Flood Risk & Drainage Requirements for Hull City Council
Contact Us
Hull City Council decides flood risk on a planning application under Hull Local Plan Policy 40 and drainage under Policy 39, both in the Hull Local Plan 2016 to 2032 adopted on 23 November 2017. Over 90% of the city lies in Flood Zone 3a. So the sequential test is run against four depth-based sub-zones drawn by the council's December 2016 strategic flood risk assessment, and floor levels and a raised place of safety follow the local Flood Risk Standing Advice. The drainage rule is the one with local numbers attached: major development needs a Drainage Impact Assessment showing greenfield runoff no higher than 1.4 litres per second per hectare, or brownfield runoff no more than half the current rate.
Kingston upon Hull City Council, to give it its formal name, is both the planning authority and the Lead Local Flood Authority inside the city boundary. One council sets both halves of the test. Below, each of its flood and drainage policies is quoted with its source and date, followed by what the council's own guidance adds and what our reports contain to meet it. Questions about a particular site: call 01293 214444 or email enquiries@unda.co.uk.
Which plan and which flood evidence apply to a Hull application in November 2026
The statutory development plan is the Hull Local Plan 2016 to 2032, which Full Council adopted on 23 November 2017 (council Local Plan page). Its Chapter 11, Water Management, holds the five water policies, numbered 37 to 41. Several other documents sit alongside it: the Kingswood Area Action Plan, adopted on 15 September 2016 with its own flood policy, KAAP6; the Joint Minerals and Joint Waste Local Plans shared with East Riding of Yorkshire Council; and the Newington Neighbourhood Plan, endorsed at referendum on 9 November 2023 and listed as part of the development plan in the council's 2024 to 2025 monitoring report. None of the Newington plan's numbered policies is a flood risk policy, but Policy GP1 requires new development to follow the plan's Design Guidance, whose section 2.6 expects new development and redevelopment to incorporate SuDS with management and maintenance arrangements.
A new Hull Local Plan, running to 2045, is being prepared under the 2026 plan-making regulations. The council published its notice of intention on 21 April 2026 and ran a scoping consultation from 15 July to 25 August 2026, with flood risk and climate resilience among the listed topics. Its Gateway 1 self-assessment was published on 30 October 2026. That date starts the 30-month preparation period. The Local Plan timetable, last updated on 30 October 2026, puts consultation on proposed content and evidence at 15 July to 25 August 2027, submission on 13 October 2028 and the adoption decision on 11 May 2029. The new plan has no draft policies of any kind at this stage. Until a new plan is adopted, Policies 37 to 41 decide applications.
The flood evidence is older than the plan itself. The Strategic Flood Risk Assessment still posted is the December 2016 Level 2 study prepared for the council by Arup. In October 2025 the council appointed Arup to carry out hydrological modelling and to update both the SFRA and the technical standing advice that goes with it (council news, 28 October 2025; contract award notice, running from 27 October 2025 to 20 July 2026 with an option to extend by up to three months). On 16 November 2026 the SFRA download page still lists only the 2016 documents. Every figure in this page's tables comes from them. Check the council's SFRA page before submitting, in case the update appears before the application is decided.
Who rules on flooding and drainage for a site inside the Hull boundary
| Body | Role | What it decides or is consulted on |
|---|---|---|
| Hull City Council (planning) | Local planning authority | Determines the application against Policies 37 to 41, KAAP6 at Kingswood and Chapter 18 of the NPPF; judges whether the sequential test is met (flooding and planning page) |
| Hull City Council (flood risk team) | Lead Local Flood Authority | Statutory consultee on surface water for major development; reviews the Drainage Impact Assessment, with 21 days to respond under the council's assessment guide; consents works affecting ordinary watercourses under section 23 of the Land Drainage Act 1991 (land drainage consent page) |
| Environment Agency (Yorkshire area) | Main rivers, the Humber and the tidal defences | Consulted on all development in Flood Zone 3b, within 20 m of a main river bank top or the Humber, and on the cases the local standing advice matrix marks for it; any works permit for a main river or flood defence is its separate decision |
| Yorkshire Water | Sewerage undertaker | Consulted by the council on all major applications and sometimes smaller ones; comments on connections to the public sewer, which in most of Hull is a pumped combined system (SPD 4 Living with Water, section 1.2; Local Plan paragraph 11.13) |
| Internal drainage boards | Drainage districts beside the city | The SFRA places Beverley and North Holderness IDB drains to the north of the city and Preston IDB drains to the east; the Beverley and North Holderness board says most of the city was taken out of its district in 1993, so a board's consent arises only where a site drains into one of its districts |
| East Riding of Yorkshire Council | Neighbouring planning authority and LLFA | Decides applications in Hessle, Anlaby, Cottingham, Willerby and the other settlements outside the tight city boundary; a site straddling the boundary goes to both councils |
Having one council in both roles shortens the drainage discussion. It does not merge the documents, though: the council asks for the flood risk assessment and the Drainage Impact Assessment to be separate, clearly titled reports (SPD 4, section 1.8). Our guides to the Lead Local Flood Authority and to local planning authorities set out the two roles in general terms.
