A flood risk assessment in Ironbridge has to deal with a fast river in a narrow gorge, temporary barriers that crews put up when the Severn rises, and valley sides where water in the ground can start a landslip. We prepare flood risk assessments in Ironbridge for planning applications, house purchases, mortgages and insurance, alongside sequential and exception tests and surface water drainage strategies, for buildings from the Wharfage and Dale End to Jackfield, Coalport and the streets climbing above the river.
Here Ironbridge means The Gorge civil parish, which the map below outlines: Ironbridge itself, with the Wharfage, Tontine Hill and Ladywood, Coalbrookdale up the valley of the Coalbrook, and Jackfield and Coalport downstream, all in the TF8 postcode district and at the heart of the Ironbridge Gorge World Heritage Site. Broseley, on the hill south of the river, is in Shropshire Council's area and falls outside it. Telford & Wrekin Council decides planning applications and is the lead local flood authority; the town above the Gorge has its own page, and the wider county is on our Shropshire page.
In February 2022 the Severn peaked at 6.65 m, 0.15 m below the 6.8 m the Wharfage barriers are built to hold. On 2 November 2000 the gauge upstream at Buildwas reached 7.04 m.
Ring 01293 214444 or email enquiries@unda.co.uk and one of our flood risk consultants will talk through your Ironbridge address. Reports for sites in Ironbridge come from Unda Consulting Limited, a CIWEM Business Partner.
What the Buildwas gauge shows about a site in the Gorge
The Environment Agency's nearest Severn gauge is at Buildwas, about 3 km upstream of the Iron Bridge, where the river has been measured since 1977 against a zero 36 m above sea level. Its normal range runs from 0.42 m to 3.40 m. The agency also records the roads and places that have flooded at each level, so a reading can be matched to the streets it affects:
| Level at Buildwas | What floods | What it means for a site |
|---|---|---|
| 0.42 m to 3.40 m | The normal range | Ordinary flows in the Gorge, well below any threshold or floor level |
| 5.30 m | The B4380 at Cressage Bridge, upstream | The first road flooding the agency logs on this stretch of the river |
| 5.80 m | Buildwas Road | The road into the Gorge from the west can be lost, which a plan for safe access has to allow for |
| 6.60 m | Buildwas Road downstream of Buildwas Bridge | Approaches to Ironbridge from upstream go under |
| 6.70 m | Coalport Road at the junction with Blists Hill Road | The road through Coalport floods, so access along the north bank is lost |
| 6.80 m | The B4373 near Jackfield Bridge | The road at the crossing to Jackfield goes under |
| 7.04 m | Highest on record, 2 November 2000 | A check on the modelled 1% annual probability flood, plus climate change, that an assessment has to use |
The agency's list of past impacts also includes flooding at Dale End and to property in Ironbridge. Three Environment Agency flood warning areas cover the parish: the Wharfage, Ironbridge, Ironbridge and Jackfield, including Coalport, and Buildwas just upstream. Our live river levels map shows the latest Buildwas reading against its normal range, and the River Severn page follows the river from mid Wales to the estuary.
The Wharfage barriers and the walls planned at Dale End and Ladywood
Ironbridge has no permanent river defence. When warnings are issued the Environment Agency builds a line of temporary barriers along the Wharfage and takes it down once the river falls. The barriers lower the chance of the river reaching the buildings behind them, but the planning map is drawn as though they were not there, so the riverside stays in Flood Zone 3.
- February 2020. Water pressure made the road surface under the barriers slip, and water seeped behind them; pumps dealt with it and the line held. Police and the council asked people behind the barriers to leave, with a rest centre at the Tontine Hotel.
- Winter 2020 to 2021. The barriers were shifted by the force of the water again, though not breached. The council's contractor was booked to resurface the Wharfage in January and February 2021 with a grippier, flatter road sloping slightly to the river, and the agency widened the waterproof membrane at the front of the line.
- February 2022. With around 60 properties expected to be affected, residents were asked to leave on 21 February. The river peaked overnight into 23 February at 6.65 m, just under the barriers' 6.8 m maximum, and they were not overtopped.
