Flood Risk & Drainage Requirements for Northumberland County Council
Contact Us
Northumberland County Council's validation notes ask for a flood risk assessment on a full or outline application in Flood Zone 1 only where the site is a hectare or more. The policy it decides applications against, Policy WAT 3 (Flooding) of the Northumberland Local Plan adopted on 31 March 2022, reaches further: land with critical drainage problems, land the county's strategic flood risk assessment shows at greater risk in future, and land at risk from other sources where a more vulnerable use comes in. Policy WAT 4 then makes sustainable drainage a requirement wherever surface water has to be managed, and the county reads the drainage against the North East lead local flood authorities' standards of July 2020.
This page sets out what Northumberland County Council requires on flood risk and drainage for a planning application, policy by policy. It covers the five water policies in the Local Plan, the April 2026 validation notes, the regional SuDS standards, the two county SFRAs and national policy. Each section says what our report contains to meet the requirement. Unda Consulting Limited is a CIWEM Business Partner, and the chartered consultants who write a Northumberland report work from the documents linked here. To talk a site through, call 01293 214444 or email enquiries@unda.co.uk.
Who decides flood risk and drainage on a Northumberland application
Northumberland has been a single unitary council since 2009, so one body validates the application, decides it and comments on its drainage. The exception is Northumberland National Park. Inside the park boundary the Northumberland National Park Authority is the planning authority, using its own Local Plan adopted on 15 July 2020, while the county council stays the lead local flood authority on both sides of the line. Hexham, Morpeth, Rothbury, Haltwhistle, Bellingham and Wooler all sit outside the park, so the county decides there.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Northumberland County Council (planning) | Local planning authority outside the National Park | Decides the application against Local Plan Policies WAT 3, WAT 4 and WAT 5, any made neighbourhood plan and the NPPF; checks the submission against its Local List, republished on 1 April 2026; applies the sequential test |
| Northumberland County Council (flood and coastal erosion risk management team) | Lead local flood authority for the whole county, the park included | Statutory consultee on major development with surface water drainage; reads the drainage against the North East standards; issues land drainage consent for works on ordinary watercourses |
| Northumberland County Council | Coast protection authority | Under WAT 5 it can ask for an erosion vulnerability assessment where it sees a risk of adverse effects, including inland of the Coastal Change Management Area |
| Northumberland National Park Authority | Local planning authority inside the park | Decides applications in the park under its 2020 Local Plan (Policies ST1 and ST2 cover flood risk); consults the county on surface water |
| Environment Agency (North East) | Statutory consultee | Consulted on development in Flood Zones 2 and 3 or within 20 metres of a main river; regulates main rivers and the sea |
| Northumbrian Water | Sewerage undertaker | Agrees any discharge rate to a public sewer; the validation notes ask for its pre-planning enquiry response where a sewer connection is proposed |
| Internal drainage board | None | No drainage board operates in Northumberland (Local Flood Risk Management Strategy, 2015, table 4-1) |
A site that straddles the park boundary needs an application to each authority, and the county comments on the drainage of both halves. For how the planning and flood authority roles split in general, our guide to local planning authorities and SuDS covers the background.
