-west London. Above Teddington the flood risk comes from rainfall and the river's own flow; below it, the tide and storm surge set the levels, which is why the tidal river is protected by the Thames Barrier and river walls while the upper river relies on relief channels and floodplain storage.
What is the worst flood the River Thames has had?
By flow, November 1894: 806 cubic metres a second at Kingston, still the highest in the record. The deadliest were tidal: 14 people drowned in London in January 1928, and 58 died on Canvey Island in the 1953 North Sea surge. March 1947, at 714, was the largest river flood of the twentieth century at Kingston.
Is the River Thames a Main River?
Yes. The Environment Agency regulates it as a Main River, so work within 8 metres of the bank, or 16 metres on the tidal river, may need a flood risk activity permit from the Agency in addition to planning permission. Smaller brooks and ditches that feed it are ordinary watercourses under the council and their riparian owners.
Which towns and suburbs does the River Thames flood?
On the non-tidal river: Oxford's western suburbs, Abingdon, Reading and Caversham, Maidenhead, Datchet, Wraysbury, Old Windsor, Staines, Chertsey, Shepperton, Walton and Molesey. Below Teddington the tidal risk runs through Richmond, west and central London, Greenwich, Thamesmead, Dartford, Thurrock, Gravesend, Canvey Island and Southend.
Does a planning application beside the River Thames need a flood risk assessment?
In most cases. A site in Flood Zone 2 or 3, or a hectare or more in Flood Zone 1, needs one, and a defended tidal site must still deal with residual risk. Work close to the bank may also need an Environment Agency permit, which is separate from planning permission.
How long will the Thames Barrier last?
The Environment Agency's Thames Estuary 2100 plan sets 2070 as the date by which the Barrier must be upgraded or replaced with a new barrier further downstream, and it keeps that date under review as sea level rise is monitored.
River or tide: which Thames is your site on?
Tell us the address and we will tell you which flood levels apply and what report the council will ask for. Get a free, no-obligation quote. One of our experienced flood risk consultants will get back to you within 60 minutes.
Start a QuoteWhether the site is a meadow plot at Lechlade or a wharf at Erith, call 01293 214444 or email enquiries@unda.co.uk and one of our chartered consultants will talk it through. Flood risk reports for Thames sites are prepared by Unda Consulting Limited, a CIWEM Business Partner.