Flood Risk & Drainage Requirements for West Berkshire Council

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

West Berkshire Policy SP6 (Flood Risk), in the Local Plan Review 2023-2041 adopted on 10 June 2025, decides flood risk on every application, and West Berkshire Council then checks the drainage itself as Lead Local Flood Authority. SP6 also asks for a Surface Water Drainage Strategy with any development in Newbury or Thatcham, however small. The same applies to every proposal in six river catchments the council rates as highly sensitive to cumulative flooding.

Behind SP6 sit Policies DM6 and DM7 and the December 2018 SuDS Supplementary Planning Document, with its 40% climate change uplift. The evidence comes from a November 2022 Strategic Flood Risk Assessment that maps groundwater emergence across the chalk, and the validation list dates from January 2025. A new Local Plan has also started: the council published its Gateway 1 assessment on 30 October 2026 and expects to adopt the replacement in April 2029. This page sets out what each document requires and how our reports meet it. To talk a site through, call 01293 214444 or email enquiries@unda.co.uk.

Who decides what on an application to West Berkshire Council

West Berkshire has been a unitary authority since 1998, so no county council stands between the planning officer and the drainage team. The council determines the application and, as Lead Local Flood Authority, comments on surface water, groundwater and ordinary watercourses. Its flood risk management page says the LLFA is a statutory consultee on major applications and assists on others where flood risk or surface water drainage is a concern.

BodyRoleWhat it decides or is consulted on
West Berkshire Council (Development Management)Local planning authorityDecides the application against SP6, DM6, DM7 and SP5 of the Local Plan Review, any neighbourhood plan and the NPPF; validates it against the January 2025 local list; applies the sequential test
West Berkshire Council (Drainage Team)Lead Local Flood AuthorityThe SuDS consultee: reviews the Surface Water Drainage Strategy and checklist against the SuDS SPD; comments on surface water and groundwater risk
West Berkshire Council (Land Drainage Authority)Consenting authority for ordinary watercoursesOrdinary Watercourse Consent for culverts, weirs, outfalls and other works in a non-main watercourse, temporary works included
Environment AgencyStatutory consultee and main river regulatorFlood Zone 2 and 3 sites on the Kennet, Lambourn, Pang, Enborne, Thames and other main rivers; an environmental permit for works on or near a main river
Thames WaterSewerage undertakerSewer connections and capacity; the council can phase development where treatment works are short of capacity (DM7)
Natural EnglandStatutory consultee on protected sitesNutrient neutrality in the River Lambourn SAC and River Test catchments (DM6 c); SSSI impact risk zones
Canal & River TrustOwner of the Kennet and Avon CanalAny discharge to the canal, by formal agreement (SuDS SPD)

No internal drainage board covers any part of West Berkshire; the SFRA and the council's flood pages name none. Supporting paragraph 5.18 of SP6 encourages early discussion with the Environment Agency and the council at pre-application stage for sites in flood risk areas. When the Drainage Team does object, the guide to answering an LLFA objection explains the usual routes.

