More than three years after it was formed, Cumberland Council still has no Local Plan of its own. An application here is decided against the plan of the former district the site sits in: the Carlisle District Local Plan 2015-2030 (Policies CC 4 and CC 5), the Allerdale Local Plan Part 1 of July 2014 (Policy S29) or the Copeland Local Plan 2021-2039 adopted on 5 November 2024 (Policies DS6 and DS7). The three set different flood risk assessment triggers and drainage tests, and the Lake District National Park Authority decides anything inside the park, so the first question on any Cumberland site is which plan applies.

Planning authority, flood authority or national park: who decides a Cumberland site

Cumberland Council took over the Allerdale, Carlisle and Copeland districts and the county's flood functions on 1 April 2023. It is the planning authority outside the Lake District National Park and the lead local flood authority for the whole area, park included. Its Flood and Development Management Team answers planning consultations as both the highway authority and the flood authority, so one team reads the access and the drainage on a major scheme.

Bodies involved in flood risk and drainage decisions across Cumberland, November 2026
BodyRoleWhat it decides or is consulted on
Cumberland Council (planning)Local planning authority outside the Lake District National ParkDecides the application against the legacy plan for the former district (Carlisle, Allerdale or Copeland), the Dalston neighbourhood plan where it applies and the NPPF; validates against the legacy checklist for that area
Cumberland Council (Flood and Development Management Team)Lead local flood authority for the whole of CumberlandComments on surface water drainage on major development; gives paid pre-application drainage advice on five or more homes and on commercial or industrial schemes; consents works on ordinary watercourses
Lake District National Park AuthorityLocal planning authority inside the parkDecides applications in the park under the Lake District Local Plan 2020-2035, including Policy 03 (Development and flooding); Cumberland still comments on drainage as flood authority
Environment Agency (Cumbria and Lancashire)Statutory consultee and main river regulatorConsulted on development in Flood Zones 2 and 3; regulates main rivers such as the Eden, Caldew, Petteril, Derwent and Cocker, the sea and reservoirs
United UtilitiesSewerage undertakerAgrees any connection and discharge rate to the public sewer, and holds the records of sewer flooding
Internal drainage boardNone"There are currently no internal drainage boards in Cumbria" (The Flood Hub, Cumbria, read November 2026)

A site that crosses the national park boundary needs the same application made to each authority. For background on how planning and flood responsibilities divide, our note on local planning authorities and SuDS sets out the general split.

Carlisle CC 4, Allerdale S29 and Copeland DS6: Cumberland's flood and drainage policies

Each legacy plan applies only inside its former district, and none of them was written for the August 2026 NPPF. The table sets the five adopted policies side by side, with the two garden village policies now at main modifications.

