Padel Courts Approved on a Site With Four Recorded Floods


Flooding has reached this Weybridge leisure site four times on record since 1947, and sewer flooding too. The application for three floodlit padel courts still needed no raised levels, no compensatory storage and no Exception Test. Unda's flood risk assessment set out why the use, not the flood zone, decided what had to be shown. The council approved it.

Project at a glance
ClientSmall developer
LocationA health and leisure club in Weybridge, Surrey
WatercourseRiver Thames, with the Engine River along the northern boundary
Planning authorityElmbridge Borough Council
Flood riskFlood Zones 1 and 2 · fluvial · surface water · groundwater · sewer · reservoir
DevelopmentCommercial · three floodlit padel courts
ServiceFlood Risk Assessment for Planning Applications — desk study of every flood source, the vulnerability classification and the flood risk management measures
OutcomeApproved

Four recorded floods, Flood Zones 1 and 2

Environment Agency records show water reaching this site four times since 1947, most recently in the winter of 2013/14, each time because the channel could not carry the flow. Nothing was breached or overtopped. There are no raised defences here to breach, only high ground holding back the Thames and the Desborough Cut.

Set against that history, the mapping reads undramatically: both the Environment Agency's Flood Map for Planning and the council's strategic flood risk assessment place the site in Flood Zones 1 and 2, entirely outside the functional floodplain, the land water has to flow across or be stored on in times of flood.

Flood zones and the 2070 to 2125 climate change extent
Environment Agency Flood map for planning showing Flood Zones 2 and 3 and the 2070 to 2125 climate change extent along the Thames at Weybridge and Walton-on-Thames.
Source: Environment Agency Flood map for planning: flood zones 2 and 3 at present day, with the 2070 to 2125 climate change extent. Contains OS data © Crown copyright and database rights. The application site is not marked. What the map shows is how closely the zones follow the river along this reach, which is why ground a short way back from it sits in Flood Zones 1 and 2; the climate change band is a future scenario rather than a record of the floods described above.

The remaining sources were less clear-cut. Surface water risk across the site is very low to low, now and with climate change allowed for. The strategic flood risk assessment puts the site in an area where groundwater could reach the surface, while the Environment Agency's advice for the same area is that groundwater flooding is unlikely, and no records show it occurring here. Sewers are the one source with a recorded incident at the site itself, and the site also falls inside the extent that would flood if a reservoir failed while river levels were normal.

What the use class changed

Flood zones describe how likely flooding is. Vulnerability classification describes what it costs when it arrives, and that is what decides whether a use belongs in a given zone.

Three open padel courts are water-compatible development: the least sensitive classification in the framework, alongside amenity open space and outdoor sport and recreation. Water-compatible uses are the only ones accepted right across the flood zones, so Flood Zones 1 and 2 raised no question of principle and no Exception Test followed. The courts add nothing more sensitive to a site that already held club buildings and courts, so the site is no more vulnerable than before.

This is the element most often misread, usually by treating a flood zone as a verdict on the scheme rather than a reading of the ground.

Advice written for buildings

Classification settles whether a use belongs somewhere, not what the development must then do about the residual risk, and here every standard requirement had nothing to act on.

Environment Agency standing advice for Flood Zone 2 asks for finished floor levels at least 600 mm above the higher of ground level, the adjacent road and the estimated flood level. A padel court has no finished floor. It is a foundation, a surface and a fence, sitting on the ground where it is laid. Answered line by line, the advice is unmeetable. What the advice protects is a building, and there is no building here to keep dry.

Outdoor floodlit padel courts on level ground, open to the sky, with standing water on the surfacing alongside.
Nothing to keep dry. Courts of this type are a foundation, a surface and perimeter fencing, open to the sky, which is why the mitigation written for buildings had nothing here to act on.

Safe escape went the same way. A dry escape route is a requirement for new residential development in Flood Zone 3, and proving one exists is the usual sticking point on a constrained site. These courts are outdoors and unmanned, so the requirement never arose.

Floodplain storage was next. Instead of raising ground levels, the scheme removes one excavated spoil mound from the site and reduces a second. The assessment found no unacceptable loss of floodplain storage. Surface water was the last of them: the applicant confirmed a permeable foundation and surface layer, and on that basis the assessment recorded any change in runoff as likely to be negligible.

Warning and closure, not levels

The applicant agreed to register with the Environment Agency's flood warning service and to keep the courts closed while a flood alert stands. Flood warning notices go up around the courts, tying into the arrangements already at the club. A flood plan was also recommended.

None of that substitutes for design mitigation. It is what proportionate looks like where flooding means a wet court rather than a flooded building: closing the courts for a day is a reasonable requirement, and raising the ground beneath them would not have been.

The council approved the courts

The council granted planning permission. Unda's flood risk assessment was one document in that application; the decision was the council's judgement on the scheme in front of it. The flood risk evidence removed flood risk from the reasons for refusal; it did not carry the application by itself. What was issued was a flood risk assessment for planning: every flood source at the site, the vulnerability classification and what followed from it, and the warning and closure measures the application relied on.

What this means for similar sites

A flood record and a flood zone answer different questions, and neither one settles whether a scheme is acceptable. What a site will be used for often matters more than how often it floods, which is why the vulnerability classification is worth reading before the layout is fixed rather than after a consultation response lands. Put a building on the same ground and the question changes.

The drainage position has moved on since this assessment, though. Sustainable drainage is now expected on development of any size, and the construction guidance for a padel court specifies a free-draining sub-base discharging through a perimeter drain: positive drainage, whatever the surface looks like. A permeable build-up is a sensible start on ground like this, and no longer an answer on its own.

About the author. Freya is a Flood Risk Consultant focused on planning (NPPF/TAN15), insurance and property. Unda has been trading since 2014, is a CIWEM Business Partner with CIWEM member and chartered (C.WEM MCIWEM) consultants, and has delivered 5,000+ flood risk assessments and drainage strategies across England and Wales.

Freya Pott · MSc, BSc (Hons), GradCIWEM

A flood risk assessment for planning establishes which flood risk tests a scheme actually has to pass, and gives the case officer the evidence to settle flood risk before it becomes a reason to refuse.

Adding courts or hardstanding to a site that has flooded?

Send the site address and what is proposed for a tailored quote from Unda's experienced consultants within 60 minutes on a working day.

Start a quote

Related projects