Flood Risk & Drainage Requirements for Calderdale Council
Contact Us
Calderdale Council decides flood risk under Calderdale Policy CC2 of its Local Plan, adopted on 22 March 2023. As Lead Local Flood Authority, it then checks the drainage against its own Flood Risk and Drainage SPD of July 2024. The requirement that reaches furthest sits in that SPD and the validation list: any development in Flood Zone 2 or 3 counts as major development for surface water, so two houses or a small conversion there need a full drainage strategy and the council's pro forma.
CC2 also goes further than national policy in two places. It creates Flood Zone 3ai, built-up land that would be functional floodplain if it were not already developed, and bars new homes from it. And it asks for a site-specific assessment anywhere in a Critical Drainage Area, whatever the flood zone. This page sets out those requirements, the documents that carry them and how our reports meet each one. To talk a site through, call 01293 214444 or email enquiries@unda.co.uk.
Calderdale Council as planning authority and flood authority: who decides what
Calderdale is a metropolitan borough, so there is no county council above it. The same council determines the application and acts as the Lead Local Flood Authority for surface water, groundwater and ordinary watercourses, which means a drainage objection lands straight on the planning file.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Calderdale Council (Planning Services) | Local planning authority | Decides the application against Policies CC1 to CC4 and RT7 of the Local Plan, the Flood Risk and Drainage SPD and the NPPF; applies the sequential test and agrees its area of search |
| Calderdale Council (Flood Risk Management Team) | Lead Local Flood Authority | Consulted on all major and relevant minor applications (SPD 9.7); reviews the drainage strategy and pro forma; agrees the discharge rate before it approves or conditions a scheme; grants ordinary watercourse consent; holds the Local Flood Risk Management Strategy (June 2016) |
| Environment Agency | Statutory consultee | Flood Zone 2 and 3 sites at risk from the River Calder and its main river tributaries; floodplain compensation; its own consent for works in or beside a main river |
| Yorkshire Water | Sewerage undertaker | Connections to public sewers, their capacity and the permitted rate; adoption of sewers |
| Canal & River Trust | Owner of the Rochdale Canal and the Calder and Hebble Navigation | Named in the SPD as one of the borough's key water management authorities; involved where a discharge or works affect a canal |
No internal drainage board covers any part of Calderdale; the SPD's list of water management authorities stops at the four bodies above. Pre-application advice is encouraged on both sides of the council, and the validation list expects the sequential test's search area to be agreed with officers, usually through formal pre-application. When the drainage team does object, the guide to an LLFA objection explains how one is answered.
Calderdale Local Plan flood and drainage policies, CC1 to CC4 and RT7
Chapter 12 of the Local Plan, "Flooding and Water Resource Management", holds the flood and drainage policies, and Policy RT7 adds a change-of-use rule for town centres. The table gives each policy's test and how our reports answer it; the sections below quote the wording.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy CC1 | Climate Change | Development to mitigate and adapt to climate change, including by minimising flood risk and limiting surface water runoff (criterion g) | Show the scheme limits runoff and allows for climate change | Climate change allowances applied to flood levels and to the drainage storage in every report | Local Plan, adopted 22 March 2023 |
| Policy CC2 | Flood Risk Management (Managing Flood Risk in New Development) | A sequential, risk-based approach; extra limits in Flood Zone 3ai; a site-specific FRA over 1 ha in Flood Zone 1, in Flood Zones 2 and 3, and in any Critical Drainage Area | Pass the sequential test where it applies, and show the scheme is safe for its lifetime without raising flood risk elsewhere | A flood risk assessment covering every source, with a separate sequential test report where one is needed and the CDA drainage check where the site lies in one | Local Plan, adopted 22 March 2023 |
| Policy CC3 | Water Resource Management | SuDS on major development unless clearly inappropriate, taking the LLFA's advice; a groundwater risk assessment in a Source Protection Zone; water and wastewater capacity in place | Provide a SuDS-led drainage strategy with operating standards and lifetime maintenance | A surface water drainage strategy built to the SPD's rates, storms and pro forma, with the maintenance plan | Local Plan, adopted 22 March 2023 |
| Policy CC4 | Catchment Management | Support for natural flood management in upper catchments and along watercourses | Where a scheme includes slow-the-flow measures, show they fit the catchment plans and protected sites | Natural flood management measures described and weighed in the flood risk assessment where they form part of the scheme | Local Plan, adopted 22 March 2023 |
| Policy RT7 | Residential Use in Town Centres | For a change of use in a town centre, the CC2 sequential and exception tests do not apply, but an assessment of flood risk showing safe access and egress is still needed | Show safe access and escape, and floor levels above the design flood where homes are created | A flood risk assessment for the conversion, with the access route and floor levels set out in figures | Local Plan, adopted 22 March 2023 |
Requirements checked November 2026.
