Shropshire Council asks for a completed surface water drainage proforma with almost every new building, a single house, a barn conversion or an agricultural shed included, and its SuDS Handbook says the council does not permit surface water pumps on new development. Flood risk and drainage are decided against Core Strategy Policy CS18 (Sustainable Water Management), adopted on 24 February 2011, and SAMDev Policy MD2, adopted on 17 December 2015. Both still apply because the plan meant to replace them was withdrawn in July 2025.
This page sets out what Shropshire Council requires on flood risk and drainage for a planning application, policy by policy, with the documents its flood and water team checks a submission against. We prepare flood risk assessments, sequential and exception tests and drainage strategies for applications to Shropshire Council, and each section says what our report contains to meet the requirement. Reports for sites in the Shropshire Council area come from Unda Consulting Limited, a CIWEM Business Partner whose consultants are chartered. To talk through a site, call 01293 214444 or email enquiries@unda.co.uk.
Who decides flood risk and drainage on an application to Shropshire Council
Shropshire Council has been a unitary authority since 2009, so it is the local planning authority, the Lead Local Flood Authority and the highway authority for the whole county outside Telford & Wrekin. One council validates the application and comments on its drainage. Telford is different. The town, Newport and the Ironbridge Gorge fall to Telford & Wrekin Council, a separate unitary with its own plan and its own flood team, and nothing on this page applies there.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Shropshire Council (Planning Services) | Local planning authority | Decides the application against Policies CS18 and MD2, any made neighbourhood plan and the NPPF; applies the sequential test; checks the submission against its 2022 validation checklist |
| Shropshire Council (Flood and Water Management Team) | Lead Local Flood Authority | Statutory consultee on major applications and, by its own choice, reviewer of smaller schemes; assesses the drainage proposal against the SuDS Handbook and advises whether detail can be left to conditions |
| Shropshire Council as LLFA | Regulator of ordinary watercourses | Consent for a culvert, dam, weir or other work that affects flow in an ordinary watercourse outside a drainage board's district |
| Environment Agency (West Midlands area) | Statutory consultee and Main River regulator | Sites in Flood Zones 2 and 3 on the Severn, Teme, Tern and the county's other Main Rivers; discharges straight to a Main River; an environmental permit for works on or near one |
| Melverley and Rea Internal Drainage Boards | Drainage boards in west Shropshire | Consulted where a scheme discharges, directly or indirectly, to a watercourse a board manages; their own consent for works to watercourses in their districts |
| Severn Trent Water (Welsh Water and United Utilities at the northern edge) | Sewerage undertaker | Agreement to connect to a public sewer; the LLFA's runoff rate overrides the water company's wherever the LLFA's is tighter |
| Canal & River Trust | Navigation authority | Consulted where drainage would discharge to one of its waterways, such as the Llangollen, Montgomery or Shropshire Union canals |
Both drainage boards are small and rural. Melverley Internal Drainage Board describes its district as about 3,400 hectares of low-lying land in west Shropshire, and the Rea Internal Drainage Board covers 1,280 hectares from the Powys border to Hanwood. Planning permission does not carry a board's consent with it, a gap our guide to internal drainage boards explains. For what a local planning authority does with a flood risk assessment once it arrives, see the separate explainer.
Shropshire's flood and drainage policies: CS18, MD2 and the parish plans
Two county-wide policies do most of the work: CS18 and MD2. Two more SAMDev policies carry single flood clauses, and SAMDev's settlement policies (S1 to S18) ask for a site-specific flood risk assessment on some named allocations. The made neighbourhood plans add their own wording, at greatest length in Much Wenlock and Shifnal and by the clause in five other plans. The table sets each one beside what goes into our report to answer it.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy CS18 | Sustainable Water Management (Core Strategy) | Development that follows the national flood risk tests and has regard to the SFRAs; SuDS in all development, changes to existing buildings included; no increase in runoff; culverts opened up; water infrastructure and water quality protected | Show the site passes the flood risk tests, is safe for its lifetime, and drains through SuDS at or below the existing runoff rate | A flood risk assessment, a sequential test where one is needed, and a drainage strategy with existing and proposed runoff rates | Shropshire Core Strategy, adopted 24 February 2011 |
| Policy MD2 | Sustainable Design (SAMDev Plan) | Sustainable drainage built into the layout from the start, applying the requirements of the SuDS Handbook | Meet the handbook's local standards and return its proforma | A surface water drainage strategy written to Local Standards A to R, with the completed proforma | SAMDev Plan, adopted 17 December 2015 |
| Policy MD8 | Infrastructure Provision (SAMDev Plan) | Enough infrastructure capacity for the scheme; hydro-electric proposals judged on flood risk, ecology, water quality and fish stocks | Evidence of sewer and treatment capacity; a flood risk case for any hydro scheme | Foul and surface water capacity checks in the drainage strategy; an FRA for works in or beside the channel | SAMDev Plan, adopted 17 December 2015 |
