Flood Risk Assessment in Hull

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

A flood risk assessment in Hull starts from an awkward fact. The city's Local Plan puts more than 90% of Hull in Flood Zone 3a, because most of its ground lies below the level the Humber reaches at high tide. The River Hull runs through the middle of the city to a tidal barrier at Victoria Pier, and the drains depend on pumping stations. For planning applications, house purchases, mortgages and insurance, our consultants prepare flood risk assessments in Hull, together with sequential and exception tests and surface water drainage strategies.

Kingston upon Hull is the formal name; almost everyone says Hull. Here it means the built-up city. That takes in the Old Town and city centre in HU1, the terraces off Hessle Road and Anlaby Road in HU3, Orchard Park, Bransholme and Kingswood to the north, Sutton-on-Hull in HU7, and Victoria Dock and Marfleet in HU9. Hessle, Anlaby, Willerby and Cottingham sit outside the city boundary in the East Riding of Yorkshire, under another council's plan. For the wider county, see our flood risk assessments across Yorkshire.

On 5 December 2013 the Humber reached 5.8 m AOD at the River Hull barrier, the highest tide since it was built. The estuary poured over Riverside Quay into Albert Dock and on into the city centre, damaging 149 homes and 115 businesses.

To discuss a Hull site, call one of our flood risk consultants on 01293 214444 or write to enquiries@unda.co.uk.

The River Hull barrier and the Humber frontage: what holds the tide back

Two lines of defence keep the Humber out of Hull. Any assessment near the water begins by working out which one protects the site. The estuary forms where the River Trent and the Yorkshire Ouse meet upstream of the city. Along it, walls and embankments run from St Andrew's Quay in the west to Victoria Dock in the east. Where the River Hull joins the estuary, the Environment Agency's tidal surge barrier shuts the river mouth whenever a surge is forecast. That stops the sea pushing up the river and over its banks through the middle of Hull.

  • A gate lowered across the river. Hull's tidal flood barrier has been in use since 1980. Hull's 2016 flood study describes a structure about 30 m wide that takes roughly 30 minutes to close, and it is closed whenever a tide above 4.25 m AOD is forecast. It was refurbished in 2009 and 2010.
  • Its closest call. In December 2013 the tide peaked at 5.805 m AOD on the seaward side, the highest since the barrier was built. The council's Section 19 report found it within 40 cm of being overwhelmed, with the walls at Victoria Dock Village and St Andrew's Quay at their design limits.
  • A new frontage scheme. In 2013 the lowest defence in the city was at Riverside Quay beside Albert Dock, at 5.04 m AOD. The Environment Agency's £42 million Humber: Hull Frontages scheme, built from January 2019 to December 2021, improved about 7 km of the 12 km frontage between St Andrew's Quay Retail Park and Victoria Dock Village. It gives greater protection to 113,000 homes and businesses.
  • Walls along the river. Upstream of the barrier, a separate £36.5 million Environment Agency programme began repairing 7.5 km of River Hull flood walls in 2016, starting with 39 weak points, to help protect 63,000 properties.

None of this takes a site out of Flood Zone 3. The Flood Map for Planning is drawn as if the barrier and the walls were absent. An assessment here therefore deals with residual flood risk: what happens if a wall is breached or overtopped, or the gate goes down late. The 2016 flood study modelled 15 breaches along the River Hull, 18 on the Humber's north bank and nine on the city frontage for exactly that reason. Our note on why defended land stays in a flood zone explains the mapping rule.

Look up a postcode in Hull, from St Andrew's Quay to Kingswood

The outline below is Hull's built-up area. Type in a postcode to screen it against Environment Agency data for rivers and the sea, surface water and reservoirs, with the planning flood zones and a climate change outlook. Our flood risk map has the same layers for the rest of England. As a Hull flood risk map check it will usually show Flood Zone 3 next to a lower risk rating for rivers and the sea. Both are right: the zone ignores the defences and the rating counts them.