Local Plan Review flood and drainage policies: SP6, DM6, DM7 and SP5

The Local Plan Review carries one flood policy, SP6, and two water policies, DM6 and DM7, with SP5 tying climate resilience back to them. Two strategic sites and three neighbourhood plans add their own requirements. Each row below pairs a policy's test with what our reports put in front of the officer, and the sections that follow quote the wording itself.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
Policy SP6Flood RiskA strict sequential approach in Flood Zones 2 and 3 and on sites of 1 ha or more; only water-compatible uses and essential infrastructure in Flood Zone 3b; a site-specific FRA on four triggers (q to t); a Surface Water Drainage Strategy for all development in Newbury and Thatcham and in high-sensitivity catchments; a 10 m undeveloped buffer to main rivers; greenfield runoff, or 50% of the existing 1 in 100 year rate on previously developed landShow the site passes the sequential test where it applies, is safe for its lifetime with safe access and egress in the 100-year plus climate change event, and drains sustainablyA flood risk assessment answering criteria d to t, a sequential test report where needed, and a drainage strategy built to the SP6 rates and the SPDLocal Plan Review, adopted 10 June 2025
Policy DM6Water QualityNo deterioration of waterbodies; built development at least 10 m from the top of bank of the nearest watercourse or main river; nutrient neutrality in the River Lambourn SSSI/SAC and River Test catchmentsKeep built form out of the 10 m buffer, treat runoff before it leaves the site, and show nutrient neutrality where the catchment requires itBuffer drawn on the layout from surveyed bank tops; SuDS treatment stages set out in the drainage strategyLocal Plan Review, adopted 10 June 2025
Policy DM7Water Resources and Waste WaterFoul drained separately from surface water to a suitable connection; no development that would overload facilities and create or worsen flooding; 110 litres per person per day for new homesProve a separate foul connection with capacity, and keep surface water out of the foul systemFoul drainage strategy and surface water strategy prepared together, with the point of connection and capacity evidenceLocal Plan Review, adopted 10 June 2025
Policy SP5Responding to Climate ChangeCriteria i and j: show flood risk from all sources can be avoided or managed, and use sustainable drainage, both in accordance with SP6; a Sustainability StatementCarry the SP6 evidence into the Sustainability StatementClimate change allowances applied to flood levels and to drainage storage, cross-referenced for the statementLocal Plan Review, adopted 10 June 2025
Policy SP13 and Policy SP14Sandleford and North East Thatcham Strategic Site AllocationsSandleford: detailed FRAs with hydraulic modelling for each phase. North East Thatcham: an FRA under SP6 taking account of the Thatcham Surface Water Management Plan, existing attenuation ponds kept and enhanced, an Integrated Water Supply and Drainage StrategyPhase-by-phase flood evidence that fits the strategic site's own drainage frameworkModelled flood levels and a phase drainage strategy consistent with the site-wide approachLocal Plan Review, adopted 10 June 2025
Policy GD3, Policy C18, Policy HUNG12Neighbourhood plans: Flood Management (Stratfield Mortimer), Sustainable Drainage (Compton), Land at Smitham Bridge Road (Hungerford)GD3: adoption and maintenance agreements with every application and a worst-case runoff check; C18: SuDS as part of the green infrastructure and streets; HUNG12: FRA and Surface Water Drainage Strategy showing downstream bettermentMeet the parish policy on top of SP6 where the site lies in that parishThe parish policy answered in the same report, with its extra rainfall check or betterment shownStratfield Mortimer NDP, June 2017; Compton NDP, February 2022; Hungerford NDP, made 27 November 2025
Proposed Policy CCR1 and Policy CCR2 (Regulation 14, October 2026)Surface Water Risk Management; Sustainable Drainage Systems (emerging Stratfield Mortimer Neighbourhood Plan)Proposed at Regulation 14 consultation, 12 October to 23 November 2026: surface water risk management designed for the 1 in 100 year storm plus 40%, and sustainable drainage; would replace GD3 once the new plan is madeNone yet: GD3 applies until the new plan is made; track the emerging wording for Mortimer sitesReports for Mortimer sites note the emerging policies and test the drainage against the 1 in 100 year plus 40% storm already required by the SuDS SPDStratfield Mortimer NDP page, Regulation 14 from 12 October 2026

Requirements checked November 2026.

Policy SP6 (Flood Risk): what it requires

West Berkshire Policy SP6 makes the sequential approach a district-wide rule and then sets the evidence an application must carry: an assessment, safe access and a drainage strategy at fixed runoff rates. Its opening test reads: "Within Flood Zones 2 and 3 (and also on sites of 1 hectare or more in size, and in other circumstances as set out in the NPPF), the sequential approach will be strictly applied across the District." (Local Plan Review, adopted 10 June 2025, page 29)

A sequential test is needed for all development in all areas of flooding unless the site is allocated and was tested at plan stage, is at low risk from every source, or is a type the NPPF exempts. Even then the policy says such applications "should still demonstrate all the requirements for site specific flood risk assessments". Flood Zone 3b, which the SFRA draws at the 1 in 20-year modelled extent (or the whole of Flood Zone 3 where no model exists), is closed to everything except water-compatible uses and essential infrastructure. Where development has to sit in a flood risk area, criterion f requires that "Safe access and egress from the development will be provided during the 100-year plus climate change event, from any source of flooding".

