Bournemouth, Christchurch and Poole Council (BCP Council) decides every application in the conurbation against the plan of the former borough the site sits in: the Bournemouth Core Strategy of October 2012, the Poole Local Plan of November 2018 or the Christchurch and East Dorset Core Strategy of April 2014. It also reviews the drainage itself, as Lead Local Flood Authority. The requirement with the widest reach is the council's 2024 Strategic Flood Risk Assessment. It maps five Flood Risk Areas from every source of flooding and expects a site-specific flood risk assessment in every one from Low-Medium upwards, so a plot in Flood Zone 1 on the national map can still need one.
A single BCP Local Plan is now being written from scratch, and its Plan Content and Evidence consultation opened on 9 November 2026. Until it is adopted, the three legacy plans, a handful of saved policies from older plans and six neighbourhood plans remain the tests. This page sets out each flood and drainage policy, what the October 2026 validation checklist and the SFRA ask for, and what our reports contain to meet them. To talk through a site, call 01293 214444 or email enquiries@unda.co.uk.
BCP Council, the Environment Agency and Wessex Water: who decides what
There is no county tier in this part of Dorset. BCP Council has been a unitary authority since 1 April 2019, when it took over from Bournemouth Borough, the Borough of Poole and Christchurch Borough, so the same council validates the application, weighs the flood evidence and comments on the drainage. Its flood and coastal work, including ordinary watercourse consents, is run through South West Flood & Coastal, a shared service the council hosts.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| BCP Council (planning) | Local planning authority | Decides the application against the legacy plan for the former borough, any neighbourhood plan and the NPPF; validates it against the October 2026 Local Validation Checklist; applies the sequential test |
| BCP Council (flood risk management) | Lead Local Flood Authority | Statutory consultee on surface water for major development (10 or more homes, 0.5 ha or more for housing, 1,000 m² of new floorspace or a 1 ha site); can advise the planners on minor schemes; can ask for the sequential test where it has evidence of surface water risk |
| BCP Council (South West Flood & Coastal) | Regulator of ordinary watercourses | Land drainage consent for culverts, outfalls and other works on the Bourne Stream, Kinson Stream and other ordinary watercourses (land drainage consent) |
| Environment Agency | Statutory consultee | Flood Zones 2 and 3, the Stour, the Avon, the Moors River and other main rivers, and the tidal frontages of Poole and Christchurch harbours; permits for work on or near a main river or sea defence |
| Wessex Water | Sewerage undertaker | Connections to public sewers, sewer capacity and adoption; the validation checklist tells applicants within 200 m of the cliffs to discuss drainage with Wessex Water before applying |
| Natural England | Statutory consultee | Nutrient neutrality for new overnight accommodation in the Poole Harbour and River Avon catchments |
| Internal drainage board | None | No internal drainage board covers the BCP area; BCP Council regulates ordinary watercourses itself |
Where a site straddles the boundary with Dorset Council or New Forest District Council, the same application goes to each council for the part in its area. Our explainer on the Lead Local Flood Authority sets out what that role covers in general, and the council pages hub lists the other councils we cover.
Three legacy plans, one council: which policies apply to your site
BCP Council inherited its predecessors' plans and has not yet replaced them. Its current Local Plans page lists one development plan for each former borough, and the flood policy that applies depends on the side of the old boundary the site falls.
- Bournemouth area (Westbourne to Southbourne, Kinson, Winton, Throop). Bournemouth Core Strategy, adopted October 2012: Policy CS4 (Surface Water Flooding). Saved policies from the Bournemouth District Wide Local Plan (2002) still in force include Policy 3.25 (Land Stability) and Policy 3.28 (Flooding), as the council's March 2013 schedule of saved policies records.
- Poole area (Poole town, Hamworthy, Parkstone, Broadstone, Canford Heath, Sandbanks, Merley). Poole Local Plan, adopted November 2018: Policy PP38 (Managing flood risk). No earlier Poole policies are saved.