| Policy MD11 | Tourism facilities and visitor accommodation (SAMDev Plan) | Support for moving static caravan, chalet and log cabin sites out of high flood risk; new visitor accommodation sites and extensions to chalet and park home sites in the Severn Valley resisted | Show a relocated site is at lower risk and safe for its lifetime | An FRA comparing the existing and proposed pitches, with access and warning arrangements | SAMDev Plan, adopted 17 December 2015 |
| Policy MW10 and Policy MW11 | Flood prevention; the plan's sustainable drainage policy (Much Wenlock Neighbourhood Plan) | Watercourses, ditches and land drains kept open; no development in flood attenuation areas where it would reduce their ability to alleviate flooding; drainage schemes approved before work starts; SuDS trains, sewer capacity and a maintenance plan; flood warning and evacuation plans for major development | Meet the parish policies on top of CS18 for any site in Much Wenlock parish | An FRA and drainage strategy that deal with the Shylte Brook catchment, off-site flows and maintenance | Much Wenlock Neighbourhood Plan 2024-2038, made 14 May 2026 |
| Policy EN3 | Flood Risk Management (Shifnal Neighbourhood Plan) | Development that reduces flood risk in the parish, opens culverts where practicable and avoids culverting open watercourses; adoption and maintenance of flood measures secured | Show where the surface water goes and who maintains the measures, for any site in Shifnal parish | A drainage strategy for the Wesley Brook catchment with a maintenance schedule | Shifnal Neighbourhood Plan 2014-2026, made 15 December 2016 |
| Policy BC8 and Policy CM8 | Sustainable Design and Construction (Bishop's Castle Neighbourhood Development Plan); Water infrastructure (Cleobury Mortimer Neighbourhood Development Plan) | BC8: rainwater capture, permeable outdoor surfaces, surface water discharged by the drainage hierarchy and larger schemes that improve water quality in the Clun catchment. CM8: proof of water supply, foul drainage and sewage treatment capacity, with phasing to match the water company's upgrades | Follow the drainage hierarchy in Bishop's Castle; show the capacity evidence in Cleobury Mortimer | A surface water drainage strategy that sets out the hierarchy, and foul capacity evidence from the water company | Bishop's Castle plan, made 18 July 2024; Cleobury Mortimer plan, made 21 March 2024 |
| Policy BC1, Policy CM1, Policy CM3, Policy SD4, Policy GRE2 and Policy G2 | Drainage clauses in the Bishop's Castle, Cleobury Mortimer, Broseley, Pontesbury and Three Parishes plans | BC1 (e), CM1 (E) and CM3 (I): SuDS and the drainage hierarchy on three allocated sites. SD4: water supply, foul drainage and treatment capacity. GRE2 (6) and G2: SuDS that use natural features such as ditches and ponds | Check the made plan for the parish before fixing the drainage approach | The parish clause quoted and answered in the drainage strategy | Broseley plan, made 15 December 2022; Pontesbury plan, made 14 December 2023; Three Parishes plan, made 26 September 2024 |
Requirements checked November 2026.
Core Strategy Policy CS18 (Sustainable Water Management): what it asks of every scheme
Policy CS18 (Sustainable Water Management) requires every development in Shropshire to manage water so that flood risk falls and water quality is protected. It opens: "Developments will integrate measures for sustainable water management to reduce flood risk, avoid an adverse impact on water quality and quantity within Shropshire, including groundwater resources, and provide opportunities to enhance biodiversity, health and recreation" (Core Strategy, page 111). Eight bullet points follow. The one with the widest reach covers small schemes as well as large ones: "All developments, including changes to existing buildings, include appropriate sustainable drainage systems (SUDS) to manage surface water. All developments should aim to achieve a reduction in the existing runoff rate, but must not result in an increase in runoff".
On flood risk the policy shows its age. Applications must be "in accordance with the tests contained in PPS25, and have regard to the SFRAs for Shropshire". PPS25 was withdrawn in 2012, so that bullet now has to be read as the sequential and exception tests in Chapter 18 of the National Planning Policy Framework. The supporting text asks a site-specific assessment to use the SFRA as its starting point, to take a sequential approach to the layout, and to show safe access for the lifetime of the development backed by flood warning and evacuation plans.
Two further bullets shape layouts. Major development, and any development in a local surface water drainage area identified by the Water Cycle Study, needs a Surface Water Management Statement or Plan; the supporting text names Much Wenlock and Albrighton as places where runoff is a particular problem. And new development "improves drainage by opening up existing culverts where appropriate", with the supporting text adding that "proposals which contribute to the artificial enclosure of watercourses will not be supported". A scheme that pipes a ditch to gain a plot runs into CS18 before it reaches the LLFA.
When CS18 was adopted it replaced the flood and water policies saved from the former district plans. Among them were Shrewsbury and Atcham Policy INF8 (Development in Areas at Risk From Flooding) and Oswestry Policy NE11 (Watercourses), both replaced by CS18 in 2011 under Appendix 1 of the Core Strategy. Our assessment for a CS18 site sets out the flood zone and the SFRA mapping, applies the national tests, and gives the existing and proposed runoff rates side by side so the officer can see the reduction the policy asks for.