WAT 3, WAT 4 and WAT 5: Northumberland's Local Plan flood and drainage policies
The Northumberland Local Plan 2016-2036 is the first plan adopted since unitary status and replaced every former district plan in one go. Its water chapter has five policies. WAT 3 and WAT 4 decide most flood and drainage questions; WAT 5 applies on the coast; WAT 1 and WAT 2 bring in water quality and sewer capacity. The council's Local Plan evaluation of May 2025 found all three flood policies in conformity with the national policy of the day and effective in decision-making, and the plan remains the basis for decisions.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy WAT 3 | Flooding | A site-specific flood risk assessment for all development in Flood Zones 2 and 3, and in Flood Zone 1 on sites of 1 ha or more, land with critical drainage problems, land the SFRA shows at greater future risk, and land at risk from other sources where a more vulnerable use is introduced; the sequential and exception tests; full separation of foul and surface water; a soakaway-first discharge order; greenfield rates on greenfield land and at least a 50% cut on previously developed land | Show the site is safe for its lifetime, does not add to risk elsewhere, keeps foul and surface water apart and sends rain to the highest available point in the hierarchy | A flood risk assessment covering every source, a sequential test where one applies, and a drainage strategy that sets the runoff rate against the WAT 3 limits | Northumberland Local Plan, adopted 31 March 2022 |
| Policy WAT 4 | Sustainable Drainage Systems | SuDS on any development where surface water has to be managed, unless shown to be unworkable or harmful (bird strike near the airport, minewater); designed for future conditions; managed and maintained for the lifetime of the development | Include SuDS, or evidence why they cannot work, and name who maintains them | A surface water drainage strategy with the SuDS layout, storage, exceedance routes and a maintenance plan | Northumberland Local Plan, adopted 31 March 2022 |
| Policy WAT 5 | Coastal erosion and coastal change management | Development in the Coastal Change Management Area only where it needs a coastal location, will not worsen coastal change and will not increase erosion through surface water runoff; an erosion vulnerability assessment where the policy or the coast protection authority asks for one | Show the coastal location is necessary and that runoff from the site will not drive erosion | A flood risk assessment for tidal and surface water risk and a drainage strategy that keeps runoff off eroding slopes; we do not prepare erosion vulnerability assessments | Northumberland Local Plan, adopted 31 March 2022 |
| Policy WAT 2 | Water supply and sewerage | Development directed to where sewer and treatment capacity exists or is planned; package treatment plants only where a site is remote from sewered areas, septic tanks only in very exceptional circumstances | Show how foul water is dealt with, and justify any non-mains system | A foul drainage strategy alongside the surface water work, with the evidence for the FDA1 form where a non-mains system is proposed | Northumberland Local Plan, adopted 31 March 2022 |
| Policy WAT 1 | Water quality | No adverse effect on surface water quality or groundwater movement and chemistry, taking account of minewater; protection of bathing waters | Treat runoff before it leaves the site and avoid disturbing groundwater | SuDS treatment stages assessed against the CIRIA SuDS Manual within the drainage strategy | Northumberland Local Plan, adopted 31 March 2022 |
Requirements checked November 2026.
Policy WAT 3 (Flooding): the assessment triggers and the drainage limits
WAT 3 asks every proposal to show how it keeps people, property and infrastructure away from flood risk from all sources, and it sets the drainage numbers the county holds a scheme to. Part 2(a) requires a site-specific assessment for "All development in Flood Zones 2 and 3" and, in Flood Zone 1, for "sites of 1 hectare or more; land which has been identified by the Environment Agency as having critical drainage problems; land identified in a strategic flood risk assessment as being at increased flood risk in future; or land that may be subject to other sources of flooding, where its development would introduce a more vulnerable use" (Local Plan, page 224).
The same part applies the sequential test and, where needed, the exception test in line with national policy, "subject to minor development and change of use exemptions". Once an assessment is needed, part 2(b) adds a checklist: the effect on sewers and flood defences, climate change, the most vulnerable uses on the lowest-risk ground, resistant and resilient construction, SuDS under WAT 4, residual risk, and safe access and escape as part of an agreed emergency plan where appropriate.
The drainage half is just as specific. Part 2(c) requires "that all development provides such separation within the development", meaning foul and surface water never share a pipe on site. Part 2(d) sets the order for surface water: a soakaway unless poor infiltration or high groundwater rules it out, then a watercourse, then a surface water sewer, and "As a last resort, once all other methods have been explored, disposal to combined sewers". On greenfield land runoff "should not exceed, and where possible should reduce, the existing run-off rates". On previously developed land the rate should be "as close as reasonably practicable to the greenfield run-off rate", and where that cannot be achieved, reduced "by a minimum of 50% of the existing site run-off rate".