- Christchurch area (Christchurch, Highcliffe, Burton, Hurn). Christchurch and East Dorset Core Strategy, adopted April 2014: Policies ME6 (Flood Management, Mitigation, and Defence) and ME7 (Protection of Groundwater), with saved Christchurch Local Plan (2001) Policy ENV 5 (Drainage and new development).
- Neighbourhood plan areas. Six made plans add local policy: Boscombe and Pokesdown, Broadstone, Poole Quays Forum, Sandbanks Peninsula, Highcliffe and Walkford, and Hurn (neighbourhood planning page).
The Christchurch and East Dorset Core Strategy is shared with Dorset Council, which still applies it in the former East Dorset district around Ferndown, Wimborne and Verwood. Our Dorset Council page covers that side of the boundary.
BCP Council's Local Plan flood and drainage policies
The table pairs each flood and drainage policy in force with what an application has to show and what our reports put in front of the case officer. The wording itself, and how officers read it, follows in the sections below.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy CS4 | Surface Water Flooding (Bournemouth) | SuDS on all new buildings, car parking and hard standing so that surface water leaving the site is no greater than before development, and local water quality is protected | Show the SuDS, the post-development runoff against the existing, and who maintains the system; argue exceptional circumstances only where no technical solution exists | A surface water drainage strategy with existing and proposed rates, the SuDS layout, the infiltration evidence and a maintenance plan | Bournemouth Core Strategy (October 2012) |
| Policy 3.25 | Land Stability (Bournemouth, saved) | Development within 200 metres of cliffs and chines, or near steep embankments, must show no adverse effect on them; major schemes submit a Development Impact Assessment | Keep infiltration away from the cliff top and chines and evidence that the drainage route does not load the slope | A drainage strategy that routes water away from the cliff zone and records the constraint; the geotechnical assessment itself comes from a geotechnical specialist | Bournemouth District Wide Local Plan (2002), saved policy (schedule March 2013) |
| Policy 3.28 | Flooding (Bournemouth, saved) | No development in or near land liable to flood, watercourses or flood defences where it would impede flows, reduce floodplain capacity, raise risk elsewhere, endanger life or hamper maintenance | Show the scheme keeps flood flows and storage, stays clear of defences and leaves maintenance access | A flood risk assessment testing displacement, flow routes and access to watercourses and defences | Bournemouth District Wide Local Plan (2002), saved policy (schedule March 2013) |
| Policy PP38 | Managing flood risk (Poole) | Sequential test for a net gain of homes in the future flood risk zones outside the town centre test area; Twin Sails sites to provide strategic flood defences; SuDS on all major developments unless a Surface Water Management Plan says otherwise or they are impractical | Expect a sequential test wherever the NPPF asks for one; on the harbourside, show the defence line; on majors, a SuDS scheme to the technical standards | A flood risk assessment with the 2133 tidal levels, a sequential test report and a surface water drainage strategy | Poole Local Plan (November 2018) |
| Policy ME6 | Flood Management, Mitigation, and Defence (Christchurch) | NPPF sequential and exception tests; flood resistance and resilience in all development at risk, extensions included; post-development runoff no higher than before; a flood management strategy and delivery plan where risk cannot be mitigated on site | Demonstrate no increase in flood risk, design in resilience, and where needed fund and phase off-site works with unaided access and escape | A flood risk assessment, the sequential and exception tests, a drainage strategy, and a flood warning and evacuation plan where access is at risk | Christchurch and East Dorset Core Strategy (April 2014) |
| Policy ME7 | Protection of Groundwater (Christchurch) | An assessment of impact and mitigation where development is likely to affect a Groundwater Source Protection Zone | Show how construction and the completed scheme avoid contaminating groundwater | Drainage proposals that keep infiltration away from protection zones where the Environment Agency would object, with the zone recorded in the report | Christchurch and East Dorset Core Strategy (April 2014) |
| Policy ENV 5 | Drainage and new development (Christchurch, saved) | Positive surface water drainage, separate from foul drainage, unless soakaway disposal works in all seasons | Prove a soakaway works year-round or provide a separate surface water system | Infiltration testing evidence and a separate surface water route in the drainage strategy | Christchurch Local Plan (March 2001), saved June 2014 |
| Policy PQF 1 | Public realm (Poole Quays Forum Neighbourhood Plan) | Public realm proposals to integrate flood risk management measures, including SuDS, into their design | Show where SuDS and flood measures sit in the public realm | A drainage strategy that places SuDS within the landscape and public realm proposals | Poole Quays Forum Neighbourhood Plan (made February 2017) |
| Policy SAND6 | Beaches Open Spaces & Harbour (Sandbanks Peninsula Neighbourhood Plan) | Schemes affecting open spaces must support their role in flood risk management, and new defences must keep open views | Show the scheme does not erode flood storage or defence access on the peninsula | A flood risk assessment covering the harbour and bay frontages and any defence works | Sandbanks Peninsula Neighbourhood Plan (made July 2024) |
Requirements checked November 2026.