Hull's built-up area, from St Andrew's Quay and Hessle Road in the west to Marfleet and Saltend in the east and Kingswood and Bransholme in the north, is shown outlined in coral. Results are an indicative screening based on Environment Agency open data — not a Flood Risk Assessment.
Loading flood map…
Rivers & Sea
—
Surface Water
—
Reservoirs
—
Flood Zone (for planning)
—
Climate change (2070–2125)
—
Historic flooding
—
Flood warning area
—
Live flood warnings (nearby)
—
Important: This tool gives an indicative screening only, based on modelled Environment Agency datasets (Flood Map for Planning Flood Zones 2 & 3, Flood Zones plus Climate Change 2070–2125, Risk of Flooding from Rivers and Sea, Risk of Flooding from Surface Water, reservoir, historic, flood warning area, flood storage area, flood defence and main river data) under the Open Government Licence. It reflects the area around the postcode, not the exact property, and does not account for finished floor levels, ground levels or groundwater. It is not a Flood Risk Assessment and must not be relied on for planning, conveyancing, insurance or design decisions. Data © Environment Agency copyright and/or database right; contains Ordnance Survey data © Crown copyright and database right. The Hull boundary shown is the Kingston upon Hull built-up area, from ONS Built-Up Areas 2022 (Office for National Statistics; Open Government Licence; contains OS data © Crown copyright and database right).

Rain, pumps and a combined sewer: why surface water floods Hull

Rain, not the tide, did the most damage in living memory. In June 2007 more than 8,000 Hull homes flooded, with 1,300 businesses and 91 of the city's 99 schools, according to the council's flood strategy. The Local Plan explains why. The city is flat, its clay soils hold water, and the chalk beneath holds an aquifer that keeps the water table high, so little rain soaks in. Most of Hull drains through combined sewers, run by Yorkshire Water, which pump rainwater and sewage together round the city to the Saltend treatment works. Rain falling on the higher ground west of the boundary fills those sewers quickly and leaves little room for the city's own runoff.

Where flood water comes from in Hull, and where it has shown up
SourceWhere in HullWhat the council's evidence records
Tidal HumberThe estuary frontage from St Andrew's Quay to Victoria Dock Village; English Street and the city centre behind Albert DockDecember 2013: water over Riverside Quay reached the city centre, Anlaby Road and Hessle Road; 149 homes and 115 businesses damaged (Section 19 report, 2014)
River HullRiverside land from Stoneferry and Sculcoates down to the Old TownDefences better than 1 in 200 while the barrier works, with one low point between 1 in 75 and 1 in 100 (SFRA, 2016)
Main river drainsHolderness Drain, Beverley and Barmston Drain, Setting Dyke, Foredyke Stream, Fleet Drain, Old Fleet Drain and Suttoncross DrainHolderness Drain relies on the East Hull pumping station when the tide locks its outfall; outfalls to the Humber are flapped (SFRA, 2016)
Surface water and sewersLow ground across the city, with overland flow into west Hull from the higher land beyond the boundaryRain the pumped combined network could not take, made worse by runoff from the higher ground to the west (Local Plan, 2017; SFRA, 2016)
GroundwaterMainly the Wolds edge west of the city, with past flooding at CottinghamA high water table over the chalk aquifer; the Environment Agency knew of no recent groundwater flooding inside the city (SFRA, 2016)
ReservoirBransholmeThe Bransholme lagoon, enlarged in 2010 to store sewer flood water, is the only reservoir over 10,000 m³; failure risk judged minimal (SFRA, 2016)

For a site, the drainage case can matter as much as the flood level. Soakaways rarely work on Hull's clay, and the council treats the combined sewer as a last resort for new rainwater. Storage schemes on the higher ground west of the city, at Willerby and Derringham, Cottingham and Orchard Park, and Anlaby and East Ella, hold water back before it reaches Hull, and the council's flood strategy records more than £220 million spent on flood infrastructure in the six years to 2022. Our guides explain surface water flooding, sewer flooding and checking the water table and aquifer maps for a site.

Floods in Hull since 1953: surges up the estuary and storms in the drains

Hull's record runs in two strands: surges that come up the estuary every few decades, and storms that overload the drains far more often. The council's Section 19 investigations, its 2016 flood study and the Environment Agency's Humber 2100+ report date the main events. The flood study's models were checked against the mapped 2007 and 2013 flood outlines.

