A flood risk assessment in Southend-on-Sea starts at the sea wall. The city faces the outer Thames Estuary from Two Tree Island to Shoeburyness, and its own strategic flood study names surge tides off the estuary and the North Sea as the largest source of risk. Defences run along the whole frontage, yet the land behind them at Leigh Marsh, the Central seafront, Southchurch and Shoeburyness is still mapped as floodplain.

Our consultants prepare flood risk assessments in Southend-on-Sea for planning applications, house purchases, mortgages and insurance, alongside sequential and exception tests and surface water drainage strategies. Southend to most people, the city runs from Leigh-on-Sea, Chalkwell and Westcliff-on-Sea in the west through Prittlewell, Eastwood and Southchurch to Thorpe Bay and Shoeburyness, mostly in the SS0, SS1, SS2, SS3 and SS9 postcode districts. Southend-on-Sea City Council, a city since March 2022, is both the planning authority and the lead local flood authority.

The worst floods of recent years in Southend did not come over the sea wall. On 24 August 2013 a downpour on a high spring tide left 151 properties flooded inside, with the worst clusters in Eastwood, Chalkwell and along Marine Parade.

To talk through a site anywhere in the city, call 01293 214444 or email enquiries@unda.co.uk and one of our flood risk consultants will take it from there.

Is Southend-on-Sea in a flood zone, and which parts?

Most of it is not. The 2018 South Essex strategic flood risk assessment put about 89% of the city in Flood Zone 1, 3% in Flood Zone 2 and 8% in Flood Zone 3. Almost all of that higher-risk land is a narrow belt behind the estuary wall, plus the corridors of three small rivers. The ground rises steeply behind much of the seafront, which is why a road can sit in Flood Zone 3 while the next street up the cliff is clear.

Where flood risk sits in the city, frontage by frontage
AreaMain sourceWhat the council's flood studies foundWhat an assessment looks at
Two Tree Island and Leigh MarshTidal (estuary)Earth banks; the 2010 modelling shows the sea overtopping here before any breach, and a breach at Hadleigh Marsh flooding most of the islandWhether the use belongs there at all; access across low ground
Leigh Old TownTidal (estuary)Kept open to the estuary for the fishing trade, with resilient buildings and quick drainage in place of a raised wallFloor levels, flood-resilient construction and a flood plan for each building
Chalkwell to the pierTidal and surface waterHard defences; a 20 m breach modelled at Chalkwell; Chalkwell is also one of the six critical drainage areasBreach depth and hazard from the 2018 modelling, and runoff from the slopes above
Central seafront and City BeachTidal, surface water and sewersWall crests of 5.61 m to 5.86 m AOD; overtopping mostly confined to the Esplanade because ground rises sharply behind itDesign flood level, a 300 mm freeboard in Flood Zone 3 and safe access to higher ground
Southchurch Park and the WillingaleTidal and riverLower ground makes this the most exposed area if a defence is breached; Flood Zones 2 and 3 reach Northumberland Crescent, Lifstan Way and GreenwaysCombined tide and river levels; breach hazard; outfall capacity when the tide is in
Thorpe Bay to ShoeburynessTidal (estuary and open coast)Defences between Thorpe Bay Yacht Club and Shoebury Garrison assessed at only a 10% to 2% annual chance standard in the council's coastal scheme appraisalResidual risk behind a lower-standard defence and wave overtopping
Eastwood Brook corridorRiver and surface waterFlood Zones 2 and 3 around White House Road, Rayleigh Road, Snakes Lane, Orchard Grove and St Lawrence GardensBrook levels, blockage of culverts and trash screens, functional floodplain
Prittle Brook and Priory ParkRiver and surface waterA 1970s relief tunnel takes high flows to the Thames, giving about a 1% annual chance standard of protectionTunnel capacity, the open channel and runoff from the Prittle Brook critical drainage area

The flood zones show what would happen with no defences in place, so a defended street still appears in Flood Zone 3. Our note on why a house can be in a flood zone when it has never flooded explains the reasoning, and our River Thames page follows the tidal river from London out to the estuary mouth.