SAMDev Policy MD2 (Sustainable Design): the link to the SuDS Handbook
Policy MD2 (Sustainable Design) makes the LLFA's handbook a development plan requirement. Its fourth criterion asks development to "Incorporate Sustainable Drainage techniques, in accordance with Policy CS18, as an integral part of design and apply the requirements of the SuDS handbook as set out in the Local Flood Risk Management Strategy" (SAMDev Plan, page 22). The supporting text says all developments must include SuDS and that the drainage should inform the layout of buildings, roads and open space early, with access left for maintenance.
MD2 also asks for at least 30 square metres of open space per person and says that space should contribute to wider aims such as surface water drainage. The two are meant to be planned together, which is easier at outline stage than after the plots are fixed. Our drainage strategy shows the SuDS on the layout plan from the first submission and answers the handbook's local standards one by one, which is the evidence MD2 points the officer to.
SAMDev Policy MD8 (Infrastructure Provision) and Policy MD11 (Tourism facilities and visitor accommodation): the flood clauses
Policy MD8 (Infrastructure Provision) and Policy MD11 (Tourism facilities and visitor accommodation) each carry one flood clause aimed at a particular kind of rural scheme. Under MD8, development should only go ahead where infrastructure has the capacity or the scheme makes up the shortfall, and for hydro-electric schemes "particular attention will also be paid to impacts on flood risk, ecology, water quality and fish stocks". Anyone proposing a turbine at a weir on the Teme or the Severn should expect to be asked for a flood risk assessment.
MD11 deals with caravans and chalets on the floodplain: "For existing static caravan, chalet and log cabin sites in areas of high flood risk, positive consideration will be given to proposals for their relocation to areas of lower flood risk to ensure they are capable of being made safe for the lifetime of the development." The policy also resists new visitor accommodation sites, and extensions to existing chalet and park home sites, in the Severn Valley. National policy pulls the same way, since a change of use to a caravan, camping, chalet or park home site is one of the few changes of use that still needs a sequential test. The holiday let flood risk assessment guide sets out which conversions keep the exemption.
Much Wenlock Policy MW10 (Flood prevention) and Policy MW11 on sustainable drainage
Policy MW10 (Flood prevention) and Policy MW11, its companion on sustainable drainage and its upkeep, add parish-level tests for any site in Much Wenlock, where the town sits in a bowl below steep slopes. The plan records that the Environment Agency classes the Shylte Brook as a high category rapid response catchment, the only one in Shropshire. Shropshire Council made the reviewed Much Wenlock Neighbourhood Plan 2024-2038 on 14 May 2026, after a referendum on 19 March 2026, and it replaced the 2014 plan and its flood policies.
MW10 says "Existing watercourses (inclusive of all ditches and land drains) should remain open, and the land safeguarded for management of existing flood risk", and it will not support development in existing or potential flood attenuation areas "where development would reduce the ability of these areas to alleviate flooding by employment of either engineering or natural solutions". It supports a pre-commencement approach under which full drainage details for surface and foul water are approved before work starts and built before occupation. One clause goes beyond the county policies: "For major development, appropriate flood warning and evacuation plans must be in place." MW11 asks applicants to show the sewer network can take the extra load, that "surface water drainage on any development must not add to the existing site run off", and that a maintenance plan names who will look after the scheme.
Shifnal Policy EN3 (Flood Risk Management)
Policy EN3 (Flood Risk Management) expects development in Shifnal parish to cut flood risk in the town, where the plan records that a significant number of properties flooded in 2007. It asks proposals to provide surface water drainage, to "open existing culverts where practicable" and to avoid losing open watercourses to culverting. Its second clause reads: "Development will not be permitted in flood risk areas where that development would reduce the ability of these areas to alleviate flooding." The Shifnal Neighbourhood Plan was made on 15 December 2016 and its supporting text asks developers to talk to the Shifnal Flood Partnership Group before applying. Shifnal drains to the Wesley Brook, one of four catchments the LLFA singles out as sensitive to extra runoff. Parish policy and handbook point the same way here.
Bishop's Castle Policy BC8 (Sustainable Design and Construction) and Cleobury Mortimer Policy CM8 (Water infrastructure)
Policy BC8 (Sustainable Design and Construction) and Policy CM8 (Water infrastructure) are the two other parish policies with a water section of their own. BC8, in the Bishop's Castle Neighbourhood Development Plan 2019-2038 made on 18 July 2024, asks schemes to capture rainwater for uses that do not need drinking water and to favour permeable surfaces outdoors. It adds: "Surface water discharges must be carried out in accordance with the principles laid out within the drainage hierarchy, whereby a discharge to the public sewerage system is avoided where possible." Larger drainage or wetland schemes are expected to improve water quality in the River Clun catchment.