Bournemouth Policy CS4 (Surface Water Flooding): SuDS on every new building
Policy CS4 makes sustainable drainage a requirement for every new building, car park and area of hard standing in the Bournemouth area, whatever its size. Its wording: "The use of SUDS is a requirement other than in exceptional circumstances where no technical solution is available." The system must hold surface water leaving the site to no more than before development, protect local water quality, and come with "suitable provision for maintenance", submitted with the application (Core Strategy, October 2012).
So a rear extension in Winton or a new driveway in Westbourne needs drainage details, and the validation checklist asks for them on the same triggers. Paragraph 3.1.21 of the Core Strategy keeps a long-standing presumption against soakaways within 200 metres of cliff tops and steep slopes such as the chines, so the drainage options there narrow to attenuation and a controlled discharge. Our report states the existing and proposed runoff, the SuDS chosen and why, and the maintenance arrangement CS4 asks for.
Saved Policy 3.25 (Land Stability) and Policy 3.28 (Flooding) in the Bournemouth area
Two policies from the 2002 Bournemouth District Wide Local Plan were saved and are still applied. Policy 3.25 asks any proposal within 200 metres of cliffs and chines, or close to steep embankments, to incorporate "THE MEASURES NECESSARY TO DEMONSTRATE THAT SUCH DEVELOPMENT WILL HAVE NO ADVERSE EFFECT UPON EXISTING CLIFFS, CHINES OR STEEP EMBANKMENTS", and major schemes there to submit a Development Impact Assessment on land stability. The plan's supporting text describes the embargo on soakaways in a strip about 200 metres inland from the cliffs (District Wide Local Plan, 2002).
Policy 3.28 refuses development in or near areas liable to flood, watercourses or flood defence works where it would impede flood flows, reduce floodplain capacity, raise flood risk elsewhere, endanger life or property, or interfere with maintenance by the drainage authorities. Along the Stour at Kinson, Throop, Holdenhurst and Iford, and beside the Bourne and Kinson Streams, our flood risk assessment shows how the layout keeps flood flows, storage and maintenance access clear.
Poole Local Plan Policy PP38 (Managing flood risk): what it asks of a Poole scheme
Policy PP38 does three things: it sets Poole's own sequential test trigger, puts a defence duty on the harbourside regeneration sites and requires SuDS on major development. Part (1) reads: "proposals (except those for some forms of change of use) that would result in a net gain in residential units within the Council's future flood risk zones, will only be permitted where they have been subject to a sequential test", with the search covering alternative sites at lower risk "within Poole" (Poole Local Plan, November 2018).
The future flood risk zones are the 2133 tidal and fluvial outlines from the Borough of Poole modelling, shown on the policies map. Part (2) exempts a town centre sequential test area that was tested when the plan was made, and expects Twin Sails development to provide strategic flood defences lasting the life of the development. Part (3) states: "Sustainable Drainage Systems will be required for all major developments, unless the relevant Surface Water Management Plan (SWMP) indicates otherwise or they are demonstrated to be impractical."
