Flood Risk Assessment in Selby

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

A flood risk assessment in Selby has to deal with land the River Ouse would cover without its banks. The town grew where Selby Dam and the Selby Canal reach the tidal Ouse, and North Yorkshire Council's flood studies put most of it in Flood Zone 3, held dry by walls, embankments and a pumping station. We prepare flood risk assessments in Selby for planning, property purchase and insurance, together with sequential and exception tests and surface water drainage strategies.

Most Selby addresses carry a YO8 postcode. The built-up area the Office for National Statistics draws for the town runs from the abbey and the market place out to the estates along the A19 and the A63 bypass. Barlby and Osgodby lie across the river to the north-east, Brayton and Thorpe Willoughby to the south-west. Each counts as a separate built-up area, but they share Selby's river and drainage board, and Barlby shares its flood warning area, so this page covers them too.

In November 2000 the Ouse reached its highest recorded level. The Environment Agency says more than 7,500 properties in Selby and Barlby stayed protected, yet water still came over a floodbank at Barlby and flooded about 150 properties.

For a Selby site, talk to one of our flood risk consultants on 01293 214444 or at enquiries@unda.co.uk. Reports for sites in Selby come from Unda Consulting Limited, a CIWEM Business Partner.

Where Selby Dam, the canal and the tidal Ouse meet

Selby's flood risk comes from one big river and several small channels that have to empty into it. The Ouse is tidal here. A high tide arriving with a river flood or a North Sea surge can hold levels up past the town, anywhere from Naburn Weir south of York down to the Humber. The council's Level 1 Strategic Flood Risk Assessment, prepared by AECOM for the former Selby District Council in August 2022, finds river flood risk in the district greatest at Selby. The channels a Selby site is likely to sit beside:

Watercourses in and around Selby and the flood risk each brings
WatercourseStatusWhat it means for Selby sites
River OuseMain river, tidalThe dominant source. Banks and walls defend the town, so most of it is mapped as land benefiting from defences, and the planning question becomes overtopping and breach
Selby DamMain riverFlows east past Thorpe Willoughby and Brayton and reaches the Ouse through a pumping station used when the river is high; homes in Brayton and Thorpe Willoughby are at risk from it in rarer floods
Selby CanalCanal and River Trust navigationJoins the Ouse at Selby Lock; the floodgate there is one of the four places where the council's Level 2 study modelled a breach
Holmes DikeMain riverWith climate change its flood storage area beside the Ouse floods further, spreading water north-west of the town towards the B1223
Cockret DikeMain riverPasses through the Cawood and Wistow storage reservoir before it reaches the Ouse
Board drainsOrdinary watercoursesMostly managed by the Selby Area Internal Drainage Board, with the Ouse and Derwent board covering land further east; building within 7 m of a Selby Area board drain needs the board's consent

Groundwater is slower, and easier to miss. The town sits on Sherwood Sandstone, a principal aquifer, with river alluvium over it. The Environment Agency's susceptibility map picks out land near the Ouse, the Wharfe and the Aire, and two groundwater source protection zones lie west of Brayton, where the study treats soakaways as potentially constrained and drainage may have to rely on storage.

Screen a Selby or Barlby address before you commit

Put a postcode into the map below to screen an address for river, surface water and reservoir flooding using Environment Agency data. Our flood risk map shows the wider Vale of York and the lower Aire. Expect most of central Selby to come back in Flood Zone 3, because the planning map ignores the defences. A site assessment shows how far they change the picture for one building.

Selby's built-up area, from the abbey and the market place to the estates along the A19 and the bypass, is shown outlined in coral. Results are an indicative screening based on Environment Agency open data — not a Flood Risk Assessment.
Loading flood map…
Rivers & Sea
—
Surface Water
—
Reservoirs
—
Flood Zone (for planning)
—
Climate change (2070–2125)
—
Historic flooding
—
Flood warning area
—
Live flood warnings (nearby)
—
Important: This tool gives an indicative screening only, based on modelled Environment Agency datasets (Flood Map for Planning Flood Zones 2 & 3, Flood Zones plus Climate Change 2070–2125, Risk of Flooding from Rivers and Sea, Risk of Flooding from Surface Water, reservoir, historic, flood warning area, flood storage area, flood defence and main river data) under the Open Government Licence. It reflects the area around the postcode, not the exact property, and does not account for finished floor levels, ground levels or groundwater. It is not a Flood Risk Assessment and must not be relied on for planning, conveyancing, insurance or design decisions. Data © Environment Agency copyright and/or database right; contains Ordnance Survey data © Crown copyright and database right. The Selby built-up-area boundary shown is from the Office for National Statistics (Built-Up Areas 2022, built-up area ‘Selby’; Barlby, Osgodby, Brayton and Thorpe Willoughby are separate built-up areas and are not drawn; Open Government Licence; contains OS data © Crown copyright and database right).