Policy CC2 Flood Risk Management (Managing Flood Risk in New Development): what it requires
Calderdale Policy CC2 steers development away from Flood Zones 2 and 3 and, where it cannot be avoided, requires an assessment proving the site safe. Part I lists nine tests, from "Development cannot be accommodated in a lower flood risk zone" to resilient design, and part III sets the assessment triggers: "Site-specific FRAs will be required for development proposals over 1 hectare in Flood Zone 1 and for development proposals in Flood Zones 2 and 3. Site-specific FRAs will also be required for development proposals which fall within CDAs, regardless of which Flood Zone applies." (Local Plan Written Statement, Chapter 12)
Part II is Calderdale's own. The 2016 SFRA mapped land that would act as functional floodplain if buildings did not already stand on it and called it Flood Zone 3ai. There, "No new highly vulnerable or more vulnerable uses will be permitted with less vulnerable uses only being permitted provided that the sequential test has been passed", extensions must be linked operationally to an existing business, a redevelopment may not exceed the footprint it replaces, and compensatory storage is expected. Any part of a site the assessment shows to be working as floodplain stays undeveloped. Because 3ai is by definition land already built on, it applies to redevelopment and conversion sites. A scheme that would bring homes onto it conflicts with part II(a) before any floor level is measured. Use comes first; levels come second.
In a Critical Drainage Area, part III adds that the assessment "should also demonstrate that new development is not at risk from flooding from existing drainage systems or potential overflow routes". The eleven CDAs from the SFRA run from Walsden to Bailiff Bridge and are drawn on the Local Plan Policies Map; our explainer on critical drainage areas covers the national picture. Our assessment checks the flood zone and the 3ai mapping first, then traces the sewer and highway drainage and any overflow route into the site. It answers part I criterion by criterion, so an officer can check each one against the evidence.
Policy CC3 (Water Resource Management): SuDS on major development
Policy CC3 is the drainage policy, and its core line is part III: "Major developments should incorporate sustainable drainage systems unless there is clear evidence that this would be inappropriate." The systems must take account of the LLFA's advice, have minimum operating standards and carry maintenance arrangements for the life of the development. Part II asks for a hydrogeological risk assessment in a groundwater Source Protection Zone, and part IV makes water and wastewater capacity a precondition (Local Plan, Chapter 12).
The supporting text says the council "will only regard SuDS as inappropriate in exceptional circumstances", which leaves little room for a pipe straight to the sewer. In practice "major" reaches further than the national definition, because the SPD and the validation list treat any scheme in Flood Zone 2 or 3 as major for surface water. Our drainage strategy works down the SuDS hierarchy with test results behind each step and fills in the council's pro forma from the same calculations.
Policy CC4 (Catchment Management) and slowing the flow
Policy CC4 supports "natural flood management such as targeted land and vegetation management and planting in upper catchments and along watercourses" where it is consistent with national and local policy, and asks such schemes to improve water quality and habitats without harming protected moorland. Its supporting text draws on the Flood Commission for Calderdale, set up after the Boxing Day 2015 floods, which found that slowing runoff from the moors could reduce risk. For most housing schemes CC4 supports rather than tests. A rural or moorland-edge proposal that includes leaky dams or planting should still show where they sit and what they hold back; the natural flood management article looks at the Calderdale schemes alongside others.
Policy CC1 (Climate Change): the runoff criterion
Policy CC1 asks every proposal to show mitigation and adaptation for climate change through nine criteria, one of which is "Minimising flood risk, limiting surface water run off". It sets no figures of its own; the numbers come from the SPD and the Environment Agency's allowances, which our reports apply to both the flood levels and the drainage storage.
