Flood Risk & Drainage Requirements for Cambridgeshire County Council
Contact Us
Cambridgeshire County Council decides few planning applications itself. As Lead Local Flood Authority, though, it reviews the surface water strategy for every major scheme in Cambridge, South Cambridgeshire, Huntingdonshire, East Cambridgeshire and Fenland, against its Surface Water Planning Guidance of February 2026. That guidance limits a simple flow control to QBAR and returns brownfield sites to the greenfield rate or 3 l/s/ha. A discharge to a drainage board's system needs the board's written agreement before the county will accept it.
Below are Cambridgeshire County Council's surface water drainage requirements and flood risk rules as they stand today. They cover the guidance figures, the county's own flood policy for minerals and waste (Policy 22 of the 2021 Minerals and Waste Local Plan) and the district policies beside them, with what our reports contain to meet each one. To talk through a site, call 01293 214444 or email enquiries@unda.co.uk. Reports for applications to Cambridgeshire County Council come from Unda Consulting Limited, a CIWEM Business Partner.
Who decides flood risk and drainage when Cambridgeshire County Council is the LLFA?
In two-tier Cambridgeshire the district or city council decides the application and the county council answers for surface water. Peterborough sits outside the arrangement. It is a unitary council that handles its own drainage consultations, so nothing on this page applies there.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Cambridge City, South Cambridgeshire, Huntingdonshire, East Cambridgeshire or Fenland | Local planning authority | Decides housing, commercial and most other applications against its own Local Plan flood and drainage policy, SFRA and validation list |
| Cambridgeshire County Council | Lead Local Flood Authority | Statutory consultee on surface water for all major development, aiming to reply within 21 days; consents works on ordinary watercourses outside drainage board districts |
| Cambridgeshire County Council | Minerals and waste planning authority | Decides minerals, waste and its own (Regulation 3) applications, such as schools, against the 2021 Minerals and Waste Local Plan and its own validation list |
| Environment Agency | Statutory consultee | Flood risk from main rivers, including the Great Ouse, the Cam and the Nene, and the tidal Nene below Wisbech |
| Internal drainage boards (Middle Level Commissioners, the Ely Group, North Level and others) | Drainage board | Consent under their byelaws for works in or beside board drains and for surface water discharged to them, often with a development charge |
| Anglian Water | Sewerage undertaker | Agrees any surface water or foul connection to the public sewer and confirms capacity at the receiving water recycling centre |
Major development follows the national definition, which the guidance repeats. That means ten or more homes, 0.5 ha where the number of homes is not yet known, 1,000 m² of new floorspace, any site of 1 ha or more, and all minerals and waste schemes. Below that threshold the county is not a statutory consultee. A district can still ask it for a view. Our explainers on the role of a Lead Local Flood Authority and how a local planning authority handles flood risk and SuDS cover the split in more depth.
The Surface Water Planning Guidance: Cambridgeshire County Council's surface water drainage requirements
The county's Surface Water Planning Guidance (February 2026, 50 pages) is the document its officers check a surface water strategy against, read with the Cambridgeshire Flood and Water SPD and the National Standards for Sustainable Drainage Systems (June 2025). The county calls it a live document, reviewed each year; copies of the 2016 SPD still rank above it in search, so the figures below are taken from the February 2026 issue.