Part (1) is narrower than national policy. That matters. The August 2026 NPPF applies the sequential test to development in any area at risk now or in the future, from any source, with only the exemptions in F5. Under NPPF Annex A, parts of a plan materially inconsistent with the national decision-making policies should be given very limited weight. An applicant in Poole should expect an F5 sequential test for any non-exempt scheme on land at risk, whether or not it adds homes, and should confirm the scope with the case officer; the council's October 2026 checklist already asks for the test on all sites in Flood Zones 2 and 3, subject to the F5 exemptions. On Poole sites our report runs the test, sets floor levels against the harbour's 2133 tide and shows a dry route out.
Christchurch Core Strategy Policy ME6 (Flood Management, Mitigation, and Defence)
Policy ME6 applies the NPPF sequential and exception tests and adds three requirements of its own: flood resistance and resilience in everything built in areas at risk, a runoff cap, and a flood management strategy where on-site measures are not enough. It covers "all developments (including redevelopments and extensions which require planning permission)" in areas at risk, and states that "Post-development surface water run-off must not exceed pre-development levels" (Christchurch and East Dorset Core Strategy, April 2014).
Sometimes a site passes the sequential test but its risk cannot be dealt with on site. Then the council needs a flood management strategy and delivery plan before it grants consent, making the site safe for its design life, "including unaided access/egress during flood events". In Purewell, Stanpit, the Quay and Jumpers, where the Stour, the Avon and the harbour tide combine, this is the clause that decides schemes. Our assessments for Christchurch set out the tidal and river levels from the 2019 Level 2 SFRA and the newer Environment Agency modelling, the resilience measures, and the escape route, with a flood warning and evacuation plan where the route floods.
Policy ME7 (Protection of Groundwater) and saved Policy ENV 5 (Drainage and new development)
Policy ME7 asks for an assessment of impact and mitigation wherever development "is proposed in a location likely to affect a Groundwater Source Protection Zone", covering contaminants during and after construction, the need for that location, nearby water supplies and the aquifer (Core Strategy, April 2014). It matters to drainage because an infiltration scheme is also a route for pollution; our explainer on groundwater source protection zones covers how the zones are drawn.
Saved Christchurch Local Plan Policy ENV 5 requires "POSITIVE SURFACE WATER DRAINAGE SYSTEMS, SEPARATE FROM ALL FOUL DRAINAGE SYSTEMS" for new development unless soakaway disposal is shown to work "UNDER ALL SEASONAL CONDITIONS" (Christchurch Local Plan, March 2001). On the river terrace gravels of the Stour and Avon valleys, where groundwater rises in winter, that means infiltration tests at the right time of year and a fallback outfall in the drainage strategy.
Neighbourhood plans: Policy PQF 1 (Public realm) and Policy SAND6 (Beaches Open Spaces & Harbour)
Two neighbourhood plans write flood measures into their policies. In the Poole Quays Forum area, made on 21 February 2017, Policy PQF 1 lists among its public realm priorities to "Integrate flood risk management measures including sustainable drainage systems" (Poole Quays Forum Neighbourhood Plan). On the Sandbanks peninsula, made on 23 July 2024, Policy SAND6(e) asks schemes affecting open spaces to support their role in flood risk management and to design any new flood defences to keep the open views (Sandbanks Peninsula Neighbourhood Plan).
The Broadstone plan's design section also deals with surface run-off and flash flooding, and the other made plans are checked in the same way. We read the plan for the site's area before any report is written.
Codes that no longer apply
Policy CS4, which replaced Bournemouth District Wide Local Plan Policy 3.24 (Drainage) in October 2012, is the Bournemouth drainage policy; 3.24 is no longer saved. Poole Core Strategy Policy PCS34 (Flood Risk) was deleted when the Poole Local Plan replaced the 2009 Core Strategy in November 2018, and Poole's flood policy is now PP38. Christchurch's 2001 floodplain policies ENV 7 and ENV 8 are listed in the council's 2014 schedule among policies deleted after the Core Strategy was adopted, as superseded or no longer needed.
The new BCP Local Plan: content and evidence consultation open until 21 December 2026
BCP Council is preparing a new Local Plan for 2029 to 2044 under the 2026 plan-making system, after withdrawing its earlier draft plan in June 2025; that withdrawn plan carries no weight, including its cliff and flood policies. The council's timetable shows the notice to commence on 3 June 2026, scoping from 15 June to 27 July 2026 and a Gateway 1 self-assessment on 30 October 2026.