- Jackfield and Coalport. The council told MPs in 2020 that the temporary barriers are the only flood defence in the Ironbridge area and that Jackfield and Coalport have none. It put the cost of permanent defences for Ironbridge at more than £70 million.
- Dale End and Ladywood. In July 2024 the council secured £1.2 million over three years for two permanent flood walls, one at Dale End and one at Ladywood, and individual protection for the most exposed buildings, expected to help around 40 homes and businesses. The walls are likely to need planning consent in the World Heritage Site.
Temporary barriers only work if the warning comes early enough for a crew to build them, and a permanent wall can still be overtopped by a flood bigger than the one it was designed for. An assessment behind either line therefore tests the defended case and what happens if the line is overtopped, fails or is not up in time, as our guides to residual flood risk and temporary and demountable barriers explain. Why a defended street stays in Flood Zone 3 is covered in this note on flood zones after new defences.
Look up an address in Ironbridge, Coalbrookdale, Jackfield or Coalport
Type a TF8 postcode into the map to screen it against the Environment Agency's river, surface water and reservoir data; elsewhere in England, our flood risk map does the same. The coral line follows The Gorge parish, from Buildwas Road and Coalbrookdale in the west to Coalport in the east and up both sides of the valley. In the Environment Agency's flood zones the Wharfage, Ladywood, Dale End, the riverside at Jackfield and Coalport and the Coalbrook valley floor through Coalbrookdale are in Flood Zone 3, while most of the town on the hillside above is in Flood Zone 1.
Severn floods in the Gorge, from 1773 to Storm Franklin
Telford & Wrekin Council's flood records, its incident updates and the Environment Agency give these dated events. The council's records group the Severn and the Coalbrook together as one source, and name Buildwas, Coalbrookdale, Ironbridge, Coalport and Jackfield as the places affected.
- 1773. A landslip at the Birches, upstream of where Ironbridge Power Station later stood, slid into the Severn and cut off its flow, according to the council's drainage guidance.
- January 1948, December 1960 and October 1998. Severn floods recorded by the council in the Gorge.
- 2 November 2000. The Severn reached 7.04 m at Buildwas, the highest level on record there.
- February 2004. Another Severn flood through Buildwas, Coalbrookdale, Ironbridge, Coalport and Jackfield.
- February 2014. The river reached 6.03 m at Buildwas on 11 February.
- 14 June 2020. A summer storm caused surface water flooding in Coalbrookdale, Ironbridge, Jackfield and Coalport.
- February 2020 and January 2021. After Storms Ciara and Dennis the river reached its highest levels at Ironbridge since 2000, with two severe flood warnings, and the barriers slipped. The council recorded a further Severn flood in January 2021.
- 21 to 23 February 2022. Storms Dudley, Eunice and Franklin: severe warnings, an evacuation behind the Wharfage, and a peak of 6.65 m just short of the barriers' limit.
We compare Ironbridge with Shrewsbury upstream and Bewdley downstream, and what each has done since 2000, in what 25 years of Severn defences changed.
The Coalbrook: a fast-rising brook through Coalbrookdale
The Coalbrook, also called the Loamhole or Lyde Brook on some maps, flows out of Loamhole Dingle, down through Coalbrookdale and into the Severn near Dale End. It is a main river, and its catchment is designated a rapid response catchment, one where flooding can arrive with little warning after heavy rain. Through Coalbrookdale its channel is heavily modified and runs in culverts in several places.
Because the brook rises so fast, it had its own flood warning system when the council's 2021 flood evidence was written, run by Telford & Wrekin Council rather than the Environment Agency. That evidence ranks the Lyde Brook catchment high for the cumulative effect of development, records 47 properties flooded internally there, and lists Coalbrookdale and Ironbridge among the places where surface water risk grows most between the 1 in 100 and the 1 in 1,000 year storm. On a Coalbrookdale site a blocked culvert is tested alongside the brook's own flood level; ownership and consent for culverts are set out in our guide to culverts.