Selby's floods on record, from the 1947 thaw to Storm Christoph

The council's flood records show water reaching the centre of Selby repeatedly since 1947, because the town lies where several tributaries meet the Ouse just downstream of the Wharfe. The events that shaped its defences and its planning rules:

  1. March 1947. The Ouse flooded Selby, Cawood, Wistow and Thorpe Willoughby in the spring covered by our account of the great floods of 1947.
  2. November 2000. The Ouse reached its highest recorded level. Cawood and Selby were mostly spared, but water came over a floodbank at Barlby up to 300 mm deep and about 150 properties flooded. More flood barriers went up in Selby afterwards.
  3. December 2015. After the Boxing Day storms the Ouse at Selby Westmill reached 6.34 m on 28 December, still the highest level on that gauge. The floodplains of the Ouse and the Aire stayed under water for weeks.
  4. January 2021. Storm Christoph pushed the Ouse out of its channel in parts of Selby and Cawood where there were no raised defences. Selby Dam at its pumping station set its own record of 3.97 m on 22 January.
  5. New Year's Day 2024. Homes and garages in Brayton flooded as the Ouse rose. Residents told the BBC they believed a nearby dyke had been overwhelmed and local drains were blocked, and many could not get sandbags.

That record matters for any new building. The floods since 2000 have come in round the edges of the defended town: up the smaller dikes, through drains that cannot empty into a high river, and along stretches with no raised bank. Brayton in 2024 is the clearest case. York's side of the November 2000 story is told in our article on the Ouse floods of 2000.

What happens behind the banks if one gives way

The defences keep the 1% annual chance flood out of most of Selby, so the risk an assessment has to measure is mainly residual: a flood bigger than the banks were built for, or a breach. The council's Level 2 Strategic Flood Risk Assessment of August 2023 modelled four breaches on the Ouse around the town, each run in a 1% annual chance flood with climate change and 1.02 m of sea level rise:

The four Ouse breaches modelled around Selby in the Level 2 study
BreachWidth and time openBreach level
Selby Canal floodgate20 m, open 30 hours5.67 m AOD
Ouse right bank20 m, open 18 hours5.37 m AOD
Ouse embankment near the meander, right bank50 m, open 30 hours3.48 m AOD
Ouse left bank near Olympia Park20 m, open 18 hours4.00 m AOD

Along Selby Dam the results are severe. At the Cross Hills Lane site on the western edge of town, the third breach floods the whole site 0.5 m to more than 3 m deep, and the hazard ranges from danger to most people to danger to all. With climate change, the Level 1 study adds, the Ouse overtops its local defences west of the town between the railway and the A1238, and east of the river at East Common. A site outside the four modelled breach extents can still be reached by a breach somewhere else, the study warns, so the residual risk has to be checked site by site. New defences do not take land out of the flood zone either, as our piece on why defended land stays in a flood zone explains.

Gauges and warning areas on the Ouse at Selby

The Environment Agency reads the river at three points in the town, and its published thresholds show how much room the banks leave:

Environment Agency gauges in Selby and their published levels, read 29 October 2026
GaugeNormal rangePublished thresholds and record
River Ouse at Selby Westmill0.36 m to 5.00 mLow-lying land may flood above 5.00 m; property flooding possible above 6.55 m; highest recorded 6.34 m (28 December 2015)
River Ouse at Selby LockTop of normal range 3.78 mHighest recorded 6.02 m (1 October 2019)
Selby Dam at Selby Dam Pumping Station0.11 m to 3.50 mProperty flooding possible above 4.10 m; highest recorded 3.97 m (22 January 2021)

In 2015 the Westmill peak came within about 0.2 m of the level at which the Environment Agency says property flooding becomes possible. That is a thin margin. Warnings for the town go out for the River Ouse at Selby and Barlby, which covers the old shipyards, Westfield and the Holmes in Selby, and Barlby from Landing Lane to the A19 bridge. A second area, the River Ouse at Selby Dam, covers homes beside the Dam. Brayton has its own area on the River Aire, and Riccall and Cawood upstream have theirs. Our live river levels map shows the Selby readings beside the gauges upstream at Cawood and on the River Aire at Chapel Haddlesey.

Do I need a flood risk assessment in Selby while the new Local Plan is written?