Look up a Southend postcode against the flood zones

Type in a Southend postcode and the map below returns the planning flood zone, the surface water risk and the climate change outlook at that point. The coral line follows the Office for National Statistics built-up area for Southend-on-Sea, which covers the city from Leigh to Shoeburyness and spills slightly into Rochford district at London Southend Airport. Rochford, Hawkwell, Hadleigh and Great Wakering are mapped as separate places and fall outside it. For an address elsewhere in England, our flood risk map runs the same check.

Southend-on-Sea's built-up area, from Leigh-on-Sea in the west to Shoeburyness in the east, is shown outlined in coral. Results are an indicative screening based on Environment Agency open data — not a Flood Risk Assessment.
Loading flood map…
Rivers & Sea
—
Surface Water
—
Reservoirs
—
Flood Zone (for planning)
—
Climate change (2070–2125)
—
Historic flooding
—
Flood warning area
—
Live flood warnings (nearby)
—
Important: This tool gives an indicative screening only, based on modelled Environment Agency datasets (Flood Map for Planning Flood Zones 2 & 3, Flood Zones plus Climate Change 2070–2125, Risk of Flooding from Rivers and Sea, Risk of Flooding from Surface Water, reservoir, historic, flood warning area, flood storage area, flood defence and main river data) under the Open Government Licence. It reflects the area around the postcode, not the exact property, and does not account for finished floor levels, ground levels or groundwater. It is not a Flood Risk Assessment and must not be relied on for planning, conveyancing, insurance or design decisions. Data © Environment Agency copyright and/or database right; contains Ordnance Survey data © Crown copyright and database right. The Southend-on-Sea boundary shown is a built-up area from the Office for National Statistics (Built-Up Areas 2022, built-up area ‘Southend-on-Sea’; Open Government Licence; contains OS data © Crown copyright and database right).

Sea walls, breach models and the levels a Southend site is judged against

A defended site is not a safe site by default. The council's flood studies test what happens if a wall is overtopped or breached. Their depth, hazard and timing maps are the starting point for floor levels and escape routes on any seafront scheme. The defences themselves vary more than the flood map suggests.

  • The record tide. The 1953 surge reached 5.03 m above Ordnance Datum, the highest tide ever recorded there according to the Environment Agency's South Essex catchment plan quoted in the 2010 study.
  • Design standard. Environment Agency asset data puts the embankment south of Leigh station, the town sea wall with its cobble masonry revetment, and the Shoebury Common and Suttons walls at a design standard of 1 in 1,000 years.
  • Actual condition. The council's 2015 development management document still records that some frontage defences fall below the 1 in 200 year standard for today's sea levels. The Shoeburyness appraisal rated the walls east of Thorpe Bay lower still.
  • Breach testing. The 2018 study modelled seven breaches for today and for 2116 with climate change. They range from a 50 m gap in the earth bank at Hadleigh Marsh to 200 m gaps in the embankments at Shoeburyness New Ranges and Morrin's Point.
  • The long-term plan. Thames Estuary 2100 gives the Leigh Old Town and Southend-on-Sea unit a P4 policy, which means further action to keep pace with rising seas. By 2040 defence owners are expected to adapt the frontage and, with the Environment Agency, raise it where needed.

Our guides to residual flood risk and how storm surges form explain what a breach model is testing, and the Environment Agency's TE2100 page for this unit sets out what is planned along the shore.

Floods recorded in Southend-on-Sea since 1953

The city's record falls into two kinds of event: rare surges off the estuary, and summer and autumn downpours that come round every few years. Since 2013 it is the downpours, often arriving on a high tide that blocks the outfalls, that have flooded homes.

  1. 31 January to 1 February 1953. The North Sea surge overtopped the defences. The Kursaal, the Thorpedene estate, Southchurch Park and the gasworks were flooded, according to the record kept in the city's 2010 flood study.
  2. September 1968. About 150 mm of rain fell on the catchment in 24 hours and roughly 200 properties in Southend flooded. Major channel works followed on all three of the city's brooks, and the Prittle Brook relief tunnel in the 1970s.
  3. 24 August 2013. Intense rain on a high spring tide brought 255 reports of flooding and 151 homes and businesses flooded inside. Three properties, two of them sheltered housing, were evacuated, and around Glenwood Avenue in Eastwood a blocked trash screen and pump failures at Rayleigh Weir added to the damage.
  4. 11 and 13 October 2013. Heavy rain at high tide caused 20 recorded incidents, with repeat flooding on Chalkwell Esplanade, Victoria Avenue, Thorpe Hall Avenue and Ness Road.
  5. 20 July 2014. A short, heavy storm over the west of the city caused 30 recorded incidents, including flooding inside Southend General Hospital.
  6. 19 September 2014. Another short storm brought 61 flood reports. Anglian Water, the council and the Environment Agency formed a flood partnership in response to the 2014 events.
  7. 20 October 2021. A slow-moving storm dropped 33.7 mm in six hours on the Southchurch Park gauge. Water mixed with sewage stood 200 mm to 250 mm deep in the Victoria Road low point for up to three hours. Homes on Rayleigh Road in Leigh flooded that night too, and again in February 2022.