Policy RT7 (Residential Use in Town Centres): conversions in Flood Zone 3
Policy RT7 encourages flats above shops, and part II takes changes of use out of the CC2 sequential and exception tests. It still requires "an assessment of flood risk which demonstrates that safe access and egress can be achieved" (Local Plan, Policy RT7). The SPD then adds that turning commercial space into ground-floor flats in Flood Zone 3 "is unlikely to be acceptable" unless floor levels can sit above the design flood level and there is safe escape from upper storeys (paragraph 7.19). For a town-centre conversion in Todmorden, Hebden Bridge or Brighouse, that puts the weight of the assessment on the ground floor. Shops can stay at ground level; new bedrooms there need floor levels above the design flood.
Local Plan 2 and the policies CC2 replaced
A review of the Local Plan is under way. The council's Local Development Scheme, in effect from July 2025, sets a timeline running to 2031, and its planning policy pages call the next plan "Local Plan 2". No consultation draft had been published at our November 2026 check, so no replacement for CC1 to CC4 is proposed yet. The 2023 policies remain the adopted development plan for every application. Older reports and appeal decisions still cite the Replacement Calderdale UDP of 2006, whose flood and drainage Policies EP16, EP17, EP18, EP19, EP20, EP21, EP22 (Sustainable Drainage Systems) and EP23 were deleted and replaced when the Local Plan was adopted in March 2023; CC2 and CC3 now cover the same ground.
In Flood Zone 3ai, a Critical Drainage Area, or both?
Send us the address and the scheme, and we will tell you which parts of CC2, CC3 and the SPD it has to meet. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteWhich reports a Calderdale application triggers, from Flood Zone 3ai to a CDA
A flood risk assessment, a sequential or exception test and a drainage strategy are separate reports, and Calderdale sets a trigger for each. The table combines Policy CC2, the SPD and the January 2025 validation list.
| Trigger | Flood risk assessment | Sequential and exception tests | Drainage strategy and pro forma |
|---|---|---|---|
| Any development in Flood Zone 2 or 3, including minor development and change of use | Yes (CC2 part III; validation list) | Sequential test unless the scheme is minor, a change of use or on a site allocated for the same use; exception test where the vulnerability table requires it | Yes: treated as major development for surface water, householder schemes excepted (validation list; SPD Appendix 3) |
| Flood Zone 3ai (developed functional floodplain) | Yes, showing compensatory storage and leaving any working floodplain undeveloped (CC2 part II) | No new highly or more vulnerable uses; less vulnerable uses only after passing the sequential test | As for Flood Zone 3 |
| Flood Zone 1 site of a hectare or more, any use | Yes (CC2 part III) | Where the SFRA or other mapping shows risk from another source (SPD Step 2) | Yes: major development |
| Any site in a Critical Drainage Area | Yes, whatever the flood zone, including the existing drainage and overflow routes (CC2 part III) | Can be needed for significant surface water risk (SPD Step 2); national guidance waives it where the assessment shows the layout keeps people safe from surface water | As for the scheme's size and flood zone; CC2 expects runoff reduced, particularly in CDAs |
| Change of use in a town centre (Policy RT7) | Yes: safe access and egress must be shown | Not applied (RT7 part II) | Where the validation list triggers apply |
| Residential site on defended land in Flood Zone 1 | May be required, with breach modelling (SPD Table 6.1) | As for the flood zone | As for the scheme's size |
| Flood Zone 1: 5 or more homes, 500 m² of commercial floor space, or 100 m² or more of new roof or hard surface | Only if another trigger applies | No | Surface water drainage form and strategy (validation list); smaller non-householder schemes give drainage details |
| Works to an ordinary watercourse or culvert | Only if another trigger applies | No | Ordinary watercourse consent from the council, separate from planning (SPD 9.38) |
Two lines in the SPD matter before any of this. Paragraph 6.4 says that "Applications for sites in Flood Zones 2 and 3 where there is no Sequential Test information submitted will be deemed to have failed the Sequential Test", and Step 2 extends the test to Flood Zone 1 land the SFRA shows at risk now or in future. The evidence goes in with the application, not after it. Before anything is drawn, check the flood zone on our flood risk map and the CDA and 3ai layers on the council's Policies Map. The guide to an application invalidated over flood risk or drainage covers what happens when either is missed.