Two parts of WAT 3 need evidence before the layout is fixed. The first is the soakaway: the county expects to see infiltration tried and tested before a watercourse or sewer is accepted, and the regional standards ask for the test results before approval. The second is minewater. The Local Plan (paragraph 11.37) makes the presence of minewater in the water table "a key consideration, in discussion with the Environment Agency and the Coal Authority", because a soakaway in former coalfield ground can make the problem worse. Our flood risk assessment for a WAT 3 site maps every source against the 2010 and 2015 SFRAs and the national maps. The drainage strategy then records the infiltration result, the minewater position from the coal mining evidence and the runoff rate set against the greenfield or 50% limit.
Policy WAT 4 (Sustainable Drainage Systems): SuDS on small schemes too
WAT 4 makes SuDS "a requirement for any development where it is necessary to manage surface water drainage", with two escape routes only: that SuDS cannot be delivered or are not viable technically, operationally or financially and the drainage can be handled another way, or that the scheme would harm the environment or safety, for example ponds that could raise the risk of bird strike near the airport, or features that could worsen minewater. The supporting text (paragraph 11.41) explains why the county does not stop at major development: many housing sites in Northumberland are under ten homes, and together they add to flood risk, so SuDS are expected on them too.
Part 4 sets the maintenance duty: "Arrangements must be put in place for the management and maintenance of SuDS over the lifetime of the development." Local standard LS15 asks for a site-specific plan saying how each feature is maintained, by whom and by what access route, and allows some councils to condition the final plan and tells applicants to settle that with the authority at pre-application. A surface water drainage strategy from us names the features, sizes them and attaches a maintenance schedule with the access routes drawn.
Policy WAT 5 (Coastal erosion and coastal change management): sites near the shore
WAT 5 controls development on the coast between the Scottish Border and Seaton Sluice. Its Coastal Change Management Area, drawn on the Policies Map, runs from the shoreline to the worst-case erosion line at the 100-year horizon in the Shoreline Management Plan, plus a 30 m buffer. Inside it, development is supported only where it would not harm the coast, needs a coastal location for a coastal activity, and "will not increase coastal erosion as a result of changes in surface water run-off".
The policy also asks for an "Erosion Vulnerability Assessment which demonstrates that the development is safe over its planned lifetime", and the council's validation Note 18 lists when one must accompany an application. That assessment is a separate specialist study which Unda does not prepare. What we provide on a coastal site is the flood risk assessment for tidal and surface water risk and the drainage strategy that shows runoff will not be discharged onto an eroding frontage; read our explainer on coastal erosion for the background.
Policy WAT 1 (Water quality) and Policy WAT 2 (Water supply and sewerage): treatment and foul water
WAT 1 refuses development that would harm surface water quality or "disrupt the ground water movement or affect its chemical balance", taking account of minewater, and protects the county's bathing waters. In a drainage strategy that means treatment stages for each runoff surface, which the North East standards assess by the CIRIA simple index method. WAT 2 deals with foul water. Its second part allows package treatment plants "only ... where the development is sufficiently remote from sewered areas" and septic tanks "in very exceptional circumstances", which is why validation Note 21 asks for the Environment Agency's FDA1 form wherever a site will not join a public sewer.
The new Northumberland Local Plan: timetable and what changes
The county is preparing a new Local Plan under the 2026 plan-making regulations. It gave notice of intention on 16 April 2026, ran a scoping consultation from 20 May to 1 July 2026 and published its Gateway 1 self-assessment on 9 September 2026. Its timetable, updated on 6 October 2026, has town and parish councils consulted on preferred sites from 12 October to 9 December 2026. After that come a consultation on proposed plan content and evidence from 28 April to 8 June 2027, the proposed plan from 29 February to 25 April 2028, submission on 14 September 2028 and adoption on 14 March 2029. No draft flood or drainage policies have been published, so WAT 1 to WAT 5 remain the policies applied until the new plan is examined and adopted.
Not sure which WAT policies your Northumberland site triggers?