| Requirement | Cambridgeshire County Council standard | Source and date |
|---|---|---|
| Greenfield sites | Runoff from impermeable areas at the greenfield rate or less; a simple flow control limited to QBAR, a complex control held to greenfield equivalents for every event up to the 1% AEP plus climate change | Guidance 5.9 (February 2026) |
| Brownfield sites | Existing runoff must reduce: greenfield rate or 3 l/s/ha, with a relaxation factor of no more than five times greenfield where evidence shows that cannot be met | Guidance 5.9.7 (February 2026) |
| Runoff volume | The 1% AEP 6-hour volume no greater than greenfield; any extra volume held as long-term storage and released below 2 l/s/ha | Guidance 5.11 (February 2026) |
| Climate change | Upper end peak rainfall allowance for the 3.3% and 1% AEP events, from the management catchment the site sits in (six cross the county); a lower allowance only with the design life justified | Guidance 5.13; EA allowances (May 2022) |
| Urban creep | 10% added to impermeable area; none where there is no external private permeable space, such as flats | Guidance 5.2 (February 2026) |
| Infiltration | BRE 365 testing at full application and condition stage; minimum usable rate 1.0 × 10⁻⁶ m/s, no extrapolated results; base at least 1.2 m above the highest likely groundwater level | Guidance 5.5 and 5.15 (February 2026) |
| Storage performance | No surcharge at the 100% and 50% AEP events, no flooding above ground at the 3.3% AEP plus climate change; half empty within 24 hours, or room for a following 10% AEP storm | Guidance 5.14 and 5.18 (February 2026) |
| Pumped sites | Pumping is treated as unsustainable; where it is the only option, floors sit above the flood level from pump failure with storage half full in the 1% AEP plus 40% event | Guidance 5.22 (February 2026) |
| Floor levels | 300 mm above surrounding ground; at least 600 mm above the predicted flood level where rivers or the sea are a risk | Guidance 5.20 (February 2026) |
| Foul sewers | No new surface water connections; a combined sewer only as the last resort, laid to allow later separation | Guidance 5.8 (February 2026) |
Discharge rate and volume: QBAR, 3 l/s/ha and long-term storage
Two numbers decide most Cambridgeshire storage volumes: the rate the site may release, and the volume it may release in the 1% AEP 6-hour storm. A greenfield site with a single orifice or vortex control is held to QBAR; one with a multi-stage control matches greenfield rates event by event. Where the developed site produces more runoff volume than the field did, that extra has to leave below 2 l/s/ha, which is what drives the size of a basin on clay ground. On most clay sites the volume test, not the rate, sets the storage. A brownfield site starts from greenfield or 3 l/s/ha and argues upwards only with evidence, never further than five times greenfield. Our orifice and throttle sizing calculator and climate change and urban creep calculator give a first figure before the network is modelled.
The drainage hierarchy and infiltration testing in Cambridgeshire
Re-use comes first, then infiltration, a watercourse, a surface water sewer or highway drain, and a combined sewer last. Each step is ruled out with evidence before the next is used, as our note on the SuDS hierarchy explains. At outline stage the county accepts a desk assessment of infiltration, provided a second workable outfall is shown. At full application it wants BRE 365 infiltration testing at the depths the SuDS will use, ideally while groundwater is high. Soakaways deeper than 2 m and borehole soakaways do not count as infiltration in the county's view: they rank with a sewer and need the Environment Agency's groundwater team to agree. The north and centre of the county sit largely on clay, with chalk and greensand in the south, so our geology and soakaway map and BRE 365 infiltration rate calculator are a useful screen before trial pits.
What the county asks for at each application stage
- Outline. 23 items, including runoff rates and volumes in l/s/ha and m³/ha, storage per m² of impermeable area, preliminary SuDS locations, infiltration results or a second viable outfall, and in-principle agreement from any third party whose system takes the water.
- Full. The detailed drainage layout, flow control details, network calculations from the 15-minute to the 7-day storm, an exceedance flow plan, finished floor levels, a Simple Index Approach water quality check and a maintenance plan naming the adopting body.
- Reserved matters. The outline strategy carried into the approved layout, with any changes to impermeable area or outfall explained.
- Discharge of condition. Fifteen items, ending in formal agreement from any third party taking the discharge; the approved strategy for the wider site goes in with every submission.
The modelling settings are specified too: FSR rainfall for storms under an hour and FEH above, a Cv of 1, the MADD factor set to 0, mass balance above 99% and a surcharged outfall unless evidence shows it runs free. Our note on the SuDS pro-forma and its checklists covers the paperwork that travels with a strategy.
Pre-application advice and ordinary watercourse consent
The county offers a free 15-minute call with an officer, booked by email to FR.Planning@cambridgeshire.gov.uk, a written review within 14 days, or a meeting followed by written advice; the flood planning and development page links the charging form. Separately, culverts, headwalls and outfalls on an ordinary watercourse need ordinary watercourse consent from the county outside drainage board districts and from the board inside them, as our explainer on ordinary watercourse consent sets out.
Why the county's drainage team objects, and what clears it
Most holding objections from Cambridgeshire County Council come down to missing evidence, not a bad scheme. The guidance lists the gaps itself. A watercourse outfall arrives with no photographs and no capacity check at its narrowest section. An IDB discharge at a non-standard rate has no written agreement from the board. A brownfield site assumes a sewer connection nobody has surveyed, or a pumped site leaves out source control. The fifth is a layout where new homes back onto a ditch, so its upkeep splits between a dozen riparian owners. The county wants an easement there, ideally 5 m wide, and one body responsible, because it puts much of the county's flooding down in part to ditches nobody maintains; our guide to riparian ownership explains the duties.