CM8, in the Cleobury Mortimer Neighbourhood Development Plan 2020-2038 made on 21 March 2024, is about capacity. It says: "Development proposals are required to demonstrate that they will be served by adequate water supply, foul drainage, wastewater and sewage treatment infrastructure." Applicants are asked to phase a scheme so the water company has time to upgrade its network first. For either parish our drainage strategy quotes the clause and answers it, with the water company's capacity reply attached where CM8 applies.
Drainage clauses elsewhere: Bishop's Castle Policy BC1, Cleobury Mortimer Policy CM1 and Policy CM3, Broseley Policy SD4, Pontesbury Policy GRE2 and Three Parishes Policy G2
Six more parish policies carry a single drainage clause. Three sit inside site allocations. Bishop's Castle Policy BC1 (e) applies the drainage hierarchy to the School House Lane housing site. Cleobury Mortimer Policy CM1 (E) asks that SuDS on the Ludlow Road allocation "control water run-off on-site and avoid pollution impacts from surface water", and Policy CM3 (I) asks SuDS on the Tenbury Road employment extension to manage all surface water risks where they are needed. Broseley Policy SD4, in the plan made on 15 December 2022, sets the capacity test in the same words as CM8.
The other two treat drainage as habitat. Pontesbury Policy GRE2 (Protection and Enhancement of Biodiversity), in the plan made on 14 December 2023, supports development that includes SuDS "using natural features such as drainage ditches and ponds". Three Parishes Policy G2, which covers Adderley, Moreton Say and Norton in Hales in the plan made on 26 September 2024, encourages the same thing. The Stoke upon Tern and Woore plans have no drainage policy. SAMDev's settlement policies work in a similar way for allocated sites: at Lydbury North, for example, the guidelines under Policy S2 say three sites lie over a culverted watercourse and that a specific flood risk assessment will be required.
The next Shropshire Local Plan and the withdrawn draft
Shropshire Council started preparing a new Local Plan on 30 September 2026, when it passed Gateway 1 of the new plan-making system, after giving notice on 8 May 2026 and holding a scoping consultation from 20 May to 15 July 2026. The council's Next Local Plan page and its plan-making timetable (version 2, September 2026) set out the stages: consultation on content and evidence in May and June 2027, consultation on the proposed plan from April to June 2028, submission in August 2028 and adoption expected in March 2029. The plan will run to 2046 and cover minerals and waste too. No draft policies exist yet. CS18 and MD2 therefore have no proposed replacements, and nothing in the emerging plan changes what an application has to show today.
The earlier attempt ended badly. The draft Shropshire Local Plan 2016-2038 was submitted in September 2021, and in March 2025 the examining inspectors said they could not let the examination continue. The council withdrew the draft plan on 25 July 2025, following a full council decision on 17 July. Its draft policies carry no weight now. The evidence does. The council's archive page records a cabinet decision that the evidence base behind the plan is a material consideration. For flood risk that means the 2018 Level 1 SFRA, the 2020 Level 2 SFRA and the 2020 Water Cycle Study still inform decisions. The adopted plan, in the council's words, stays part of the development plan "even beyond the end of the plan period", which ran to 2026.
Proforma to fill in for a Shropshire site?
Tell us the site and the scheme and we will say which proforma, tests and reports the council will expect. Get a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteWhen Shropshire asks for an FRA, a sequential test or a drainage proforma
The triggers come from three places: policy F4 of the NPPF for a flood risk assessment, the council's SuDS requirements page and handbook for the drainage submission, and the made neighbourhood plans, chiefly Much Wenlock and Shifnal. Check the flood zone and the surface water mapping on our flood risk map before working down the table.