The council investigated each of these under its Section 19 duty, and the reports are on its flood investigation page. Our article on the 1953 North Sea flood covers the surge along the whole east coast, including Canvey Island next door.

Prittle Brook, Eastwood Brook and the Willingale: three rivers that rise fast

All three are main rivers, run by the Environment Agency and heavily engineered since the 1968 flood, and while the Prittle and Eastwood brooks drain the higher western half of the city north to the River Roach in Rochford district, the Willingale runs south through Southchurch Park to the estuary. Steep urban catchments mean little warning when they rise. The Prittle Brook peaks in under three hours.

The city's rivers and how each one behaves in a storm
RiverCourseHow it respondsFlood warning cover
Prittle BrookFrom Belfairs Park east to Priory Park, then north to the Roach at Sutton Ford BridgePeaks about 2.8 hours after heavy rain; 33.3 m³/s in a 1% annual chance flood; high flows diverted to the Thames at Chalkwell by the relief tunnelNamed with the Eastwood Brook in the Prittlewell Brook warning area
Eastwood BrookEast through Eastwood, in and out of culverts, then north to the Roach at RochfordPeaks about 4 hours after rain; 28.6 m³/s in a 1% annual chance flood; about 7.6 km of channel straightened and concrete-linedEastwood Brook from downstream of Rayleigh Weir and the Prittlewell Brook to Southend Airport
Willingale BrookThrough Southchurch Park in an open channel to an outfall on the estuaryTwo balancing ponds and an Anglian Water pumping station; the outfalls south of Camper Road have non-return valves and cannot empty while the tide is highShoeburyness to Southend Pier including Southchurch Park (tidal)

Upstream, the culvert under Belfairs Park cuts the Prittle Brook's capacity, and at high flows water backs up behind it into homes in Woodlands Park and Cosgrove Avenue, according to the council's 2015 surface water management plan. Our live river levels map shows current readings and warnings across the estuary. Where a brook runs beside or under a plot, the owner usually has a riparian owner's duties, which our notes on main rivers and ordinary watercourses and culverts explain. The Roach itself reaches the sea through Rochford district, which has its own page.

Surface water, sewers and clay: the six critical drainage areas

Rain is the flood source a Southend drainage strategy meets most often. It caused every flood the council has investigated since 2013. The council's 2015 surface water management plan estimated about 3,100 homes at risk in a 1% annual chance storm and grouped the worst areas into six critical drainage areas. London Clay under much of the city stops water soaking in, and the land falls west to east, so runoff gathers in the low ground near the seafront.

Critical drainage areas named in the 2015 surface water management plan
Critical drainage areaWhat the plan records
CDA1 EastwoodFluvial and surface water flooding beside the Eastwood Brook, including Glenwood Avenue
CDA2 Prittle BrookSurcharging sewers and lifted manhole covers around Prince Avenue and Rochford Road
CDA3 Temple SuttonSurface water ponding in the north-east of the city
CDA4 SouthchurchSewer flooding on the Eastern Esplanade, Marine Parade and Hartington Road
CDA5 ShoeburynessSurcharging manholes on Ness Road and Campfield Road, where outfalls to the sea are restricted
CDA6 ChalkwellRepeated flooding at the manhole under the railway crossing on Chalkwell Avenue

Groundwater adds to the picture in places. The 2018 study puts the town centre at a 50% to 75% chance of groundwater emergence and the land north of Shoeburyness above 75%, which matters for basements and deep storage tanks. Our ground conditions and soakaway checker gives an early read on the geology, the BRE 365 infiltration rate calculator works through test results, and our drainage calculators size storage. Our explainer on critical drainage areas covers why a site inside one is treated more strictly.