Hull Local Plan Policies 37 to 41 and Kingswood Policy KAAP6
Policy 40 governs where development can go and what an application must show about flood risk; Policy 39 governs what happens to the rainwater. Policies 37, 38 and 41 protect the defences, the storage schemes and the chalk aquifer. KAAP6 adds its own rate for Kingswood.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy 40 | Addressing Flood Risk in Planning Applications | No built development in Flood Zone 3b unless water compatible or essential infrastructure that has passed the exception test; sequential tests and assessments to use the Flood Zone 3a sub-division; unallocated sites tested as the standing advice requires; area of search set in part 5 | Show the site's sub-zone and depth band; supply a sequential test over the right area where one is required; show mitigation, resilience and, where appropriate, drainage built into the layout | A flood risk assessment keyed to SFRA Figures 13, 14 and 15, with a separate sequential and exception test report when the site needs one | Hull Local Plan, adopted 23 November 2017, page 188 |
| Policy 39 | Sustainable Drainage | SuDS on all development unless not technically or economically feasible; a Drainage Impact Assessment for major development; greenfield 1.4 l/s/ha, brownfield no more than 50% of the current rate; storage for the 1 in 75 and 1 in 100 year events plus 30%; exceedance kept off habitable buildings; maintenance shown | Run the runoff and storage calculations to the policy figures, show the exceedance routes and the maintenance arrangement | A Drainage Impact Assessment (the council's name for a drainage strategy) with the calculations, storage and outfall evidence | Hull Local Plan, adopted 23 November 2017, page 186 |
| Policy 37 | Flood Defences | Development beside defences must not reduce their effectiveness or hinder maintenance or improvement; a minimum 8 m easement to defences, ordinary watercourses and main rivers unless agreed otherwise; development may be required to improve defence standards where needed to make it acceptable, if the improvement is not already planned and funded within an appropriate timescale | Show the easement on the layout and how the scheme affects any defence | The assessment plots the easement, the defence line and the breach evidence for a riverside or estuary site | Hull Local Plan, adopted 23 November 2017, page 184 |
| Policy 38 | Surface Water Storage and Drainage | Supports strategic water storage facilities where they can be shown to improve the city's flood resilience and are well designed, and supports localised surface water storage; refuses development that reduces the effectiveness of any surface water storage operation or facility | Show that the site does not interfere with an existing storage facility | The drainage evidence identifies any storage area or facility affected and how its function is kept | Hull Local Plan, adopted 23 November 2017, page 185 |
| Policy 41 | Groundwater Protection | A detailed hydro-geological risk assessment for all development in Source Protection Zone 1; in zones 2 and 3 where there is potential for a negative impact on the aquifer, a demonstration (through such an assessment where necessary) that the risk has been taken into account and mitigated | Establish the zone and, where needed, commission the hydro-geological assessment | The flood risk assessment and drainage evidence record the zone and keep infiltration out of protected ground where needed; groundwater work is scoped where the policy asks for it | Hull Local Plan, adopted 23 November 2017, page 189 |
| Policy KAAP6 | Flood Resilience and Groundwater Protection | At Kingswood: protection from a 1 in 100 year event plus climate change without flooding properties; no increase in flood risk elsewhere; SuDS reducing runoff to 1.4 l/s/ha; maintenance plans; groundwater protection in Source Protection Zones | Meet the Kingswood rate and submit SuDS proposals with maintenance plans | Kingswood assessments and drainage strategies are scoped to KAAP6 as well as Policies 39 and 40 | Kingswood Area Action Plan, adopted 15 September 2016, page 58 |
Requirements checked November 2026.