  1. 1953 and 1954. The 1953 surge broke defences down the east coast and killed 307 people in England, a story told in our account of the 1953 North Sea flood. The Humber 2100+ report records about 1,000 Hull properties flooded by another surge in 1954.
  2. September 1969. A surge travelled up the River Hull and the Holderness Drain and overtopped their banks, flooding 855 houses; the Environment Agency describes the city as "3 feet under water in some areas". The tidal surge barrier came into use in 1980.
  3. June 2007. Heavy, sustained rain on 15 and 25 June overloaded the drains in west, east and north Hull. The 2016 flood study lists the streets affected, from Boothferry Road and Chanterlands Avenue to Holderness Road and Kingswood. It was part of the summer of flooding examined by the Pitt Review.
  4. August 2012 and August 2014. Intense summer storms flooded roads across the city; the council's Section 19 reports record 21 properties flooded in 2012 and two in 2014.
  5. 5 December 2013. A 1.9 m surge on a high spring tide took the Humber to 5.8 m AOD at the barrier. Water came over Riverside Quay and through the lock gates into Albert Dock, then into English Street and the city centre; St Andrew's Quay and Victoria Dock Village were overtopped as well.
  6. October and November 2019. Prolonged rain overtopped the Old Fleet Drain, and seven properties across the city were reported flooded inside, one of them on a street that had flooded before.
  7. July 2026. The Environment Agency's Humber 2100+ tidal risk evidence put about 500,000 people around the estuary in areas at risk, after more than £350 million spent on Humber defences since 2008.

Two Environment Agency gauges track the river through the city: River Hull at Hull Barrier Victoria Pier, and River Hull at Stoneferry Bridge. The Stoneferry record is 4.55 m, reached on 9 September 2002. Both sit on our live river levels map, and warnings for the centre are issued for the River Hull and Humber estuary at Hull City Centre warning area. Our piece on sea level rise beyond 2100 covers what the newer projections mean for building lifetimes.

How much of Hull is in Flood Zone 3? The depth bands the council uses instead

Very nearly. With over 90% of the city in Flood Zone 3a, the national sequential test would separate almost nothing. Since 2007 Hull has therefore split Flood Zone 3a by the depth of flooding expected in a design flood. The current bands come from the December 2016 Strategic Flood Risk Assessment, prepared for the council by Arup. Its Figure 14 grades Flood Zone 3a into four for the sequential test: low (no flooding in the design event), medium-1 (up to 0.3 m), medium-2 (0.3 to 0.6 m) and high (over 0.6 m). The layer can be viewed on the council's Hull My Maps viewer. The council's standing advice uses the depths on Figure 13, which allow for climate change, to set floor levels.

Floor levels in Hull's Flood Zone 3: what the standing advice asks for each depth
Flood depth (SFRA Figure 13)New homes and other more vulnerable usesShops, offices and other less vulnerable uses
Over 600 mmSite-specific assessment with the Environment Agency consultedFloors above the predicted depth and at least 600 mm above site or road level; resilience to the full predicted depth
300 to 600 mmFloors at least 600 mm above average site or road level, whichever is higher, plus 300 mm of resilience above the floorThe same: 600 mm floors and 300 mm of resilience
Under 300 mm, and the rest of Flood Zone 3Floors at least 300 mm above site or road level, plus 300 mm of resilienceThe same: 300 mm floors and 300 mm of resilience
Minor development, at any depthFloors no lower than existing; resilience to at least 300 mm above the Figure 13 depth where water cannot be kept outAs for homes

Two rules sit across every band. All development, including permitted changes of use, needs a place of safety at the level shown on the flood study's Figure 15. It has to hold everyone in the building (five people for a three-bedroom, five-person house) and be backed by an evacuation plan. Basement homes count as highly vulnerable and should not be permitted anywhere in Flood Zone 3. Our explainer on levels in metres AOD shows how a relative 300 mm or 600 mm becomes the absolute floor level a planning condition will name.

Policies 37 to 40: what the Hull Local Plan asks of an application

The Hull Local Plan 2016 to 2032, adopted in November 2017, contains four flood and drainage policies, and the council reads them alongside chapter 18 of the August 2026 NPPF. Nationally, policy F4 sets when an assessment is needed, F5 and F6 set the sequential and exception tests, and F8 expects development to follow the 2025 National Standards for sustainable drainage.