Planning policy for flood risk in Southend-on-Sea while the new Local Plan waits

Applications are still decided against plans adopted between 2007 and 2018. None of them post-dates the 2021 storm. The council's new Local Plan proposes 14,700 homes to 2045. Its final consultation was due in September 2026, but the council paused publication in August, and on 4 September the housing minister issued a direction requiring the draft and its evidence. As lead local flood authority, the city council also reviews the drainage of major schemes itself.

Plans, studies and national policy behind a Southend planning decision
DocumentStatusWhat it asks of a site
Core Strategy, Policies KP1 and KP2Adopted December 2007A detailed flood risk assessment wherever flood maps or the strategic study show risk; a sequential approach that avoids or mitigates flooding
Development Management Document, Policy DM6 The SeafrontAdopted July 2015Flood defence works or resistant and resilient design with safe refuge, without blocking future maintenance or raising of the defences
Southend Central Area Action Plan, Policy DS4Adopted February 2018For homes, habitable floors above the 1 in 200 year level plus climate change, with 300 mm freeboard in Flood Zone 3; safe access to Flood Zone 1; a flood plan; SuDS for all new hard surfaces and no surface water to foul sewers
The city's own strategic flood risk assessment (Scott Wilson, two volumes)September and November 2010Tidal breach and overtopping maps for the Central Area and the airport area
South Essex Level 1 strategic flood risk assessmentApril 2018, shared with Basildon, Castle Point, Rochford and Essex County CouncilUpdated breach modelling to 2116, flood zone shares and the record of floods to 2014
Local flood risk management strategy and surface water management planNovember 2015The six critical drainage areas and the council's surface water actions
National Planning Policy Framework, chapter 18August 2026Policy F4 on when an assessment is needed, F5 and F6 for the sequential and exception tests, F8 for the 2025 National Standards for sustainable drainage

The development management document also expects a site of more than a hectare to check the council's and Anglian Water's flood records as well as the national maps. Our explainer on the 2025 National Standards for sustainable drainage sets out what a drainage strategy now has to show.

Planning a scheme behind the Southend sea wall?

Send us the address and the proposal and we will tell you which reports the city council is likely to ask for. Get a free, no-obligation quote: one of our experienced flood risk consultants will reply within 60 minutes.

Start a Quote

Seafront regeneration, flats and the airport: what development here involves

The Core Strategy asks development to make the best use of previously developed land, so much of the city's new housing comes from conversions, infill and town-centre renewal. Much of that sits in the Central Area and along the seafront, where Policy DS4 and the tidal breach maps shape the layout before anything else.

  • Better Queensway. The council's town-centre renewal includes three underground tanks, 126 m long in total, holding up to 750,000 litres of rain to protect seafront businesses; the first sections arrived in July 2026.
  • Flats and conversions. Turning a house or shop into flats in Flood Zone 3 adds a more vulnerable use, which brings the sequential test into play and puts bedrooms above the design flood level.
  • The seafront character zones. Policy DM6 divides the shore into zones from Two Tree Island and Leigh Port to Shoeburyness, each with its own rules, and every scheme there must take account of flood risk and coastal change.
  • Basements. Basements in the town centre face groundwater and sewer surcharge as well as the tide; our guide to basement conversions in a flood zone covers the planning rules.
  • Employment land by the airport. The 2010 study found the London Southend Airport area free of tidal risk, with the Eastwood Brook the main concern for business and industrial schemes there.

On brownfield plots in the Central Area, the action plan aims for greenfield runoff rates wherever possible. Any shortfall has to be agreed by whoever runs the receiving drain: the council for watercourses, Anglian Water for public sewers.

Proposals that need a flood risk assessment in Southend-on-Sea, and some that do not

It depends on the flood zone, the size of the plot and the use. An assessment is needed in Flood Zones 2 and 3, on sites of a hectare or more, and where surface water or another source puts the site at risk. In the Central Area, Policy DS4 asks for one wherever a scheme falls in a flood zone.