Hull Local Plan Policy 40 (Addressing Flood Risk in Planning Applications): what it requires
Policy 40 asks sequential tests and flood risk assessments to work from Hull's subdivided Flood Zone 3a, keeps built development out of the functional floodplain, and sets a city-wide area of search for the sequential test with two narrower exceptions.
Its five parts say that built development in Flood Zone 3b "is not acceptable unless of a water compatible use or essential infrastructure that has passed the Exception Test"; "Sequential Tests and Flood Risk Assessments should have regard to the local sub-division of Flood Zone 3a"; "Development of sites or uses not allocated on the Policies Map must be supported by a Sequential Test and Exception Test as required by the Council's current standing advice"; development needing an assessment or the exception test "must demonstrate that appropriate flood mitigation, flood resilience and where appropriate, sustainable drainage measures have been incorporated in its design and layout"; and the area of search "should be the local authority boundary", except that city centre development searches "the defined city centre" and development of one or two dwellings within Use Class C3(a) searches "the ward in which the application site is located" (Hull Local Plan, page 188).
The standing advice supplies the trigger. It asks for a sequential test for all development in Flood Zone 2 or 3 except minor applications and changes of use (a change of use to a caravan, camping or chalet site, or to a mobile home or park home site, is not excused), and says sites allocated through the sequential test need not repeat it if the use accords with the plan. The exception test follows the cases in Table 3 of the Planning Practice Guidance (now Annex F table 3 of the Framework) and, like the sequential test, is not needed for minor applications or the same changes of use. The plan's supporting text says allocated sites still have to meet the exception test (paragraph 11.26); F6 of the NPPF drops it where the exception test was applied to the allocation at plan-making, unless the risk of flooding to the site has increased significantly since, or the development has changed significantly so as to introduce a more vulnerable use, so this is worth confirming for the allocation concerned.
The sub-zone comes first. The reason is in paragraph 11.3: a search that treated the whole of Flood Zone 3a alike would separate almost nothing in a city where it covers over 90% of the land. A sequential test that compares sites only by Environment Agency flood zone, searches the wrong area, or leaves out the place-of-safety level falls short of what Policy 40 and the standing advice ask.
Our flood risk assessment for planning states the Figure 14 sub-zone, the Figure 13 depth band with climate change and the Figure 15 place-of-safety level, then applies the matching standing advice note. Where a test is needed, a separate report sets out the area of search, the sites considered and why each is or is not reasonably available.
Hull Local Plan Policy 39 (Sustainable Drainage): the Drainage Impact Assessment
Policy 39 expects SuDS on every scheme where they are technically and economically feasible, and asks major development for a Drainage Impact Assessment built on fixed local runoff and storage figures.
The policy wording is: "All development should incorporate sustainable drainage systems (SuDS) unless it has been demonstrated this is not technically or economically feasible. Major development should be accompanied by a Drainage Impact Assessment." That assessment "should account for" greenfield run-off rates that "should not exceed 1.4 litres per second per hectare", brownfield rates that "should not exceed 50% of the current run-off rate", an on-site system "capable of storing water for the 1 in 75 year (1.33% annual probability) rainfall event" and a site "capable of storing the water from a 1 in 100 year (1% annual probability) rainfall event", with "A 30% allowance" added for climate change (Hull Local Plan, page 186). Parts 3 to 6 ask that system failure or exceedance causes no surface water flooding of habitable buildings on or off site, that the layout reflects relative flood risk and existing features, that SuDS have regard to Source Protection Zones, and that long-term maintenance is shown.
The SuDS requirement covers all development; the assessment covers major development. The council's guide uses the national major development thresholds: generally 10 or more dwellings, 1,000 m² of floorspace, or a site of 1 ha or more for non-residential or mixed schemes.
The council's guide and SPD 4 expect the discharge hierarchy worked through in order, real storage volumes for the 1 in 75 and 1 in 100 year events, and an outfall other than the combined sewer. A submission without calculations, one that assumes a soakaway on clay, or one that joins the combined sewer without showing why the higher options fail, conflicts with the council's guide and SPD 4 and invites an objection.
Our surface water drainage strategy is written as the Drainage Impact Assessment the policy names, with the greenfield or brownfield rate, storage, exceedance routes and the maintenance arrangement set out for the LLFA.