| Trigger | Flood risk assessment | Sequential and exception tests | Drainage submission |
|---|---|---|---|
| Any development in Flood Zone 2, 3a or 3b, minor schemes and changes of use included | Required (NPPF policy F4; 2022 validation checklist) | Sequential test unless policy F5 exempts the scheme; exception test where Annex F table 3 requires one | The minor proforma asks for a simplified FRA for a single building and a full FRA for several |
| A site of 1 hectare or more that lies wholly in Flood Zone 1 | Required | Sequential test only if part of the site is at risk from another source; exception test not required | Category A and B proforma (the form covers all sites over 1 hectare) |
| Flood Zone 1 land that the SFRA or the Flood Map for Planning shows at risk from any source, now or in future | Required (F4) | Sequential test unless no built development, access or land raising would sit on the land at risk, or the risk is surface water only and occupiers stay safe for the lifetime of the scheme; exception test not required | Proforma asks for a plan showing how close surface water flooding comes |
| Flood Zone 1 land the Environment Agency has notified as having critical drainage problems | Required (F4) | Not required for the notification alone | As the size of scheme requires |
| Major development: 10 or more homes, 0.5 hectares or more of housing where numbers are unknown, 1,000 square metres of floor space, or a 1 hectare site | Where a trigger above applies | Where the land is at risk | LLFA is a statutory consultee; Category A and B proforma with supporting evidence |
| New-build homes, commercial and agricultural buildings below those sizes; commercial extensions; barn conversions | Where a trigger above applies | Where the land is at risk (most changes of use are exempt from the sequential test) | Category C and D proforma statement |
| Householder extension or works to an existing house | Where the house is in Flood Zone 2 or 3, or on Flood Zone 1 land shown at risk from another source (F4) | Exempt from both tests (F5 and F6) | Source control SuDS; the council's flow chart asks for no proforma |
| Site in the Wesley Brook, Shylte Brook, Tanat and Cynllaith or Corve catchments | Where a trigger above applies | Where the land is at risk | Contact the LLFA to agree the surface water requirements before drawing the scheme |
| Scheme that would exceed the greenfield rate on previously developed land | Not triggered by this alone | Not required | Viability assessment showing the greenfield rate cannot be met; betterment of 50% on existing rates and volumes is then the limit |
| Discharge to, or works on, a watercourse managed by the Melverley or Rea Internal Drainage Board | Where a trigger above applies | Where the land is at risk | LLFA consults the board; the board's own consent for the works |
| Culvert, weir, dam or other work that affects flow in an ordinary watercourse | Where a trigger above applies | Where the land is at risk | Ordinary watercourse consent from Shropshire Council, separate from planning permission |
| No mains sewer available | Not triggered by this alone | Not required | Foul Drainage Assessment Form FDA1 with percolation tests and plant sizing (Local Standard P) |
| Major development in Much Wenlock parish | Where a trigger above applies | Where the land is at risk | Flood warning and evacuation plan (Policy MW10), with full drainage details approved before work starts |
The drainage column reaches much further than the flood column. The council's SuDS requirements page asks for a surface water management document with all new-build residential, commercial and agricultural development, with commercial extensions, with conversions of agricultural buildings and with anything else that may affect drainage or flood risk. A steel-framed farm building in Flood Zone 1 needs no flood risk assessment. It still needs the proforma. The flood side of those rural schemes is covered in our note on a flood risk assessment for a barn conversion; what an LLFA does with the completed form is in the SuDS proforma explainer.
On the sequential test, policy F5 sets a ceiling as well as a trigger. The area searched for lower-risk sites should be no wider than the catchment the development would draw its occupiers or users from, so a rural worker's dwelling and a county-wide distribution depot have very different searches. Allocated SAMDev sites that were tested when the plan was prepared are exempt, as are householder schemes, non-residential extensions under 250 square metres and most changes of use. How that search is run is explained in our guide to the sequential and exception tests.
What the SuDS Handbook asks of a drainage strategy in Shropshire
Shropshire's drainage standards sit in one document, the Sustainable Drainage Systems (SuDS) Handbook, written jointly with neighbouring West Midlands LLFAs and carrying a cover date of February 2022. Shropshire's own rules are in Appendix E. Where the appendix amends the shared text, the appendix wins. The handbook sorts applications into categories. Categories A and B are the majors and use the Category A and B proforma; categories C and D are everything smaller and use the Category C and D proforma statement, dated 2021.
| Requirement | Shropshire standard and where it comes from |
|---|---|
| Greenfield discharge rate | Peak runoff for the 1 in 1 year and 1 in 100 year events no higher than the greenfield rate for the same event, and, where reasonably practicable, the 1 in 100 year, 6 hour volume no higher than the greenfield volume (standards S2 and S4 of the 2015 non-statutory technical standards, which the council has adopted; Appendix E, E4.9.2) |
| Previously developed sites | As close to greenfield as reasonably practicable. To go above it, a viability assessment must prove greenfield cannot be met, and "an upper limit of a 50% betterment on the existing rates of flow and volume produced by the site must be provided" (E4.9.3) |
| Whose rate applies | The LLFA's rate takes precedence over the rate set by Severn Trent, Welsh Water or United Utilities wherever the LLFA's is more restrictive (E4.2.1) |
| Climate change | 40% on peak rainfall for wholly residential schemes and for mixed schemes that share a system, and 20% for commercial schemes, applied to infiltration systems as well (Appendix E, E4.9.6). The handbook uses the Environment Agency's 2016 figures; the current allowances were last updated on 27 May 2022 and are set by management catchment |
