Flood Risk & Drainage Requirements for the London Borough of Hounslow

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

Hounslow Policy EQ3 (Flood risk and surface water management), in the Hounslow Local Plan 2015-2030 adopted on 15 September 2015, is the policy the London Borough of Hounslow decides flood risk and drainage against, read with the London Plan 2021. The detail applicants most often miss sits in the West London Strategic Flood Risk Assessment, which counts land in the 1 in 100 year surface water extent as Flood Zone 3a, so a site well away from the Thames can still need a flood risk assessment and a sequential test. A replacement plan for 2020 to 2041 has been at examination since June 2025 and would cap runoff at greenfield rates or 2 l/s.

As a London borough, Hounslow is both the local planning authority and the Lead Local Flood Authority. The tidal Thames runs along its eastern side past Chiswick, Brentford and Isleworth, the River Brent meets the Thames at Brentford, and the River Crane bounds it to the west and south. On its western edge the borough meets the southern perimeter road of Heathrow Airport. Reports for applications to Hounslow Council come from Unda Consulting Limited, a CIWEM Business Partner, and we prepare flood risk assessments, sequential tests and drainage strategies for applications in the borough. Our chartered consultants write each one to the clause of EQ3 it has to answer.

Hounslow Council, the Environment Agency and Thames Water: who decides what

There is no county tier in London and no internal drainage board in the borough. One council holds two of the roles below, so the planning officer and the drainage consultee work for the same authority.

BodyRoleWhat it decides or is consulted on
London Borough of HounslowLocal planning authorityDecides the application against Policies EQ2, EQ3 and GB5 of the 2015 Local Plan, London Plan Policies SI 12 and SI 13 and Chapter 18 of the NPPF; validates it against its planning application checklists; applies the Sequential Test
London Borough of HounslowLead Local Flood AuthorityAdvises the planning authority on flood risk and drainage for all major applications, and may advise on non-major ones where there are flood risk or drainage concerns (flood risk and planning page); runs a pre-application drainage advice service; consents works affecting an ordinary watercourse (fee £50); can designate structures and features that affect flood risk
Environment AgencyMain rivers and the tidal ThamesAdvises on development in Flood Zones 2 and 3 and beside the Thames, Brent, Crane and Duke of Northumberland's River; a flood risk activity permit from the Agency may be needed for work in, under, over or near a main river
Thames WaterSewerage undertakerOwns and runs the public sewers, including Mogden sewage treatment works at Isleworth; the Drainage Assessment Form asks for its confirmation that capacity exists before a sewer connection is accepted
Mayor of LondonStrategic planning authoritySets the London Plan 2021, which every borough decision applies; applications of potential strategic importance are referred to the Mayor