Hull Local Plan Policy 37 (Flood Defences): the 8 m easement
Policy 37 protects the city's tidal and river defences: "Development adjacent to flood defences must not reduce their effectiveness, or prevent or hinder their future maintenance or improvement (including set-back). Proposals should include a minimum 8m easement to allow for access to flood defences, ordinary watercourses and main rivers, unless otherwise agreed with the regulatory body" (Hull Local Plan, page 184). Part 3 adds that development may have to improve defence standards where needed to make it acceptable, taking climate change into account, and where the improvement is not already planned and funded within an appropriate timescale.
It matters along the River Hull corridor, the Humber frontage and the drains. A layout drawn to the boundary can lose space once the easement is plotted, so our assessment shows the defence line, the easement and the SFRA breach depths before the layout is fixed.
Hull Local Plan Policy 38 (Surface Water Storage and Drainage): protecting the storage schemes
Policy 38 supports strategic water storage facilities where they can be shown to improve the city's flood resilience and are well designed, supports localised surface water storage, and states that "Development which will reduce the effectiveness of any surface water storage operation or facility will be refused" (Hull Local Plan, page 185). The supporting text links it to the flood alleviation schemes at Willerby and Derringham, Cottingham and Orchard Park, and Anlaby and East Ella, which store surface water and slow its flow before it reaches Hull (paragraphs 11.18 and 11.19). A site beside one of these areas needs its drainage evidence to show the storage keeps working.
Hull Local Plan Policy 41 (Groundwater Protection): the chalk aquifer
Policy 41 requires "a detailed hydro-geological risk assessment" for all development in Source Protection Zone 1, and in zones 2 and 3, where development "has the potential to have a negative impact on the aquifer", a demonstration "through a hydro-geological risk assessment where necessary" that the risk has been taken into account and mitigated (Hull Local Plan, page 189). Hull's public drinking water comes from groundwater in the chalk aquifer beneath the clay (paragraphs 11.12 and 11.31), which is one reason the council's assessment guide says few sites suit infiltration. Our note on source protection zones explains the zones.
Kingswood Area Action Plan Policy KAAP6 (Flood Resilience and Groundwater Protection)
In the Kingswood growth area on the northern edge of the city, Policy KAAP6 asks proposals to show they can cope with "a 1 in 100 event plus allowance for climate change without flooding properties", do not increase flood risk elsewhere and do not contaminate protected groundwater. Its part C expects a range of SuDS integrated in development "with a reduction of the water run-off rate to 1.4 litres per second per hectare", and part F asks for detailed SuDS proposals and maintenance plans with the application (Kingswood Area Action Plan, page 58). Part H applies any updated SFRA and flood zones at the time a proposal is prepared, so the Arup update will feed straight into Kingswood schemes.
Unallocated site somewhere in Hull's Flood Zone 3a?
Send us the address and what you plan to build. We will tell you which sub-zone it sits in, whether Policy 40 needs a sequential test and over what area, and what the drainage assessment must show. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.
Start a QuoteThe 2016 SFRA sub-zones and the standing advice floor levels
The December 2016 SFRA splits Flood Zone 3a into four sub-zones by the deepest flooding expected from any of three sources in the design event (overtopping, a breach of the River Hull or Humber defences, and surface water), without climate change. Zone 3a i (low) has no flooding in the design event, 3a ii (medium-1) up to 0.3 m, 3a iii (medium-2) 0.3 to 0.6 m and 3a iv (high) more than 0.6 m (SFRA Appendix B, Table 17). These are mapped on Figure 14, which can be viewed on the council's Hull My Maps Figure 14 layer.
The SFRA defines the functional floodplain, Flood Zone 3b, as land flooding at an annual probability of 5% or greater, the same as its 2007 predecessor, and maps it mainly around watercourses without defences or with a low standard of protection. Annex F of the August 2026 NPPF now says Flood Zone 3b will normally comprise land at 3.3% annual probability or greater with defences operating, or land designed to flood, so a site near the hashed 3b areas needs the boundary checked against current data. Our explainer on Flood Zone 3b covers the change.