Cumberland's Local Plan flood and drainage policies and what each asks of an application
PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
Carlisle Policy CC 4Flood Risk and DevelopmentAn FRA for all new development in Flood Zones 2 and 3, minor schemes and changes of use included; in Flood Zone 1 for sites of 1 ha or more, land with surface water concerns or listed as an area of concern in the flood strategy; any development or change of use to a more vulnerable class that may be subject to other sources of flooding; sequential and exception tests where applicable; residual risk behind defences, including overtopping and breachShow the site is safe from every source with climate change, does not add to risk elsewhere, has safe access and accounts for the defencesA flood risk assessment that works through CC 4's points (a) to (g), with breach and overtopping evidence where the site is defendedCarlisle District Local Plan, adopted 8 November 2016 (PDF)
Carlisle Policy CC 5Surface Water Management and Sustainable Drainage SystemsSurface water managed at source and discharged by priority: infiltration, surface water body, surface water sewer or highway drain, combined sewer as a last resort; a drainage strategy where SuDS are usedEvidence for the discharge route chosen; for a combined sewer, why nothing else works and an attenuated rate with climate changeA surface water drainage strategy with infiltration evidence, hydraulic calculations, pollution treatment and the maintenance regimeCarlisle District Local Plan, adopted 8 November 2016 (PDF)
Allerdale Policy S29Flood Risk and Surface Water DrainageDevelopment at greatest flood risk in the SFRA or the flood strategy strongly resisted; an FRA wherever national policy requires one; foul and surface water separated; SuDS ahead of discharge to a watercourse or sewerSeparate the systems and justify any discharge to a watercourse or sewer on ground conditions or viabilityA flood risk assessment scaled to the scheme and a drainage strategy that tests infiltration firstAllerdale Local Plan Part 1, adopted July 2014 (PDF)
Copeland Strategic Policy DS6Reducing Flood RiskDevelopment directed to allocated sites outside flood risk areas where possible, unless wider sustainability benefits outweigh the flood risk and the development is safe for its lifetime without increasing flood risk elsewhere; windfall sites in flood risk areas only after the sequential and exception tests and with mitigation; development kept out of areas at risk under the Shoreline Management PlanPass the tests on a windfall site at risk, and show drainage capacity exists or will be providedA sequential test scoped to the development's catchment, a flood risk assessment, and the exception test where national policy calls for itCopeland Local Plan 2021-2039, adopted 5 November 2024 (PDF)
Copeland Policy DS7Sustainable DrainageSuDS on new development unless shown inappropriate; pre-development runoff or better sought on greenfield sites and a reduction in surface water discharge sought on previously developed land; a drainage strategy where the validation list asks; a four-step discharge orderEvidence of existing connections and rates on brownfield land, and long-term SuDS management secured by section 106A drainage strategy with existing and proposed rates, the discharge order tested in turn and a maintenance planCopeland Local Plan 2021-2039, adopted 5 November 2024 (PDF)
St Cuthbert's Strategic Policy 14a (proposed)Flood RiskMain modification MM29 at consultation 9 November to 21 December 2026: an FRA test in the CC 4 form for the garden village south of CarlisleApplies only once the plan is adopted, and only inside the garden villageA flood risk assessment written to the modified wording while the consultation runsSt Cuthbert's Garden Village Local Plan, main modifications November 2026 (schedule)
St Cuthbert's Strategic Policy 14b (proposed)Water and Wastewater Infrastructure and Sustainable Drainage SystemsMain modification MM31 at consultation 9 November to 21 December 2026: predominantly pipe-free SuDS to the June 2025 National Standards; no surface water to the existing public sewerApplies only once the plan is adopted, and only inside the garden villageA drainage strategy built on the National Standards and the garden village's blue infrastructure networkSt Cuthbert's Garden Village Local Plan, main modifications November 2026 (schedule)

Requirements checked November 2026

Carlisle Policy CC 4 (Flood Risk and Development): the widest FRA trigger in Cumberland

Policy CC 4 asks for a site-specific flood risk assessment on every new development in Flood Zones 2 and 3, including minor development and changes of use, in Flood Zone 1 on sites of a hectare or more, on land with surface water concerns or listed as an area of concern in the local flood risk management strategy, and wherever development or a change of use to a more vulnerable class may be subject to other sources of flooding. The policy's own words are that development should "be supported by a Flood Risk Assessment for all proposals of 1 hectare or greater in Flood Zone 1 or in an area within Flood Zone 1 which has surface water concerns or is listed as an area of concern in the Lead Local Flood Authority local flood risk management strategy" (Carlisle District Local Plan, page 157).

The assessment then has to answer seven points, (a) to (g). The last point is specific to Carlisle's defended city: where defences exist, the residual risk behind them has to be considered, "including reference to overtopping of defences in extreme events and possible breach analysis evidence". The supporting text adds that the council discourages more vulnerable uses close to the defences, where a breach or overtopping would hit hardest, and that sites allocated in the plan were sequentially tested already, so they need no separate sequential test. The council's five-year review, now complete, found CC 4 and CC 5 still sound.