Landslips, mine workings and the no-soakaway zone
The Gorge is cut through layers of coal, limestone, iron ore and clay, and more than 20 landslides are logged in the National Landslide Database. The council has spent more than £33 million on stabilisation in the Gorge. Because water draining into a slope can set it moving, the council does not allow soakaways in parts of Coalbrookdale, Ironbridge and Jackfield unless a scheme proves infiltration will not harm land stability.
| Place | What the record shows | What it means for drainage |
|---|---|---|
| Jackfield | The 1952 landslide broke up six houses and damaged the railway, a road and gas mains; earlier movement in 1925 and 1931 and later in 1984. Piles up to 14 m long, in nine rows, and a revetment along the bank were finished in October 2016 | Inside the no-soakaway zone: surface water is stored and released to a sewer or the river at a controlled rate rather than put into the ground |
| The Lloyds and Lloyd's Coppice | An active landslide on the north bank between Ironbridge and Coalport; a stabilisation project costed at about £31.2 million is awaiting a funding decision | Any extra water into the slope is avoided; drainage routes are kept away from the moving ground |
| Coalbrookdale | Large areas the council describes as potentially unstable, on the Coalbrook valley sides | Inside the no-soakaway zone; runoff is led to the brook or a sewer with consent |
| Jiggers Bank and Lloyd's Head | Past stabilisation projects; slopes the council lists as susceptible to slippage | Drainage is planned with the slope, and outfalls checked for erosion |
| Old coal workings | Mine water issues recorded on higher ground in Ironbridge, and mine entries in the area | Shallow workings are assumed to hold mine water until a site investigation shows otherwise |
Land stability sits in Policy BE 9 of the Local Plan, and the council says changes to buildings, land or property in the Gorge must not adversely affect its stability. A drainage strategy here usually turns on attenuation sized to greenfield rates and a consented outfall. Outside the zone, infiltration still has to be tested on the plot, as our guide to when infiltration testing is needed explains; the ground conditions and soakaway map gives an early view of the geology.
Which policies apply to a flood risk assessment in Ironbridge?
Telford & Wrekin Council decides applications in the Gorge against the Telford & Wrekin Local Plan 2011-2031, adopted in January 2018. The World Heritage Site and land stability add their own policies to the flood and drainage ones:
| Policy or document | Bearing on an Ironbridge or Coalbrookdale site |
|---|---|
| Local Plan Policy ER 12 Flood risk management | Written with the Gorge's flood history in mind: water held on site through sustainable drainage, climate change allowed for, development kept back from land prone to flooding, and measures on culverts and watercourses agreed with the Environment Agency |
| Local Plan Policy BE 3 Ironbridge Gorge World Heritage Site | Protects the World Heritage Site, inscribed in 1986; work to historic buildings and their setting, flood measures included, is judged against it |
| Local Plan Policy BE 9 Land stability | Development must not make unstable ground worse; in the Gorge it goes with the no-soakaway zone |
| The council's October 2021 Level 1 Strategic Flood Risk Assessment by JBA Consulting | The Severn and Coalbrook records, the barriers' history, the no-soakaway zone, the rapid response catchment and advice on residual risk |
| Telford & Wrekin SuDS appendix | Greenfield runoff rates, or on brownfield land as close as practicable with a 50% cut on viability evidence; no soakaways in the mapped zone over Coalbrookdale, Ironbridge and Jackfield |
| NPPF chapter 18, policies F4 to F8 | Policy F4 decides whether a Gorge site needs an assessment at all; F5 and F6 hold the sequential and exception tests; F8 points drainage to the 2025 National Standards for sustainable drainage |
The new Telford and Wrekin Local Plan to 2041 was found sound subject to changes in June 2026, and the council consulted on those changes over the summer; it is not yet adopted, so the 2018 policies still apply. New homes on the Wharfage or at Jackfield would face the sequential test before any question of floor levels, and a change of use to housing raises a building's flood vulnerability.
Converting or extending a building by the Severn in the Gorge?
Send the address and a line about the plans. One of our experienced flood risk consultants will reply within 60 minutes with a fixed fee, free and with no obligation.
Start a QuoteDoes a project in the Gorge need a flood risk assessment, a drainage strategy or both?