Criteria q to t then decide when a site-specific assessment is required. They cover all sites over 1 ha in Flood Zone 1 and anything in Flood Zone 2 or 3 "or 1 in 100-year flood extent plus climate change", householder schemes and changes of use included. They also cover smaller Flood Zone 1 sites that could be affected by other sources, and land the LLFA or the Environment Agency has "highlighted as having critical drainage problems". Further requirements follow on drainage and watercourses. In 2018 the Environment Agency identified Newbury and Thatcham as a nationally significant Flood Risk Area, and SP6 states that "a Surface Water Drainage Strategy will be required for all developments in Newbury and Thatcham regardless of their size". The same applies to every proposal in a catchment the Cumulative Impacts Assessment rates as highly sensitive. An undeveloped 10-metre buffer is kept along both banks of main rivers, measured from the top of the bank.

On runoff, undeveloped sites must be restricted to greenfield rates and volumes for all events up to the 1 in 100 year storm with climate change, unless that is shown not to be achievable, and "For pre-developed sites, a maximum discharge rate equivalent to 50% of the existing 1 in 100 year runoff rate would be accepted." Supporting paragraph 5.31 adds that surface water "must not be allowed to drain to the foul sewer". Our assessment answers criteria d to t in order, with the flood zone, the climate change extent and the SFRA groundwater mapping read for the exact site. It calculates the existing 1 in 100 year rate on a brownfield site before any discharge is proposed, so the 50% ceiling is a figure on the page rather than an assumption.

Policy DM6 (Water Quality): the 10-metre watercourse rule and nutrient neutrality

Policy DM6 protects the district's rivers and reaches further than SP6's main-river buffer. Criterion f says "Proposals for built development will be required to be at least ten metres away from the top of the bank of the nearest watercourse or main river providing or retaining a natural or semi-natural habitat buffer" (Local Plan Review, adopted 10 June 2025, page 174). Supporting paragraph 10.66 counts footpaths, lighting, fencing and formal landscaping as built development. A new fence along a ditch can conflict with it.

Criterion c requires proposals within the hydrological catchments of the River Lambourn SSSI/SAC or the River Test to demonstrate nutrient neutrality. Criterion d asks for a water quality risk assessment where a non-mains scheme lies within 500 metres of an SSSI. Paragraph 10.67 also warns that deep soakaways such as boreholes are not a recognised SuDS solution and may be refused a permit. We measure the buffer from surveyed bank tops, keep attenuation and outfalls clear of it where the layout allows, and set out the treatment stages in the drainage strategy. The nutrient neutrality explainer covers the calculation that sits alongside.

Policy DM7 (Water Resources and Waste Water): keeping foul and surface water apart

Policy DM7 makes drainage capacity a planning test as well as a water-efficiency one. Criterion b requires that "Foul water flows produced by the development will be drained separately from surface water run off to a suitable point of connection to a public foul sewer", and the policy adds that "Development which would overload available facilities and create or exacerbate problems of flooding or pollution will not be permitted" (Local Plan Review, adopted 10 June 2025, page 177). The Water Cycle Study cited in its supporting text found the Chieveley, Hungerford and Newbury treatment works predicted to exceed, or already exceeding, their flow permits during the plan period, and the council may phase development until upgrades arrive.

New homes must meet 110 litres per person per day, and non-residential schemes of 1,000 m² or more BREEAM 'excellent' for water consumption. For drainage, the practical point is a foul connection proven with Thames Water and no surface water anywhere near it. Where the foul side needs its own report, a foul drainage strategy is written alongside the surface water strategy so both use the same layout.

Policy SP5 (Responding to Climate Change): criteria i and j

Policy SP5 asks every proposal to embed climate adaptation and, by criteria i and j, "To demonstrate that flood risk from all sources can be avoided or managed in accordance with policy SP6" and "To use sustainable urban drainage systems in accordance with policy SP6" (Local Plan Review, adopted 10 June 2025, page 27). It sets no figures. The Sustainability Statement it requires can lift its flood and drainage content from the assessment and strategy, so the two documents should agree on every number.