Send the site plan and a line on the scheme, and we will tell you which of WAT 3, WAT 4 and WAT 5 it engages and what the validation notes ask for. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteWhen a Northumberland application needs an FRA, a sequential test or a drainage strategy
Three sources set the triggers: NPPF policy F4 and WAT 3 for the flood risk assessment, the county's validation notes for what must arrive with the application, and the North East standards for the drainage detail. The validation notes are the minimum for registration; WAT 3 and F4 decide what the case officer can still ask for afterwards. Check the flood zone and the surface water picture on our flood risk map before reading across the table.
| Trigger | Flood risk assessment | Sequential and exception tests | Drainage submission |
|---|---|---|---|
| Any development in Flood Zone 2, 3a or 3b, including changes of use | Required (WAT 3; NPPF F4; validation Note 20) | Sequential test unless NPPF F5 exempts the scheme; exception test only where Annex F table 3 calls for one | Surface water drainage strategy on major development; SuDS under WAT 4 on smaller schemes |
| Householder extension or annexe in Flood Zone 2 or 3 | Required with the application (Note 20); the Environment Agency's standing advice for minor extensions applies to attached extensions | Not required: F5 exempts householder development | Source control SuDS where surface water needs managing (WAT 4) |
| Site of 1 ha or more wholly in Flood Zone 1 | Required (WAT 3; F4; Note 20) | Sequential test only if part of the site is at risk from another source now or in future; no exception test in Flood Zone 1 | Surface water drainage strategy (the site will be major development) |
| Flood Zone 1 land with critical drainage problems, or shown at future risk by the SFRA or the Flood Map for Planning | Required by WAT 3 and F4 even though Note 20 does not list it | Sequential test where the land is at risk from any source, unless F5(2)(b) exempts it | As for the scheme size |
| Flood Zone 1 land at risk from surface water, groundwater or another source where a more vulnerable use comes in | Required (WAT 3; F4) | Sequential test unless F5(2)(b)(ii) applies: surface water risk only and occupiers kept safe for the lifetime of the development | As for the scheme size |
| Major development (10 or more homes, 0.5 ha where numbers are unknown, 1,000 square metres of floorspace or a 1 ha site) | Where any trigger above applies | As above | Required at full and outline stage (Note 35), with Northumbrian Water's pre-planning response if a sewer connection is proposed; the county is consulted as lead local flood authority |
| Site in the Coastal Change Management Area | Required where the site is also in a flood zone or at risk from another source | As above | Drainage that does not increase erosion (WAT 5 part 4(c)); erosion vulnerability assessment by a specialist (Note 18) |
| Foul water not going to a public sewer | Not triggered by this alone | Not applicable | FDA1 form and system plan (Note 21; WAT 2) |
| Works in, over or near an ordinary watercourse | As for the scheme | Not applicable | Land drainage consent from the county (separate from planning) |
Two rows need a word. WAT 3's own sequential test wording includes "minor development and change of use exemptions". The current Framework exempts householder development, small non-residential extensions under 250 square metres and changes of use, except changes to a caravan, camping or chalet site or to a mobile or park home site, which still need the test. Where WAT 3's older wording is looser than F4 to F6, Annex A of the Framework gives a materially inconsistent part of a plan policy very limited weight, so an applicant should expect the F5 test and confirm the scope with the case officer. Our guide to the sequential and exception tests explains both, and the surface water exemption has its own page.
Householders in Flood Zone 2 or 3 should note that the FRA has to be with the application. A rear extension that is fine in principle can still be made invalid without one; our note on house extensions in a flood zone sets out what a short assessment for one contains.
Northumberland's April 2026 validation notes on flood risk and drainage
The council's validation requirements page sets out 40 numbered notes, used with its checklists for each application type and on their own where no checklist exists. Notes 1 to 7 are national requirements; notes 8 to 40 are the county's Local List. The council reviewed that list in April 2026, made no changes, and republished it on 1 April 2026 with a further review due by 1 April 2027, so it sits well inside the two-year limit on local validation requirements. Four notes bear on flood risk and drainage.