Which reports an Ironbridge site needs depends on how low it sits, what is proposed and whether it drains into a moving slope. The usual cases:
| Proposal | Where in the Gorge | Usually needed |
|---|---|---|
| Shop or café to flats, or holiday lets | The Wharfage, Dale End, the riverside at Jackfield | A flood risk assessment with floor levels, an access and escape plan and the barrier failure case |
| Extension or outbuilding in Flood Zone 2 or 3 | Ladywood, Coalport Road, the Coalbrook valley floor | A flood risk assessment sized to the extension; minor extensions are not put through the sequential test |
| New homes on the riverside or the valley floor | Infill plots in Flood Zone 2 or 3 | The sequential test first, then an assessment of the river or brook levels, and the exception test if the use calls for it |
| A house or extension up the slope | The streets above the High Street, Coalbrookdale's hillsides | A drainage strategy that respects the no-soakaway zone, and an assessment if a surface water route or the Coalbrook affects the plot |
| Buying a riverside house or business | The Wharfage, Dale End, Jackfield, Coalport | A survey of the building's thresholds and flood history for the buyer or the lender |
| A drainage condition on a permission | Any approved scheme | The details and maintenance plan needed to discharge it |
An address on the hillside in Flood Zone 1, away from the Coalbrook and outside the surface water routes, may need no more than a short drainage note.
Reports we prepare for buildings on both banks of the Gorge
Each of these is written for the river level, the brook and the ground at the address:
- Applications on the riverside. Conversions, extensions and new homes in Flood Zone 3 on the Wharfage, at Dale End or in Jackfield need a flood risk assessment for planning that meets Policy ER 12 and respects the World Heritage Site.
- River, brook and slope in one report. A flood risk assessment in the Gorge covers the Severn, the Coalbrook, surface water off the valley sides, groundwater and mine water, and the case where the barriers fail.
- Buying in the Gorge. With roads in the Gorge flooding from 5.80 m at Buildwas, a flood risk survey for property purchase looks at one building's thresholds, cellars and flood history.
- Whether it should be built there. For new homes on the valley floor, the sequential and exception test shows whether lower-risk land elsewhere in the borough could take the scheme.
- Drainage on steep ground. Our drainage strategy work deals with surface water and foul flows on ground where soakaways are often barred.
- Storage instead of soakaways. Inside the no-soakaway zone, a surface water drainage strategy sizes storage to greenfield rates and finds a consented outfall to a sewer or watercourse.
- Once consent is granted. The discharge of drainage conditions covers the calculations, details and maintenance plan the council asks for before work starts in the Gorge.
- Levels on the Coalbrook and the Severn. National mapping cannot show a blocked Coalbrook culvert or a breach in the Wharfage barriers, so flood modelling sets the flood levels and depths at the site.
- Leaving before the barriers are tested. With three warning areas, a fast-rising Coalbrook and evacuations in 2020 and 2022, a flood warning and evacuation plan sets out who leaves, when and by which route.
- Uninsured after 2020. The council told MPs that many homes flooded in 2020 were uninsured, and a flood risk assessment for insurance gives an insurer evidence about one address.
- Water in the slopes. With mine water recorded on high ground in Ironbridge and slopes that have moved at Jackfield and still move at the Lloyds, a groundwater flood risk assessment checks a cellar, basement or cut into the hillside.
- Trading through a flood. Some small businesses in the Gorge flooded two or three times in about a week in 2020, and a business continuity flood risk assessment plans how a shop, pub or museum keeps going while the river is up.
Flood contacts for the Ironbridge Gorge
When the river threatens life, call 999; a power cut is reported on 105. Day to day, flood risk in the Gorge is shared between these bodies:
| Organisation | Role in the Gorge | Contact |
|---|---|---|
| Telford & Wrekin Council | Lead local flood authority and planning authority: surface water, groundwater, ordinary watercourses and land stability in the Gorge | Report flooding or a drainage problem; land instability in the Gorge |
| Environment Agency (West Midlands) | The Severn and the Coalbrook as main rivers, the Wharfage barriers and flood warnings | Floodline 0345 988 1188; warnings for the Wharfage and Jackfield areas |
| Severn Trent Water | Public sewers and sewer flooding | Flooding help |
| The Coal Authority | Shafts, adits and water or gas from old workings | 01623 646333 (24 hours) |
| English Severn and Wye RFCC | The regional flood and coastal committee for the Severn basin, on which Telford & Wrekin Council sits | Committee page |
| West Mercia Local Resilience Forum | Multi-agency emergency planning for Telford & Wrekin, Shropshire, Herefordshire and Worcestershire | Flooding advice |
Upstream the Severn runs through Shrewsbury and downstream to Bridgnorth, both covered on their own pages, and every other place we cover is in our list of areas.