Policy SP13 (Sandleford Strategic Site Allocation) and Policy SP14 (North East Thatcham Strategic Site Allocation)

The two strategic allocations carry site-level flood requirements on top of SP6. Policy SP13 allocates about 1,500 homes at Sandleford, south of Newbury, and states that "Detailed flood risk assessments accompanied by hydraulic modelling will be required for each development phase of the site". Policy SP14 requires the North East Thatcham site's assessment to take account of the Thatcham Surface Water Management Plan of 2010, written after the July 2007 flooding. It must keep and enhance the attenuation ponds already built on the site and be supported by an Integrated Water Supply and Drainage Strategy in line with the SuDS SPD (Local Plan Review, adopted 10 June 2025). Our reports for a phase on either site start from the site-wide drainage framework, then deal with the phase's own red line.

Neighbourhood plans: Policy GD3 (Flood Management), Policy C18 (Sustainable Drainage) and Policy HUNG12 (Land at Smitham Bridge Road)

Five neighbourhood plans are part of the development plan. Three add flood or drainage wording. Policy GD3 of the Stratfield Mortimer plan (June 2017) encourages a worst-case runoff check, including 20 mm of rain in 30 minutes, and requires that "All Planning Applications shall include agreements for the adoption of the anti-flooding systems establishing the permanent owner". Policy C18 of the Compton plan (February 2022) requires SuDS as part of the green infrastructure and street network. Policy HUNG12 of the Hungerford plan, made on 27 November 2025, allocates land at Smitham Bridge Road and asks its assessment and drainage strategy to show betterment downstream. GD3 and C18 still cite Core Strategy Policy CS16, which SP6 replaced in June 2025. A new Stratfield Mortimer Neighbourhood Plan is at Regulation 14 consultation (12 October to 23 November 2026); its proposed Policies CCR1 (Surface Water Risk Management, designed for the 1 in 100 year storm plus 40%) and CCR2 (Sustainable Drainage Systems) would replace GD3, which stays in force until the new plan is made. The Cold Ash and Hermitage plans, both made in May 2024, should be checked for any site in those parishes.

The new West Berkshire Local Plan, and how SP6 replaced Policy CS16

The Local Plan Review is already due to be replaced. Under the 2026 plan-making regulations the council has started a new West Berkshire Local Plan. Scoping consultation ran from 24 July to 4 September 2026 and the Gateway 1 self-assessment was published on 30 October 2026. The published timetable puts consultation on proposed content in May to July 2027, submission in October 2028 and adoption on 30 April 2029. No draft policies exist yet. SP6, DM6 and DM7 remain the tests for every application. Policy SP6 replaced Core Strategy Policy CS16 (Flooding) when the Local Plan Review was adopted in June 2025, and appeal decisions, older officer reports and two of the neighbourhood plans still quote CS16.

In Newbury, Thatcham or a high-sensitivity catchment?

Send us the address and the scheme, and we will tell you which parts of SP6, DM6 and the SuDS SPD apply before anything is drawn. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Start a Quote

From a garden wall by the Kennet to North East Thatcham: what triggers each report

A flood risk assessment, a sequential or exception test and a Surface Water Drainage Strategy are separate reports, and West Berkshire sets a trigger for each. The table combines SP6 with the January 2025 local validation list, which also states that an assessment "is NOT a Surface Water Drainage and Foul Drainage Strategy".