Typical proposals in the city and the flood evidence each needs
ProposalAssessment needed?Why
Rear extension to a house near Southchurch ParkYes, usually a short householder assessmentFlood Zone 2 or 3 from the Willingale and the tide; floor levels and resilience are the main points
Flats above a shop on the Central seafrontYes, with the sequential testA more vulnerable use in Flood Zone 3; DS4 floor levels, 300 mm freeboard and a flood plan
New house on a garden plot in Prittlewell, Flood Zone 1Not normally for flood zones; check surface waterRequired if the plot is in a mapped surface water flow path or on land the council's records show has flooded
Business unit near London Southend AirportOften, depending on the brookEastwood Brook Flood Zones 2 and 3 and runoff from the airport catchment
Ten or more homes anywhere in the cityYes, with a drainage strategyMajor development: the city council, as lead local flood authority, reviews the surface water drainage
Café or beach-hut kiosk on the EsplanadeYes, a proportionate assessmentLess vulnerable use in Flood Zone 3; DM6 asks that it does not block future work on the defences

Where the sequential test applies, showing that no lower-risk site is reasonably available can take longer than the assessment itself, so it is worth starting early. Our guide to converting a house into flats covers that case in more detail.

Reports we prepare for sites from Leigh to Shoeburyness

Each report answers a different question about a site in the city, from whether it can be built to where the rain goes afterwards. The consultants who prepare them are chartered, Unda is a CIWEM Business Partner, and every report is checked and signed off by a senior consultant.

  • Schemes behind the sea wall. Flats, conversions and new homes in the tidal flood zones need a flood risk assessment for planning that uses the breach maps and meets Policy DS4 or DM6.
  • Tide, rain and brooks together. A flood risk assessment for a Southend site weighs the estuary, the three rivers, surface water, sewers and groundwater against each other, because the river and sea map alone misses the floods of 2013 and 2014.
  • Before you exchange. Homes on the Esplanade, around Southchurch Park or beside the Eastwood Brook often come back flagged in searches, and a flood risk survey for property purchase looks at the actual building, its floor level and its flood history.
  • Homes in Flood Zone 3. New homes on the Central seafront usually need a sequential and exception test to show why the site is needed and how it stays safe.
  • Clay and tide-locked outfalls. London Clay and outfalls that shut on a high tide mean a drainage strategy here has to plan for storage rather than soakaways in most of the city.
  • Major schemes and the Central Area. The city council reviews every major scheme, and DS4 asks for SuDS on all new hard surfaces, so a surface water drainage strategy belongs in the first submission.
  • After permission. Where consent comes with drainage conditions, we handle the discharge of drainage conditions with the calculations and maintenance plan the council asks for.
  • Plans for the flood zone. Policy DS4 asks for a flood plan covering warning and evacuation, and five Environment Agency warning areas cover the city, so a flood warning and evacuation plan often accompanies a seafront scheme.
  • Breach and brook detail. Where the 2010 and 2018 breach maps or the brook models are too coarse for a plot, flood modelling sets the depth and hazard on the site itself.
  • After 2013 and 2014. Homes flooded in the storms of 2013, 2014 and 2021 can face higher premiums, and a flood risk report for insurance gives brokers property-level evidence.
  • High groundwater. The town centre and the land north of Shoeburyness show a high chance of groundwater emergence, so a groundwater flood risk assessment matters for basements and below-ground tanks.
  • Combined sewers. Anglian Water's combined and pumped sewers surcharge in four of the critical drainage areas, so a foul drainage strategy shows where the waste goes and that the network can take it.
  • Buying seafront property. Hotels, arcades and shops on the Esplanade change hands on defended land, and flood risk due diligence sets out the residual risk before a commercial purchase.
  • Seafront trading. The Queensway storage tanks were built to protect seafront businesses from rain floods, and a business continuity flood assessment helps an operator plan for the tide and the storm.
  • Commercial schemes. Business units near London Southend Airport and offices in the Southend Central Area may be aiming for BREEAM credits, and a BREEAM flood risk assessment covers the flood and runoff criteria.