In the city, that means an assessment for a Denton Holme, Willowholme or Warwick Road site that stops at the flood zone is incomplete. Our report sets out the defended and undefended flood picture, the residual risk from overtopping, the access route at times of flood and the floor levels, and it uses the Carlisle SFRA's breach work for the defended centre.

Carlisle Policy CC 5 (Surface Water Management and Sustainable Drainage Systems)

Policy CC 5 sets a four-step order for where surface water goes and asks for a drainage strategy wherever SuDS are part of the scheme. Its opening line is that "surface water should be managed at the source, not transferred". The order runs infiltration, an attenuated discharge to a surface water body, then a surface water sewer or highway drain, and only then a combined sewer, where the applicant must show there is no alternative and that the rate is attenuated with an allowance for climate change agreed with the appropriate bodies.

The strategy CC 5 describes covers the type of SuDS, hydraulic calculations, pollution treatment and the maintenance regime. The plan's evidence notes that soils in Carlisle are mainly of low permeability, so infiltration may well fail on a Carlisle site and only a test settles it. We test the ground first, then build the rates, storage and exceedance routes around whichever outfall the tests leave open.

Allerdale Policy S29 (Flood Risk and Surface Water Drainage): resistance at the highest risk

Policy S29 covers Workington, Maryport, Wigton, Cockermouth, Silloth and the rest of former Allerdale outside the national park. It says that development "within areas at the greatest risk of flooding, as identified within the Allerdale Strategic Flood Risk Assessment (SRFA) and/or Lead Local Flood Authority (LLFA) Local Flood Risk Management Strategy, will be strongly resisted" (Allerdale Local Plan Part 1, page 124). For the assessment itself it defers to national policy, so NPPF policy F4 sets when one is needed.

On drainage, S29 asks for foul and surface water to be kept apart and for SuDS ahead of any pipe to a watercourse or the main sewer. A watercourse or sewer connection will normally be resisted unless ground conditions make SuDS impractical or the cost makes the scheme unviable. The policy also mentions approval by a SuDS Approving Body; that regime was never brought into force in England, so in practice the council secures the drainage through conditions and planning obligations. The supporting text records that Workington and Cockermouth grew on the floodplains of the Derwent and the Cocker.

For an Allerdale site we write the flood risk assessment to the scale of the scheme, then a drainage strategy that shows infiltration was tested (to BRE 365, as the Allerdale validation list expects) before any outfall to a beck, the Derwent or a sewer is proposed.

Copeland Strategic Policy DS6 (Reducing Flood Risk): both tests on windfall sites

Strategic Policy DS6 steers development to allocated sites outside flood risk where possible, unless wider sustainable benefits outweigh the flood risk and the development would be safe for its lifetime without increasing flood risk elsewhere, and lets windfall development into areas at risk only where the tests are passed. Part (b) reads: "Only permitting windfall development in areas of flood risk where applicants have carried out the flood risk sequential and exception tests to the satisfaction of the Council and appropriate mitigation is provided" (Copeland Local Plan 2021-2039, page 50). Part (h) keeps new development out of areas identified as at risk in the Shoreline Management Plan, now or in future revisions.

Read on its face, DS6(b) asks for both tests on every windfall site at risk. National policy now exempts householder development, small non-residential extensions and most changes of use from the sequential test (F5), and needs the exception test only where Annex F, table 3 calls for it (F6). NPPF Annex A says plan policies that are materially inconsistent with the Framework's decision-making policies should be given very limited weight. Expect the case officer to read DS6 alongside F5 and F6, and confirm the scope of the tests at pre-application.

Policy DS6 and Policy DS7 replaced Copeland's former Policy ENV1 (Flood Risk and Risk Management) and Policy DM24 (Development Proposals and Flood Risk) when the 2021-2039 plan was adopted in November 2024, according to the council's adoption statement. The Copeland planning policy page still lists the 2013 Core Strategy as current, and the Copeland validation list still cites the superseded ENV1 and DM24; the adoption statement is the authority. For a Whitehaven, Egremont or Cleator Moor windfall site we scope the sequential test to the catchment the development serves, write the flood risk assessment, and set out the exception test only where the vulnerability table needs one.

Copeland Policy DS7 (Sustainable Drainage): greenfield rates and a brownfield reduction

Policy DS7 says that "New development must incorporate Sustainable Drainage Systems unless it can be demonstrated that this not appropriate." Development on greenfield sites should seek to achieve pre-development or better runoff, and on previously developed sites a reduction in surface water discharge should be sought, with "clear evidence of existing connections from the site and associated rates of discharge calculations" (Copeland Local Plan, page 52). Where the validation list asks, a drainage strategy must show how foul and surface water are managed and maintained, and long-term SuDS management is secured through a section 106 agreement.

The plan's text adds that soakaways on contaminated brownfield land can mobilise pollution, and that sites in the catchment of the River Ehen Special Area of Conservation need stringent pollution control. For a brownfield Copeland site we survey or trace the existing connections, calculate the existing rate, and show the reduction the policy seeks, with treatment sized to the receiving water.

The new Cumberland Local Plan and the St Cuthbert's plan: what changes and when

Cumberland Council gave notice on 30 June 2026, under the 2026 plan-making Regulations, that it has started the Cumberland Local Plan, which will replace all three legacy plans and the minerals and waste plan outside the national park. Its timetable, last amended on 2 November 2026, runs as follows: scoping consultation 14 September to 23 October 2026, Gateway 1 self-assessment 31 October 2026, plan content and evidence consultation 18 October to 26 November 2027, proposed plan consultation 12 June to 4 September 2028, submission 3 November 2028 and adoption on 24 April 2029. No draft flood or drainage policy has been published, so CC 4, CC 5, S29, DS6 and DS7 stay in force until then.

South of Carlisle, the St Cuthbert's Garden Village Local Plan for about 10,000 homes is further on. It was submitted on 31 October 2025, the hearings ran from 23 June to 2 July 2026, and the main modifications are at consultation from 9 November to 21 December 2026 (examination page). Modifications MM28 to MM31 would replace its Strategic Policy 14 with two policies. Proposed Strategic Policy 14a (Flood Risk) carries CC 4's assessment triggers into the garden village and adds Flood Zone 1 land at increased risk during the development's lifetime. Proposed Strategic Policy 14b would require predominantly pipe-free SuDS designed to the June 2025 National Standards and would bar surface water from the existing public sewer. Inside the garden village area CC 4 and CC 5 still apply until that plan is adopted.

Carlisle, Allerdale or Copeland: which policy decides your site?

Send us the site address and a line on the scheme, and we will tell you which of CC 4, S29 or DS6 applies, whether a sequential test is needed and what the drainage has to show. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.

Start a Quote

Which Cumberland applications need an FRA, a sequential test or a drainage strategy

Three things set the triggers: the legacy plan policy, NPPF policies F4 to F6, and the validation checklist for the area. Where they differ, the wider trigger is the one a case officer can still apply after registration. Check the flood zone and the surface water picture on our flood risk map before reading the table.

Triggers for each report in the three legacy areas of Cumberland
Report or consentTrigger: former Carlisle (CC 4, CC 5)Trigger: former Allerdale (S29)Trigger: former Copeland (DS6, DS7)
Flood risk assessmentAll new development in Flood Zones 2 and 3, minor development and changes of use included; in Flood Zone 1, sites of 1 ha or more, land with surface water concerns or listed as an area of concern in the local flood risk management strategy; and any development or change of use to a more vulnerable class that may be subject to other sources of floodingWherever NPPF F4 requires one; S29 resists the highest-risk areas outrightFlood Zones 2, 3a and 3b; Flood Zone 1 at 1 ha or more (validation list); F4 also covers critical drainage land and land at risk from any source
Sequential testFlood Zones 2 and 3, except sites allocated in the plan (supporting text)Under F5 (S29 defers to national policy)Windfall sites in areas of flood risk (DS6 b), read with the F5 exemptions
Exception testWhere applicable under national policyWhere Annex F, table 3 requires itDS6 b names it for windfall sites at risk; F6 needs it only where table 3 does
Drainage strategyWherever SuDS are used (CC 5); majors via the LLFAMajor development or 5 or more homes (except a change of use with no increase in impermeable area), 0.5 ha in a critical drainage area, Flood Zones 3a and 3b (Allerdale validation list, December 2022, item 22)Where the validation list identifies (DS7): major development or 5 or more homes (except a change of use with no increase in impermeable area), 0.5 ha in a critical drainage area, Flood Zones 3a and 3b (Copeland draft list, February 2023, item 21)
North West SuDS pro-formaMajor development (LLFA drainage checklist: full, reserved matters and condition discharge)Major development or 0.5 ha in a critical drainage area (Appendix H)Major development or 0.5 ha in a critical drainage area (Appendix H)
Infiltration testing to BRE 365From outline stage on major schemes (LLFA drainage checklist)Where a watercourse or sewer discharge is proposed (Allerdale list, items 21 and 22)Same as Allerdale (Copeland draft list, items 20 and 21)
Ordinary watercourse consentAny culvert or obstruction of an ordinary watercourse: Cumberland Council as LLFASameSame
Environment Agency permitWorks on or near a main river or its defences: the Environment Agency issues itSameSame

National policy fills the gaps. NPPF F4 asks for an assessment in Flood Zone 1 on "land identified in a strategic flood risk assessment or the Flood Map for Planning as being at risk of flooding from any source, whether now or in the future", and that reaches further than the Copeland draft list's hectare test. The sequential test is not needed for householder development, small non-residential extensions under 250 m² or most changes of use (F5), and where no sequential test is needed, no exception test is needed either (F6). Our guide to the sequential and exception tests explains the order, and the note on the surface water exemption covers sites at risk from surface water only.

Cumberland's validation checklists: three legacy lists and an unadopted 2025 draft

Cumberland has not yet published a single adopted validation list. Its application pages still send applicants to the legacy checklists, and each one is more than two years old, so its local items are best treated as the council's published guidance (a local list must have been published in the two years before an application to be relied on at validation).

  • Former Allerdale. The Allerdale validation checklist, final December 2022, asks for an FRA in Flood Zones 2 and 3 and on Flood Zone 1 sites at 1 ha or more, with critical drainage problems, at increased future risk in the SFRA, or at risk from other sources where a more vulnerable use comes in. It accepts a basic screening study for minor development (Appendix G) and asks for a SuDS strategy with the North West SuDS pro-forma (Appendix H) on major schemes, linked from the Allerdale application page.
  • Former Copeland. The Copeland local validation list is still the consultation draft of February 2023. It asks for an FRA in Flood Zones 2 and 3 and on Flood Zone 1 sites at 1 ha or more, and a SuDS strategy on major development or 5 or more homes (except a change of use with no increase in impermeable area), on 0.5 ha in a critical drainage area, and in Flood Zones 3a and 3b (item 21). It still cites the superseded ENV1 and DM24 that DS6 and DS7 replaced.
  • Former Carlisle. The Carlisle application page links no local list. Applications there are checked against the national requirements, with CC 4 and CC 5 setting what the case officer then expects.
  • The 2025 Cumberland draft. The council's consultation page gave a deadline of 9 May 2025 for comments on a single Cumberland validation checklist (document dated May 2025, its cover still reading "Final: Add date"). It would ask for a drainage strategy on major development, 0.5 ha in a critical drainage area and Flood Zones 2 and 3, and an emergency planning statement where applicable. No adopted version is linked from the application pages, so treat it as a guide to where the council is heading.

An application that arrives without the assessment the case officer expects can be held at validation rather than registered. Our note on applications invalidated over flood risk and drainage covers the common gaps.

What Cumberland, as lead local flood authority, asks of a drainage strategy

Cumberland has written no drainage standard of its own. It still uses the Cumbria Development Design Guide, version 1.1 of January 2023, prepared by the former county council, whose Chapter N sets the SuDS rules. The numbers that decide most strategies are these.

Drainage standards in the Cumbria Development Design Guide (January 2023), Chapter N
StandardWhat it requiresSource
Discharge orderInfiltration, then a surface water body, then a surface water sewer or other surface water system, then a combined sewerCumbria Development Design Guide, January 2023
Peak ratePeak runoff for the 1 in 1, 1 in 30 and 1 in 100 year events, with climate change and urban creep where required, must not exceed the greenfield peak rate for the same event; greenfield rate by IH 124 or FEHCumbria Development Design Guide, January 2023
VolumeRunoff volume for the 1 in 100 year 6-hour event must not exceed the greenfield volume; where infiltration is unsuitable, show the extra volume does not increase flood riskCumbria Development Design Guide, January 2023
Flooding on siteNo flooding in the drainage system up to the 1 in 30 year event; no flooding of any building or vulnerable plant in the 1 in 100 year event plus climate change; exceedance routed away from people and propertyCumbria Development Design Guide, January 2023
Climate changeUplifts taken from current government guidance, not set in the guide (see the Environment Agency allowances)Cumbria Development Design Guide, January 2023
Urban creep10% of impermeable area at 25 dwellings per hectare or less, falling to 2% at 50 or more and 0% for flatsCumbria Development Design Guide, January 2023
Evidence by stage (majors)Drainage strategy and existing drainage evidence from pre-application; infiltration testing to BRE 365 from outline; the North West SuDS pro-forma, maintenance schedule, drawings, hydraulic calculations and exceedance plan with full, reserved matters and condition discharge applicationsAppendix 7 drainage checklist

Minor schemes of one to nine homes are reviewed against the authority's standing advice, according to the Appendix 7 checklist. The guide predates the 2025 National Standards for sustainable drainage, and no Cumberland statement adopting them has been found; NPPF policy F8 now asks for SuDS designed to those standards, and the St Cuthbert's main modifications would write them into that plan. Where they and the guide differ, we show both are met.

For the ground, our ground conditions and soakaway map gives a first read, and the BRE 365 infiltration rate calculator turns test results into a design rate; our note on whether you need infiltration testing explains when the tests are worth booking early. For urban creep and the climate uplift, the climate change and urban creep calculator applies the guide's density bands.

Two other council routes matter. Works that culvert or obstruct an ordinary watercourse need Cumberland's consent as flood authority, separate from planning (our note on ordinary watercourse consent covers the process). And the team's pre-application drainage advice, charged, covers whether a drainage strategy is likely to be acceptable on schemes of five or more homes or commercial and industrial sites.

Cumberland's SFRAs: Carlisle 2011, Allerdale, Copeland 2021, and a new study for the Cumberland plan

There is no Cumberland-wide strategic flood risk assessment yet. Each legacy area has its own, of different ages, and the council's Gateway 1 summary of November 2026 lists a Level 1 SFRA for the Cumberland Local Plan among the evidence being produced or commissioned. Our explainer on strategic flood risk assessments covers what an SFRA does.

  • Carlisle, November 2011. The Carlisle SFRA by Atkins (final report, version 3.0, 22 November 2011) covers the whole former district, with a second-stage study of the defended city centre giving indicative breach modelling. CC 4 tells applicants to use it, or more recent information, in their assessment.
  • Allerdale, 2018. The Allerdale Local Plan Part 2 lists a 2018 SFRA in its evidence base, and S29 makes the Allerdale SFRA the reference for the highest-risk areas. No current public copy was found on Cumberland's website in November 2026; we work from the Environment Agency mapping and ask the council for the SFRA layers where a site sits near the edge of a zone.
  • Copeland, October 2021. The Copeland Level 1 SFRA by JBA Consulting (final report, October 2021), in the Copeland examination library, screened 119 candidate sites and treats surface water risk as of equal importance to river risk. Its functional floodplain (Flood Zone 3b) was drawn from a 1 in 20 (5%) starting point agreed with the Environment Agency in 2021; national policy now normally starts from 3.3% (1 in 30), so a site near the 3b line is checked against both. Our note on Flood Zone 3b covers the difference.

How NPPF Chapter 18 applies alongside Cumberland's older plans

The national rules sit in Chapter 18 of the National Planning Policy Framework, the Framework published on 17 August 2026. Policy F4 says when a site-specific assessment is needed, F5 and F6 set the sequential and exception tests, F7 asks that development is safe for its lifetime with residual risk managed, and F8 asks for sustainable drainage to the National Standards, with the lead local flood authority's advice on major development. F5 also caps the sequential test: the area searched "should not be greater than the anticipated catchment of the development in terms of its likely occupiers or users".

All three Cumberland plans were written before the August 2026 Framework. NPPF Annex A says plan policies that are materially inconsistent with the Framework's decision-making policies should be given very limited weight, while other policies should not lose weight simply because they are older. CC 4's wider FRA trigger and CC 5's discharge order are consistent with Chapter 18; DS6's blanket wording on the tests is where the two can part. The Planning Practice Guidance on flood risk and coastal change, last updated on 17 September 2025, sets the method, and the Environment Agency's climate change allowances, last updated on 27 May 2022, set the uplifts for rivers and rainfall. Our summary of the August 2026 NPPF changes covers what moved, and our NPPF guidance service helps where a policy reading is in doubt.

Rivers, coast and fells: where flood risk falls in Cumberland

Carlisle shows the scale of the river risk. The city sits where the Caldew and Petteril join the Eden; in December 2015 Storm Desmond flooded 2,128 properties in the city, and the defences were overtopped but not breached, according to the Section 19 report on Carlisle. Our flood risk assessment in Carlisle page covers the city's defences and history, and the River Eden page follows the river from Mallerstang to the Solway.

In former Allerdale, the Allerdale plan records that Workington and Cockermouth grew on the floodplains of the Derwent and the Cocker. The Cockermouth flood risk page and the River Cocker page set out the town's flood record. In Copeland, the 2021 SFRA identifies flash flooding in the south of the borough, north Whitehaven and Cleator Moor, and the Copeland plan names the Whitehaven harbour, Midgey Gill and Pow Beck valleys as places where town-centre sites are at risk.

The council has published more than 40 Section 19 flood investigations across the three areas since 2011; our explainer on Section 19 reports says how to use them. The county picture, Westmorland and Furness included, is on our Cumbria flood risk page, and current river readings are on our live river levels map.

Reports for an application to Cumberland Council

A flood risk assessment, a sequential test and a drainage strategy answer different questions, and a Cumberland application can need one, two or all three. CC 4 and S29 turn on whether the site is safe, DS6 on whether a lower-risk site is available, and CC 5, S29 and DS7 on where the water goes. Reports for applications to Cumberland Council come from Unda Consulting Limited, a CIWEM Business Partner, and are written by our chartered consultants.

  • Any site in Cumberland. Whichever legacy plan applies, the starting point is a site-specific flood risk assessment covering rivers, the sea, surface water, groundwater and sewers.
  • Carlisle sites under CC 4. From a change of use in Flood Zone 2 to new homes behind the Eden defences, a flood risk assessment for planning answers CC 4's points (a) to (g).
  • Buyers of Cumberland property. Before exchange, a flood risk survey for property purchase checks the flood record and zones for a home or premises.
  • Windfall sites under DS6. Copeland's windfall rule makes the sequential and exception test the deciding report on windfall sites at risk.
  • Drainage under CC 5, S29 and DS7. Every legacy plan sets a discharge order, and a drainage strategy shows it was followed.
  • Major schemes reviewed by the LLFA. The design guide's greenfield rate and volume tests are met through a surface water drainage strategy with the North West SuDS pro-forma.
  • Conditions on a Cumberland permission. Where the drainage is conditioned, we prepare what is needed for the discharge of drainage conditions, including the checklist items for that stage.
  • Defended land in Carlisle. CC 4(g) asks for breach and overtopping evidence, and flood modelling supplies it where the SFRA's indicative work is not enough.
  • Access and egress. CC 4(e) asks how access is kept open in a flood, and the Allerdale and Copeland lists ask for an emergency planning statement where applicable; a flood warning and evacuation plan answers both.
  • Foul drainage. S29 asks for foul and surface water to be kept separate, DS7's drainage strategy covers both, and the Allerdale and Copeland lists include a foul drainage form; a foul drainage strategy covers it.
  • Land for the new plan. With the Cumberland Local Plan's site selection under way and St Cuthbert's at main modifications, a flood risk feasibility study tests land before it is promoted.
  • Policy questions. Where a legacy policy and Chapter 18 point different ways, our NPPF guidance and advice sets out which carries weight.

Questions on Cumberland Council's flood and drainage requirements

What does Carlisle Local Plan Policy CC 4 require?

Policy CC 4 (Flood Risk and Development) asks for a flood risk assessment on all new development in Flood Zones 2 and 3, minor development and changes of use included, in Flood Zone 1 on sites of a hectare or more, land with surface water concerns or listed as an area of concern in the local flood risk management strategy, and any development or change of use to a more vulnerable class that may be subject to other sources of flooding. The assessment must cover seven points, including access in a flood and the residual risk behind defences, with overtopping and breach evidence. Sites allocated in the plan need no separate sequential test.

Which Local Plan applies to my site in Cumberland?

The plan of the former district the site is in: the Carlisle District Local Plan 2015-2030, the Allerdale Local Plan Part 1 (2014) and Part 2 (2020), or the Copeland Local Plan 2021-2039. Inside the Lake District National Park the national park authority decides, under its own plan. The new Cumberland Local Plan is timetabled for adoption on 24 April 2029.

Does a Flood Zone 2 site in former Allerdale, Carlisle or Copeland need a flood risk assessment?

Yes, for almost any new building or change of use. Carlisle's Policy CC 4 asks for one on all new development in Flood Zones 2 and 3, and the Allerdale and Copeland validation lists ask for one in Flood Zone 2. A minor scheme can use the basic screening study in the Allerdale and Copeland lists. A householder extension is exempt from the sequential test, not from the assessment.

Does Cumberland Council check the drainage on a planning application?

Yes, on major development. As lead local flood authority, its Flood and Development Management Team reviews the drainage against the Cumbria Development Design Guide (January 2023): greenfield peak rates for the 1 in 1, 1 in 30 and 1 in 100 year events, greenfield volume for the 1 in 100 year 6-hour event, and infiltration testing to BRE 365. Minor schemes of one to nine homes are reviewed against its standing advice.

Does any internal drainage board cover land in Cumberland?

No. The Flood Hub records that there are currently no internal drainage boards in Cumbria. Works on an ordinary watercourse need consent from Cumberland Council as lead local flood authority, and works on or near a main river need a permit from the Environment Agency.

Does Copeland's Policy DS6 mean every flood-risk site needs both tests?

Strategic Policy DS6 (Reducing Flood Risk) reads that way for windfall sites in areas at flood risk. National policy exempts householder development, small non-residential extensions and most changes of use from the sequential test, and needs the exception test only where Annex F, table 3 requires it. Confirm the scope with the case officer before the tests are written.

Infiltration tests and greenfield rates decided before the layout is fixed?

Cumbria's design guide holds every major scheme to the greenfield peak rate and volume, and the tests come first. Tell us about the site and we will set out what the drainage strategy needs. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.

Start a Quote

For a site anywhere in Cumberland, call 01293 214444 or email enquiries@unda.co.uk with the address and a short description of the scheme. Every council page is listed on our local authorities hub.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.