TriggerFlood risk assessmentSequential and exception testsSurface Water Drainage Strategy
Any development in Flood Zone 2 or 3, or within the 1 in 100 year plus climate change extent, householder and change of use includedYes (SP6 r; local list section 22)Sequential test unless allocated, low risk from all sources, or an NPPF-exempt type (householder, small non-residential extensions, most changes of use); exception test where the vulnerability table requires itWhere the scheme is major, adds more than 100 m² of hard surface, or changes to a more vulnerable use (local list section 40)
Flood Zone 1 site of more than 1 haYes (SP6 q)SP6 applies the sequential approach to sites of 1 ha or more; a test where any part is at risk from any sourceYes: major development (section 40; SPD Major Applications checklist)
Flood Zone 1 site under 1 ha at medium or high surface water or groundwater risk, or near reservoirs or drains, per the SFRAYes (SP6 s; section 22)May be needed at moderate or high risk from other sources (section 22); not needed where the assessment shows the layout safe from surface water only (NPPF F5)As for the scheme's size and use
Land the LLFA or the Environment Agency has flagged for critical drainage problemsYes (SP6 t)As for the flood zone and other sourcesAs for the scheme's size; the SPD expects greenfield rates
Any development in Newbury or ThatchamOnly if another trigger appliesAs for the flood zoneYes, whatever the size (SP6)
Any proposal in a catchment the Cumulative Impacts Assessment rates high sensitivity (Kennet from the Lambourn to the Enborne, Kennet and Holy Brook, Holy Brook, Foudry Brook, Thames Wallingford to Caversham, Kennet and Avon Canal and Dun above Hungerford)Only if another trigger appliesAs for the flood zoneYes (SP6)
Any proposal within 8 m of the top of bank of a main river or flood defence, boundary walls included, or any culverting or control of flowYes (section 22)As for the flood zoneAs for the scheme's size; DM6 keeps built development 10 m from the bank top
Major development anywhere: 10 or more homes or 0.5 ha; 1,000 m² of floor space or 1 haOnly if another trigger appliesNo, unless at riskYes, with a foul water strategy (section 40) and the SPD Major Applications checklist
Three to nine homesOnly if another trigger appliesNo, unless at riskYes where hard surface rises by more than 100 m²; the SPD Minor Applications checklist
Works in an ordinary watercourse (culvert, outfall, headwall, bridge)Only if another trigger appliesNoOrdinary Watercourse Consent from the council, separate from planning; SP6 5.30 says the council is generally opposed to culverting

The 8-metre rule reaches schemes that look minor: a boundary wall, an outbuilding or a driveway near the bank of a main river needs an assessment at validation, and works there need an environmental permit from the Environment Agency as a separate consent. Check the flood zone first on our flood risk map, then the SFRA groundwater and surface water appendices. The guide to an application invalidated over flood risk or drainage covers what happens when a document is missing, and the main rivers and ordinary watercourses explainer covers which body consents to what.

The SuDS SPD's numbers: what the Drainage Team checks

West Berkshire's drainage standards are in section 5 of the Sustainable Drainage Systems SPD, adopted by the council on 6 December 2018, read with SP6's runoff wording. The SPD turned the national non-statutory standards into local ones, adding a fixed climate change uplift and urban creep.

RequirementWest Berkshire standard and source
Peak runoff rateNo higher than the greenfield peak for the 1 in 1 year and 1 in 100 year events; if not achievable, evidence and a rate agreed with the LLFA (SPD 5.1.2)
Runoff volume1 in 100 year, 6-hour volume limited to the greenfield volume, or long-term storage provided (SPD 5.1.2)
Previously developed sitesGreenfield rates and volumes unless shown not achievable; a maximum of 50% of the existing 1 in 100 year rate accepted (Policy SP6)
Climate changeA 40% uplift on peak rainfall, the upper end estimate for the 2080s; 20% may be accepted case by case for short design lives (SuDS SPD 5.1.5). The Environment Agency's peak rainfall allowances were revised by catchment in May 2022, after the SPD
Urban creepAn increase in impermeable area by density: 10% at 25 dwellings per hectare or less, falling to 2% at 50 or more (SPD Table 5-1)
Design eventsNo flooding anywhere on site in a 1 in 30 year storm; no flooding of any building, basements included, or of sensitive plant in a 1 in 100 year plus 40% storm; exceedance routed safely (SPD 5.1.2)
Drain-downAttenuation half-empty within 24 hours (SPD 5.1.2)
Discharge hierarchyReuse, then infiltration, then a surface watercourse, then a surface water sewer; never to foul or combined sewers or existing highway drains (SPD 5.1.3)
InfiltrationDesk study plus infiltration tests and groundwater monitoring; the base more than 1 m above the maximum estimated groundwater level; not proposed where groundwater flooding is likely (SPD 5.1.3 to 5.1.4)
SubmissionThe Major or Minor Applications Sustainable Drainage Strategy checklist; maintenance plan and adoption arrangements; ground investigation report, flow mapping and groundwater depth (SPD section 4; local list section 40)