  • Policy 37, flood defences. Development beside a defence must not weaken it or obstruct its maintenance or future raising, and should leave an 8 m easement to defences, main rivers and ordinary watercourses unless the regulator agrees otherwise. Where a scheme needs a better standard of defence that nobody has planned or funded, the developer may have to provide it.
  • Policy 38, surface water storage. Strategic storage schemes are supported, and development that would make one less effective is refused.
  • Policy 39, sustainable drainage. SuDS on every scheme unless shown unworkable, and a Drainage Impact Assessment for major development. Greenfield runoff should not exceed 1.4 litres per second per hectare, and brownfield runoff should not exceed half the current rate. The drainage system should store the 1 in 75 year storm and the site the 1 in 100 year storm, with 30% added to both for climate change.
  • Policy 40, flood risk in applications. No built development in Flood Zone 3b except water-compatible uses or essential infrastructure that passes the exception test. Sequential tests and assessments must work with the city's sub-division of Flood Zone 3a, and unallocated sites need the sequential and exception tests set out in the standing advice.
  • Three areas of search. The sequential test searches the whole city by default, only the defined city centre for city-centre schemes, and only the ward for one or two new homes. Sites allocated in the Local Plan have passed it already, though they still face the exception test.

Two parts of that framework are changing. The standing advice still posted by the council predates the August 2026 Framework and prints an expiry date of 1 March 2023. Arup was appointed in October 2025 to update it and the 2016 flood study, and until the new versions are published an assessment has to say which evidence it relies on. A new Hull Local Plan running to 2045 is at its earliest stage, with consultation on its content timetabled for summer 2027 and adoption to be considered in May 2029.

Recent case law on the sequential test is covered in our guide to applying the test after Mead, and the national drainage expectations in our summary of the National Standards for sustainable drainage.

Planning in Flood Zone 3a or beside the River Hull?

Send the address and an outline of the scheme. One of our experienced flood risk consultants will reply within 60 minutes with a free, no-obligation quote for whatever the site needs: the assessment, the sequential test or the Drainage Impact Assessment.

Start a Quote

Which Hull schemes need a flood risk assessment, a sequential test or a Drainage Impact Assessment?

With nearly every plot in Flood Zone 3, the question in Hull is less whether a flood risk assessment is needed than what has to go with it. The standing advice asks for a site-specific assessment for new building and changes of use across Flood Zone 3. Its matrix then sets the floor level and decides whether the Environment Agency is consulted, and the Lead Local Flood Authority is consulted on every major scheme.

What a Hull application usually needs, by type of scheme
SchemeFlood risk assessmentSequential and exception testsDrainage
Extension or other minor developmentA short assessment: floors no lower than existing, resilience to 300 mm above the Figure 13 depthNot requiredSuDS where practicable (Policy 39)
Change of use to homesYes, with raised floors or passive flood proofing to the standing advice level and a place of safetyNot required, except for caravan, camping, chalet or park home sitesSuDS where practicable (Policy 39)
One or two new homesYesSequential test across the ward, then the exception test where national policy calls for itSuDS on the plot (Policy 39)
Ten or more homes, or a site of 0.5 haYes; consultation with the Lead Local Flood Authority as major developmentCitywide search unless allocated; city-centre schemes search the city centreDrainage Impact Assessment: 1.4 l/s/ha greenfield or half the brownfield rate, plus 30%
Commercial: 1,000 m² of floorspace or 1 haYes; the Environment Agency is consulted within 20 m of a main river bank top or the HumberSequential test unless allocated; exception test only where the use and zone call for itDrainage Impact Assessment, as for housing

Purchases, mortgages and insurance follow a different path. A buyer's lender wants to know whether the house has flooded and how likely it is to flood again, which a pre-purchase flood survey answers for one building. Our article on the sequential and exception tests sets out the national tests in more depth.

Reports our consultants prepare for Hull sites, from the docks to the northern estates

Each report below answers a different question about a Hull site, and many applications in the city need two or three of them. Whichever a Hull site needs, the work is done by chartered consultants at a CIWEM Business Partner firm, and nothing goes to the council until a senior consultant has signed it off.