Most applicants do. North Yorkshire Council became the planning authority and the lead local flood authority in April 2023, replacing the county council and the district councils, Selby District Council among them. It stopped work on the Selby Local Plan in February 2025, so applications are still judged against plans adopted in 2013 and 2005, with the council's later flood evidence beside them:

The plans, studies and guidance a Selby application is judged against
DocumentStatus, October 2026What it asks of a Selby site
Selby District Core Strategy, Policy SP15 Sustainable Development and Climate ChangeAdopted October 2013Avoid flood risk areas through the sequential and exception tests; where building in them is unavoidable, make it safe without raising risk elsewhere; SuDS that promote groundwater recharge
Core Strategy Policies SP2, SP5 and SP7Adopted October 2013Selby as the principal town and focus for growth; Olympia Park a strategic site needing a sequential approach to residual risk within it and site-specific assessments of floor levels
Selby District Local Plan saved policiesAdopted 2005Still part of the development plan alongside the Core Strategy
Selby Local PlanWork stopped by full council, 26 February 2025No longer being prepared; the evidence written for it, including both SFRAs, is still published by the council
North Yorkshire Local PlanScoping consultation 26 October to 7 December 2026; adoption planned for October 2029Will replace the Selby plans; nothing in it applies to applications yet
Level 1 SFRA (August 2022) and Level 2 SFRA (August 2023)Published evidenceFlood zones including functional floodplain, breach and climate change mapping, and the overall flood risk score for sites in and near the town
Sustainable drainage systems guidance2022 updateGreenfield sites held to the greenfield rate; brownfield sites cut peak runoff by at least 30%, and only where an existing connection is proved
National Planning Policy Framework, chapter 18August 2026Policy F4 sets when a Selby site needs an assessment, F5 and F6 the sequential and exception tests, and F8 the 2025 National Standards for sustainable drainage

In Flood Zones 2 and 3 an assessment is needed for any development. The Level 1 study also maps part of the land beside the river as Flood Zone 3b, the functional floodplain, where new homes are not permitted. In Flood Zone 1 a site of a hectare or more needs one, and so does a smaller site the SFRA shows at risk from another source.

Planning in Selby with only the 2013 plan to go on?

Send the address and what you plan to build. One of our experienced flood risk consultants will reply within 60 minutes with a free, fixed-fee quote, with no obligation, for the evidence SP15 and the council's flood studies ask for.

Quote for a Selby site

The sequential test in Selby: the town's own limits, not the district

For housing in Selby the area of search is narrow. The former district council's sequential test guidance note was prepared with the Environment Agency in October 2019 and is still published by North Yorkshire Council. It limits the search to land within and immediately next to Selby's development limits. There, a site is compared with allocated housing sites, sites in emerging plans at an advanced stage and unimplemented permissions, and a comparison site only counts against it if it could actually be delivered. A site that is half or more previously developed land is compared only with other brownfield sites inside the town's limits, so the test cannot push development from brownfield to greenfield.

The note predates the decision to stop the Selby Local Plan, so check with the council which comparison list it now expects. Minor development, most changes of use and replacement dwellings that add no homes fall outside the test; our guide to the sequential and exception tests explains the national rules behind it. To tell one Flood Zone 3 site from another, the Level 2 study scored sites in and near the town on this scale, agreed with the Environment Agency:

The Level 2 study's overall flood risk score for sites in and near Selby
ScoreBandCriterion
6HighMore than 25% of the site in Flood Zone 3b, flood storage areas included
5HighMore than 30% in Flood Zone 3 outside the areas where defences reduce the risk
4HighMore than 30% inside the defended 1% annual chance flood extent with climate change
3MediumMore than 30% in Flood Zone 3 where defences reduce the risk
2MediumMore than 50% in Flood Zone 2, or in Zones 2 and 3 together, or at surface water risk
1LowMore than 50% in Flood Zone 1

Floors, refuges and drainage on Selby's defended land

  • Floor levels from the breach, not the defended flood. For housing at Cross Hills Lane the Level 2 study sets finished floors and sleeping rooms 300 mm above the breach level for a 1% annual chance flood with climate change. It doubts that ground-floor bedrooms will be acceptable anywhere on the site. Levels are given in metres above Ordnance Datum.
  • A refuge where escape is cut off. Dry access may not be possible after a breach, so the study asks for a safe refuge above the breach level and an evacuation plan. At Olympia Park the Core Strategy asks for first-floor refuges in commercial buildings and automated warning systems.
  • Storage given back like for like. Where a site takes up floodplain, compensatory storage has to be provided level for level and volume for volume.
  • Strips kept clear for maintenance. The Environment Agency asks for 8 m beside a fluvial main river and 16 m beside the tidal Ouse. The council looks for 5 m beside an ordinary watercourse, and the Selby Area board's byelaws apply within 7 m of its drains.
  • Runoff held to the council's rates. Major schemes must not increase runoff, with the rate agreed with the council and, where a site drains to a board drain, with the drainage board as well.