Drainage rules in the Flood Risk and Drainage SPD (July 2024)
The LLFA's standards are in chapter 9 of the Flood Risk and Drainage SPD, adopted by the council on 24 July 2024 to implement CC2, CC3 and CC4. It builds on the West Yorkshire Combined Authority's Leeds City Region SuDS guidance of 2020, adding Calderdale's own rates, storms and evidence requirements.
| Requirement | Calderdale standard (SPD paragraph) |
|---|---|
| Discharge to a watercourse | Greenfield runoff (Qbar, by FEH or IH124) or 2.5 litres per second per hectare, whichever is greater, for all storms up to 1 in 100 years with climate change (9.44) |
| Previously developed site with a proven connection | Existing rate minus at least 30% where the receiving watercourse is proven sound; minus at least 50% where its condition or capacity cannot be proven (9.45) |
| Brownfield discharge to a sewer | Existing 1 in 1 year rate minus at least 30%, held for all storms up to 1 in 100 years with climate change, unless Yorkshire Water advises otherwise (9.54 to 9.55) |
| Design storms | No system surcharge in a 1 in 2 year storm plus 30% for climate change; no surface flooding in a 1 in 30 year storm plus 30%; no internal flooding, including access and egress, in a 1 in 100 year storm plus an appropriate allowance (9.16, adopted SPD) |
| Climate change on the 1% AEP storm | Aire and Calder catchment: central 25% to the 2050s and 30% to the 2070s, upper end 40% and 45% (SPD Tables 5.5 and 5.6, from the Environment Agency allowances) |
| Urban creep | 10% added to the impermeable area on every scale of development (9.22) |
| Discharge hierarchy | Infiltration, then a watercourse, then a surface water sewer or highway drain, then a combined sewer (9.31) |
| Soakaways | Percolation tests and calculations to BRE Digest 365; no soakaway within 5 m of a building, highway or retaining wall (9.32 to 9.34) |
| Pro forma | Required for all major applications at outline and full or reserved matters, and for minor schemes that could increase flood risk elsewhere (9.67, Appendix 3) |
Behind the figures sit five evidence demands, and the LLFA can withhold approval on any of them:
- Prove the outfall. A connection to a culverted watercourse cannot be assumed; it has to be shown by condition or CCTV survey, and an unproven one is treated as a new greenfield discharge (9.35 to 9.37). Without a condition and capacity assessment of the receiving watercourse, the LLFA will not approve or condition the scheme (9.41).
- Test the ground first. Infiltration heads the hierarchy, so ground testing comes before the application, not after it (9.13). Our geology and soakaway map and BRE 365 infiltration rate calculator give an early read on the Pennine ground.
- Show the whole system. Calculations and drawings with pipe numbers and contributing areas go in with a full application (9.16), with flow paths, exceedance routes and storage for the 1 in 100 year event plus climate change (9.29).
- Keep watercourses open. Culverted watercourses should be opened where possible, a maintenance strip of 3 m either side of the centreline of an ordinary watercourse is kept free of development (9.61), and any works to one need consent from the council (see the ordinary watercourse consent guide).
- Plan maintenance for the lifetime. A management and maintenance plan and an ownership drawing go with the strategy (9.62 to 9.63). The council will consider adopting SuDS under a Section 106 maintenance agreement where appropriate, and says it will look at wider SuDS adoption once the SuDS approval provisions of the Flood and Water Management Act are brought in (9.4); until then maintenance is usually secured by Section 106 agreement or condition (9.3).
The SPD predates the 2025 National Standards for Sustainable Drainage Systems, which NPPF policy F8 now names, and we found no council statement adopting them. A strategy for Calderdale therefore meets both: the SPD's local rates and creep allowance, and the national standards' water quality and amenity aims. We prepare the strategy and the pro forma from one set of calculations, so the rates match; the SuDS pro forma explainer and the climate change and urban creep calculator show the numbers involved.
The 2016 Calder Catchment SFRA and the January 2025 validation list
- Strategic Flood Risk Assessment (2016). The Calder Catchment Level 1 SFRA, prepared by JBA Consulting for Calderdale, Kirklees and Wakefield: Volume I (April 2016) and Volume II for Calderdale (version 3.0, July 2016). It defines Flood Zone 3ai, proposes the eleven indicative Critical Drainage Areas and assesses surface water, groundwater, canal and reservoir risk. A Level 2 SFRA site screening (JBA Consulting, September 2018, examination document EV 20) assessed 12 potential Local Plan sites in more detail; it covers those sites only, and no borough-wide SFRA update is in preparation.