- Note 20, flood risk assessment. Required for householder extensions and annexes in Flood Zone 2 or 3; full and outline applications in Flood Zone 2 or 3, changes of use there, and sites of 1 ha or more in Flood Zone 1; and listed prior approvals, including film-making uses under Class E in any flood zone. The note says an FRA is needed only if the development itself is in the flood zone, and warns that an officer may ask for one later where foundations sit close to a zone. The assessment must be under three years old or come with an updated statement.
- Note 35, surface water drainage strategy. Required with full and outline applications for major development. Where infiltration or a watercourse is not possible and a sewer connection is proposed, the strategy should include Northumbrian Water's pre-planning enquiry response. The document must be titled on its front cover; the council will not search reports for missing information.
- Note 21, foul drainage assessment form (FDA1). Required where a householder, full or outline application installs or replaces a non-mains system, or where wastewater will not go to a public sewer, with a plan showing the treatment plant, drainage field and discharge points.
- Note 18, coastal erosion vulnerability assessment. Required for listed householder, full and outline proposals in the Coastal Change Management Area, with WAT 5 and the North Northumberland Coast Neighbourhood Plan named as the policies used.
The notes still point applicants to paragraph numbers in an earlier version of the NPPF; national flood policy now sits in Chapter 18 of the August 2026 Framework. For full and outline applications, Note 20 lists only the 1 ha trigger in Flood Zone 1, while WAT 3 and F4 also cover land with critical drainage problems and land at risk from other sources. An application can pass validation on Note 20 and still draw a request for an assessment from the case officer. Our article on applications invalidated over flood risk and drainage covers why applications stall at validation on these grounds. Both notes 20 and 35 also direct applicants to the made neighbourhood plan for their parish. More than 50 parish councils are involved in neighbourhood planning in Northumberland, and a made plan can add flood or drainage clauses of its own, so the plan for the site's parish is read alongside WAT 3.
What the North East SuDS standards ask of a Northumberland drainage strategy
Northumberland's drainage numbers come from the North-East Lead Local Flood Authorities Sustainable Drainage Local Standards, final issue July 2020, which the county agreed with Durham, Gateshead, Newcastle, North Tyneside, South Tyneside and Sunderland. There are 22 local standards and a checklist spreadsheet. The council's SuDS page, last updated in May 2025, says every new development "will need to incorporate SuDS" to national and local standards, and that major development needs a drainage statement or an extended surface water section in the flood risk assessment.
| Requirement | Northumberland standard and its source |
|---|---|
| Discharge rate | Equivalent greenfield runoff rates for new development on all sites, greenfield and brownfield (LS1), calculated by FEH (preferred) or IoH 124 over the whole site less large open spaces (LS2, LS3); a single Qbar rate or the 1 in 1 and 1 in 100 year greenfield rates (LS6), and Qbar only in other areas of known flood risk (NE standards, July 2020) |
| Rate to sewer | Set by the standards unless Northumbrian Water allows less; a formal agreement on the sewer rate is expected with the submission (LS4) |
| Discharge to the sea or an estuary | Free, unrestricted discharge accepted, with treatment and source control still required and the outfall drawn with high water levels (LS7) |
| Climate change | 40% on the 100-year event (LS9), the upper end allowance when the standards were written; current allowances by management catchment are set in the Environment Agency's climate change allowances, last updated 27 May 2022 |
| Urban creep | Up to 10% on residential development, 0% on commercial (LS5) |
| Storms and freeboard | Storms from 15 to 360 minutes as a minimum (LS8); 300 mm freeboard, or 300 mm between the 1 in 100 year plus 40% water level and finished floor level, with exceedance routes checked (LS10) |
| Tide locking | A combined tidal and rainfall event checked where the site is in or beside Flood Zone 2 or 3, such as a 1 in 100 year tide with a 1 in 10 year storm (LS13) |
| Infiltration testing | Required at all sites before planning approval: at least two representative falling head tests of six hours to BRE Digest 365, except where contamination, proven ground instability or groundwater within 1 m of the surface rules testing out (LS19) |
| Interception and water quality | 5 mm of rainfall retained on site by source control (LS20); treatment assessed by the CIRIA SuDS Manual simple index method (LS22) |
| Modelling | 1D or 2D modelling of ordinary watercourses within or beside the site may be required (LS11); overland flow modelling may be requested on slopes and known flow routes (LS12) |
| Maintenance and construction | A site-specific maintenance plan (LS15) and a construction-phase runoff plan (LS16); green, surface SuDS are expected, and a viability case is needed if vegetated SuDS are not proposed (LS17) |
The standards predate the National Standards for Sustainable Drainage Systems published in June 2025, and no council statement on them appears on its SuDS or planning pages. NPPF policy F8 now asks SuDS to be designed to the National Standards and, on major development, to take account of the lead local flood authority's advice. We write a Northumberland strategy to both: the National Standards set the framework, and the North East figures above are what the county's officers check. Our summary of the 2025 National Standards explains what they require.