The Plan Content and Evidence consultation runs from 9 November to 21 December 2026 and, in the council's words, "seeks views on the content, evidence, spatial strategy and any draft policies". Consultation on the proposed plan is timetabled for 27 September to 19 November 2027, submission for 31 August 2028 and adoption, indicatively, for 30 April 2029. A new SFRA is listed among the evidence still to come, and the council's Gateway 1 summary says scoping responses asked for more priority on flood risk, drainage and water infrastructure. Section 8.17 of the consultation document lists five potential flood policies, none yet drafted: F.A, compliance with updated SFRAs (the Environment Agency wants a new Level 1 and new Level 2s using its latest national flood risk data); F.B, a local approach to the sequential test, possibly with localised sequential test areas where the test would be treated as passed, with the exception test to be reviewed; F.C, sustainable drainage; F.D, flood defences; and F.E, Coastal Change Management Areas at Rockley Park, Holes Bay and Hengistbury Head alongside the Coastal Vulnerability Zones and the Cliff and Chine Stability Consultation Zone. No new flood policy has any weight yet.
Which of the three BCP plans decides your site?
Tell us the address and we will say which BCP policy and Flood Risk Area applies and what the council will expect. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.
Start a QuoteWhat the October 2026 validation checklist asks for on flood risk and drainage
BCP Council redeveloped its Local Validation Checklist as a single document, marked "Updated October 2026" and published on its validation page with a requirements matrix. It is under two years old, so its local items apply at validation. The flood and drainage triggers are below.
| Trigger | What the council asks for | Our report |
|---|---|---|
| Flood Zone 2 or 3, Flood Zone 1 over 1 ha, or the future flood risk zones | A flood risk assessment that sets out mitigation and links to the drainage strategy where appropriate | Flood risk assessment |
| Low-Medium, Medium, High or Very High Flood Risk Area of the 2024 SFRA | A site-specific flood risk assessment, whether or not the sequential test applies (SFRA explanatory note, September 2025) | Flood risk assessment |
| Flood Zones 2 and 3, unless exempt | A flooding sequential test; exemptions follow NPPF F5: householder work, non-residential extensions under 250 m², most changes of use, sites laid out with only open space or similar at risk, surface-water-only sites shown safe by an FRA, and allocated sites already tested | Sequential test report |
| Medium, High or Very High Flood Risk Area, or LLFA evidence of surface water risk | The sequential test (SFRA Table 1-2 and the 2025 note) | Sequential test report |
| New building, larger footprint, car parking or other hard surfacing | Drainage/SuDS details: the system (for example the soakaway), drainage points and routes on the plans, and a maintenance statement; any soakaway at least 5 m from the building | Drainage strategy or surface water drainage strategy |
| Within 200 m of the cliffs | No soakaways along the cliff top; discuss drainage with Wessex Water before applying and submit drainage details | Drainage strategy with a non-infiltration outfall |
| Coastal Vulnerability Zone, Coastal Change Management Area or Cliff and Chine Stability Consultation Zone | The council's Coastal Vulnerability Assessment form; a flood risk assessment as well where the site is also in a flood risk area | Flood risk assessment (the coastal form is a separate council submission) |
| New overnight accommodation in the Poole Harbour or River Avon catchments | A Nutrient Neutrality Statement and Natural England's calculator | Not a flood report: see our nutrient neutrality explainer |
Two documents set the flood risk assessment trigger in different places. The checklist keys on the Environment Agency's zones and the council's future flood risk zones, while the September 2025 SFRA explanatory note asks for one in every SFRA Flood Risk Area from Low-Medium upwards. We check a site against both before quoting. Our article on applications invalidated over flood risk and drainage covers what happens when a report is missing.
The 2024 Level 1 SFRA, its Flood Risk Areas and the 2025 explanatory note
BCP Council's Level 1 SFRA, prepared by WSP and published in June 2024, replaced the separate Bournemouth, Poole and Christchurch assessments. Rather than relying on the Environment Agency's zones alone, it combines rivers, the sea, surface water, groundwater, sewers and reservoirs into Flood Risk Areas. The SFRA page holds the reports and the interactive maps; our explainer on strategic flood risk assessments covers what an SFRA is for.