- National and Local Planning Validation Requirements (January 2025). Sets the flood risk assessment, sequential and exception test, surface water drainage strategy, drainage details and foul drainage assessment requirements in the table above, each tied to CC2 or CC3. The list still cites the SPD as "(November 2023)", the consultation draft; the version that applies is the one adopted in July 2024.
- Local Flood Risk Management Strategy (June 2016). The council's strategy as LLFA, which Policy CC2 part IV asks development to have regard to, alongside Surface Water Management Plans.
The SFRA uses the Environment Agency's August 2015 flood map, which has since been updated. The Local Plan itself tells applicants to start from the current Flood Map for Planning and use the SFRA for the detail it adds. Our assessment does the same: the live national map for the flood zone, the SFRA for 3ai, the CDAs and the local flood history. The SFRA explainer covers what these documents are for.
NPPF Chapter 18 and the sequential test on a valley floor
Above the Local Plan sits Chapter 18 of the National Planning Policy Framework published on 17 August 2026, "Managing flood risk and coastal change", with its policies F1 to F9. F4 sets when a site-specific assessment is needed, F5 is the sequential test, F6 the exception test, and F8 requires sustainable drainage to the 2025 National Standards. The Planning Practice Guidance on flood risk, last updated on 17 September 2025, sits underneath; our NPPF guidance page sets out the August 2026 policy letters.
The SPD was written under the 2023 Framework, and on one point the national guidance has moved since. Stage A of its sequential test says the area of search is "usually over the entire LPA area", reduced only by agreement with the council. Paragraph 027a of the September 2025 guidance says that for non-major housing the search would not usually extend beyond the town or city where the site is, or beyond the village and its immediate neighbouring settlements. Large parts of the Calder Valley towns sit in Flood Zones 2 and 3, so the choice between those two areas can decide the result. Our sequential and exception test reports state the search area, the reason for it and the guidance it follows, and the September 2025 PPG update explains the change.
Flooding in the Calder Valley, in brief
The River Calder runs about 40 km through the borough, from Heald Moor above Todmorden to Cooper Bridge, through Hebden Bridge, Mytholmroyd, Sowerby Bridge, Elland and Brighouse. Walsden Water, Hebden Water, Cragg Brook, Luddenden Brook, the River Ryburn and the Hebble Brook through Halifax feed it, alongside about 7,000 ordinary watercourses (SPD 2.2 to 2.3). The Local Plan counts 4,648 residential properties in Flood Zone 3, 2,124 of them in Todmorden ward.
Steep moorland sends runoff to the valley floor within minutes, carrying silt that blocks culverts. The Rochdale Canal and the Calder and Hebble Navigation take river water and overtop, and at Brighouse and Todmorden outfalls back up behind the flood walls when the river is high. The SPD traces flooding records back to the early 17th century. In council news of July 2020 the council put Storm Ciara, which affected around 1,200 homes and businesses that February, second only in impact to Boxing Day 2015. Our River Calder page follows the whole river, and the place pages for flood risk assessment in Halifax, Hebden Bridge and Mytholmroyd cover the local detail. Defences reduce the chance of flooding without removing it, which is why residual flood risk stays in every valley-floor assessment; the live river levels map shows the Calder gauges.
Reports we prepare for applications to Calderdale Council
We have prepared flood risk assessments and drainage strategies for applications to Calderdale Council. A flood risk assessment asks whether the site is safe, the sequential test asks whether a lower-risk site was available, and the drainage strategy shows where the water goes. A valley-floor scheme here can need all three, each written to its own policy.
- Planning applications. CC2 part III asks for an assessment in Flood Zones 2 and 3, over a hectare in Flood Zone 1 and anywhere in a CDA: flood risk assessment for planning.
- Buying a property. Thousands of Calderdale homes sit in Flood Zone 3, so a search or lender query often needs the actual building assessed: flood risk survey for property purchase.
- Locational tests. SPD paragraph 6.4 treats a Flood Zone 2 or 3 application without sequential test evidence as failing it: sequential and exception test.
- Surface water. CC3 and the SPD expect a SuDS-led scheme for every major development, and for any scheme in Flood Zone 2 or 3: drainage strategy.