Hounslow's adopted flood and drainage policies, from EQ3 to London Plan SI 13

Applications are decided on the Hounslow Local Plan 2015-2030, Volumes 1 and 2, which Full Council adopted on 15 September 2015, and on the London Plan 2021. No neighbourhood plan has been made in the borough: the council's neighbourhood planning page lists three designated areas and no plan. Five policies hold the flood and drainage tests, and the replacement plan's versions of two of them are shown below with their stage.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
EQ3Flood risk and surface water managementSequential and exception tests in flood risk areas; flood risk assessments consistent with the Environment Agency and the SFRA; the sequential approach inside the site; defences maintained for the development's lifetime; SuDS aiming for greenfield runoff; room to raise the Thames defenceA site-specific flood risk assessment where a trigger applies, a sequential site layout, and SuDS with greenfield runoff as the aimOur assessment works through parts (g) to (j) in turn, with the SFRA zone, the defence line and the runoff rate set out for the case officerHounslow Local Plan 2015-2030, Volume 1, pp.197-199, adopted 15 September 2015
GB5Blue Ribbon NetworkDevelopment set back 8 m from a main river, 16 m from the Thames tidal defence and 5 m from an ordinary watercourse, with SuDS maximised; an assessment of effects on the waterbody where harm is likelyA layout that keeps the buffer clear and evidence of any effect on the riverWe measure the buffer from the defence or bank on the site plan and state it in the reportHounslow Local Plan 2015-2030, Volume 1, p.162, adopted 15 September 2015
EQ2Sustainable design and constructionLondon Plan sustainable design principles, sustainable drainage among them; a sustainability statement for major development; BREEAM Excellent for new non-residential buildings over 500 sqmSustainable drainage shown in the design and the sustainability statementOur drainage strategy supplies the SuDS section of the statement and, where BREEAM applies, the flood risk evidenceHounslow Local Plan 2015-2030, Volume 1, pp.194-195, adopted 15 September 2015
SI 12Flood risk management (London Plan)Flood risk minimised and mitigated and residual risk addressed; development set back from flood defences and their integrity protectedResidual risk and defence access addressed in the assessmentBreach and overtopping scenarios and defence access are covered in the flood risk assessmentLondon Plan 2021, Chapter 9, March 2021
SI 13Sustainable drainage (London Plan)Greenfield runoff as the aim, water managed close to source, a six-step drainage hierarchy, impermeable surfacing normally resistedEach step of the hierarchy considered and justifiedThe drainage strategy records why each step is or is not used before any sewer connectionLondon Plan 2021, Chapter 9, March 2021
EQ3 (proposed)Flood Risk and Surface Water Management, Hounslow Local Plan 2020-2041 (examination)Adds 8 m and 16 m watercourse buffers, defence raising in line with TE2100, a drainage strategy with a SuDS Proforma, and greenfield runoff or 2 l/s at mostNot yet adopted: weight depends on the examination outcomeWe design to the proposed rate where it is achievable so a scheme does not need reworking if the plan is adoptedProposed Submission Version, pp.212-215, July 2024; examination hearings closed 2 July 2026
GB5 (proposed)Blue Ribbon Network, Hounslow Local Plan 2020-2041 (examination)Keeps the 8 m, 16 m and 5 m buffers, left undeveloped or natural where feasible; adds a Water Framework Directive assessment where a proposal would have an adverse impactNot yet adoptedBuffers are shown as natural space on the drainage layout where the site allowsProposed Submission Version, pp.182-183, July 2024; examination hearings closed 2 July 2026

Requirements checked November 2026.

Policy EQ3 (Flood risk and surface water management): what the 2015 plan asks of a site

Hounslow Policy EQ3 asks every proposal in a flood risk area to show it is in the right place, safe for its lifetime and drained to greenfield rates where it can be. The council's half of the policy, parts (a) to (f), describes how it applies the sequential and exception tests and works with the Environment Agency; the applicant's half, parts (g) to (j), is what a report has to answer.

Part (g) asks applicants to "Prepare flood risk assessments, consistent with the requirements of the Environment Agency and the Strategic Flood Risk Assessment, and apply the sequential approach within site boundaries to ensure flood risk is further decreased". Part (i) asks them to "Incorporate sustainable drainage systems and avoid non-permeable hard standings with the aim of achieving greenfield runoff rates and being consistent with the Surface Water Management Plan" (Local Plan Volume 1, p.197).

The notes to the policy list the cases that need an assessment as Flood Zones 2 and 3 and Flood Zone 1 sites over 1 ha. National policy now goes wider (see the Chapter 18 section below), and the SFRA the policy points to maps surface water as Flood Zone 3a, so in practice the trigger list in the notes is the minimum.

The sequential approach in part (g) means putting the more vulnerable rooms and uses on the lowest-risk part of the site, and it is the first thing we check on a layout. For drainage, the council's form shows what the review turns on: the runoff rate against greenfield, and proof that infiltration was tested before a sewer connection was proposed.

Our flood risk assessment for planning states the West London SFRA zone for each source, sets out the layout logic for part (g), records the defence standard and maintenance for part (h), and includes the greenfield calculation that part (i) aims at.

Policy EQ3 part (j): leaving room to raise the Thames defences

Beside the Thames, part (j) requires development to "demonstrate that they will not preclude future rising or set back of the defence as identified in the Thames Estuary 2100 Plan". Hounslow's riverside falls in two TE2100 policy units, Twickenham from Teddington Lock along the north bank to Brentford, and Hammersmith from Kew Bridge downstream, both under policy P5 for the tide. The 2020-2041 plan's supporting text expects the Thames defences, the lower Brent defences between the lock and weir and the Thames, and the Crane defences from Crane Gate to the Thames to rise by up to 0.3 m by 2050 and a further 0.5 m by 2090. A riverside report therefore shows the defence line, its crest level and the space kept behind it.