| Urban creep | Residential only: 10% extra impermeable area at 25 homes per hectare or fewer, 8% at 30, 6% at 35, 4% at 45, 2% at 50 or more, none for flats (Local Standard F) |
| Infiltration | Considered first. BRE Digest 365 testing where a soakaway serves more than 100 square metres. Size for the 1 in 10 year event with a proven exceedance route, or for the 1 in 100 year event with the climate change uplift in Appendix E (E1.1). The minor proforma asks whether rates are above 1 x 10-6 m/s and for the depth to the high water table |
| Exceedance | Flows up to the 1 in 100 year event plus climate change kept on site, away from the more vulnerable parts of the scheme, with no discharge across neighbouring land (Local Standard D as amended) |
| Freeboard and overflows | 300 mm of freeboard on storage ponds above the 1 in 100 year plus climate change water level; an emergency overflow on piped and storage features (Local Standards G and H) |
| Pumping | "Shropshire Council do not permit the use of surface water pumps on new development"; land that cannot drain by gravity "should remain as Public Open Space" (Local Standard N) |
| Highway drains | No connection to the existing highway drainage network unless the downstream system is offered for adoption and modelling shows no flooding of the highway (Local Standard Q) |
| Watercourses | Floodplains of ordinary watercourses mapped, by detailed modelling for a full application; no culverting except for essential crossings; culverted lengths across a site opened up (Local Standards I and J) |
| Rainwater harvesting | Encouraged, but not counted when sizing attenuation, because the tank may be full when the storm arrives (E1.4) |
| Maintenance and lifetime | Who maintains the system, how it is funded and an operation manual; a 100 year design life for residential schemes and at least 75 years recommended for others (Local Standard L and the handbook's maintenance section) |
| Adoption | The highway authority adopts only SuDS that drain a public highway, usually with a commuted sum, and does not currently accept permeable paving on roads put forward for adoption (E3.4) |
Three of those rows decide more layouts than the rest. Take pumping first. The ban fixes where built development can go on a sloping or low-lying site, because every plot must reach an outfall by gravity. The 50% limit on previously developed land means a town-centre redevelopment in Shrewsbury or Oswestry cannot offer a token reduction. And the amended infiltration rule brings BRE Digest 365 testing down to roofs and yards of barely 100 square metres, where the shared handbook text had set the threshold at 2 hectares. The BRE 365 explainer describes the test, and the BRE 365 infiltration rate calculator turns trial pit readings into a rate.
The handbook predates two national changes. Policy F8 of the NPPF now says SuDS should be designed in line with the National Standards for Sustainable Drainage Systems, published on 19 June 2025 and updated on 30 July 2025, yet the handbook still works from the 2015 non-statutory standards. We found no Shropshire Council statement on the 2025 standards when we checked on 11 November 2026, so our strategies answer both sets and say where they differ. The same goes for rainfall: we take the uplift from the current Environment Agency allowances for the management catchment and compare it with the handbook figure. We use the higher. The climate change and urban creep calculator applies both uplifts to a baseline area. For soils, the soakaway ground conditions map gives a first view before anyone digs a pit.
Works to a watercourse need their own consent. Planning permission is not enough. The council's ordinary watercourse consent page says any work that would affect the flow when the channel is full to the top of the bank needs consent, temporary works included. The fee is £50, a valid application is determined within two months, and a consent lasts three years. Policy 6 of the Local Flood Risk Management Strategy says the council will generally oppose culverting unless there is no reasonable alternative. Which regulator a channel falls to depends on whether it is one of the main rivers or an ordinary watercourse, and the ordinary watercourse consent guide walks through an application. If the flood and water team objects to a submitted scheme, the reply is usually a matter of supplying the calculation or plan it asked for, and our note on an LLFA objection lists what to send back.
The 2018 SFRA, the Level 2 studies and the 2022 validation checklist
- Level 1 SFRA (October 2018). The Shropshire Level 1 Strategic Flood Risk Assessment, prepared by JBA Consulting, covers the whole council area. It maps river, surface water, groundwater, canal and reservoir flooding, and the council's flood risk and planning policy page links its map index and appendices.
- Flood Zone 3b. The SFRA states: "Functional floodplain (Flood Zone 3b) is identified as land which would flood with an annual probability of 1 in 20 years". Where no detailed model exists it treats Flood Zone 3a as an indicative Zone 3b and expects a site-specific assessment to define the extent. Annex F of the NPPF now normally starts from a 3.3% annual probability, 1 in 30, so an assessment should test both.
- Cumulative impact catchments. The SFRA ranks the 15 catchments where new development could add most to flood risk. They include the Rad Brook and Rea Brook in Shrewsbury, the Wesley Brook at Shifnal, Oswestry Brook, the Shylte Brook at Much Wenlock and two small Severn tributaries at Bridgnorth. In these catchments the SFRA expects further assessment in a Level 2 study or a site FRA.
- Level 2 SFRA (July 2020). A Level 2 Strategic Flood Risk Assessment by JBA Consulting tested site options for the withdrawn plan at Shrewsbury, Bridgnorth, Whitchurch, Wem, Market Drayton, Shifnal and elsewhere. It sits in the withdrawn plan's evidence library, not on the council's flooding pages, and is easy to miss.
- Shrewsbury Level 2 SFRA (August 2009). The council's Shrewsbury Level 2 SFRA page holds a Halcrow study of the town centre inside the river loop, with depth, velocity, hazard and breach maps. It is 17 years old. Its climate change scenarios predate the current allowances, so its levels are a starting point for a town-centre assessment and no more.
- Watercourse buffers. The SFRA's review list for planners asks whether a scheme keeps an access strip at least 8 m wide along both banks of a Main River, and 5 m along an ordinary watercourse, for maintenance. It is a prompt for officers and not adopted policy, but it is the distance the council's own evidence tells them to look for.