- Five Flood Risk Areas. Low, Low-Medium, Medium, High and Very High (SFRA Table 1-2). Low generally needs no site-specific assessment; Low-Medium needs a site-specific assessment and, for highly vulnerable uses, the exception test; Medium and above trigger the sequential test.
- Sensitive Drainage Zones. Low points that have flooded repeatedly, where surface water discharge "will be heavily restricted and brownfield sites will be expected to reduce peak runoff and volume to greenfield conditions" (Table 1-2).
- Functional floodplain, read from one layer. Since the September 2025 note, Flood Zone 3b is taken from the "Risk from Rivers (Present Day Flood Zone 3b)" layer of the SFRA maps; the Very High area is used only to rank sites in the sequential test.
- Exception test, interim position. Pending an SFRA update, the note does not apply the exception test to sites at risk only from surface water, groundwater or reservoirs, or only in future flood zones, though the safety requirements still apply.
- Future surface water. The note asks applicants to assess the Environment Agency's 2040-2060 surface water mapping in the FRA, and says the LLFA may ask for a sequential test on that evidence. Our guide to the long-term flood risk map and the Flood Map for Planning explains the two datasets.
- Level 2 assessments. The Poole Level 2 (November 2017) and the Christchurch Level 2 (JBA, September 2019) still apply alongside the 2024 report; the council says no Level 2 is needed for Bournemouth. A new Poole Level 2, promised for late 2025 or early 2026, had not been published on 12 November 2026.
- Other models. The note lists the 2024 Atkins Lower Avon and Christchurch Harbour model, the 2024 WSP Poole tidal model and others; legacy Level 2 models predate the current climate change allowances, so using them needs further assessment.
The explanatory note still cites paragraph numbers from the December 2024 Framework; the policies it refers to now sit in Chapter 18 of the August 2026 NPPF. An applicant can bring other data, but the council expects it to be agreed with the planners, the Environment Agency or the LLFA, and recommends pre-application advice.
What BCP Council checks as Lead Local Flood Authority
BCP Council has not published a standalone SuDS guide for developers. Section 9 of the 2024 SFRA is its current statement, and it says the legacy guidance from the three former councils will be reviewed and replaced. Those older notes, Bournemouth's 2003 SuDS guidance and Poole's 2002 SuDS guidance, are still listed on the council's plan pages.
| Topic | What the council expects | Source |
|---|---|---|
| Which schemes | The LLFA is statutory consultee on major development; under Policy CS4 and the checklist, smaller Bournemouth schemes with new hard surfaces need drainage details too | SFRA section 9.1 (June 2024); Core Strategy CS4 |
| Discharge hierarchy | Infiltration, then a surface water body, then a surface water sewer, then a combined sewer, each step justified | SFRA section 9.1, citing the PPG |
| Runoff rate | Bournemouth CS4 and Christchurch ME6: no more than before development. In Sensitive Drainage Zones, brownfield sites to cut peak runoff and volume to greenfield | Policies CS4 and ME6; SFRA Table 1-2 |
| Climate change | Design for the upper end 45% increase in peak rainfall intensity, with a freeboard of typically 300 mm, per the SFRA reading of the Environment Agency allowances | Level 1 SFRA, section 9.1 |
| Design storm | No flooding on any part of the site in a 1 in 100 year event with climate change, except areas designed to hold water; exceedance flows kept on site | SFRA section 9.1 |
| Standards | The SFRA bases design objectives on the Non-Statutory Technical Standards and detail on the CIRIA SuDS Manual; NPPF F8 now points to the 2025 National Standards | SFRA section 9.1; NPPF Chapter 18 |
| Cliffs and chines | No soakaways along the cliff top; within 200 m discuss with Wessex Water; Bournemouth saved Policy 3.25 applies | Validation checklist (October 2026); District Wide Local Plan |
| Maintenance | Ownership and a maintenance plan submitted with the application; systems built to adoptable standards where possible | SFRA section 9.1 |
| Watercourse works | Land drainage consent from BCP Council before any culvert, outfall or obstruction on an ordinary watercourse; in the former Christchurch borough, the council's byelaw 41 also applies | South West Flood & Coastal (consent page) |
Infiltration comes first in the hierarchy, but the cliff zone, the winter water table in the Stour and Avon valleys and the combined sewers that the SFRA says serve significant parts of Bournemouth change the answer from one site to the next. Infiltration tests to BRE 365 settle it; our BRE 365 infiltration rate calculator and soakaway ground conditions map give a first read. Our explainer on the 2025 National Standards for sustainable drainage covers the standards F8 now names, and the guide to ordinary watercourse consent covers works on a stream.