Policy GB5 (Blue Ribbon Network): the 8 m, 16 m and 5 m buffers

Hounslow's buffer distances are in Policy GB5 part (j), not in EQ3. It requires developments "set back to provide a minimum 8m buffer strip to the main river, 16m to the Thames Tidal defence and 5m to ordinary watercourses", and says "SuDS must be maximised on these sites" (Local Plan Volume 1, p.162). Part (k) adds an assessment of a proposal's effect on the status of the waterbody where a significant adverse effect is likely. The main rivers here are the Thames, Brent, Crane, Duke of Northumberland's River, Lower Feltham Brook and Felthamhill Brook. We mark the buffer on the layout and say in the report whether anything built sits inside it.

Policy EQ2 (Sustainable design and construction): drainage in the sustainability statement

Policy EQ2 brings sustainable drainage into the design standard: part (d) expects proposals to follow the London Plan's sustainable design principles, which include sustainable drainage, and part (f) asks for a sustainability statement on major development. Table EQ2.1 sets BREEAM Excellent as the minimum for new non-residential buildings over 500 sqm (Local Plan Volume 1, pp.194-195). The council's Character, Sustainability and Design Codes SPD, adopted on 14 May 2024, reads EQ2 and EQ3 together at paragraph A2.163 and asks for green SuDS ahead of grey ones.

London Plan Policy SI 12 (Flood risk management) on a Hounslow site

Policy SI 12 applies in every London borough and adds two things EQ3 leaves implicit. Part C says "Development proposals should ensure that flood risk is minimised and mitigated, and that residual risk is addressed", and part F asks development next to a flood defence to protect its integrity, allow access for maintenance and upgrading, and be set back from it unless exceptional circumstances are shown (London Plan 2021). SI 12 replaced London Plan Policy 5.12 in March 2021. Behind the Thames walls that means a breach and overtopping check and a strip kept clear for the Environment Agency. Our article on residual flood risk explains what that check involves.

London Plan Policy SI 13 (Sustainable drainage): the hierarchy a Hounslow strategy follows

Policy SI 13 part B reads: "Development proposals should aim to achieve greenfield run-off rates and ensure that surface water run-off is managed as close to its source as possible." It ranks six routes, from rainwater reuse and infiltration down to a controlled discharge to a combined sewer, and part C says impermeable surfacing "should normally be resisted", front gardens and driveways included. London Plan Policy 5.13, which SI 13 replaced in March 2021, is still the policy named on Hounslow's Drainage Assessment Form, so the form's references need reading against SI 13. Our guide to the SuDS hierarchy covers each step.

Is your Hounslow site in the surface water Flood Zone 3a, a GB5 buffer or the Thames defence strip?

We will tell you which parts of Policy EQ3 apply, whether a sequential test is needed and what runoff rate to design to. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.

Start a Quote

The Hounslow Local Plan 2020-2041 at examination: what proposed EQ3 would change

The council submitted the Hounslow Local Plan 2020-2041 to the Secretary of State on 23 June 2025. Hearings ran from 13 January 2026 and closed on 2 July 2026, and the council's updated table of suggested modifications (EX82a, September 2026) proposes no change to EQ3 or GB5. The Inspectors then asked everyone who made representations at Regulation 19 to comment on the examination documents by 29 October 2026, gave the council until 12 November 2026 to reply, and expect to announce next steps during November 2026 (examination news page). No main modifications consultation has been held and there is no report or adoption date yet.

Until adoption, adopted EQ3 decides applications and proposed EQ3 is a material consideration, with weight that grows as the examination closes out objections. Its supporting text keeps the Thames and Brent defence raising figures quoted above.