Four further SPD requirements shape the strategy:

  • Prove the ground on chalk. The SPD says the base of an infiltration unit "must be more than 1m above the maximum estimated high groundwater level", which on the chalk valleys can mean winter readings rather than a single summer test. It also warns that soakaways can open solution features in chalk. Our geology and soakaway map and BRE 365 infiltration rate calculator give a first read; the groundwater monitoring guide explains why the timing matters.
  • Show the receiving body will take it. A discharge to a watercourse or sewer needs written acceptance from its owner and evidence of capacity, and a discharge to the Kennet and Avon Canal needs a formal agreement with the Canal & River Trust.
  • Keep it on the surface. End-of-pipe attenuation alone, such as a tank with a controlled outlet, is accepted only where nothing else is feasible; the SPD wants source control and open features, and the local list asks for open SuDS too.
  • Plan who maintains it. The council adopts only SuDS serving public highways or on open space it maintains, and soakage crates are not accepted under roads or footways. Everything else needs a named owner and a maintenance plan for the lifetime of the development.

The SPD predates the 2025 National Standards for Sustainable Drainage Systems, which NPPF policy F8 now names, and we found no council statement adopting them; its SuDS web page still cites the non-statutory standards. A strategy for West Berkshire therefore meets both, the SPD's local figures and the national standards' water quality and amenity aims, from one set of calculations. The climate change and urban creep calculator shows the uplifts involved, and the 2025 National Standards article sets out what changed.

The November 2022 SFRA, the Cumulative Impacts Assessment and the January 2025 local list

  • Level 1 SFRA (November 2022). Prepared by JBA Consulting for the Local Plan Review and the Minerals and Waste Local Plan, final report version 7.0 (SFRA page; report). It keeps Flood Zone 3b at the 1 in 20-year modelled extent, because no 1 in 30-year modelled outlines were available when the August 2022 guidance changed the definition, maps groundwater emergence with Jacobs and JBA datasets, and finds the highest groundwater risk in the upper Lambourn and Pang valleys. It also records the Critical Drainage Areas identified in the 2008 SFRA in Thatcham and Hungerford. A Level 2 SFRA of January 2021, with site sheets updated in 2022 for the new rainfall allowances, covers allocation sites only.
  • Cumulative Impacts Assessment (December 2020). An addendum to the Level 1 SFRA ranking each river catchment by flood risk and growth. Six are rated high sensitivity: Kennet and Holy Brook (Burghfield Common, Aldermaston Wharf); Thames Wallingford to Caversham (Purley-on-Thames, Streatley); Kennet from the Lambourn to the Enborne confluence (Thatcham, Newbury, Woolhampton); Holy Brook (Theale, Calcot); Foudry Brook (Mortimer); and the Kennet and Avon Canal and Dun above Hungerford. Under SP6, every proposal in these catchments needs a Surface Water Drainage Strategy.
  • Local validation list (January 2025). National and Local Lists of Requirements: section 22 sets the assessment triggers in the table above, and section 40 the drainage strategy triggers and contents. The list was published before the Local Plan Review was adopted and still cites the Core Strategy and the 2023 draft plan; the policies that apply are SP6, DM6 and DM7.
  • Local Flood Risk Management Strategy 2022-2027. The council's strategy as LLFA, listed with its Section 19 flood investigations on the flood reports page.

Supporting paragraph 5.12 of SP6 says the most up-to-date information should always be used, including the Flood Map for Planning, because the SFRA's mapping may change. Our assessment uses the live national map for the flood zone and the SFRA for what the national map does not show: groundwater emergence, the climate change extents and the catchment sensitivity. Our guide to SFRAs explains how a strategic assessment feeds a site report.