None of these needs a redesign. Each is answered with evidence before submission, and our guide to answering an LLFA objection works through the responses that lift one.
Cambridgeshire County Council's own flood policies: the Minerals and Waste Local Plan
When the application is for a quarry, a waste site or one of its own buildings, Cambridgeshire County Council decides it, and still comments on the drainage as LLFA. The Cambridgeshire and Peterborough Minerals and Waste Local Plan, adopted jointly with Peterborough City Council on 28 July 2021 and running to 2036, holds the county's flood and drainage tests in two policies.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| 22 | Flood and Water Management | No significant adverse impact on surface or groundwater quantity, quality or flow; on land at risk of flooding, the sequential and exception tests with climate change, a site-specific FRA where national policy needs one, maintenance and adoption settled, and SuDS wherever built development is proposed | Show water resources are protected, pass the tests where they apply, and submit an FRA and SuDS proposals with their maintenance | A flood risk assessment covering every source and the working, restoration and aftercare phases, a sequential test where the site is in Flood Zone 2 or 3, and a surface water strategy for the built areas to the county's rates | Minerals and Waste Local Plan (July 2021) |
| 1 | Sustainable Development and Climate Change | Proposals adapt to climate change over the life of the development and its restoration, including sustainable drainage to minimise flood impacts and, where viable, reduce existing flood risk | Set out climate resilience in proportion to the scheme, including drainage | Climate change applied to every flood source and storm, with restoration landforms tested for flood storage opportunities | Minerals and Waste Local Plan (July 2021) |
Requirements checked November 2026.
Minerals and Waste Local Plan Policy 22 (Flood and Water Management): what it requires
Policy 22 permits minerals and waste development only where it does no significant harm to water resources and, on land at risk of flooding, only after the flood tests and an assessment. Its opening test reads: "Mineral and waste management development will only be permitted where it can be demonstrated (potentially through a detailed hydrogeological assessment) that there would be no significant adverse impact on: (a) the quantity and quality of surface or groundwater resources" (Minerals and Waste Local Plan, July 2021). For sites at risk from any source it requires "the successful completion of a sequential test (if necessary) and an exception test if required, with both tests applying climate change allowances to define flood risks", then a site-specific FRA where national policy calls for one, showing the flood zones, climate change over the development's life, a sequential layout, mitigation and "all reasonable actions" to reduce flood risk overall.
It applies to quarries, waste transfer and recycling sites, landfill, water recycling centres and the county's own buildings. Officers look hardest at dewatering, pumped discharges, bunds and stockpiles in the floodplain, and restoration levels. The plan's own site profiles say an FRA and a hydrological assessment will be needed for allocations lying largely in Flood Zones 2 and 3. Clause (g) asks for "the incorporation of Sustainable Drainage Systems (SuDS) wherever feasible" on built development, and the policy closes by pointing applicants to the Cambridgeshire Flood and Water SPD. We prepare the flood risk assessment and sequential test for the working and restored site, and a surface water strategy for yards, buildings and haul roads to the Surface Water Planning Guidance rates.
Minerals and Waste Local Plan Policy 1 (Sustainable Development and Climate Change): drainage and resilience
Policy 1 is the plan's opening test, and it brings flood risk into every minerals and waste proposal: "Proposals should take a proactive approach to mitigating and adapting to climate change, taking into account the long-term implications for flood risk" (Minerals and Waste Local Plan, July 2021). Among its resilience measures it lists "(f) incorporation of sustainable drainage schemes to minimise flood impacts, and, if viable opportunities exist, reduce current floodrisk". Restoration to wetland or washland is one way schemes meet it, and our report shows the climate change case for the restoration landform as well as the working site.
A new Cambridgeshire and Peterborough Minerals and Waste Plan is at its first stage under the 2026 plan-making regulations. Its scoping consultation and call for sites ran from 3 August to 12 October 2026, and the plan timetable (3 August 2026) puts submission on or after 1 February 2029. The scoping document proposes relying on the national flood policies F4 to F9 in place of Policy 22, so the policy may not carry into the new plan. Until then, Policy 22 governs every minerals and waste application.
Major scheme going to Cambridgeshire County Council for drainage?
Send the layout before the strategy is fixed and we will set the rate, volume and outfall the county will look for. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteDistrict flood policies that apply beside the county's drainage guidance
For housing and commercial schemes the binding flood policy is the district's, and the county's guidance applies underneath it. Two plans are moving this winter: the Greater Cambridge Local Plan goes to the councils for submission in November and December 2026, and Huntingdonshire's Local Plan to 2046 closed its pre-submission consultation on 28 October 2026.
| District | Adopted plan and flood or drainage policies | Emerging plan | Source and date |
|---|---|---|---|
| Cambridge City | Cambridge Local Plan (October 2018): Policy 31 Integrated water management and the water cycle (no discharge for the first 5 mm of rainfall); Policy 32 Flood risk (2 l/s/ha where volume cannot be held to undeveloped) | Greater Cambridge Local Plan: Regulation 19 consultation 3 August to 25 September 2026; submission December 2026; examination expected from spring 2027 | Cambridge Local Plan (October 2018); Greater Cambridge plan page (November 2026) |
| South Cambridgeshire | South Cambridgeshire Local Plan (September 2018): CC/7 Water Quality; CC/8 Sustainable Drainage Systems; CC/9 Managing Flood Risk (floors 300 mm above the 1 in 100-year level plus climate change; greenfield rates or lower) | Greater Cambridge Local Plan, as for Cambridge | Greater Cambridge plan page (November 2026) |
| Huntingdonshire | Local Plan to 2036 (May 2019): LP 5 Flood Risk; LP 15 Surface Water (discharges to the Middle Level or a drainage board agreed with it; water-retaining features where flow reaches the Great Ouse) | Local Plan to 2046: pre-submission consultation 16 September to 28 October 2026, submission intended by the end of December 2026; proposed LP 21 Managing Flood Risk and LP 23 Managing Surface Water | Local Plan to 2036 (May 2019); Local Plan update (October 2026) |
| East Cambridgeshire | Local Plan 2015 (as amended 2023): ENV 8 Flood risk (sequential and exception tests strictly applied; FRA in Flood Zones 2, 3 and the SFRA's modelled Zone 3) | New Local Plan put on hold by Full Council on 25 February 2025 | Adopted Local Plan (October 2023); emerging plan page (February 2025) |
| Fenland | Fenland Local Plan (May 2014): LP14 Responding to Climate Change and Managing the Risk of Flooding in Fenland (drainage strategy for relevant development; greenfield rates; drainage board byelaws) | Fenland 50: scoping consultation 28 January to 23 March 2026, repeated as the statutory scoping consultation 29 May to 29 June 2026; Gateway 1 summary published 27 July 2026; submission scheduled for March 2028 and adoption by October 2028 on the council's timetable page | Fenland 50 timetable (November 2026) |
The county's guidance quotes each of these policies in full in its section 2.5, which is a quick way to see the local rule beside the county's own. Fenland's requirements, including LP14 and the tidal Nene, are covered on our Fenland District Council page.
Which reports a Cambridgeshire application needs, trigger by trigger
| Trigger | Flood risk assessment | Sequential test | Surface water drainage strategy | Other consent |
|---|---|---|---|---|
| Site in Flood Zone 2 or 3 (much of the fens and the Great Ouse and Nene valleys) | Yes, including minor development and change of use | Yes, unless an exemption applies; Fenland and East Cambridgeshire apply it strictly | Yes on major development; often asked for on minor schemes by the district | Drainage board consent if discharging to a board drain |
| Flood Zone 1 site covering 1 ha or more | Yes | No | Yes: major development | Ordinary watercourse consent for new outfalls or culverts |
| Flood Zone 1 under 1 ha with surface water, groundwater or reservoir risk, or a critical drainage problem | Yes | Possibly, where the SFRA shows future risk | Where the district or validation list asks | None usually |
| Major development (10+ homes, 1,000 m², 1 ha) | Where a zone or source trigger applies | Where a zone trigger applies | Yes: the county is statutory consultee | Anglian Water agreement for any sewer connection |
| Minerals or waste application to the county | Where national policy calls for one (Policy 22) | Where the site is at risk (Policy 22) | Yes for waste and for built development; a foul drainage strategy too | Dewatering that takes more than 20 m³ a day needs an Environment Agency abstraction licence |
| Discharge of a drainage condition | No | No | Detailed strategy to the condition checklist | Formal third-party agreement |
The Exception Test follows the sequential test for highly vulnerable development in Flood Zone 2, for essential infrastructure and more vulnerable uses in Flood Zone 3a, and for essential infrastructure in Flood Zone 3b (NPPF Annex F, table 3). Our note on what the sequential and exception tests involve explains both. Missing documents stop an application at registration, as our account of a planning application invalidated for flood risk and drainage shows.
The Flood and Water SPD, SFRAs and validation lists in Cambridgeshire
The county wrote the Cambridgeshire Flood and Water SPD with the districts and endorsed it as LLFA on 14 July 2016. Each of the five districts then adopted it, and Cambridge and South Cambridgeshire re-adopted it in 2018. It weighs on every district decision, and its section 6.3 sets the greenfield rate and source control expectation the county's guidance builds on. The Minerals and Waste Local Plan notes that the county endorsed the SPD but did not adopt it. Fenland's SPD page links its own copy.
There is no county SFRA for general development; each district publishes its own, and an assessment should use the district's current version rather than the national map alone. Each SFRA has its own date. Greater Cambridge has an Integrated Water Management Study Level 1 SFRA (October 2025) with a Level 2; Huntingdonshire a Level 1 and Level 2 SFRA for its Local Plan update (Level 1 final report March 2024); East Cambridgeshire a Level 1 and 2 SFRA (October 2017); and Fenland a Level 1 SFRA (June 2022). Our explainer on what strategic flood risk assessments map covers the levels.
For its own minerals, waste and county applications, the county has its own Local Validation List Requirements (June 2025). They ask for a flood risk assessment in Flood Zones 2 and 3, minor development and change of use included, and on Flood Zone 1 sites over 1 ha. Smaller Flood Zone 1 sites need one too where other sources affect them, or where a change to a more vulnerable use or new hard standing is proposed. A surface water and foul drainage strategy is required for major development, 1,000 m² of floorspace, sites of 1 ha or more and every waste application. The list still cites the December 2024 Framework and a 2018 version of the surface water guidance. Both have been replaced. Applications are now decided under the August 2026 Framework and the February 2026 guidance.
Internal drainage boards across Cambridgeshire
The county's Local Flood Risk Management Strategy (2021 to 2027) counts 62 internal drainage board catchments and records more than half the county's land below mean sea level, kept dry by pumps. A site in one of those districts answers to its board as well as to the county. The Middle Level Commissioners require consent under their 2021 byelaws for works in or beside protected watercourses, and charge a one-off sum on surface water released to their system. Their standing advice is named in Huntingdonshire's LP 15. The Ely Group runs ten boards, among them Littleport and Downham and Middle Fen and Mere, and other boards, including North Level District, cover the fens around Wisbech and Whittlesey.
The county will not approve a discharge to a board drain at a non-standard rate until the board's agreement is in the report, so the board's position comes first. Storage is sized after it. Our note on why internal drainage boards matter for planning sets out how consent fits around the planning application.
National flood policy as Cambridgeshire County Council applies it
The National Planning Policy Framework published on 17 August 2026 puts flood risk in Chapter 18, Managing flood risk and coastal change, with policies F1 to F9. Policy F4 sets when a site-specific flood risk assessment is needed, and F5 and F6 cover the sequential and exception tests. F8 asks for sustainable drainage to the National Standards with maintenance in place; the county's guidance already follows those standards on urban creep and the brownfield relaxation factor. The Planning Practice Guidance on flood risk was last updated on 17 September 2025, and the Environment Agency's climate change allowances (May 2022) set the upper end peak rainfall values the county asks for. What changed from the December 2024 version is set out in our note on the August 2026 NPPF.
Flood risk across Cambridgeshire in brief
Fen flooding, river flooding and summer storms all reach the county's records. The strategy notes over 300 homes flooded in August 2014 and more than 200 in December 2020, and the county has published Section 19 investigations from Linton in July 2021 to Brampton in 2024. The River Great Ouse runs through St Neots, Huntingdon, St Ives and Ely, the River Cam through Cambridge, and the River Nene to its tidal reach at Wisbech.
The place-by-place picture sits on our area pages: the Cambridgeshire overview, Cambridge, Ely, Huntingdon, St Ives, St Neots and Wisbech. Any address can be screened on our flood risk map, and river levels checked on the live river levels map.
Reports we prepare for applications reviewed by Cambridgeshire County Council
Three separate questions sit behind a Cambridgeshire submission: is the site safe, should the development be on this land, and where does the water go at the county's rate. Each has its own report, and we prepare each one to the district's policy and the county's guidance. Other councils' requirements are on our local authorities page, including the Essex County Council page for comparison with another county LLFA.
- Every source, one report. Rivers, the tidal Nene, surface water, groundwater and reservoir risk from the Ouse Washes, assessed together in a flood risk assessment.
- District applications. Prepared to the district's own policy, such as Huntingdonshire LP 5 or South Cambridgeshire CC/9, and to NPPF F4: flood risk assessment for planning.
- Buying in the fens. Where a search flags fen or river risk on a home or commercial building, the flood risk survey for property purchase looks at the building itself.
- Flood Zone 2 and 3 land. Required by every district plan and by Policy 22 for minerals and waste: sequential and exception test.
- Major development. Every scheme the county reviews as statutory consultee needs a drainage strategy that clears its checklist for the stage.
- The county's rates. QBAR or greenfield equivalents, long-term storage below 2 l/s/ha, 10% urban creep and upper end rainfall: surface water drainage strategy.
- Condition stage. The 15-item checklist, network calculations and third-party agreements the county asks for when a condition is discharged: discharge of drainage conditions.
- Groundwater. The guidance asks for monitoring where groundwater sits within 1.2 m of the surface, and the county strategy puts about a quarter of the county at high groundwater susceptibility: groundwater flood risk.
- Unmodelled watercourses. Huntingdonshire's proposed LP 21 (pre-submission, October 2026) asks for hydraulic modelling where none exists: flood modelling.
- Waste and county schemes. The county's validation list requires a foul drainage strategy beside the surface water one, with Anglian Water's capacity confirmed: foul drainage strategy.
- National policy. Chapter 18 of the August 2026 Framework applied to a Cambridgeshire site: NPPF flood risk guidance.
Cambridgeshire County Council flood and drainage questions
Which council is the Lead Local Flood Authority across Cambridgeshire's five districts?
Cambridgeshire County Council. It covers Cambridge, South Cambridgeshire, Huntingdonshire, East Cambridgeshire and Fenland, reviews surface water on major applications as a statutory consultee and aims to reply within 21 days. Peterborough is a separate unitary council outside its area.
What surface water discharge rate does Cambridgeshire County Council require?
Under its Surface Water Planning Guidance (February 2026), a greenfield site with a simple flow control is limited to QBAR, and one with a complex control to greenfield rates for every storm up to the 1% AEP plus climate change. Brownfield sites return to greenfield or 3 l/s/ha, with no more than five times greenfield where that is shown to be unachievable. Extra runoff volume leaves the site below 2 l/s/ha.
What does the Cambridgeshire Flood and Water SPD require?
It is the shared guidance the county prepared with the districts, endorsed by the county on 14 July 2016 and adopted by all five districts. It asks for greenfield runoff rates on greenfield land, betterment on brownfield land and source control on every site, and it is a material consideration on every district application.
What does Minerals and Waste Local Plan Policy 22 (Flood and Water Management) require?
Policy 22 of the Cambridgeshire and Peterborough Minerals and Waste Local Plan (July 2021) allows minerals and waste development only where it does no significant harm to surface or groundwater. On land at risk of flooding it needs the sequential and exception tests with climate change, a site-specific flood risk assessment where national policy requires one, and SuDS wherever built development is proposed.
Does a Cambridgeshire application need a flood risk assessment or a drainage strategy?
A flood risk assessment is needed in Flood Zones 2 and 3, on sites of 1 ha or more in Flood Zone 1 and on smaller sites at risk from other sources. A surface water drainage strategy is needed on major development because Cambridgeshire County Council reviews it, and districts ask for one on many smaller schemes. Low-lying sites usually need both. Call 01293 214444 to check a site.
Do internal drainage boards affect a Cambridgeshire planning application?
Yes, across much of the county. Discharging to a board drain or working beside it needs the board's consent under its byelaws, sometimes with a development charge, and Cambridgeshire County Council will not accept a non-standard discharge rate until the board's agreement is in the strategy.
Will local government reorganisation change who deals with drainage in Cambridgeshire?
Not yet. Proposals would replace the county and district councils with unitary councils, but the government paused its decision in September 2026 and no start date is confirmed. Until new councils exist, the districts decide applications and Cambridgeshire County Council remains the Lead Local Flood Authority.