The local Flood Risk Standing Advice is an Environment Agency document written for Hull and posted on the council's SFRA page. Its matrix crosses the vulnerability of the use with the Figure 13 depth band (allowing for climate change) and points to a mitigation note. For a new home where depths could exceed 600 mm the Agency is consulted with a full assessment; where depths could reach 600 mm, finished floors go at least 600 mm above the average site level or adjacent road frontage level, whichever is higher, with 300 mm of flood resilience above; where depths could reach 300 mm, the figures are 300 mm and 300 mm. Development must include a place of safety at the Figure 15 level (room for at least five people in a three-bedroom house, for example) with an evacuation plan; for minor development the advice asks for one to be explored where there is no access to an existing place of safety.
The standing advice prints an expiry date of 1 March 2023 and predates the August 2026 Framework. Even so, it is the version the council posts, Policy 40 points to the council's current standing advice, and the October 2025 contract covers its replacement. Until that appears, our assessments apply it as posted and check each answer against Chapter 18. Basement dwellings are classed as highly vulnerable and the advice expects an objection to new ones in Flood Zone 3; our guide to basement and cellar conversions explains the narrow exception it allows for change of use.
Where depths on Figure 13 exceed 1.2 m, the advice asks the assessment to characterise depths more accurately or to take the Figure 15 level as the flood depth. On riverside and estuary sites exposed to a breach, flood modelling can be the way to fix an absolute floor level for the planning condition, and one of the advice's model conditions asks for a flood warning and evacuation plan before development starts. For background, see our pieces on strategic flood risk assessments, residual flood risk and the Environment Agency's standing advice.
What Hull's flood risk team expects in a Drainage Impact Assessment
Three council documents carry the drainage figures: Policy 39 itself, the Living with Water SPD (SPD 4, prepared with Yorkshire Water and adopted in December 2019 according to the council's monitoring report) and the Drainage Impact Assessment guide, dated December 2015 on its cover. The guide predates the 2017 plan, so where the two differ the adopted policy figure leads and the guide shows how the flood risk team tests a submission.
| Item | What Hull asks for | Source |
|---|---|---|
| When needed | Major development; a Drainage Impact Strategy is enough at outline, and a full Drainage Impact Assessment is needed for full and reserved matters applications | Policy 39(1); DIA guide, sections 2 and 3.1 |
| Discharge hierarchy | Collect for use; infiltrate; watercourse; surface water sewer or highway drain to a watercourse; combined sewer only in exceptional circumstances | SPD 4, section 1.9 |
| Greenfield rate | No more than 1.4 l/s/ha (SPD 4 section 1.9 also refers to a current greenfield rate of approximately 3.5 l/s) | Policy 39(2a); Hull Local Plan |
| Brownfield rate | No more than 50% of the current run-off rate; the guide asks for a rate as close as reasonably practicable to 1.4 l/s/ha, then a 50% reduction for the 1 in 2 year 6-hour event, then 5 l/s/ha | Policy 39(2b); DIA guide, section 3.4.1 |
| Storage events | On-site system stores the 1 in 75 year event; the site stores the 1 in 100 year event, which SPD 4 allows on roads, parking and gardens within the site boundary | Policy 39(2c-d); SPD 4, section 1.9 |
| Climate change | 30% added to the storage and rate requirements; the Environment Agency's peak rainfall allowances are now set by management catchment, so the assessment states both | Policy 39(2); Hull Local Plan |
| Urban creep | 10% for housing schemes | SPD 4, section 1.14; DIA guide, section 3.4.1 |
| Interception | No discharge for most rainfall events up to 5 mm depth | DIA guide, section 3.3 |
| Infiltration | Few sites suit it because of the clay and the Source Protection Zones; porosity tests where infiltration is proposed, and a hydrogeological risk assessment may be needed | DIA guide, section 3.2; Local Plan paragraph 11.22 |
| Exceedance | Blockage and exceedance routes for 150 to 200 year rainfall showing no loss to land or property | DIA guide, section 3.4.1 |
| Maintenance | Maintenance responsibility confirmed; private-garden swales avoided; highway, open space and Yorkshire Water adoption routes described | Policy 39(6); SPD 4, sections 1.14 and 1.15 |
The guide also states that failure to provide a Drainage Impact Assessment or Strategy with a relevant application will result in the application not being validated, and that agreement by the LLFA is not planning consent. None of these council documents mentions the National Standards for Sustainable Drainage Systems published in 2025, but F8 of the August 2026 NPPF expects sustainable drainage to follow them, so our strategies show compliance with both. Our articles on the 2025 National Standards, the SuDS hierarchy and foul, surface water and combined sewers give the background.