- Validation checklist (2022). The council's validation checklist lists a flood risk assessment, a drainage assessment, surface water management and evidence of the sequential and exception tests among its local requirements, plus a River Clun checklist for sites in that catchment.
The council's own documents disagree about the proforma. The handbook page says completed proformas "will be required as part of any application before any application will be validated". The 2022 checklist says an application may be validated without them, and warns that in that case "an objection to the application, based on the quality of information that is submitted, may be made by the consultee in response". Either way the form has to exist before a decision. We submit it with the application.
The checklist is dated 2022 and the council's submission requirements page showed no later review when we checked. Under article 11 of the Development Management Procedure Order 2015, a local list binds at validation only if it was published or reviewed in the two years before the application, so treat the document as the council's published guidance on what it expects. Its flood wording also cites older guidance in places, and the council's drainage flow chart still refers to PPS25. The national items, which no council can waive, are listed in our article on applications invalidated over flood risk or drainage. An SFRA, for its part, is a strategic study; what one can and cannot say about a single plot is the subject of our explainer on strategic flood risk assessments.
Applying NPPF Chapter 18 alongside a 2011 Core Strategy
Because CS18 points to withdrawn national guidance, the working flood tests for a Shropshire application come from Chapter 18 of the National Planning Policy Framework, published on 17 August 2026. Policy F4 says when a site-specific assessment is needed. Policies F5 and F6 set the sequential and exception tests. Policy F7 asks that development is safe for its lifetime, and F8 covers sustainable drainage and watercourses. The flood risk and coastal change guidance, last updated on 17 September 2025, explains how to apply them, and our summary of the August 2026 NPPF changes covers what moved.
On culverts, old and new agree. F8 says development should not enclose existing watercourses without compelling reasons and should remove culverts where possible, which is CS18's culvert bullet and Local Standard J in national form. F8 also asks proposals that could affect drainage to include SuDS in proportion to their scale, matching CS18's reach into small schemes. Where plan and Framework differ, Annex A of the Framework sets the rule. Development plan policies, or parts of them, that are materially inconsistent with its national decision-making policies "should be given very limited weight" unless they were examined and adopted or made against the August 2026 Framework; other plan policies do not lose weight because of their age alone. For a Shropshire application that leaves F5 and F6 as the working sequential and exception tests, while CS18's drainage and culvert bullets, which F8 echoes, are not undermined by their 2011 date. An exception test applies only in Flood Zones 2, 3a and 3b, and Annex F table 3 says which uses need one.
One national change has a local edge. A site at risk from surface water alone can avoid the sequential test if the flood risk assessment shows occupiers would stay safe for the lifetime of the development without raising risk elsewhere. In Shropshire's hill towns, where the SFRA maps overland flow routes down dry valleys, that route is often the practical one, and our note on the surface water sequential test exemption explains the evidence it takes. The River Clun catchment adds a separate constraint: the validation checklist asks for a River Clun checklist there because of the Special Area of Conservation, and the handbook bars discharge from a package treatment plant to a watercourse in that catchment. The background is in our nutrient neutrality guide.
The Severn, the hill brooks and the canals: flood risk across the council area
The River Severn enters the council area at Melverley, loops round the centre of Shrewsbury and leaves below Bridgnorth, and it is the reason Frankwell has flood walls with demountable barriers. Our River Severn page follows the whole river, and the pages for Shrewsbury and Bridgnorth cover the two towns where it does most damage. The record levels at both date from November 2000, an event our article on the 2000 Severn floods looks back on. The live river levels map shows the current readings at Welsh Bridge and Bridgnorth.
Away from the Severn the risk comes from smaller water. The council's Local Flood Risk Management Strategy counts 2,094 properties at risk from surface water in an event with a 1% chance of happening in any year, against 1,922 from rivers. The Teme and Corve meet at Ludlow; steep brooks run off the Shropshire Hills and Wenlock Edge into Church Stretton, Much Wenlock and Craven Arms; and the Tern, Roden and Perry drain the flatter north. The county-wide picture, with Telford & Wrekin included, is on our flood risk assessment in Shropshire page.
Canals are a third source. The SFRA treats the Llangollen, Montgomery and Shropshire Union canals as possible flow paths and breach risks, and the Llangollen Canal breached near Whitchurch on 22 December 2025. What a raised canal means for a site below it is set out in our article on the Shropshire canal breach. On the western edge the handbook lists the Tanat and Cynllaith at Llanyblodwell, rivers that rise in Wales, among its four catchments sensitive to extra runoff.
Reports we prepare for applications to Shropshire Council
A flood risk assessment asks whether a site is safe and whether it pushes water onto anyone else. A sequential test asks whether the development should be on that land at all. A drainage strategy says where the rain goes. Shropshire Council can ask for one, two or all three on the same application, and each answers a different part of CS18.
- Sites in Flood Zones 2 and 3. Policy F4 and the council's checklist ask for an assessment on every Severn, Teme or Tern floodplain site, minor schemes included, which is a flood risk assessment for planning.