- Rates and storage. Greenfield Qbar or 2.5 l/s/ha, 30% or 50% brownfield betterment and 10% urban creep are calculated and set out in a surface water drainage strategy.
- Conditions after approval. Where the LLFA asks for an outfall survey or detailed calculations by condition, the SPD wants one complete package: discharge of drainage conditions.
- National policy. The SPD predates the August 2026 NPPF, so each report applies Chapter 18 as well as the local rules: NPPF flood risk guidance.
- Modelled levels. The SPD notes that the Flood Map for Planning does not cover every watercourse and recommends agreeing detailed modelling with the Environment Agency and the LLFA: flood modelling.
- Evacuation. SPD paragraph 7.3 asks every site-specific assessment to plan emergency access, egress and evacuation: flood warning and evacuation plan.
- Insurance. Homes flooded in 2015 and 2020 can face high premiums or restricted cover: flood risk assessment for insurance.
Our consultants are chartered and Unda Consulting Limited is a CIWEM Business Partner. Each report goes through the council's own documents first and quotes the paragraph it relies on. Every council we work with is listed on our local authorities page. For a quote, call 01293 214444 or email enquiries@unda.co.uk.
Questions about Calderdale's flood and drainage rules
Does Calderdale require a flood risk assessment?
Policy CC2 and the January 2025 validation list ask for one on any development in Flood Zone 2 or 3, minor schemes and changes of use included. The same applies to sites over one hectare in Flood Zone 1 and to any site in a Critical Drainage Area, whatever its flood zone. The SPD says one may also be needed at medium or high surface water risk, behind a local defence or where the site has flooded before. Send us the address on 01293 214444 and we will confirm whether one is needed.
What does Calderdale Policy CC2 (Flood Risk Management) require?
Policy CC2 of the Calderdale Local Plan (March 2023) sets a sequential, risk-based approach and permits development in Flood Zones 2 and 3 only where nine tests are met. It bars new homes from Flood Zone 3ai and asks for a site-specific assessment in Flood Zones 2 and 3, over one hectare in Flood Zone 1 and in any Critical Drainage Area. In a CDA the assessment must also show the site is not at risk from existing drainage or overflow routes.
What discharge rate does Calderdale require for surface water?
To a watercourse, greenfield Qbar or 2.5 litres per second per hectare, whichever is greater, for storms up to 1 in 100 years with climate change. A brownfield site with a proven connection may discharge at its existing rate minus at least 30%, or minus 50% if the watercourse's condition or capacity is unproven. To a sewer, the limit is the existing 1 in 1 year rate minus 30% (Flood Risk and Drainage SPD, July 2024, paragraphs 9.44 to 9.55).
Does a Calderdale application need a drainage strategy as well as a flood risk assessment?
Often, yes. The SPD asks for a drainage strategy wherever site drainage changes, and the validation list requires one for major development, for minor schemes over its size thresholds and for any non-householder scheme in Flood Zone 2 or 3. The two are different reports: the assessment deals with flood risk to and from the site, the strategy with where its surface water goes, and both are checked by the same council.
Which design storms must a Calderdale drainage scheme meet?
Paragraph 9.16 of the SPD asks for no surcharge in a 1 in 2 year storm plus 30% for climate change and no surface flooding in a 1 in 30 year storm plus 30%. In a 1 in 100 year storm plus an appropriate allowance, no building may flood internally, access routes included. For the Aire and Calder catchment the Environment Agency allowance on the 1% AEP storm runs from 25% to 45%, depending on the development's lifetime.
Is Calderdale Council its own Lead Local Flood Authority?
Yes. As a metropolitan borough, Calderdale Council is both the planning authority and the Lead Local Flood Authority. Its Flood Risk Management Team comments on all major and relevant minor applications and grants ordinary watercourse consent. The Environment Agency remains responsible for the River Calder and the other main rivers.
How is the fee set for a flood risk assessment on a Calderdale application?
It depends on the flood zone, whether the site is in Flood Zone 3ai or a Critical Drainage Area, and whether the scheme needs modelling, a sequential test or an outfall survey. We quote a fixed fee with no obligation: one of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444.
Submitting to Calderdale Council soon?
A missing sequential test or drainage pro forma can stop a Calderdale application at validation. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.
Get a Fixed Quote