Reporting a flood in Southend-on-Sea, and who manages each source

If floodwater threatens anyone's safety, dial 999, and report a power cut on 105. Otherwise, who to contact turns on the source of the water:

Which body handles each kind of flooding in the city
OrganisationIts part in Southend-on-SeaWhere to find it
Southend-on-Sea City CouncilLead local flood authority for surface water, groundwater and ordinary watercourses; planning and highway authority; maintains the defences along the central frontageFlood strategies and responsibilities; LLFA@southend.gov.uk
Environment Agency, East Anglia area (it covers Essex, Norfolk and Suffolk)The estuary, the Prittle, Eastwood and Willingale main rivers; flood warningsFloodline 0345 988 1188; current warnings and levels for Southend
Anglian WaterPublic sewers, surface water outfalls to the estuary and the Southchurch Park pumping stationReport sewer flooding to Anglian Water
Anglian Eastern Regional Flood and Coastal CommitteeApproves flood and coastal schemes and local levy spending; the city council has a seatCommittee page
Essex Resilience ForumMulti-agency emergency planning for Essex, Southend and ThurrockEssex Prepared
Emergency services and power networkAnyone in danger from floodwater; a power cut caused by flooding999 in an emergency; 105 for power cuts

Environment Agency flood warnings are free and cover the three tidal warning areas from Hadleigh Marshes to Shoeburyness as well as the Eastwood Brook. The 2018 flood zone shares predate the latest national flood mapping, so check any site on the Environment Agency's Flood Map for Planning as well.

Before you buy or build in Southend-on-Sea: common flood questions

My plot is in Flood Zone 1. Could it still need a flood risk assessment in Southend-on-Sea?

Sometimes. Outside the flood zones you need one for a site of a hectare or more, or where another source such as surface water, a sewer or groundwater puts the site at risk. In Southend that often means plots in or beside the six critical drainage areas, from Eastwood and Chalkwell to Shoeburyness.

Is Southend-on-Sea at risk of flooding from the sea or from heavy rain?

Both, but in different places. The sea is the bigger threat in theory and is held back by defences along the whole frontage. In practice the floods of 2013, 2014 and 2021 were caused by heavy rain, often when a high tide stopped the drains emptying into the estuary.

How can I find the flood zone for a Southend address?

Most addresses are in Flood Zone 1. The belt behind the sea wall from Leigh Marsh to Shoeburyness, the area around Southchurch Park and the brook corridors in Eastwood and Prittlewell fall in Flood Zones 2 and 3. Type the postcode into the map on this page or the Environment Agency's Flood Map for Planning to see the zone for a specific spot.

What does a flood risk assessment in Southend-on-Sea cost, and what affects the price?

It depends on the site, the proposal and whether breach data or modelling is needed. A short householder assessment costs less than a report for flats on the seafront. Every quote is a fixed fee, and one of our consultants will reply to a quote request within 60 minutes.

Who can prepare a flood risk assessment for a site in Southend?

A flood risk specialist who can read the breach maps, the council's drainage records and Policy DS4 together. Our chartered consultants prepare assessments across the Thames Estuary, and a senior consultant checks and signs off every report.

My flood map search came back low risk. Can I skip the assessment?

Not always. National maps screen an area, not a building, and the Flood Map for Planning shows river and sea flooding only. A low result can miss surface water in a critical drainage area, a culverted brook or a past sewer flood, any of which can still lead the council to ask for an assessment.

How do I get a flood risk assessment started for a Southend site?

Email us the address with a site plan and a short description of the scheme or the purchase. We will confirm which reports the city council or your lender is likely to need and send a fixed-fee quote.

Does Leigh Old Town have a flood wall?

Not a raised one along the old town itself. The Thames Estuary 2100 plan keeps Leigh Old Town open to the estuary for its fishing industry and relies on resilient buildings and quick drainage instead. Any work to a building there should plan for water getting in and drying out quickly afterwards.

Will a soakaway work in Southend?

In most of the city, probably not. London Clay underlies large areas and slows infiltration, although River Terrace sands and gravels near the coast can drain better. Our guide to infiltration testing explains when the council will want test results before accepting a soakaway.

Is Essex County Council or the city council the lead local flood authority for my site?

Within the city it is Southend-on-Sea City Council, the same body that decides planning applications. Outside it, in Rochford, Castle Point and the rest of Essex, the role belongs to Essex County Council. A site at London Southend Airport can sit on either side of the line, so check the boundary first.

Up against an exchange date or a planning deadline in Southend?

Tell us about the site and when you need the report. Your quote is free and fixed, and one of our experienced flood risk consultants will reply within 60 minutes.

Start a Quote

For a site anywhere from Two Tree Island to Shoebury, call 01293 214444 or email enquiries@unda.co.uk. The wider county is covered on our Essex page, and the neighbouring estuary pages cover Canvey Island, a few miles upstream, and the Isle of Sheppey across the water in Kent.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.