NPPF Chapter 18 as BCP Council applies it
National policy sits beside the local plans. Flood risk is in Chapter 18 of the August 2026 NPPF (F1 to F9), supported by the flood risk and coastal change guidance, last updated on 17 September 2025.
- F4: when an assessment is needed. All development in Flood Zones 2, 3a and 3b; in Flood Zone 1, sites of 1 ha or more, land with critical drainage problems, and land shown in the SFRA or the Flood Map for Planning as at risk from any source now or in the future. BCP's Flood Risk Areas are that SFRA evidence.
- F5: the sequential test. Applied to areas at risk now or in the future from any form of flooding, with exemptions for allocated sites already tested, sites where no built development sits on land at risk, surface-water-only sites shown to be safe, householder development, small non-residential extensions and most changes of use. The search area should not be larger than the development's likely catchment of occupiers or users, which caps a borough-wide "within Poole" search. Our guide to the sequential test and the note on the surface water exemption go further.
- F6: the exception test. Only in Flood Zones 2, 3a and 3b, where Annex F, table 3 calls for it: wider sustainability benefits, safety for the development's lifetime, and no increase in flood risk elsewhere. It does not apply in Flood Zone 1.
- F7: safe for its lifetime. Most vulnerable uses on the lowest-risk land, residual risk managed with safe access and escape, and flood resistance and resilience; our note on residual flood risk applies behind the harbour walls.
- F8: sustainable drainage. Any development that could affect drainage should include SuDS in proportion to its scale, designed to the National Standards, maintained for its lifetime and, on major schemes, taking account of the LLFA's advice.
- F9: coastal change. Development in a Coastal Change Management Area, or other land likely to be affected by erosion or tidal inundation over the next century, must be safe, consistent with the shoreline management plan and justified by wider benefits.
Our summary of the August 2026 NPPF changes sets out what changed from the previous Framework.
Harbours, rivers, cliffs and cloudbursts across the BCP area
Each former borough floods in its own way, which is why their policies read so differently.
- Bournemouth. Short summer cloudbursts on steep, paved streets are behind the worst recorded flooding: the SFRA records at least 157 properties flooded internally in August 2011 and at least 56 in July 2015. The Stour on the northern edge and the chines and cliffs on the seafront add their own constraints. See flood risk assessment Bournemouth for the town's record.
- Poole. Tide and surge in Poole Harbour and Holes Bay set the risk on the waterfront, and the harbour shuts the outfalls that drain the streets behind it. The new Poole Bridge to Hunger Hill defences are being built in phases. Our Poole flood risk page covers the harbour levels and the defence programme.
- Christchurch. The Stour and the Hampshire Avon meet the tide in Christchurch Harbour, so river and sea flooding combine at the Quay, Purewell and Stanpit; the Mude and the Bure Brook add smaller corridors. See Christchurch flood risk and our River Avon (Hampshire) page.
The Environment Agency's zones can be checked on our flood risk map, and river and harbour gauges on the live river levels map. Places in the council area with no page of their own yet include Hurn, Burton and Merley; the council's SFRA maps cover them.
How our reports answer BCP Council's requirements
We prepare flood risk assessments, sequential tests and drainage strategies for applications to BCP Council, and each is a separate report answering a different question. Reports for applications to BCP Council come from Unda Consulting Limited, a CIWEM Business Partner, and our consultants are chartered.