  1. Buffers in EQ3 itself. Part C sets buffer zones "with 8m for fluvial watercourses and 16m for tidal watercourses", to stay undeveloped or natural where feasible; proposed GB5 part K keeps the 5 m buffer to ordinary watercourses.
  2. Defences raised as well as kept. Part K asks proposals to "account for future raising or set back of defences" for the lifetime of the development, in line with TE2100.
  3. A drainage strategy and a proforma. Part L asks for a drainage strategy that follows SI 13, prioritising rainwater harvesting, infiltration and green and blue features, and says developers "should also complete a SuDS Proforma to accompany their Drainage Strategy".
  4. Greenfield or 2 l/s. Part M reads: "Developments should achieve greenfield runoff rates, or a maximum runoff rate of 2 l/s unless it can be demonstrated that this is unfeasible." It also names Defra's 2015 non-statutory technical standards. Those were replaced by Defra's National Standards for Sustainable Drainage Systems in June 2025, and Policy F8 of the August 2026 NPPF now requires SuDS designed to them.

The plan's allocations were tested in the council's Flood Risk Sequential and Exceptions Tests report (2024). National policy exempts allocated sites from a second sequential test only once they are allocated in the development plan, so on our reading an application on a proposed allocation still needs one until the plan is adopted; we confirm that with the case officer at pre-application stage.

London's plan is being replaced as well. The draft London Plan 2026 was consulted on from 16 July to 15 October 2026 (MD3515); its draft Policies GHR5 (Flood risk and drainage) and GHR9 (Clean and healthy waterways) would come in with the rest of the draft London Plan on adoption, which the GLA expects in early 2028. The Hounslow Inspectors are testing conformity against the London Plan 2021.

Drainage for a Hounslow application: the Drainage Assessment Form and the 2 l/s question

Hounslow's drainage requirements live in a form, not an SPD. The Drainage Assessment Form (DAF) is the council's own nine-page summary sheet. The West London SFRA's general guidance for all six boroughs asks for a drainage strategy for all major developments other than changes of use, and for minor developments and changes of use that alter the existing surface water drainage; section 4.2.4 names the DAF as Hounslow's form for it (West London SFRA, section 4).

  • Rates for four storms. The form asks for greenfield, existing and proposed rates for QBAR, the 1 in 1, 1 in 30 and 1 in 100 year events and the 1 in 100 year plus climate change event, and says that discharging every storm at the existing 1 in 100 year rate "would not be permitted".
  • Volume as well as rate. For previously developed land, the 1 in 100 year 6 hour runoff volume should come as close to greenfield as practicable and never exceed the pre-development volume.
  • Infiltration tested first. Rates follow BRE 365, infiltration is not relied on below 1 x 10-6 m/s, and the base of a soakaway needs 1 m above the water table; our BRE 365 infiltration rate calculator and ground conditions map give a first view.
  • Exceedance shown. No part of the site floods in a 1 in 30 year storm, flooding up to the 1 in 100 year plus climate change event stays on site and no deeper than 300 mm on roads and paths, and routes for bigger storms are drawn.
  • Ownership and upkeep. A standalone maintenance plan and a named owner for every part of the system, with a drawing where there is more than one owner.

The form dates from 2019. It quotes London Plan Policy 5.13, which SI 13 replaced in March 2021, and climate change allowances of 20% and 40%, adding that "Typically for heavily urban sites we would ask for 40% to be used". The Environment Agency rebuilt its peak rainfall allowances by management catchment in May 2022 (guidance last updated 27 May 2022), so we take the figure from the current guidance and note it against the form. The council's flood risk and planning page now lists the National Standards for Sustainable Drainage Systems among the documents applicants should consider, beside SI 12, SI 13, the NPPF and EQ2 and EQ3, and says the form should go in with all relevant applications. Policy F8 of the NPPF asks for SuDS designed to those standards, so our strategies are written to the 2025 National Standards and use the form as the summary sheet.

On rate, adopted EQ3 and SI 13 aim for greenfield runoff. The 2 l/s figure is proposed EQ3 part M and binds only once the plan is adopted. We still check a scheme against it now: a strategy that already meets 2 l/s will not need redesigning if the plan is adopted while the application is live. Proposed part L asks only for "a SuDS Proforma" and names no template; the London-wide one is the GLA's London Sustainable Drainage Proforma, which our article on the SuDS proforma walks through. Discharge to an ordinary watercourse needs the council's agreement, to a main river the Environment Agency's, and to a sewer Thames Water's written confirmation of capacity.

The West London SFRA and Hounslow's Level 2: what the council's flood maps add

EQ3 draws on the West London Strategic Flood Risk Assessment, a joint Level 1 study by Metis Consultants for Barnet, Brent, Ealing, Harrow, Hillingdon and Hounslow. It was first published in March 2018. Section 6.2 records that Hounslow's updated Flood Zone 3b mapping, needed after the August 2022 change to national guidance, was published in September 2024. Our explainer on strategic flood risk assessments covers what a Level 1 and Level 2 study each do.

  • Surface water as Flood Zone 3a. Section 3 defines Flood Zone 3a to include "Land within EA modelled surface water flood risk extents predicted for up to and including 1 in 100 year" (West London SFRA, section 3). Our flood risk map gives a first look at the surface water extents before the SFRA's own maps are checked.
  • Functional floodplain. Flood Zone 3b is the Environment Agency's modelled 1 in 30 year river and tidal extent plus its flood storage areas, with no surface water element. In Hounslow it uses the defended Thames model updated in 2023; our note on Flood Zone 3b explains what can be built there.
  • The SFRA's Hounslow notes. Basements, extensions and conversions likely to flood need internal access to a higher floor, basements must not contain sleeping accommodation, and the borough sits in TE2100 Action Zone 1 (West London).
  • Level 2, July 2024. Hounslow's Level 2 SFRA (Metis, version 1.1) screened 96 draft allocations and assessed 18 in detail, with depth and hazard mapping from the Environment Agency's Brent, Crane and Thames models; an addendum for Albany Riverside followed in 2025.

Section 6 of the SFRA calls it a live document, to be reviewed when national policy, flood risk data or baseline maps change, and notes that its static Flood Zone 3a and 3b layers need updating when the Environment Agency revises river extents (West London SFRA, section 6). We read the SFRA maps beside the current national mapping and say in the report where the two differ.

Hounslow's planning application checklists: which flood and drainage documents each application needs

Hounslow publishes a validation checklist for each application type. They went through public consultation from 14 October to 29 November 2019 and the files date from January 2020, so the lists are over two years old: under the Development Management Procedure Order the council can still publish them as guidance, but cannot refuse to validate an application for want of a local item. In practice the documents below are what officers expect to see.

The full application checklist lists a Drainage Assessment Form and a flood risk assessment, the latter for sites of one hectare or more in Flood Zone 1 and "all proposals for new developments located in Flood Zones 2 and 3". It also lists what a drainage submission should hold, from infiltration feasibility and greenfield calculations to a maintenance and adoption plan. The householder checklist asks for the Environment Agency flood risk matrix where a basement or ground floor extension is proposed in Flood Zone 2 or 3.

Hounslow triggers from Policy EQ3, Policy GB5, the West London SFRA, the planning application checklists and NPPF Chapter 18
TriggerFlood risk assessmentSequential and Exception TestsDrainage and other documents
New development, minor development or change of use in Flood Zone 2, 3a or 3bRequired (F4; checklist FRA item; West London SFRA section 4.3.3)Sequential Test unless F5(2) exempts it; Exception Test where Annex F table 3 requires it; not in Flood Zone 1Drainage strategy on the DAF for majors and where surface water drainage changes
Householder extension or basement in Flood Zone 2 or 3Required (F4); the householder checklist asks for the Environment Agency flood risk matrix for a basement or ground floor extensionSequential Test not required (F5(2)(c)); Exception Test not required (F6(2)(a))SFRA basement notes: internal access to a higher floor, no bedrooms below ground
Any Flood Zone 1 plot of at least one hectareRequired (F4; checklist; EQ3 notes)Not required for river and sea risk; Exception Test never applies in Flood Zone 1Drainage strategy and DAF if major
Flood Zone 1 inside the SFRA's surface water Flood Zone 3a, or at risk from another sourceRequired (F4: land an SFRA shows at risk from any source)Sequential Test for surface water unless F5(2)(b)(ii) applies; no Exception TestDAF where drainage changes
Major development (DMPO 2015: 10 or more homes, 0.5 ha for housing where numbers are unknown, 1,000 sq m, or a 1 ha site)As the zone requiresAs the zone requiresDrainage strategy on the DAF; LLFA consulted; proposed EQ3 L adds a SuDS Proforma
Within 8 m of a main river, 16 m of the Thames tidal defence or 5 m of an ordinary watercourseShows the GB5 buffer and any effect on the waterbodyAs the zone requiresEnvironment Agency permit or council ordinary watercourse consent (£50) for works
Beside the River ThamesShows room to raise or set back the defence (EQ3 j, SI 12 F)As the zone requiresBreach and overtopping check; emergency plan where F7 calls for one

Chapter 18 of the August 2026 NPPF beside a 2015 Hounslow policy

National flood policy has sat in Chapter 18 of the National Planning Policy Framework since 17 August 2026. Five of its policies matter here: F4 decides when an application needs its own assessment, F5 and F6 hold the Sequential and Exception Tests, F7 covers safety, and F8 asks for SuDS built to the National Standards. Our summary of the August 2026 changes sets them out clause by clause.

EQ3 was adopted in 2015, long before the current Framework, and Annex A says plan policies "should not be given reduced weight simply because they were adopted prior to the publication of this Framework", while parts that are materially inconsistent with national decision-making policy "should be given very limited weight". The policy itself fits Chapter 18. The trigger list in its notes is narrower: F4 also covers Flood Zone 1 land that an SFRA or the Flood Map for Planning shows at risk from any source, which in Hounslow includes the surface water Flood Zone 3a, so we plan on F4 and confirm with the case officer.

Under F5 the area of search is no wider than the development's anticipated catchment. The test does not apply to householder development, non-residential extensions under 250 sq m or most changes of use. Nor does it apply where an assessment shows no built development on land at risk, or shows that, with surface water risk only, the layout keeps occupiers safe. Our article on the surface water exemption explains that second case. F6 applies only in Flood Zones 2, 3a and 3b. The Planning Practice Guidance was last updated on 17 September 2025 and the climate change allowances on 27 May 2022. For the tests themselves, see what the sequential and exception tests are.

Tide, the Brent and the Crane, and storm water: flood risk across the borough

The Thames tidal defences, from the Thames Barrier to the walls along the borough's frontage, protect at-risk properties to a 1 in 1,000 year event, according to Hounslow's Local Flood Risk Management Strategy (version 4.0, August 2022). The River Thames is tidal along the whole frontage and for a short reach of the Crane at Isleworth. Riverside sites in Chiswick and Brentford are covered in detail on those pages.

Inland, the Brent has been straightened between Hanwell and Brentford and shares its channel with the Grand Union Canal; where the canal runs separately it is an ordinary watercourse. The upper and lower Duke of Northumberland's Rivers are artificial channels that carry water from the Colne to the Crane near Hatton and Hounslow Heath, the lower one then running through Isleworth to the Thames; the Agency treats both as main rivers. The Longford River is the borough's most prominent ordinary watercourse.

Surface water is the risk spread most widely across the borough. Hounslow's Surface Water Management Plan (version 3.0, April 2021) found 35 hotspots and puts 276 homes at risk in a 1 in 30 year storm, 2,904 in a 1 in 100 year storm and 15,088 in a 1 in 1,000 year storm. In July 2021 the TW8 postcode district logged nine flood reports, more than any other in the borough. The strategy names Feltham, Hanworth, Hounslow town centre and north Brentford as the places with the greatest potential for groundwater flooding. Current readings on the borough's rivers are on our live river levels map.

Hounslow is part of historic Middlesex, and our London page covers the city-wide picture. Three other councils share the West London SFRA and have their own pages: Hillingdon, Harrow and Barnet.

What Unda prepares for a Hounslow planning application

A flood risk assessment shows whether the site is safe, the sequential test whether it should be built there at all, and the drainage strategy where the rain goes. Hounslow's checklist lists the assessment and the Drainage Assessment Form as separate items, and each of our reports answers the policy that asks for it.

  • Every source, every zone. EQ3 part (g) wants an assessment consistent with the Environment Agency and the SFRA, and our flood risk assessment covers river, tide, surface water, groundwater, sewers and reservoirs.
  • For the application. A flood risk assessment for planning: one per site, with the West London SFRA zone stated for each source and the TE2100 defence line beside the Thames.
  • Before you buy. Riverside Chiswick and Brentford homes sit behind defences that planning treats as land at risk, which a flood risk survey for property purchase explains to a buyer and lender.
  • Surface water zones too. Flood Zone 2 and 3 sites, and sites in the SFRA's surface water Flood Zone 3a, usually need a sequential and exception test set against the development's own catchment.
  • Major schemes. A drainage strategy on the Drainage Assessment Form, following the SI 13 hierarchy, for every major application other than a change of use.
  • Minor schemes that change the drainage. A surface water drainage strategy with greenfield rates, BRE 365 testing and the 2 l/s figure checked.
  • After permission. Where Hounslow attaches a drainage condition, we prepare the evidence for the discharge of drainage conditions.
  • National policy. Where EQ3's notes and Chapter 18 differ, our NPPF guidance sets out which test applies.
  • Groundwater. Basements in Feltham, Hanworth, Hounslow town centre or north Brentford, where the strategy maps the highest groundwater potential, need a groundwater flood risk assessment before excavation.
  • Escape and warning. Defended riverside sites and Flood Zone 3 schemes often need a flood warning and evacuation plan to meet SI 12 C and Policy F7.
  • Commercial floorspace. New non-residential buildings over 500 sqm need BREEAM Excellent under Policy EQ2, and a BREEAM flood risk assessment supplies the flood credit evidence.
  • After a flood. TW8 logged the most flood reports in the borough in July 2021, and a flood risk assessment for insurance gives an underwriter evidence about the property.

Frequently asked questions

What does Hounslow Policy EQ3 (Flood risk and surface water management) require from a planning application?

Policy EQ3 of the Hounslow Local Plan 2015-2030, adopted on 15 September 2015, asks for a flood risk assessment consistent with the Environment Agency and the West London SFRA, the lowest-risk parts of the site used first, flood defences kept in place for the development's lifetime, and SuDS that avoid hard standing and aim for greenfield runoff. Beside the Thames it requires proof that the defence can still be raised or set back under TE2100.

Do I need a flood risk assessment for Flood Zone 2 in Hounslow?

Yes. Chapter 18 of the NPPF (Policy F4) and the council's full application checklist both expect a site-specific assessment for new development in Flood Zone 2, and the West London SFRA's trigger list includes minor development and changes of use there. A householder extension needs one too, though the Planning Practice Guidance accepts a shorter, simpler assessment for minor extensions.

Can I write my own flood risk assessment for a house extension in Hounslow?

Possibly, for a modest single-storey extension in Flood Zone 2 or 3: the Planning Practice Guidance accepts a shorter assessment for minor extensions, and the Environment Agency publishes standing advice on its contents. A basement is harder: the West London SFRA's Hounslow notes require internal access to a higher floor and rule out bedrooms below ground. So is a riverside site behind the Thames defences, where breach levels come into play.

Does the 2 l/s runoff limit in the new Hounslow Local Plan apply yet?

Not as adopted policy. The 2 l/s figure is in proposed Policy EQ3 part M of the Hounslow Local Plan 2020-2041, which has been at examination since June 2025; hearings closed on 2 July 2026 and the Inspectors expect to announce next steps in November 2026. Until adoption, adopted EQ3 and London Plan Policy SI 13 aim for greenfield runoff, and the proposed figure carries weight as a material consideration.

Is the Drainage Assessment Form needed for every Hounslow application?

No. The West London SFRA's general guidance asks for a drainage strategy for all major developments other than changes of use, and for minor developments and changes of use that alter the existing surface water drainage, and names the form as Hounslow's way of submitting it. For a householder extension the question is whether it changes the existing surface water drainage, which we check with the case officer.

Does a Hounslow site need a sequential test if surface water is the only flood risk?

It can. The West London SFRA counts the 1 in 100 year surface water extent as Flood Zone 3a, and Policy F5 applies the Sequential Test to risk from any source. F5 exempts a site where the assessment shows that, with surface water risk only, the layout, design and mitigation keep occupiers safe for the development's lifetime without raising risk elsewhere.

Submitting to Hounslow Council while the 2020-2041 plan is still at examination?

We design to adopted EQ3 and check the proposed 2 l/s cap, so the scheme works under either plan. Get a no-obligation, free quote, with a fixed quote within the hour.

Start a Quote

To talk through a site in the London Borough of Hounslow, call 01293 214444 or email enquiries@unda.co.uk. Pages for the other councils we cover sit on our local authorities hub.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.