LS19 is the standard most likely to delay a submission, because two six-hour tests need a contractor, a trial pit and dry enough ground, and they have to be done before approval. Our ground conditions and soakaway map gives a first read of the geology. The BRE 365 infiltration rate calculator turns a trial pit result into a rate, and our article on whether you need infiltration testing explains when the test can be scoped down. The urban creep and climate change calculator applies the LS5 and climate change uplifts to an impermeable area.
Works that alter flow in an ordinary watercourse, such as a culvert, a new outfall or a headwall, need land drainage consent from the county as lead local flood authority: £50 per structure, decided within two months. That consent is separate from planning permission. Works on a main river need a permit from the Environment Agency; our explainer on main rivers and ordinary watercourses sets out which body regulates which.
The 2010 and 2015 SFRAs, and the new study under way
- Level 1 SFRA, September 2010. The Level 1 Strategic Flood Risk Assessment by Scott Wilson maps river, tidal, surface water and sewer flooding. It identifies rapid response catchments at Bellingham, Kielder (Buttery Haugh) and the Coplish Burn in Rothbury, where the flood peak can arrive too quickly for a warning, in some places in under an hour. It also records tidal flooding at Berwick-upon-Tweed, Blyth and Alnmouth. The Local Plan points to its resistance and resilience measures (table 6-1).
- Flood Zone 3b in the 2010 study. The SFRA takes land flooding at 1 in 20 (5%) or more as the starting point for functional floodplain, and its addendum treats Flood Zone 3a as a stand-in for Zone 3b in tidal areas and behind defences where no functional floodplain was drawn. Annex F of the Framework now normally starts from a 3.3% annual probability, so an assessment tests both and explains which it relies on; our note on Flood Zone 3b explains the change.
- Level 2 SFRA, October 2015. The Level 2 Strategic Flood Risk Assessment by URS gives exception test information for potential development areas in the Core Strategy delivery areas, with groundwater and minewater notes. It flags possible minewater intrusion in the former coal mining settlements on the coast and recorded groundwater flooding at Spittal and Darras Hall.
- The replacement under way. The county has appointed WSP UK to prepare a new SFRA and water cycle study for the new Local Plan (Contracts Finder award notice, published 15 April 2026; contract to April 2028). Until it is published the 2010 and 2015 studies remain the council's evidence, listed on its studies and evidence page.
An SFRA from 2010 was drawn under the guidance of its day and before the current climate change allowances. A site-specific assessment therefore uses the current Flood Map for Planning and the Environment Agency's long-term risk maps alongside it, and says where they differ. For how councils build these studies, see our guide to strategic flood risk assessments.
How NPPF Chapter 18 applies alongside the 2022 Local Plan
National policy is in Chapter 18 of the National Planning Policy Framework, published on 17 August 2026. Policy F4 says when a site-specific assessment is needed, F5 and F6 set the sequential and exception tests, F7 asks that development is safe for its lifetime with residual risk managed, F8 covers SuDS and watercourses, and F9 sets the tests for Coastal Change Management Areas. Planning practice guidance on flood risk and coastal change (last updated 17 September 2025) adds the method behind each test, and our summary of the August 2026 NPPF changes covers what moved.