  • Every source together. A flood risk assessment weighs the tide, the River Hull, the drains, the combined sewer and the water table against one another, because in Hull the tide and the drains act on each other.
  • Applications across Flood Zone 3a. A flood risk assessment for planning places the site in the flood study's sub-zones, sets floors to the standing advice and shows the place of safety at the Figure 15 level.
  • Before exchange. Lenders ask about surges and surface water street by street, and a flood risk survey for property purchase answers for one house, including whether it sits behind the frontage defences improved between 2019 and 2021.
  • Windfall sites. An unallocated site needs the sequential and exception test, searched across the city, the city centre or the ward under Policy 40 and judged against Hull's own sub-zones.
  • Policy 39 on every scheme. The council expects SuDS on all development, so even a small Hull scheme needs drainage strategy evidence showing how runoff is held back.
  • Runoff limits and storage. A surface water drainage strategy works to the 1.4 l/s/ha greenfield and half-rate brownfield limits plus 30%, with storage for the 1 in 75 and 1 in 100 year storms, on clay where soakaways rarely drain.
  • After the permission. Under the standing advice, floor levels and places of safety are secured by planning condition, and a drainage condition can sit alongside them; discharge of drainage conditions supplies the detail and maintenance arrangements the council needs to sign it off.
  • Levels for one site. The 2016 breach and depth maps were drawn for the whole city; a riverside or estuary scheme setting floors in metres AOD may need flood modelling of its own.
  • Places of safety and warnings. Warnings in December 2013 came with very little lead time, and the standing advice includes a model condition requiring a flood warning and evacuation plan before work starts.
  • Homes with a flood history. More than 8,000 Hull homes flooded in 2007 and some streets have flooded since, so owners facing a renewal or a refused policy can turn to a flood risk assessment for insurance.
  • Port and employment buildings. The 56 ha the Local Plan identifies at Alexandra Dock for Green Port Hull, and the employment land around the docks, bring commercial buildings seeking credits under Pol 03, which a BREEAM flood risk assessment addresses.
  • Estuary and dock property. Buyers and lenders taking on commercial land along the Humber frontage can commission flood risk due diligence before the deal closes.
  • Keeping a business running. The 2013 surge damaged 115 Hull businesses and the 2007 rain affected 1,300, and a business continuity flood risk assessment plans for the next event.
  • A pumped, combined network. Most of Hull drains through combined sewers pumped to the Saltend treatment works, and Yorkshire Water is consulted on every major application, so a foul drainage strategy has to show where the sewage goes and that the network can take it.
  • Before buying land. A flood risk feasibility study tests a site against its sub-zone, the standing advice floor levels and the Policy 40 area of search before an offer is made.

Who handles flooding in Hull, and who covers the East Riding next door

Hull City Council is both the planning authority and the Lead Local Flood Authority for the city, so the same council decides an application and comments on its drainage. Its boundary is tight. Hessle, Anlaby, Willerby, Kirk Ella and Cottingham, though many people think of them as Hull, are run by East Riding of Yorkshire Council. That council adopted its Local Plan Update 2020 to 2039 in April 2025 and has its own flood team. Under the Flood Risk Regulations, Hull and the Haltemprice settlements to its west form one Area of Significant Flood Risk, and the two councils work on surface water together through Living with Water.

Flooding contacts for Hull
BodyRole in HullHow to reach them
Hull City Council (planning authority and LLFA)Planning decisions; surface water, groundwater and ordinary watercourses; drainage comments on major applications; Section 19 flood investigationsFlood risk enquiry form, flood.risk@hullcc.gov.uk, 01482 300300
Environment Agency (Yorkshire area)The Humber, the River Hull and the main river drains; the tidal surge barrier; flood warningsCheck for flooding in Hull, Floodline 0345 988 1188
Yorkshire Regional Flood and Coastal CommitteeOversees the Environment Agency's flood and coastal programme for the region, Humber schemes includedYorkshire RFCC
Humber Local Resilience ForumMulti-agency planning and response for major floods on both banks of the HumberHumber LRF; the council's emergency flood planning page
Yorkshire WaterPublic sewers, the pumped combined network and sewer flooding; consulted on major applicationsReport sewer flooding to Yorkshire Water
Living with WaterPartnership of the council, East Riding of Yorkshire Council, Yorkshire Water, the Environment Agency and the University of HullLiving with Water partnership
EmergenciesDanger to life: 999. Power cuts: 105. Flood warnings and advice: Floodline 0345 988 1188Sign up for flood warnings

The council's Section 19 reports on the 2012, 2013, 2014 and 2019 floods, its flood strategy for 2022 to 2028 and the Local Plan are the documents an assessment here leans on most. Across the estuary, Grimsby and Scunthorpe come under different councils, and our list of the places we cover has the rest.

Questions about flooding and planning in Hull and Kingston upon Hull

Is Kingston upon Hull the same as Hull City Council?

