North Northamptonshire Council assesses flood risk and drainage against Policy 5 (Water Environment, Resources and Flood Risk Management) of the North Northamptonshire Joint Core Strategy, adopted on 14 July 2016, and against the Part 2 plan of whichever former district the site sits in. The council is also the Lead Local Flood Authority, so the same organisation decides the application and checks its drainage. Site-level flood evidence still sits in the former districts' strategic flood risk assessments, the newest dated 2020, behind an area-wide flood risk management study of 2012, and the Level 1 studies for Corby, Kettering and East Northamptonshire are released only on request.
That patchwork shapes every application here. North Northamptonshire Council replaced Corby, East Northamptonshire, Kettering and Wellingborough councils and the county council on 1 April 2021. Their plans, flood studies and drainage guidance did not lapse. They still apply until a single North Northamptonshire Local Plan is adopted, which the council's timetable puts at March 2029. In the former Kettering borough a scheme in a critical drainage catchment needs a flood risk assessment under local policy whatever its size; in the other three former districts the national triggers decide. This page sets out each policy that applies, what the LLFA expects from a drainage strategy, and how our reports meet both. We prepare flood risk assessments and drainage strategies for applications to North Northamptonshire Council; to talk a site through, call 01293 214444 or email enquiries@unda.co.uk.
Planning authority and LLFA in one: who decides what across North Northamptonshire
One unitary council does both jobs. North Northamptonshire Council (NNC) is the local planning authority and the Lead Local Flood Authority for Kettering, Corby, Wellingborough, Rushden, Higham Ferrers, Raunds, Thrapston, Oundle, Desborough, Rothwell, Burton Latimer, Irthlingborough and the villages between them. Northampton itself sits in West Northamptonshire, a separate unitary with its own plan and drainage team.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| North Northamptonshire Council (planning) | Local planning authority | Decides the application against the Joint Core Strategy, the Part 2 plan for the former district, any made neighbourhood plan and the NPPF; checks the flood risk assessment and applies the sequential and exception tests |
| North Northamptonshire Council (flood and water team) | Lead Local Flood Authority | Statutory consultee on surface water drainage for major development; publishes the county Local Standards it uses to assess drainage; consents works affecting the flow in ordinary watercourses; carries out Section 19 flood investigations |
| Environment Agency | Main rivers, flood zones and reservoirs | Consulted on certain development in Flood Zones 2 and 3; works on or near a main river such as the Nene, Ise, Slade Brook, Willow Brook or Harpers Brook may also need a flood risk activity permit from the Environment Agency |
| Anglian Water | