Flood Risk & Drainage Requirements for Cambridge City Council
Contact Us
Cambridge City Council expects new buildings to hold back the first 5 mm of every rainfall and to send no surface water to a foul or combined sewer. Both rules come from Policies 31 and 32 of the Cambridge Local Plan 2018, adopted on 18 October 2018. Policy 32 also caps runoff at the rate and volume of the site before any development, falling back to 2 litres per second per hectare only where the volume cannot be held. Those tests apply to brownfield redevelopment as well, and they sit on top of Cambridgeshire County Council's own drainage standards.
This page goes through what Cambridge City Council, Cambridgeshire County Council and the Environment Agency look for in a planning application in the city, policy by policy. Each requirement has its source and date, and the report that answers it. It covers the 2018 plan and the two area action plans still in force, the joint Greater Cambridge Local Plan due for submission in December 2026, the October 2025 flood evidence, the city's validation checklists, and the new development corporation.
Who decides what on a Cambridge planning application
Cambridge is a two-tier district. Greater Cambridge Shared Planning, the planning service the city shares with South Cambridgeshire District Council, validates and determines applications for Cambridge City Council. Cambridgeshire County Council is the Lead Local Flood Authority and comments on surface water for major development; the Environment Agency deals with the Cam and Bin Brook and with the flood zones.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Cambridge City Council, through Greater Cambridge Shared Planning | Local planning authority | Validates and decides applications against the Cambridge Local Plan 2018, the Cambridge East and North West Cambridge area action plans and the South Newnham Neighbourhood Plan; checks drainage on minor schemes itself; adopts SuDS on public open space under its sustainable drainage guidance |
| Cambridgeshire County Council | Lead Local Flood Authority | Statutory consultee on surface water for major development, judged against its Surface Water Planning Guidance of February 2026; consents works on ordinary watercourses (ordinary watercourse consent) |
| Environment Agency | Main rivers and flood zones | Consulted on development in Flood Zones 2 and 3 and near the main rivers, which in the city are the Cam and Bin Brook from Newnham (Level 1 SFRA, section 2.3.4); works on or near a main river may also need an environmental permit from the Environment Agency |
| Anglian Water | Sewerage undertaker | Foul and surface water sewers and wastewater treatment capacity, which Policy 32 (d) and the area action plans tie development to |
| Cambridge Water | Water supply | Supply connections; water-efficiency targets under Policy 28 and, if adopted, proposed Policy CC/WE of the Regulation 19 plan |
| Internal drainage board | None in the city | No internal drainage district crosses the city boundary (Environment Agency internal drainage districts layer checked against the ONS district boundary, 13 November 2026); the boards named in the SFRA lie in South Cambridgeshire |
| Greater Cambridge Development Corporation | Established 23 July 2026 | Set up by the Greater Cambridge Development Corporation (Establishment) Order 2026; no planning functions have been conferred yet, so Greater Cambridge Shared Planning still decides every application in the city |
That could change for large schemes. In its June 2026 response to consultation the government said a further order would let the corporation determine applications on strategic sites. The interim thresholds are 250 or more homes, 5,000 m² or more of other floorspace, and major infrastructure on sites over 1 hectare; everything else stays with the shared planning service. No such order had been made on 13 November 2026. Local government reorganisation is on hold: the city council's reorganisation page says the government paused the programme on 7 September 2026, and that a decision for Cambridgeshire and Peterborough is expected by early 2027 at the latest. Our article on reorganisation and flood risk planning covers what carries over when councils merge.
Cambridge Local Plan Policies 31 and 32 and the other flood and drainage policies in force
Most flood and drainage questions in the city turn on two policies of the 2018 plan: Policy 31 on how water is managed across a site and Policy 32 on flood risk. Policy 28 adds water efficiency and BREEAM, the two area action plans add their own drainage policies for Cambridge East and North West Cambridge, and the city's one made neighbourhood plan adds two drainage clauses. The table sets out each policy; the sections below quote them.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy 32 | Flood risk | Runoff rate and volume no greater than the undeveloped site, a 2 l/s/ha fallback, no foul or combined sewer discharge, a discharge priority order, and limits on building in Flood Zones 3a and 3b | Show the greenfield rate and volume, the discharge route, maintenance for the lifetime of the scheme, and floor levels above the design flood | A surface water drainage strategy with greenfield runoff calculations and storage sized to hold the volume, plus a flood risk assessment setting floor levels and access | Cambridge Local Plan 2018, pp. 125-128 (adopted 18 Oct 2018) |
| Policy 31 | Integrated water management and the water cycle | SuDS on the surface and close to source, no discharge for the first 5 mm of rainfall, green or brown flat roofs, treatment of runoff, no new culverts, permeable hard surfaces | Show how the first 5 mm is held on site and how runoff is treated before it leaves | A SuDS layout that intercepts the first 5 mm (green roofs, permeable paving, rain gardens), with a treatment train and a culvert check | Cambridge Local Plan 2018, pp. 121-125 (adopted 18 Oct 2018) |
| Policy 28 | Carbon reduction, community energy networks, sustainable design and construction, and water use | A Sustainability Statement for major development covering climate adaptation and water management; 110 litres per person per day for new homes; BREEAM Excellent for new non-residential buildings | Submit the statement (major development); meet the water and BREEAM standards unless shown not viable | Flood risk and drainage sections written so they can drop into the Sustainability Statement and the BREEAM flood and runoff credits | Cambridge Local Plan 2018, pp. 108-110 (adopted 18 Oct 2018) |
| Policy CE/22 | Land Drainage, Water Conservation, Foul Drainage and Sewage Disposal | A strategic surface water drainage scheme at outline stage, no more discharge than the undeveloped site, wastewater capacity before phases proceed, drainage managed in perpetuity | At outline, a site-wide drainage scheme; later phases tied to it | A strategic drainage strategy for the outline, then phase-level strategies and condition discharges that track it | Cambridge East Area Action Plan, pp. 118-120 (adopted 21 Feb 2008) |
| Policies NW25, NW26 and NW27 | Surface Water Drainage; Foul Drainage and Sewage Disposal; Management and Maintenance of Surface Water Drainage Systems | Release at or below the pre-development rate, climate change in all mitigation, wastewater capacity phasing, and drainage maintained in perpetuity by publicly accountable bodies | Show each phase keeps to the strategic drainage approach and that the maintenance body is agreed before work starts | Phase-level surface water drainage strategies and condition discharges set against the site-wide strategy | North West Cambridge Area Action Plan, pp. 49-51 (adopted 22 Oct 2009) |
| Proposed CC/FM (Regulation 19) | Managing flood risk | Sequential and exception tests, sequential layout, greenfield peak runoff with betterment on brownfield sites, floor levels, no highly or more vulnerable use at basement or ground-floor-only level in Flood Zone 3, and FRA triggers | Weight grows as the plan proceeds; submission due December 2026 | Reports that already meet the proposed tests where they go further than Policy 32 | Proposed Submission Greater Cambridge Local Plan, pp. 488-490 (Regulation 19, consultation 3 Aug to 25 Sep 2026) |
| Proposed CC/IW (Regulation 19) | Integrated water management, sustainable drainage and water quality | A site-wide water management approach, a five-step surface water priority order starting with rainwater reuse, the 5 mm rule, SuDS to the National Standards, and wastewater capacity before occupation | As above | Drainage strategies that follow the priority order and state the treatment and water-reuse position | Proposed Submission Greater Cambridge Local Plan, pp. 483-487 (Regulation 19, Aug 2026) |
| Proposed CC/WE (Regulation 19) | Water efficiency in new developments | 80 litres per person per day for 100 or more homes and 90 for fewer, water butts, and BREEAM water credits | As above | Rainwater reuse noted in the drainage strategy without counting it as storage | Proposed Submission Greater Cambridge Local Plan, pp. 479-482 (Regulation 19, Aug 2026) |
Requirements checked November 2026.
Policy 32 (Flood risk): runoff, discharge and floor levels
Policy 32 of the Cambridge Local Plan 2018 asks every development to drain no faster, and in no greater volume, than the site would in its undeveloped state, and to keep surface water out of foul and combined sewers. The rate test reads: "the peak rate of run-off over the lifetime of the development, allowing for climate change, is no greater for the developed site than it was for the undeveloped site" (Local Plan 2018, p. 125).
On volume, the policy allows a fallback: "If this cannot be achieved then the limiting discharge is 2 litre/s/ha for all events up to the 100-year return period event." A footnote lets a discharge point run at up to 5 litres per second where a lower rate would risk blockage, but not where the discharge is pumped. The discharge priority is infiltration first, then a water body, then a surface water sewer. Sewers carrying foul water are ruled out: "Discharge to a foul water or combined sewer is unacceptable." Property in and next to the site must not flood in a 1 in 100 year event with climate change, or if the drainage system fails, and the scheme needs a management and maintenance plan for its lifetime, including who adopts it.
The second half deals with flood risk to the development, and its detailed tests are written for undeveloped sites. They rule out Flood Zone 3b except for water-compatible uses, and Flood Zone 3a except for water-compatible uses or minor development, each with resilient construction and a safe means of evacuation. In Flood Zone 2 or a surface water wet spot they ask for flood resilient and resistant construction, and floor levels on an undeveloped site are to be "300mm above the 1-in-100-years flood level, plus an allowance for climate change where appropriate and/or 300mm above adjacent highway levels where appropriate". On previously developed land it asks schemes to take the opportunity to reduce the existing risk through where the buildings go, without displacing flood water or blocking flow routes, and to use flood resilient and resistant construction, with suitable boundary treatment and a safe means of evacuation.
Officers and the county's drainage team look for greenfield rate and volume calculations, an outfall that exists and has capacity, and an adoption route. Applications that put surface water into a combined sewer, or that skip the volume test because the site is already built on, are the common sticking points. The rules apply to brownfield sites in full because the policy compares the scheme with the site in its natural state (supporting text para 4.30). Our surface water drainage strategy sets the greenfield rate and volume, sizes storage to meet them, and shows the discharge route in Policy 32's order; the flood risk assessment sets floor levels from Environment Agency levels and the adjacent road.
Older reports sometimes quote two earlier policies. Policy 4/16 (Development and Flooding) of the Cambridge Local Plan 2006 expired on 20 July 2009 under the Secretary of State's direction, and Policy 8/18 (Water, Sewerage and Drainage Infrastructure) was saved until the 2018 plan replaced the 2006 plan's saved policies on 18 October 2018.
Policy 31 (Integrated water management and the water cycle): the 5 mm rule
Policy 31 asks every scheme to manage surface water close to its source and on the surface where reasonably practicable, to treat it before it leaves, and to hold back the first 5 mm of rainfall. Its key clause permits development provided that "there is no discharge from the developed site for rainfall depths up to 5 mm of any rainfall event" (Local Plan 2018, p. 122).
Flat roofs are to be green or brown where that is acceptable in the historic setting and, on a refurbishment, where the roof structure can take it. Runoff from hard surfaces is treated to the CIRIA SuDS Manual (C753), watercourses stay open, culverts come out where possible, and hard surfaces are permeable "where reasonably practicable, and having regard to groundwater protection". The supporting text explains why: the 2010 SFRA and the 2011 surface water management plan found little or no spare capacity in the rivers and watercourses that take the city's runoff.
The 5 mm rule is the one most often missed on small schemes, because a single attenuation tank with a flow control does not hold back the first few millimetres. We show it with interception features that soak up or evaporate the first 5 mm (green roofs, permeable paving, rain gardens and swales) and report it as its own line in the drainage calculations.
Policy 28 (Carbon reduction, community energy networks, sustainable design and construction, and water use): BREEAM and water
Policy 28 asks promoters of major development for a Sustainability Statement covering climate adaptation and water management, and sets minimum standards for all new development (110 litres per person per day for new homes; BREEAM Excellent with full Wat 01 credits for new non-residential buildings) "unless it can be demonstrated that such provision is not technically or economically viable" (Local Plan 2018, pp. 108-110). The Greater Cambridge Sustainable Design and Construction SPD of January 2020 sets out what the statement should contain. Our flood risk and drainage findings are written so they can be lifted into that statement and into the BREEAM flood risk and surface water runoff credits.
Policy CE/22 (Land Drainage, Water Conservation, Foul Drainage and Sewage Disposal): Cambridge East
Policy CE/22 of the Cambridge East Area Action Plan, adopted on 21 February 2008, asks for a site-wide sustainable drainage system and states: "A Strategic Surface Water Drainage Scheme will be required at the outline planning application stage for the Cambridge East area." It ties each phase to wastewater treatment capacity through Grampian-style conditions, and requires that "No additional discharge is made into surrounding water courses or onto surrounding land than that naturally discharging from the site in its current undeveloped form".
The supporting text records that the watercourses downstream of the airport site are at full capacity at peak flows and that full attenuation is needed for 100-year storms. No development may start until a body with the powers and funding to run the drainage in perpetuity is legally committed. The 2018 plan keeps the action plan in force except for Policies CE/3 and CE/35 (Local Plan para 1.14). For a Cambridge East phase we prepare the drainage strategy against the strategic scheme and the discharge limits it sets, then the evidence to clear each drainage condition.
Policy NW25 (Surface Water Drainage), Policy NW26 (Foul Drainage and Sewage Disposal) and Policy NW27 (Management and Maintenance of Surface Water Drainage Systems): North West Cambridge
The North West Cambridge Area Action Plan, adopted on 22 October 2009, asks that surface water be released "at an equal, or slower, rate than was the case prior to development" and that "All flood mitigation measures must make allowance for the forecast effects of climate change" (Policy NW25). Policy NW26 links each phase to wastewater treatment and watercourse capacity, and Policy NW27 requires written agreement, before work starts, that a publicly accountable body will maintain the surface water system in perpetuity. Later phases and changes to consented schemes there need drainage evidence that stays within the site-wide strategy, which is what our condition and phase strategies are built around.
South Newnham Neighbourhood Plan (made 24 February 2025): two drainage clauses, no flood policy
The South Newnham Neighbourhood Plan is the only made plan in the city. Its section on climate change and local flooding has context and supporting text but no policy wording, and the supporting text sends applicants to the 21 SuDS design principles in the Cambridgeshire Flood and Water SPD. Two of its policies carry drainage clauses: Policy SNNP5 asks that improvements to the Barton Road path integrate sustainable drainage so they do not add to surface water flooding, and Policy SNNP11 (g) asks that front gardens are not covered in hard non-permeable surfaces for car parking. A householder scheme in South Newnham that paves a front garden for parking has to answer SNNP11 (g) as well as Policies 31 and 32.
Greater Cambridge Local Plan 2024-2045: proposed Policies CC/FM, CC/IW and CC/WE before submission
Cambridge City Council and South Cambridgeshire District Council are preparing the first joint plan for Greater Cambridge. The Proposed Submission plan was consulted on under Regulation 19 from 3 August to 25 September 2026. A joint Cabinet meets on 17 November 2026, then the city council's Full Council on 26 November and South Cambridgeshire's on 8 December. The councils intend to submit the plan in December 2026, and expect the examination to start in spring 2027 (Greater Cambridge Local Plan page; Local Development Scheme, July 2026). It is being prepared under the current plan-making system. Once adopted it would supersede the 2018 plan and remove the Cambridge East and North West Cambridge area action plans from the development plan (Proposed Submission plan paras 1.11 and 1.12).
In the Regulation 19 text, proposed Policy CC/FM (Managing flood risk) brings the flood rules together. It keeps the greenfield rate test and adds that "Betterment must be provided on previously developed sites"; it keeps the floor level rule at 300 mm above the 1 in 100 year level with climate change; and it adds a bar: unless exceptional circumstances can be shown, proposals in Flood Zone 3 (with climate change) that would put a highly vulnerable or more vulnerable use at basement level or ground-floor-only level will not be permitted. The proposed policy also lists when a site-specific flood risk assessment is needed, including Flood Zone 1 sites shown at greater risk in future. Its volume fallback is printed as "2 litres per second for all events up to the 100-year return period event", without the per-hectare unit of Policy 32, and the examination may settle which is meant.
Proposed Policy CC/IW in the Regulation 19 plan keeps the 5 mm rule, sets a five-step surface water priority order that starts with collecting runoff for non-potable use, and asks for SuDS designed in line with the CIRIA SuDS Manual "and the National Standards for SuDS". It also asks applicants to show wastewater treatment and network capacity, or an agreement with the provider, before occupation. Proposed Policy CC/WE in the same draft sets 80 litres per person per day for schemes of 100 or more homes and 90 for smaller ones. The climate change topic paper for the Regulation 19 stage records the changes made since the draft plan, several of them at the Environment Agency's request. Until adoption, Policies 31 and 32 decide applications; the proposed policies carry weight that grows as the plan moves through submission and examination. The supporting text to proposed CC/IW (para 4.33) says the drainage network must be designed without counting rainwater storage as attenuation, because tanks can be full in winter; our article on rainwater harvesting in SuDS covers the same point.
Working out Policy 32's runoff limits for a Cambridge site?
Send us the address, the site area and the plans, and we will set out the greenfield rate and volume, the 5 mm interception and the outfall Policies 31 and 32 call for. Get a no-obligation, free quote.
Start a QuoteWhich reports a Cambridge application needs, and when
Greater Cambridge Shared Planning publishes separate validation checklists for city and South Cambridgeshire applications. The city's checklists carry no adoption date and still cite the NPPF's former Chapter 14 and the 2010 SFRA, so their local items are best read as the council's published guidance; national policy and Policies 31 and 32 apply in full regardless. A single checklist for both councils was consulted on until 28 July 2026 and is being reviewed.
| Trigger | What is needed | Source |
|---|---|---|
| Any development in Flood Zone 2, 3a or 3b, including minor development, householder schemes and changes of use | Site-specific flood risk assessment | NPPF F4; full application checklist |
| A site of 1 hectare or more in Flood Zone 1 | Site-specific flood risk assessment | NPPF F4; checklist |
| Flood Zone 1 land the SFRA or the Flood Map for Planning shows at risk from any source, now or in future, or land with critical drainage problems | Site-specific flood risk assessment | NPPF F4 |
| A site under 1 hectare in Flood Zone 1 changing to a more vulnerable use where other sources such as surface water could affect it | Site-specific flood risk assessment | City checklists |
| New development at risk now or in future from any source, other than allocated sites already tested, sites where the FRA shows no built development on land at risk, sites at risk only from surface water where the layout keeps occupiers safe, householder development, non-residential extensions under 250 m² and most changes of use | Sequential test | NPPF F5 |
| Highly vulnerable development in Flood Zone 2; essential infrastructure in Flood Zone 3a or 3b; more vulnerable development in Flood Zone 3a, where the sequential test applies | Exception test | NPPF F6 and Annex F, table 3 |
| Any scale of development where surface water will be created or affected | Surface water drainage strategy; for householder schemes, the drainage changes shown on the plans | Full application checklist; Policy 32 |
| Major development (10 or more homes, or 0.5 hectares or more for housing where the number of homes is not known; 1,000 m² or more of new floorspace; or a site of 1 hectare or more) | Drainage strategy to the county's checklist; the Lead Local Flood Authority is consulted | Surface Water Planning Guidance, February 2026 |
| Every surface water drainage strategy on a city application | Completed drainage pro-forma from the Cambridgeshire Flood and Water SPD; BRE 365 tests where infiltration is proposed | Full application checklist |
| Proposals for non-mains foul drainage or trade waste | Foul drainage assessment | Full application checklist |
| Works to an ordinary watercourse (culverts, outfalls, structures) | Ordinary watercourse consent from Cambridgeshire County Council | County consent page |
The drainage gaps that stop an application at validation are plain enough: no drainage pro-forma, infiltration proposed without BRE 365 results, or a householder extension with no note of where the roof water goes. Our article on why applications are invalidated over flood risk and drainage lists the gaps, and the sequential test explainer sets out how the two national tests work.
Drainage on Cambridge sites: county standards and the city's own rules
Two sets of rules meet on a Cambridge drainage strategy. The county's Surface Water Planning Guidance, dated February 2026 and described as a live document reviewed every year, sets the technical standard the Lead Local Flood Authority applies to major schemes. Policies 31 and 32 add the city's own figures, and apply to minor schemes that the county never sees. The county's planning and development page lists the National Standards for sustainable drainage of June 2025 among the documents it uses.
- Greenfield runoff. A simple flow control is limited to QBAR; a complex control matches greenfield rates for every event up to the 1% annual chance event with climate change (guidance 5.9.5 and 5.9.6).
- Brownfield sites. Existing runoff must fall, towards greenfield rates or 3 l/s/ha; where that is shown not to be feasible, a relaxation factor of no more than five times the greenfield rate applies (5.9.7). Policy 32 still asks for the undeveloped-site rate and volume on a city site.
- Volume. Where reasonably practicable, the 1% annual chance 6-hour volume from a greenfield site should not exceed the greenfield volume, and from a previously developed site should be as close to it as possible and never more than the existing volume; extra volume held as long-term storage leaves at under 2 l/s/ha (5.11). This is the county's figure for long-term storage, separate from Policy 32's 2 l/s/ha fallback.
- Climate change and urban creep. All developments use the upper end allowance (5.13.2), which for the Cam and Ely Ouse catchment is 40% for the 1% annual chance rainfall event and 35% for the 3.3% event (Level 1 SFRA, table 5-3, from the Environment Agency allowances last updated May 2022). Urban creep adds 10%, except where there is no private external permeable space, such as flats (5.2.1); our climate change and urban creep calculator applies both.
- Infiltration. The lowest rate the county accepts is 1.0 x 10⁻⁶ m/s, with the base of the soakaway at least 1.2 m above groundwater, shown by testing (5.5.2, 5.15.2). Our BRE 365 infiltration rate calculator works the rate out from trial pit readings, and the ground conditions and soakaway map gives a first view of the geology.
- Foul sewers. No new surface water connections to foul sewers, the same line Policy 32 takes.
- Pre-application advice. The county offers a free 15-minute call, written advice and a meeting with written advice, with charges on its online form.
For SuDS on public open space that the city will adopt, the council's Sustainable Drainage: Cambridge Design and Adoption Guide sets its requirements; the validation checklists ask for management plans showing which SuDS and landscape features the city council will adopt. The Cambridgeshire Flood and Water SPD was re-adopted by the city council in December 2018 and contains the drainage pro-forma. A major scheme that misses these points can draw an objection from the Lead Local Flood Authority, and an outfall to a ditch or brook may need ordinary watercourse consent from the county.
The October 2025 Greater Cambridge SFRAs
The current evidence is the Greater Cambridge Integrated Water Management Study Level 1 Strategic Flood Risk Assessment by Stantec. It was issued as a final report in October 2025 and published with the draft plan consultation of December 2025 to January 2026. The Level 2 SFRA of the same month assesses 22 proposed sites, among them Cambridge East, North East Cambridge and the Cambridge Biomedical Campus. The council's own SFRA web page labels its link "2025" but the file it opens is the July 2021 study, so an assessment that cites it is a version behind.
The Level 1 SFRA defines the functional floodplain, Flood Zone 3b, as land with a 3.3% or greater annual chance of flooding with defences working, plus land designed to flood, and treats its maps as a first indicator. It lists the city's surface water wet spots from the 2014 update of the surface water management plan, including the city centre, Cherry Hinton, King's Hedges and Arbury, Chesterton, Trumpington and Coldham's Common, and it maps groundwater susceptibility from British Geological Survey data without a climate change allowance. It also notes that the Environment Agency updated several models in 2023, including the Cam Urban and Bin Brook models, and suggests further model updates can be made through site-specific assessments. The Flood Risk Sequential Test Update (2026) applied to the allocations is a plan-making test; it does not stand in for an applicant's own test on a windfall site. Our explainers on what an SFRA does and on Flood Zone 3b give the background.
National policy on a Cambridge site: NPPF Chapter 18
Chapter 18 of the National Planning Policy Framework, published on 17 August 2026, sets the national tests. F4 asks for a site-specific flood risk assessment for development in Flood Zones 2, 3a and 3b, and in Flood Zone 1 on sites of 1 hectare or more, on land with critical drainage problems, and on land the SFRA or the Flood Map for Planning shows at risk from any source now or in future. Householder schemes are exempt from the sequential test, not from F4.
F5 sets the sequential test and limits its search area to the anticipated catchment of the development's likely occupiers or users. Allocated sites already tested are exempt. So are sites where no built development, access or escape route would sit on land at risk, and sites at risk only from surface water where the layout keeps occupiers safe. Householder development, non-residential extensions under 250 m² and changes of use are exempt too, unless the change is to a caravan, camping or chalet site, or a mobile or park home site. F6 sets the exception test for the cases in Annex F and does not apply where no sequential test is needed. F7 asks that the most vulnerable parts sit on the lowest-risk land and that residual risk is managed, and F8 expects SuDS designed to the National Standards. Our page on NPPF guidance and advice and the article on the August 2026 NPPF changes cover the wording.
The 2018 plan was prepared and examined under the earlier 2012 Framework. Under Annex A, plan policies are not given less weight just because they predate the current Framework, though parts that are materially inconsistent with its decision-making policies carry very limited weight. Policy 32's Flood Zone 3a and 3b limits on undeveloped land are stricter than F6 and still apply; on the sequential test, applicants should expect the F5 approach and confirm the area of search with the case officer. The national guidance sits in the flood risk and coastal change guidance, last updated on 17 September 2025.
Flood risk in Cambridge in brief: the Cam, Bin Brook and surface water
River flooding in the city comes from the River Cam, which runs from Grantchester Meadows through the Backs and on past Chesterton towards the Great Ouse, and from Bin Brook, a main river from Newnham. Our River Cam page has the river's flood history and gauges, and the live river levels map shows current readings. Smaller watercourses run through the city too, among them Hobson's Brook, Cherry Hinton Brook and Coldham's Brook, and surface water collects in the wet spots the SFRA lists. Our flood risk map shows the flood zones for a site.
Groundwater matters too. The Level 1 SFRA describes chalk bedrock in a band from the south-west to the north-east of Greater Cambridge, giving way to clay in the north-west, with river terrace sand and gravel, alluvium and peat above it (section 2.2.1). Permeable ground makes infiltration possible on many sites. Where the water table is high, though, the county's 1.2 m rule decides whether a soakaway works; our article on groundwater flood risk in planning applications covers what monitoring involves. Wastewater capacity also limits growth: Policies CE/22 and NW26 tie phasing to it and proposed CC/IW would tie occupation to it, and our article on the politics of water infrastructure gives the background. The place-level detail, from Trumpington to King's Hedges, is on our flood risk assessment in Cambridge page, and the county picture on Cambridgeshire.
Reports for an application to Cambridge City Council
A flood risk assessment shows the site is safe, a sequential test shows no lower-risk site is reasonably available, and a drainage strategy shows where the water goes; one Cambridge application can need all three. The list pairs each service with the Cambridge policy, checklist item or county standard that calls for it. We have prepared reports for applications to Cambridge City Council, and every one goes out under the name of Unda Consulting Limited, a CIWEM Business Partner whose chartered consultants work to the policies on this page.
- Every source on one site. Policy 32 and the SFRA look at rivers, surface water, groundwater and sewers together, which a flood risk assessment covers in one report.
- Applications to the city. A rear extension in Newnham or a block of flats in Chesterton in Flood Zone 2 needs a flood risk assessment for planning with floor levels set against the design flood level.
- Buying near the Cam. Before exchange on a house beside the river or Bin Brook, a flood risk survey for property purchase reads the SFRA maps against the property itself.
- Sites outside Flood Zone 1. Where F5 applies, a sequential and exception test sets an area of search proportionate to the scheme's catchment.
- Drainage on any scheme. The city's checklists ask for drainage evidence at every scale, and a drainage strategy shows where the water goes in the order Policy 32 sets.
- Runoff and the 5 mm rule. For new homes and commercial buildings, a surface water drainage strategy gives greenfield rates and volumes, the 5 mm interception and the county's pro-forma.
- Clearing conditions. Phases at Cambridge East and North West Cambridge sit under site-wide drainage schemes required by Policies CE/22 and NW25, and our work on the discharge of drainage conditions answers each condition against that scheme.
- National policy on a 2018 plan. Because Policy 32 predates the August 2026 Framework, our NPPF guidance sets out how the two fit on a given site.
- Groundwater on the chalk. Where testing finds water within 1.2 m of a soakaway base, the county asks for monitoring, which our groundwater assessments cover.
- Modelled levels. Where the Environment Agency's model does not give the levels a scheme needs, flood modelling can set current design levels.
- Foul capacity. Policy 32 (d) and Policies CE/22 and NW26 tie development to sewer and treatment capacity, which a foul drainage strategy checks with Anglian Water.
- BREEAM schemes. Policy 28 asks for BREEAM Excellent on new non-residential buildings, and a BREEAM flood risk assessment supports the flood and runoff credits.
- Safe evacuation. Policy 32 asks for a safe means of evacuation in the floodplain, which a flood warning and evacuation plan sets out.
- Strategic sites. The Level 2 SFRA reviews 22 proposed sites, including Cambridge East and North East Cambridge, where a feasibility study tests flood risk and drainage before a layout is fixed.
Our page on local planning authorities explains how councils and their consultees divide the work, and the Lead Local Flood Authority article covers the county's role. The Cambridgeshire County Council page covers the county's own standards and minerals and waste plan, and Fenland shares the same Lead Local Flood Authority. Other councils are listed on our local authorities hub, and the 2025 National Standards for sustainable drainage are summarised in a separate article.
Cambridge flood and drainage questions
What does Cambridge Local Plan Policy 32 (Flood risk) require of a planning application?
Policy 32 of the Cambridge Local Plan 2018, adopted on 18 October 2018, asks that runoff from the developed site is no greater in peak rate, or in volume, than from the undeveloped site, with climate change. Where the volume cannot be held, the limiting discharge is 2 litres per second per hectare up to the 100-year event. Discharge goes to the ground first, then a water body, then a surface water sewer, and never to a foul or combined sewer. For undeveloped sites it rules out Flood Zones 3b and 3a except in stated cases, and sets floor levels 300 mm above the 1 in 100 year flood level with climate change and/or 300 mm above adjacent highway levels, where appropriate.
Can I write my own flood risk assessment for an application to Cambridge City Council?
The council does not require a particular author, but the assessment has to cover what the checklist and Policy 32 ask for: every source of flooding, climate change, the sequential test where it applies, and floor levels. A new dwelling or a site in Flood Zone 3 needs surveyed levels and a drainage strategy as well, which are hard to produce without survey data. Call 01293 214444 if you want a view on a particular site.
Does a Flood Zone 2 site in Cambridge need a flood risk assessment and a sequential test?
It needs a site-specific flood risk assessment under NPPF F4, and the city's checklists say the same for minor development and changes of use. Whether it needs a sequential test depends on the scheme: householder extensions, non-residential extensions under 250 m² and most changes of use are exempt under F5, while a new dwelling is not. The exception test applies in Flood Zone 2 only to highly vulnerable development.
Does a house extension in Cambridge need drainage details?
Yes, in a light form. The city's checklists ask for a surface water drainage strategy wherever surface water will be created or affected, and for a householder application that means showing the changes to surface water drainage on the submitted plans. Policy 31's 5 mm interception and its preference for permeable surfaces apply to every scheme, so a soakaway or rain garden, with infiltration evidence where it matters, normally answers both.
Will the Greater Cambridge Development Corporation decide my application?
Not yet. The corporation was established on 23 July 2026, but no order giving it planning functions had been made by 13 November 2026, so Greater Cambridge Shared Planning decides applications for the city council. The government has said strategic sites (interim thresholds of 250 or more homes, 5,000 m² or more of other floorspace, and major infrastructure on sites over 1 hectare) would pass to the corporation once a further order is made.
What will flood and drainage reports for a Cambridge scheme cost?
It depends on the flood zone, the scheme and whether a drainage strategy or sequential test is also needed. We quote a fixed fee for each site after looking at the address and plans; send them to enquiries@unda.co.uk or call 01293 214444 for a no-obligation, free quote.
Applying to Cambridge before the joint plan is examined?
Tell us the site and where the scheme has reached, and we will scope the reports Policies 31 and 32 and the county's February 2026 guidance call for, allowing for proposed CC/FM. One of our experienced flood risk consultants will get back to you within 60 minutes.
Get a fixed quoteFor an application to Cambridge City Council, call 01293 214444 or email enquiries@unda.co.uk with the address and a short description of the scheme, and we will send a fixed quote within the hour.