- Every source the SFRA maps. A flood risk assessment for a Shropshire Council application covers the 2018 SFRA's surface water, groundwater, canal and reservoir mapping as well as the rivers, because CS18 asks applicants to have regard to it.
- Buying before applying. Riverside houses in Shrewsbury and Bridgnorth change hands with a flood history attached, and a flood risk survey for property purchase sets out the risk to the building before exchange.
- Unallocated land at risk. CS18's flood tests are now those in policies F5 and F6, and our sequential and exception test report keeps the search within the catchment the scheme would serve.
- Category A and B schemes. The LLFA expects the major proforma and a full set of supporting evidence, and our drainage strategy work answers Local Standards A to R in order.
- Category C and D schemes. Single plots, barn conversions and farm buildings need the minor proforma statement with greenfield rates and soakaway sizing, which a surface water drainage strategy provides.
- After permission. The LLFA's response says whether the strategy can be finalised by planning conditions, and our discharge of drainage conditions service supplies the final levels, calculations and maintenance manual when it can.
- Unmodelled brooks. Local Standard I asks for the floodplain of an ordinary watercourse to be mapped by detailed modelling on a full application, and the SFRA leaves Zone 3b undefined where no model exists, so flood modelling often decides the layout.
- Safe access. CS18's supporting text and Much Wenlock Policy MW10 both ask for warning and evacuation arrangements, which a flood warning and evacuation plan sets out.
- Off-mains sites. Local Standard P asks for form FDA1, percolation tests and plant sizing where there is no sewer, with tighter rules in the Clun catchment, and a foul drainage strategy covers them.
- Promoting land for the plan to 2046. The council is taking site submissions for the next Local Plan, and a feasibility study tests the flood and drainage constraints before a site goes in.
- Reading an old plan against new policy. CS18 still cites PPS25, and our NPPF guidance service applies Chapter 18 of the August 2026 Framework to the site.
Every council we cover is listed on the local authorities page. For a Shropshire Council site, send the address and the drawings and we will come back with a fixed fee: start a quote, call 01293 214444 or email enquiries@unda.co.uk.
Questions on Shropshire Council's flood and drainage rules
Does a single new house in Shropshire need a drainage proforma?
Yes. Shropshire Council's SuDS requirements page asks for a surface water management document with all new-build residential, commercial and agricultural development, and its handbook supplies a Category C and D proforma statement, dated 2021, for schemes of nine homes or fewer. The form asks for existing and proposed impermeable areas, greenfield runoff rates and soakaway sizing to BRE Digest 365. Householder extensions are the exception: the council's flow chart asks only for source control SuDS.
What does Shropshire Core Strategy Policy CS18 (Sustainable Water Management) require?
Policy CS18, adopted on 24 February 2011, requires all development to include sustainable drainage, to aim for a reduction in the existing runoff rate and never to increase it. It asks applications to follow the national flood risk tests and have regard to the council's SFRAs, to open up culverts where appropriate, and to protect water quality and groundwater. Its reference to PPS25 is now read as the sequential and exception tests in Chapter 18 of the August 2026 NPPF.
Will Shropshire Council accept a pumped surface water outfall?
Not on new development. Local Standard N of the council's SuDS Handbook says Shropshire Council does not permit surface water pumps and that development should go where a gravity connection to an outfall can be made. Land that cannot drain by gravity should stay as public open space. Foul pumping stations are treated differently: they should be built to an adoptable standard and offered to Severn Trent.
Is the 2011 Core Strategy still the plan Shropshire applications are decided against?
It is. The Core Strategy (2011) and the SAMDev Plan (2015) remain the adopted Local Plan, alongside nine made neighbourhood plans, and the council says they stay in force until a new plan is adopted. The draft Shropshire Local Plan 2016-2038 was withdrawn from examination on 25 July 2025. Work on a new Local Plan to 2046 started on 30 September 2026, and the council's timetable expects adoption in March 2029.
Which internal drainage boards cover land in the Shropshire Council area?
Two: the Melverley Internal Drainage Board, on low-lying land in the west of the county, and the Rea Internal Drainage Board, between the Powys border and Hanwood. The SuDS Handbook says the council consults whichever board manages a watercourse that a scheme would drain to. The Strine Internal Drainage Board, between Newport and Crudgington, works with Telford & Wrekin Council's flood team and is described on that council's website.
Does a site in Telford or Ironbridge come under Shropshire Council?
No. Telford, Newport and Ironbridge are in the borough of Telford & Wrekin, a separate unitary council with its own Local Plan, SFRA and flood team. Shropshire Council's Policies CS18 and MD2 stop at the borough boundary, although the two councils share the West Midlands SuDS Handbook, each with its own appendix. Broseley and Much Wenlock, just south of the Gorge, are Shropshire Council sites.
Sloping site and nowhere to pump?
Shropshire wants every plot to drain by gravity, so the outfall is worth settling before the layout is fixed. Get a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.
Start a Quote