For early checks, the drainage calculators include a climate change and urban creep calculator; infiltration questions start with the soakaway ground check and the BRE 365 infiltration rate calculator.
Triggers for each report on a Hull planning application
| Requirement | Trigger in Hull | Source |
|---|---|---|
| Site-specific flood risk assessment | All development in Flood Zones 2, 3a and 3b; in Flood Zone 1, sites of 1 ha or more, land identified by the Environment Agency as having critical drainage problems, and land identified in the SFRA or the Flood Map for Planning as at risk of flooding from any source, whether now or in the future. SPD 4 notes that, with 95% of the city in Flood Zone 3a, all proposed development needs one | NPPF F4; SPD 4, section 1.8; standing advice |
| Sequential test | Unallocated development in Flood Zone 2 or 3 except minor applications and changes of use (other than to a caravan, camping, chalet, mobile home or park home site), using Figure 14. F5 also covers land at risk from any source and excuses householder schemes, non-residential extensions under 250 m², the same changes of use, and sites where a site-specific assessment shows clearly that no built development, including access or escape routes, land raising or other potentially vulnerable elements, would be at risk from any source now or in the future, or that a site at surface water risk only keeps occupiers and users safe for its lifetime without increasing flood risk elsewhere | Policy 40; standing advice; NPPF F5 |
| Exception test | After the sequential test, in the cases in Annex F table 3 (for example more vulnerable use in Flood Zone 3a); not where the sequential test is not required. Not needed in Flood Zone 1 | NPPF F6; Annex F; standing advice |
| Drainage Impact Assessment | Major development (a Drainage Impact Strategy at outline) | Policy 39; DIA guide |
| SuDS | All development, unless shown not to be technically or economically feasible | Policy 39; NPPF F8 |
| Hydro-geological risk assessment | All development in Source Protection Zone 1; in zones 2 and 3 where there is potential for a negative impact on the aquifer, where necessary | Policy 41 |
| Place of safety and evacuation plan | All development, at the Figure 15 level, with an evacuation plan; for minor development, explored where there is no access to an existing place of safety | standing advice, question k |
| Environment Agency consultation | Flood Zone 3b; within 20 m of a main river bank top or the Humber; the matrix cells marked for it | standing advice |
| Ordinary watercourse consent | Culverts, structures and other works affecting the flow of an ordinary watercourse; separate from planning permission | council land drainage consent page |
| IDB consent | Only where a site drains into an internal drainage board district beside the city; confirm with the board | SFRA, Appendix A3.5 |
Our explainers on the vulnerability classification, the surface water exemption from the sequential test, ordinary watercourse consent and main rivers and ordinary watercourses cover each trigger in general terms.
Flood and drainage items on Hull's validation checklist
The validation checklist linked from the council's planning application forms page states that it was adopted on 17 January 2023 (the PDF itself is titled Validation Checklist 2024 and was last produced in December 2024). As a local list more than two years old, it stands as the council's published guidance on what to submit. Under Drainage, Flooding, Ground Conditions and Utilities it lists four items: a flood risk assessment ("A detailed assessment of flood requirements including mitigation", referred to the Hull SFRA and Local Plan Policy 40); a Drainage Impact Assessment covering surface water drainage, sustainable drainage options including ecological enhancements, and maintenance (Policy 39); drainage plans showing existing and proposed infrastructure and connections for applications needing new surface or foul water drainage (Policy 38); and a foul sewerage assessment where a scheme disposes of trade waste, or of foul sewage effluent other than to the public sewer.
The flooding and planning pages say applications should include a site-specific assessment following the standing advice and a Drainage Impact Assessment (council page). Our guide to why applications get invalidated on flood risk and drainage covers what usually goes wrong. Where a scheme relies on a non-mains outfall, a foul drainage strategy answers the checklist's foul sewerage item.
Chapter 18 of the NPPF beside Hull's 2017 policies
The August 2026 Framework sets national flood policy in Chapter 18: F4 says when a site-specific assessment is needed, F5 and F6 set the sequential and exception tests, F7 the safety tests, and F8 asks for sustainable drainage to the National Standards, with advice from the LLFA on major development. The Planning Practice Guidance on flood risk was last updated on 17 September 2025, and the Environment Agency's climate change allowances have set peak rainfall by management catchment since 10 May 2022.