- Site-specific assessment. The SFRA's Flood Risk Areas reach well beyond Flood Zones 2 and 3, so the first question on most BCP sites is whether a flood risk assessment is needed at all.
- Planning applications. Policies 3.28, PP38 and ME6 and NPPF F4 call for a flood risk assessment for planning that tests flows, floor levels and escape against the council's own mapping.
- Buying a property. Harbourside flats in Poole and riverside homes in Christchurch sit behind defences that the national zones ignore, which a flood risk survey for property purchase takes into account.
- Locational tests. PP38's own trigger, ME6 and F5 decide whether a sequential and exception test is needed and how far the search runs.
- Drainage for the application. Policy CS4, saved Policy ENV 5 and the checklist's drainage item make a drainage strategy part of most BCP submissions, small ones included.
- Surface water and SuDS. Sensitive Drainage Zones, the cliff-top soakaway ban and the SFRA's 45% design allowance shape a surface water drainage strategy here.
- After permission. Where the council imposes a pre-commencement drainage condition, we prepare the information needed for the discharge of drainage conditions.
- Evacuation planning. ME6 asks for unaided access and escape in Christchurch, and the Environment Agency runs harbour flood warnings for Poole and Christchurch, so a flood warning and evacuation plan often accompanies the assessment.
- Modelled levels. The 2025 note says legacy Level 2 models predate the current allowances, so some sites need fresh flood modelling to settle levels.
- National policy. Council guidance still cites the December 2024 Framework, so our NPPF guidance sets out the August 2026 position.
Questions about BCP Council's flood and drainage rules
Does a Flood Zone 1 site in the BCP Council area need a flood risk assessment?
Often, yes. The council's 2024 SFRA maps five Flood Risk Areas from every source of flooding, and its September 2025 explanatory note asks for a site-specific assessment in every one from Low-Medium upwards. The October 2026 validation checklist also asks for one on Flood Zone 1 sites over 1 ha and in the future flood risk zones, and NPPF F4 covers Flood Zone 1 land the SFRA shows at risk.
What does Poole Local Plan Policy PP38 (Managing flood risk) require?
PP38 asks for a sequential test where a scheme adds homes in Poole's 2133 future flood risk zones outside the town centre test area, strategic flood defences from the Twin Sails regeneration sites, and SuDS on all major developments unless a Surface Water Management Plan says otherwise or they are impractical. Because national policy applies the sequential test more widely, applicants should expect an F5 test on any non-exempt scheme on land at risk and confirm it with the case officer.
Can I use a soakaway near the cliffs in Bournemouth?
Not along the cliff top. The October 2026 validation checklist bans soakaways there, the Core Strategy keeps a presumption against infiltration within 200 metres of cliff tops and steep slopes such as the chines, and saved Policy 3.25 asks schemes in that zone to show no adverse effect on cliff stability. The checklist tells applicants within 200 m of the cliffs to discuss drainage with Wessex Water before applying.
Which plan applies while BCP Council writes its new Local Plan?
The plan of the former borough the site is in: the Bournemouth Core Strategy (2012) with saved 2002 policies, the Poole Local Plan (2018), or the Christchurch and East Dorset Core Strategy (2014) with saved 2001 policies, plus any made neighbourhood plan. The new BCP Local Plan is at its content and evidence consultation (9 November to 21 December 2026) and is not expected to be adopted before April 2029.
Is there an internal drainage board in the BCP area?
No. No internal drainage board covers Bournemouth, Christchurch or Poole. BCP Council regulates ordinary watercourses itself, through South West Flood & Coastal, and its land drainage consent is needed before building a culvert, outfall or other obstruction on a stream such as the Bourne or Kinson Stream.
Who can prepare a flood risk assessment for a BCP Council application?
The council's checklist does not name a qualification. It expects the assessment to be proportionate, to set out the mitigation and to link to the drainage strategy, and officers and the Environment Agency judge it on the evidence. Our assessments are prepared by chartered consultants and draw on the council's SFRA maps, the Level 2 models and the Environment Agency's latest data.