Questions about Ironbridge floods, flood zones and permissions
Does Ironbridge flood every winter?
Not every winter, but often. The council's records show Ironbridge floods from the Severn in 1948, 1960, 1998, 2000, 2004, 2014, 2020 and 2021, and the barriers went up again in February 2022. Flooding in Ironbridge also comes from the Coalbrook and from surface water, as in the storm of 14 June 2020.
Will my Gorge planning application be refused without a flood risk assessment?
Near the river it is likely to be, or not validated at all. NPPF policy F4 calls for one in Flood Zones 2 and 3, on sites of 1 ha or more, and where surface water or another source puts a Flood Zone 1 site at risk. The Wharfage, Ladywood, Dale End and the riverside at Jackfield and Coalport are in Flood Zone 3, so almost any application there needs one.
Is my house on the Wharfage or in Coalbrookdale in Flood Zone 3?
The riverside streets and the Coalbrook valley floor are mostly in Flood Zone 3, and the hillside streets above the High Street mostly in Flood Zone 1. Enter the postcode in the map above for the zone at an address; an assessment then gives the flood levels that apply to the building itself.
Is Ironbridge covered by Telford & Wrekin Council or Shropshire Council for flooding?
Telford & Wrekin Council. The Gorge is in the Telford & Wrekin unitary area, not Shropshire Council's, so the same council decides the planning application, advises on its drainage and looks after land stability in the Gorge. The Environment Agency is responsible for the Severn and its barriers.
Do the Wharfage barriers or the new walls mean my site is safe?
They make flooding less likely, not impossible. The planning map ignores them, so defended plots stay in Flood Zone 3, and a larger flood, a failure or a late deployment can still put water behind them. An assessment sets floor levels and an escape route on that basis, for the barriers now and the Dale End and Ladywood walls once built.
Can I use a soakaway in Ironbridge?
In much of Coalbrookdale, Ironbridge and Jackfield, no: the council does not allow soakaways in its mapped zone unless a scheme proves they will not harm land stability. Elsewhere in the parish infiltration has to be tested, and old mine workings may hold water. Most schemes store runoff and release it slowly to a sewer or watercourse.
How do I check the river in the Gorge before it reaches the Wharfage?
The Environment Agency's Buildwas gauge, just upstream, gives the nearest reading and its normal range, and the check for flooding service lists any warnings for the Wharfage and for Ironbridge, Jackfield and Coalport. Our live river levels map shows the same gauges.
Why do quotes for a flood risk assessment in Ironbridge differ from one building to the next?
It depends on the building and on who needs the report. A pre-purchase report on a cottage is a smaller job than an assessment for flats on the Wharfage that needs modelled flood levels and the barrier failure case. Send the address and a line about the work, and a fixed fee comes back within 60 minutes, free and with no obligation.
Can you prepare a drainage strategy as well as a flood risk assessment?
Yes. They are separate reports: the assessment asks whether the building and its users are safe from flooding, and the drainage strategy where the rain from roofs and paving goes. In the Gorge the drainage answer is shaped by the no-soakaway zone and the steep ground, so the two are often prepared together.
Is Ironbridge in Telford or Shropshire?
Both, in a sense. Ironbridge is part of Telford and of the borough of Telford & Wrekin, which is a unitary council in the ceremonial county of Shropshire. Broseley, across the river, is run by Shropshire Council, so a site there follows a different local plan.
Exchanging on a Gorge property, or facing a validation check?
Tell us the address and the date you are working to. A fixed-fee quote, free and with no obligation, comes back within 60 minutes.
Start a QuoteTo talk about a shop on the Wharfage, a cottage in Coalbrookdale or a house at Jackfield, call 01293 214444 or email enquiries@unda.co.uk. A chartered consultant at Unda Consulting Limited will tell you which reports the building needs, and why.