Not quite. Kingston upon Hull is the city's formal name, and Hull City Council is the everyday name for the unitary council that runs it, formally Kingston upon Hull City Council. The council covers only the city inside its own boundary. Hessle, Cottingham, Anlaby and Willerby belong to East Riding of Yorkshire Council, so a site there answers to a different Local Plan and flood team.

Is Hull below sea level?

Much of it lies below the level the Humber reaches at high tide, which is the comparison that matters for flooding. The Local Plan says ground levels in the city are generally lower than the estuary's high tide, which is why over 90% of Hull is in Flood Zone 3a and relies on walls, the barrier and pumps. For a site, the useful figure is its ground level in metres AOD set against the modelled flood level.

Where can I find the flood zone for a site in Hull?

In two places. The Environment Agency's Flood Map for Planning gives the national zone, which in Hull is nearly always Zone 3. The council's Figure 14 on Hull My Maps then shows the local sub-zone that the sequential test uses, and Figure 13 shows the depth that sets floor levels under the standing advice. The map on this page gives a quick first answer.

Why does a riverside site in Hull cost more to assess than a rear extension?

Because the work is different. A rear extension in the lowest sub-zone needs a short report; a block of flats beside the River Hull that needs breach levels, a place of safety at the Figure 15 level and a Drainage Impact Assessment needs much more. We quote a fixed fee once we have the address and the proposal, and the quote costs nothing.

How can I check the flood risk of a house I am buying in Hull?

Start with the postcode map on this page and the government's long-term flood risk service, which counts the defences. Then look at the street's history: the council's 2016 flood study lists the roads that flooded in June 2007, and its Section 19 report covers the city-centre streets hit in December 2013. A search will flag Flood Zone 3 almost everywhere, so a flood risk survey is what shows how one house compares.

Can I write my own flood risk assessment for a small extension in Hull?

For minor development such as an extension, the standing advice asks for floors no lower than existing. Where water cannot be kept out, flood resilience should reach at least 300 mm above the Figure 13 depth, and the Environment Agency is not consulted unless the site is within 20 m of a main river or the Humber. An owner or architect can set that out without a specialist report. A new home, a change of use or a riverside site needs a specialist assessment.

Will Hull be underwater by 2050?

No published study says so. The Environment Agency's Humber 2100+ evidence (July 2026) projects sea level in the Humber rising by about 10 to 15 cm a decade, possibly more than a metre by 2100. It also estimates that keeping today's defences will cost over £1 billion by 2046. The risk grows if the defences are not maintained and raised, which is why Hull's places of safety are set against a flood level that allows for climate change to 2115.

What caused the 2007 floods in Hull?

Rain on ground and drains that could not take it. Heavy, sustained rain on 15 and 25 June 2007 overloaded the combined sewers and pumping stations on the city's flat clay, and water ran into west Hull from the higher land beyond the boundary. The Humber played no part, according to the Environment Agency's Humber 2100+ evidence. The storage schemes at Willerby, Cottingham and Anlaby, named in the Local Plan, were built to hold water on that higher ground before it reaches the city.

Do soakaways work in Hull?

Rarely. The Local Plan describes clay and silt subsoils that waterlog quickly over a high water table, and says extensive use of soakaways will not be appropriate. Schemes in Hull therefore store water in tanks, ponds or permeable paving and release it at the Policy 39 rate; the council's drainage guidance puts a watercourse ahead of the sewer and allows the combined sewer only in exceptional circumstances. Our soakaway ground check gives a first view before any infiltration test.

When will a flood risk assessment in Hull be ready?

That depends on what the site needs. A householder scheme in a low sub-zone moves quickly; a riverside block that needs its own breach levels, a topographic survey or a Drainage Impact Assessment takes longer, as does anything waiting on the Environment Agency. Every quote request gets a reply within 60 minutes, and the reply sets out how long your site is likely to take.

Building or buying near the Humber or the River Hull?

Tell us the address, the plans and any date you are working to. A free quote, with no obligation, comes back within 60 minutes from one of our experienced flood risk consultants.

Start a Quote

Unda Consulting Limited prepares flood risk assessments, sequential and exception tests and drainage strategies for sites across Kingston upon Hull, from conversions in the Old Town to new homes at Kingswood. For a site in Hull, call 01293 214444 or email enquiries@unda.co.uk.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.