Hull's policies date from 2017. Annex A says policies should not lose weight simply because they predate the Framework, while parts materially inconsistent with its decision-making policies get very limited weight. For a Hull site, three points follow. First, F5 says the area to which the sequential test is applied "should not be greater than the anticipated catchment of the development in terms of its likely occupiers or users", so the city boundary in Policy 40(5) works as an outer limit, and a smaller search can be argued where a scheme serves a smaller catchment. Second, F5 reaches land at risk from any source, while the standing advice trigger is drawn around Flood Zones 2 and 3, so a Flood Zone 1 site at surface water risk should expect the national test unless an F5 exemption applies. Third, F5(2)(b) excuses a site where a site-specific assessment shows clearly that "No built development within the site boundary, including access or escape routes, land raising or other potentially vulnerable elements, would be located on an area that would be at risk of flooding from any source, now and in the future", or where the site is at risk of surface water flooding only and "the proposed layout, design, and mitigation measures would ensure that occupiers and users would remain safe from current and future surface water flood risk for the lifetime of the development without increasing flood risk elsewhere".
Where Hull's local rule and F5 point different ways on a site, we set out both in the report and recommend confirming the approach with the case officer. The council's own flooding and planning page says the Framework "is not always applicable to planning applications in Hull" because of the refined Flood Zone 3, and its applications page still cites a paragraph number from an earlier Framework, so the Chapter 18 letters are the reference to use. Our summaries of the August 2026 NPPF changes and the September 2025 PPG update go further, and our NPPF guidance and advice service covers questions on how the national policy applies to a particular scheme.
Tide, rivers and rain: Hull's flood record in brief
Ground levels across the city are mostly below the Humber's high tide, so Hull depends on the estuary defences, the River Hull defences and the tidal surge barrier at the river mouth (Local Plan paragraphs 11.7 to 11.9). The River Hull, the Beverley and Barmston Drain and the Holderness Drain bring water in from the north, and a high tide meeting high flows inside the city boundary raises the risk (paragraph 11.11). The 1953 and 2013 tidal surges are the events the plan names; the council's Section 19 reports cover December 2013 and the rainfall floods of 2012, 2014 and 2019.
Rain, though, has done the most damage in recent memory. The council's flood risk management strategy for 2022 to 2028 records more than 8,000 homes flooded in June 2007, with 91 of the city's 99 schools and 1,300 businesses affected. Outside Kingswood and Bransholme, almost all surface water is piped round the city through a pumped, combined system to the Saltend treatment works (paragraph 11.13), which explains the strict drainage policies. The street-level history is on our page on flood risk assessment in Hull, and the Yorkshire page covers the region. Check a postcode on the Unda flood risk map or follow gauges on the live river levels map; the Living with Water partnership and Yorkshire Water publish their own flood information.
Reports we prepare for applications to Hull City Council
Each report here answers a different question, and many Hull applications need two or three of them because of the flood zone and the drainage policy together. Each is written by chartered consultants at Unda Consulting Limited, which is a CIWEM Business Partner, and we have prepared them for applications to Hull City Council.
- Assessment against Policy 40. Nearly every Hull site falls in Flood Zone 3a, so most applications need a flood risk assessment reading the SFRA sub-zone, depth band and place-of-safety level.
- The application itself. The flood risk assessment for planning applies the matching standing advice note and sets floor levels in metres above Ordnance Datum for the condition.
- Buying in the city. A buyer or lender facing a Flood Zone 3 search result can commission a flood risk survey for property purchase that reads the defences and the 2016 depth maps for the building.
- Unallocated sites. Policy 40 and the standing advice call for a sequential and exception test searched across the city, the city centre or the ward, using Figure 14.
- Major schemes. Policy 39 asks for a Drainage Impact Assessment, prepared as a drainage strategy covering foul and surface water and the Yorkshire Water connection.
- Rates and storage. A surface water drainage strategy proves the 1.4 l/s/ha or 50% reduction and the 1 in 75 and 1 in 100 year storage plus 30%.
- After permission. The standing advice expects floor levels and the place of safety to be secured by condition, and drainage conditions often sit alongside them; discharge of drainage conditions supplies the detail and maintenance arrangements the council asks for.