NPPF Chapter 18 and the sequential test's area of search in West Berkshire

Above the Local Plan sits Chapter 18 of the National Planning Policy Framework published on 17 August 2026, "Managing flood risk and coastal change", with policies F1 to F9. F4 sets when a site-specific assessment is needed, F5 is the sequential test, F6 the exception test, F7 safety for the lifetime of the development, and F8 requires sustainable drainage to the National Standards. The Planning Practice Guidance on flood risk, last updated on 17 September 2025, sits underneath; our NPPF guidance page sets out the policy letters.

Two national points interact with SP6. F5 exempts householder development, small non-residential extensions and most changes of use from the sequential test, which is the exemption SP6 criterion c refers to. And F5 says the area of search should not be greater than the development's anticipated catchment, with the September 2025 guidance adding that non-major housing would not usually search beyond the town or village concerned. Paragraph 5.15 of SP6 lets the catchment come from the settlement policies or from the Western Berkshire functional economic market area, which is the whole district. For a small village scheme the two can give different answers. Our sequential test reports state the area chosen, the reason for it and the guidance it follows; the September 2025 PPG update explains the change, and the surface water exemption article covers sites at risk from surface water only.

Chalk, groundwater and flash floods: flood risk across the district

Rivers are only part of the picture. The 2022 SFRA confines river flooding mainly to the floodplains of the Kennet, Pang, Thames, Lambourn and Sulham Brook, but finds groundwater risk significant across the chalk, with the district hit hard in the winter of 2013 to 2014. At Lambourn the 2014 modelling it reports shows groundwater emergence affecting the whole town in a 1 in 30-year event. Theale, at the source of the Sulham Brook on the Kennet floodplain, is at very high groundwater risk. In July 2007 intense rain on saturated ground flooded Newbury, Thatcham, Bucklebury, Aldermaston, Pangbourne and Woolhampton, and it led to the Thatcham Surface Water Management Plan and the attenuation schemes built around the town. The council's Section 19 report on the winter 2024 floods counted about 210 properties affected by Storms Henk, Isha and Jocelyn, about 77 of them internally.

The Newbury flood alleviation scheme, completed by the Environment Agency in October 2013, protects about 380 homes and 70 commercial properties from the Kennet to a 1 in 100-year standard, which leaves residual flood risk for an assessment to address behind it. Our place page on flood risk assessment in Newbury and the Berkshire county page cover the local detail, and the River Kennet, River Lambourn and River Thames pages follow the main rivers. The groundwater flood risk guide explains how emergence mapping is used on a site, and the live river levels map shows the Kennet and Lambourn gauges.

Our reports for West Berkshire applications, matched to SP6 and the SPD

A flood risk assessment asks whether a site is safe, a sequential test asks whether a lower-risk site was available, and a drainage strategy shows where the water goes. In Newbury or Thatcham a scheme in Flood Zone 2 can need all three, each answering a different part of SP6.

  • Planning applications. SP6 asks for a site-specific assessment in Flood Zones 2 and 3, over 1 ha in Flood Zone 1, at other-source risk and in critical drainage areas: flood risk assessment for planning.
  • Buying a property. Homes in the Lambourn and Pang valleys and along the Kennet can be flagged for groundwater or river risk in a search: flood risk survey for property purchase.
  • Locational tests. SP6 applies the sequential approach strictly across the district, with its own exemptions: sequential and exception test.
  • Surface water. SP6 and the local list ask for a strategy on majors, on minors adding over 100 m² of hard surface, and on everything in Newbury and Thatcham: drainage strategy.
  • Rates and storage. Greenfield peaks for the 1 in 1 and 1 in 100 year storms, the 50% brownfield ceiling, a 40% uplift and urban creep are calculated in a surface water drainage strategy.
  • Conditions after approval. Where infiltration testing, winter groundwater readings or a maintenance plan are left to a condition: discharge of drainage conditions.
  • National policy. The SuDS SPD and the local list both predate the August 2026 Framework, so each report applies Chapter 18 as well: NPPF flood risk guidance.
  • Groundwater. The SFRA maps groundwater emergence across the chalk valleys and the SPD asks for monitoring before soakaways are relied on: groundwater flood risk assessment.
  • Modelled levels. Policy SP13 requires hydraulic modelling for each Sandleford phase, and ordinary watercourses often have no mapped levels: flood modelling.
  • Foul water. DM7 requires foul flows drained separately to a connection with capacity, and the local list asks majors for a foul strategy: foul drainage strategy.
  • Insurance. The council's winter 2024 investigation recorded about 77 properties flooded internally: flood risk assessment for insurance.