These points decide a layout. Settle them at the sketch stage. Whether a soakaway will work depends on the sandstone, the water table and the source protection zones, covered on our soakaway and ground conditions page. Our note on internal drainage boards and planning explains the board consents.

Olympia Park, Cross Hills Lane and the riverside: Selby's larger sites

The 2013 plan sent about half of the district's new housing to Selby, and the larger sites the council studied around the town sit largely on defended floodplain. The Level 2 study assessed these against the exception test in 2023:

  • Olympia Park, Barlby Road. The Core Strategy's strategic site between the A19, the Ouse and the bypass, planned for 1,000 homes and 23 ha of employment land. The 60.4 ha employment area assessed in 2023 lies 99% in Flood Zone 3a and 99% on land benefiting from defences.
  • Land at Cross Hills Lane. 78.9 ha of mixed use on the western edge, 87% in Flood Zone 3a, with Selby Dam along its southern side and Cockret Dike nearby.
  • The former Ousegate Maltings. Riverside land in the town centre, beside the main river frontage.
  • Industrial land at Denison Road and Bawtry Road. Existing employment sites the study assessed for redevelopment, one of them by the canal.

The 2023 assessments were written for the Selby Local Plan, which was never adopted. A proposal on one of these sites cannot lean on that plan's site testing and has to make its own sequential and exception test case. Conversions and infill in the town centre are the other common Selby cases, and our note on converting a house into flats covers why a change of use that adds homes is treated more strictly than an extension.

Which report does a Selby proposal need?

Common Selby proposals and the reports each usually needs
ProposalUsually needed
New homes on land in Flood Zone 3 inside the development limitsA flood risk assessment covering breach and overtopping, the sequential test within Selby's limits, and the exception test
An extension to a house near the Ouse or Selby DamA proportionate flood risk assessment; no sequential test for minor development
Splitting a house or shop into flats in the town centreA flood risk assessment showing safe floors and a refuge for the new homes
A warehouse or factory near the bypass or the canalA flood risk assessment and a surface water drainage strategy to the council's runoff rates
Buying a house in Barlby or by Selby DamA pre-purchase flood survey before exchange
A permission with a drainage conditionThe information needed to discharge it, agreed with the council and the drainage board

Our page on the flood evidence a planning application needs sets out what goes to the council. Householders will find the smaller cases in our guide to building an extension in a flood zone.

Reports for sites between the Ouse, the Dam and the canal

A riverside flat in Ousegate, a house in Barlby and a unit off the bypass each need something different. Each is written by one of our chartered consultants and signed off by a senior consultant before it goes to you.

  • Applications on defended floodplain. New homes and commercial schemes in Selby need a flood risk assessment for planning that answers SP15 and the Level 2 study's breach results.
  • River, tide, dikes and drains together. A flood risk assessment for a Selby site weighs the tidal Ouse, Selby Dam, the canal, surface water, groundwater in the sandstone and the reservoirs upstream in one report.
  • A house before exchange. Before buying in Barlby, Brayton or beside Selby Dam, a flood risk survey for property purchase shows the buyer and the lender what the 2000, 2021 and 2024 floods mean for that address.
  • Housing on Flood Zone 3 land. The sequential and exception test is run within and next to Selby's development limits, against the comparison sites the council's guidance lists.
  • Drainage for larger schemes. The council reviews drainage on major applications as lead local flood authority, and our drainage strategy work answers its 2022 guidance.
  • Runoff that has to wait for the river. Where outfalls back up when the Ouse is high, a surface water drainage strategy sizes the storage and sets the discharge rate agreed with the council and the board.
  • Conditions on a North Yorkshire permission. Where a drainage condition is attached, the discharge of drainage conditions supplies the calculations, layout and maintenance plan the council asks for.
  • Sites near a modelled breach, or between them. The Level 2 study asks for further breach modelling at Cross Hills Lane and covers only four Ouse breach points, so flood modelling tests depth and hazard at the site itself.
  • Getting people out, or up. With dry access unlikely after a breach, a flood warning and evacuation plan ties a scheme to the Selby and Barlby or Selby Dam warning area and sets out the refuge.
  • Employment land on the floodplain. Before buying a unit off the bypass, at Olympia Park or by the canal, flood risk due diligence sets out the defended and residual risk for a buyer or lender.
  • Homes that have flooded before. For a house in Barlby or Brayton, a flood risk assessment for insurance gives the insurer evidence about that one property.
  • Land that is no longer allocated. Before an offer on a site the Selby Local Plan would have allocated, a flood risk feasibility study checks its score, its breach depths and whether a workable layout remains.