WAT 3 and the Framework mostly agree. Where they differ, the difference runs both ways. F4(2)(c) asks for an assessment on Flood Zone 1 land shown at risk from any source "whether now or in the future", which is wider than WAT 3's other-sources trigger. On drainage, WAT 3's soakaway-first order matches the drainage hierarchy in the PPG. Standard 1 of the National Standards follows the same order but puts collecting rainwater for non-potable use first. Two parts are local: full separation of foul and surface water within every development, and the brownfield rule of a rate as close as practicable to greenfield or at least a 50% cut. A strategy is checked against both the WAT 3 limits and the National Standards discharge rates. F9 and WAT 5 line up closely on the coast. For a wider explanation of the national regime, our NPPF flood risk guidance page sets it out.
Rivers, coast and coalfield: where flood risk falls in Northumberland
The 2010 SFRA describes river risk across most of the county as generally low, because the floodplains sit in narrow, incised valleys. The exceptions are towns with a long flood history: Morpeth, Ponteland, Rothbury, Hexham, Belford and Wooler. The Tyne is the largest system. In December 2015 Storm Desmond produced flows on it not seen since 1771, and Hexham, Corbridge and Haydon Bridge flooded worst; our River Tyne page follows the river, and the live river levels map shows the gauges. The county's flood investigation reports record the main events since 2012.
On the Wansbeck, Morpeth's flood alleviation scheme followed the 2008 flood; our Morpeth page covers the defences and the burns that cross the town. The Hexham page covers the 2023 Tyne defences, and the Rothbury page covers the Coquet and the Coplish Burn. For the county as a whole, our page on flood risk assessment in Northumberland brings the flood history and the planning flood map together.
Surface water is the commoner risk in the towns. The Local Flood Risk Management Strategy of November 2015 sets the county's Section 19 threshold low, at internal flooding of five or more homes or businesses, because in a mainly rural county a few flooded properties hit a whole community. On the coast, Blyth faces sea flooding and the Lynemouth shore has eroding colliery spoil, both named in the Local Plan. In the south-east, minewater and possible groundwater rebound at Blyth, Ashington, Ponteland and Bedlington affect which drainage will work. The county is also testing flood prediction in six communities through FloodAI, which our article on AI in flood risk management describes.
Reports for a Northumberland County Council application
Three separate reports answer WAT 3. The flood risk assessment deals with part 2(b), the safety of the site and its effect on neighbours; the sequential test deals with part 2(a), whether a lower-risk site is available; and the drainage strategy deals with parts 2(c) and 2(d), the separation, the discharge order and the rate. Northumberland County Council can ask for one, two or all three on the same application.
- Floodplain sites under WAT 3. Riverside plots on the Tyne, Wansbeck, Coquet and Blyth, and tidal land at Blyth and Berwick, need a flood risk assessment for planning that answers WAT 3 part 2(b) as well as the national tests.
- Every source the county asks about. WAT 3 measures risk "from all potential sources", so a flood risk assessment for a Northumberland site covers surface water, sewers, groundwater and minewater alongside the rivers and the sea.
- Before buying. Homes and business units in Corbridge, Hexham and Morpeth change hands with recorded flooding behind them, and a flood risk survey for property purchase sets out the risk to the building before exchange.
- Unallocated land at risk. WAT 3 applies the national tests, and an unallocated site in Flood Zone 2 or 3 needs a sequential test on a catchment no wider than F5 allows, and an exception test where Annex F table 3 calls for one.
- The WAT 3 drainage limits. Greenfield rates, the 50% brownfield minimum and the soakaway-first order are met through a drainage strategy that sets out the hierarchy step by step.
- Major schemes reviewed by the lead local flood authority. Note 35 asks for a surface water drainage strategy on major full and outline applications, checked against the North East standards and the infiltration test results.
- Conditions after approval. Maintenance plans under WAT 4 part 4 and construction runoff plans under LS16 often follow as conditions, and the discharge of drainage conditions gathers the details the county's flood team asks for.