- Recorded flooding. With thousands of homes flooded in 2007, an insurance flood risk assessment helps an owner show an insurer the current position.
- Groundwater under the clay. Policy 41 asks for a hydro-geological risk assessment in Source Protection Zone 1; groundwater assessment work is scoped into the report where the zone applies.
- Deep or fast flooding. Where Figure 13 depths pass 1.2 m the standing advice asks for depths to be characterised more accurately, which can call for hydraulic flood modelling.
- Getting people out. The standing advice's place-of-safety rule and model conditions can bring a flood warning and evacuation plan into a Hull permission.
- Reading Chapter 18 here. The council's own page says the Framework is not always applicable in Hull; our NPPF guidance sets out where F5 and Policy 40 meet on a given site.
- Port and industrial land. Docks and riverside industry sit on the floodplain behind the Humber defences; due diligence reports set the flood position before a purchase.
Other LPA pages are listed on our local authorities hub. To discuss a Hull site, call 01293 214444 or email enquiries@unda.co.uk.
Questions on Hull's flood and drainage policies
What does Hull Local Plan Policy 40 require for a site in Flood Zone 3a?
Policy 40 asks the sequential test and the flood risk assessment to use the SFRA's four Flood Zone 3a sub-zones, and asks unallocated sites for a sequential test, as the standing advice requires, for all development in Flood Zone 2 or 3 except minor applications and changes of use (other than to caravan, camping, chalet, mobile home or park home sites), and for an exception test in the cases in Annex F table 3. The area of search is the city, the defined city centre for city centre schemes, or the ward for one or two C3(a) dwellings, and F5 of the NPPF caps it at the development's anticipated catchment. Built development in Flood Zone 3b is not acceptable unless water compatible or essential infrastructure that has passed the exception test (Hull Local Plan, page 188).
Does every planning application in Hull need a flood risk assessment?
Almost every one. NPPF F4 asks for a site-specific assessment for all development in Flood Zones 2 and 3, and SPD 4 says that with 95% of the city in Flood Zone 3a all proposed developments need one. In Flood Zone 1 an assessment is still needed for sites of 1 ha or more, land identified by the Environment Agency as having critical drainage problems, and land shown in the SFRA or the Flood Map for Planning at risk from any source. The standing advice decides how detailed it must be (standing advice).
Is a Drainage Impact Assessment the same as a drainage strategy?
It is Hull's name for one. Policy 39 asks major development for a Drainage Impact Assessment, and the council's guide accepts a shorter Drainage Impact Strategy at outline stage. It has to show greenfield runoff of no more than 1.4 l/s/ha or a brownfield rate no more than 50% of the current rate, storage for the 1 in 75 and 1 in 100 year events plus 30% for climate change, and maintenance, and the council asks for it to be a separate document from the flood risk assessment (DIA guide; SPD 4, section 1.8).
Can Hull's 2016 SFRA still be used for a planning application?
Yes. On 16 November 2026 the December 2016 SFRA and the standing advice that goes with it are still the documents on the council's SFRA page, and Policy 40 relies on them. An update by Arup was commissioned in October 2025 and has not yet been published, so an assessment should use the 2016 figures, check them against current Environment Agency data, and be checked again if the new version appears before the decision.
What does the standing advice ask of a small extension in Hull?
For minor development the standing advice asks for floor levels no lower than existing, for raised floors or passive resistance to keep out the Figure 13 depth to be explored, and, where water cannot be kept out, for flood resilience to at least 300 mm above that depth. The Environment Agency is not consulted on flood risk unless the site is in Flood Zone 3b or within 20 m of a main river bank top or the Humber. Anything larger, a change of use, or a site near the defences needs the depth band, place-of-safety level and drainage worked out properly; call 01293 214444 if you are unsure which applies.
Which part of Hull City Council reviews the drainage on an application?
The same council, wearing a different hat. Its flood risk team is the Lead Local Flood Authority and reviews the Drainage Impact Assessment on major applications, while Yorkshire Water comments on connections to the public sewer and the Environment Agency on the main rivers, the Humber and Flood Zone 3b (flooding and planning page).
Hull drainage strategy still to be written before you submit?
We prepare the flood risk assessment and the Drainage Impact Assessment as separate reports, to Policies 39 and 40, the 2016 SFRA and the standing advice, so the checklist's flood and drainage items are covered when you submit. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.