Unda Consulting Limited holds CIWEM Business Partner status, and its consultants are chartered. Each report quotes the council document it relies on, by policy and paragraph. Every council covered is listed on our local authorities page. For a quote, call 01293 214444 or email enquiries@unda.co.uk.

Questions about West Berkshire's flood and drainage rules

Does West Berkshire require a flood risk assessment?

Yes, on many sites. Policy SP6 and the January 2025 validation list ask for one in Flood Zone 2 or 3 or the 1 in 100 year plus climate change extent, householder schemes and changes of use included. They also ask for one on Flood Zone 1 sites over 1 ha, smaller sites at risk from surface water, groundwater or other sources, and land flagged for critical drainage problems. The local list adds anything within 8 metres of a main river bank. Send us the address on 01293 214444 and we will confirm what is needed.

What does West Berkshire Policy SP6 (Flood Risk) require?

Policy SP6 of the Local Plan Review 2023-2041 (adopted June 2025) applies the sequential approach strictly across the district, limits Flood Zone 3b to water-compatible uses and essential infrastructure, and requires safe access and egress in the 100-year plus climate change event. It sets four assessment triggers, requires a Surface Water Drainage Strategy for all development in Newbury and Thatcham and in high-sensitivity catchments, and keeps a 10-metre buffer along main rivers. Runoff must be greenfield, or at most 50% of the existing 1 in 100 year rate on previously developed land.

What discharge rate does West Berkshire require?

On undeveloped land, greenfield rates and volumes for all storms up to the 1 in 100 year event with climate change (Policy SP6). The SuDS SPD (December 2018) applies this to the 1 in 1 and 1 in 100 year peaks and the 1 in 100 year, 6-hour volume, with a 40% climate change uplift. On previously developed land the council expects greenfield where achievable and accepts at most 50% of the existing 1 in 100 year rate.

Do developments in Newbury and Thatcham need a drainage strategy?

Yes. Policy SP6 requires a Surface Water Drainage Strategy for all developments in Newbury and Thatcham, whatever their size, following the Environment Agency's 2018 identification of the two towns as a nationally significant Flood Risk Area for surface water. The same applies to every proposal in the six catchments the Cumulative Impacts Assessment rates as highly sensitive.

Which West Berkshire policies deal with flood risk and drainage?

In the Local Plan Review 2023-2041: SP6 (Flood Risk), DM6 (Water Quality), DM7 (Water Resources and Waste Water) and criteria i and j of SP5 (Responding to Climate Change), with site requirements in SP13 (Sandleford) and SP14 (North East Thatcham). SP6 replaced Core Strategy Policy CS16. Neighbourhood plan Policies GD3 (Stratfield Mortimer), C18 (Compton) and HUNG12 (Hungerford) add parish wording. A new West Berkshire Local Plan is timetabled for adoption in April 2029.

Which part of West Berkshire Council reviews a drainage strategy?

The council's Drainage Team, acting for the council as Lead Local Flood Authority, is the SuDS consultee on planning applications and checks strategies against the SuDS SPD. Because West Berkshire is a unitary authority, the same council also determines the application and consents works in ordinary watercourses. The Environment Agency deals with the main rivers, Thames Water with sewer connections.

How is the fee set for a flood or drainage report on a West Berkshire application?

It depends on the flood zone, whether the site is in Newbury, Thatcham or a high-sensitivity catchment, whether groundwater monitoring or modelling is needed, and whether a sequential test is required. We quote a fixed fee with no obligation: one of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444.

Submitting to West Berkshire Council before the new Local Plan?

An application without its Surface Water Drainage Strategy, or with a soakaway untested against winter groundwater, can stall at validation or at the Drainage Team. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Get a Fixed Quote

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.