- Off-mains and rural sites. WAT 2 limits package plants and septic tanks, and Note 21 asks for the FDA1 form, which a foul drainage strategy supports with the evidence the form needs.
- Minewater and groundwater. In the south-east coalfield and at Spittal and Darras Hall, where the SFRAs record groundwater flooding, a groundwater assessment tests whether infiltration is safe before WAT 3's soakaway step is used.
- Ordinary watercourses beside the site. LS11 lets the county ask for 1D or 2D modelling of an ordinary watercourse within or next to a development, which flood modelling provides.
- Emergency planning under WAT 3. Part 2(b)(vii) asks for safe access and escape within an agreed emergency plan where appropriate, set out in a flood warning and evacuation plan for tidal Blyth or the Tyne flats.
- Port and coastal land. On coastal sites we offer flood risk assessments and due diligence for buyers and lenders of commercial land at Blyth, Amble and Berwick.
- Wind and solar in the uplands. The validation notes include a pre-application statement for wind turbines (Note 32), and renewable energy flood risk assessments cover access tracks, compounds and runoff on rural sites.
- National policy in practice. Where WAT 3's older wording and Chapter 18 differ, our NPPF guidance and advice service sets out which test applies.
Our local authorities index lists the other councils we cover, and our guide to the climate change allowances explains the current figures.
Questions on Northumberland County Council's flood and drainage rules
What does Northumberland Local Plan Policy WAT 3 require?
WAT 3 (Flooding) asks for a site-specific flood risk assessment for all development in Flood Zones 2 and 3, and in Flood Zone 1 on sites of 1 hectare or more, land with critical drainage problems, land the SFRA shows at greater future risk, and land at risk from other sources where a more vulnerable use comes in. It also requires foul and surface water to be fully separated on site, a soakaway-first order for surface water, greenfield runoff rates on greenfield land and at least a 50% cut on previously developed land.
Do I need a flood risk assessment for an extension in Flood Zone 2 in Northumberland?
Yes. The county's validation Note 20 asks for one with a householder application for an extension or annexe in Flood Zone 2 or 3, and the application can be made invalid without it. For an attached extension the Environment Agency's standing advice for minor extensions sets the content. Householder schemes are exempt from the sequential test under NPPF policy F5.
Does Northumberland National Park follow the county's flood policies?
No. Inside the park the Northumberland National Park Authority decides applications under its own Local Plan, adopted on 15 July 2020, where Policies ST1 and ST2 cover flood risk. The county council is still the lead local flood authority there, so it comments on drainage on both sides of the boundary.
What discharge rate does Northumberland expect from a brownfield site?
Two documents apply. WAT 3 asks for a rate as close as reasonably practicable to greenfield, and at least a 50% reduction where greenfield cannot be achieved. The North East standards of July 2020 go further and ask for equivalent greenfield runoff rates on all sites, brownfield included, limited only by the smallest flow control Northumbrian Water accepts. A drainage strategy sets out the calculation for both.
Can a householder in Northumberland write the flood risk assessment without a consultant?
For an attached householder extension the Environment Agency's standing advice and its FRA template are written for applicants to use, and the council links both from Note 20. For new homes, changes of use in a flood zone or anything engaging WAT 3's drainage limits, the assessment has to deal with all sources, climate change and residual risk, which goes well beyond the template. Call 01293 214444 to talk a site through.
Is a new Northumberland Local Plan replacing WAT 3?
Not yet. The county gave notice of a new Local Plan on 16 April 2026, and its October 2026 timetable has a consultation on proposed content and evidence from 28 April to 8 June 2027, submission in September 2028 and adoption planned for 14 March 2029. No draft flood policies have been published, so WAT 3, WAT 4 and WAT 5 remain the policies applied.
Two infiltration tests between you and a valid drainage strategy?
If the drainage answer depends on whether the ground will take water, the two six-hour tests are the first thing to book. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteFor a site anywhere in Northumberland, call 01293 214444 or email enquiries@unda.co.uk with the address and a short description of the scheme.