Who answers for Selby's river, dikes and sewers

Call 999 if flood water puts anyone in danger in Selby, and 105 for a power cut. Otherwise, responsibility is split between these bodies:

Who to call about the Ouse, the dikes and the drains in Selby
OrganisationIts part in SelbyHow to reach it
North Yorkshire CouncilPlanning authority and lead local flood authority: surface water, groundwater and ordinary watercourses outside the board districts, and flood investigationsReport flooding; flood and water management
Environment AgencyThe Ouse, Selby Dam and the other main rivers, the Ouse banks, the Selby Dam pumping station gauge and the warningsFloodline 0345 988 1188; warnings sign-up
Selby Area Internal Drainage BoardAbout 450 km of ordinary watercourses and 21 pumping stations across a 19,747 ha district north of the AireBoard page and consents
Yorkshire WaterPublic sewers and the sewage treatment works serving the townReport sewer flooding
Yorkshire Regional Flood and Coastal CommitteeApproves Environment Agency flood and coastal programmes across Yorkshire; North Yorkshire Council has a memberCommittee page
North Yorkshire Local Resilience ForumPlans the emergency response to a major flood across North Yorkshire and YorkNorth Yorkshire LRF

Up the Ouse, the washlands south of York help hold back water before it reaches Selby. Leeds lies up the Aire, Goole down the Ouse at the head of the Humber, and Doncaster on the River Don, which reaches the Ouse near Goole. For the wider county see Yorkshire, and every other place we cover is listed under areas we cover.

Selby flood questions from buyers, builders and agents

Why do quotes for a flood risk assessment in Selby vary between a house and a housing site?

We quote a fixed fee for each site once we know the address and the proposal, free and within 60 minutes. The fee follows the work. A house extension behind the Ouse walls needs far less than new homes near Selby Dam, where the assessment has to deal with breach depths and usually comes with the sequential and exception tests.

My Selby postcode says Flood Zone 3. Does that mean the house will flood?

Not necessarily. The planning map shows the land as if the Ouse banks were not there, and most of the town is defended. Check the Environment Agency's long-term flood risk service, which allows for the defences, and whether the street is in the Selby and Barlby or Selby Dam warning area. Ask the seller about 2000, 2021 and 2024, and commission a pre-purchase survey before exchange.

How do I get a flood risk assessment for a site in Selby or Barlby?

Send us the address, a site plan and a short description of the scheme, and tell us if the council or the Environment Agency has already commented. We reply with a fixed-fee quote, and the assessment then works through SP15 and the council's Level 1 and Level 2 studies, setting out floor levels and any refuge for your architect to draw.

Is a householder's own flood statement enough for a Selby extension?

Sometimes. For a small extension the Environment Agency's standing advice allows a short statement, and some householders write their own. The advice still asks for floor levels no lower than the existing ones, or 300 mm above the estimated flood level. Near the Ouse or Selby Dam, a statement that gets that level or its datum wrong can hold up the application.

What happened to the Selby Local Plan, and what decides applications now?

North Yorkshire Council stopped work on it in February 2025, after it had reached a revised publication stage in 2024. The council is now preparing one North Yorkshire Local Plan, at scoping in autumn 2026 with adoption planned for October 2029. Until then the 2013 Core Strategy and the 2005 saved policies decide applications, and the 2022 and 2023 flood studies remain the evidence.

Does a site in Brayton or Thorpe Willoughby need the same evidence as one in Selby?

The flood studies and the council's drainage guidance are the same, but the sources differ: Brayton and Thorpe Willoughby sit on Selby Dam, and Brayton has a warning area on the Aire. Both are service villages with their own development limits, so the sequential test for housing looks within that village, not across Selby.

Exchanging on a YO8 house or answering the council on a Selby scheme?

Tell us the address and the date you are working to, whether it is exchange, validation or a reply to an officer. A free fixed-fee quote, with no obligation, follows within 60 minutes.

Start a Selby quote

To talk through a house in Barlby, a conversion near the market place or a unit off the bypass, call 01293 214444 or email enquiries@unda.co.uk.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.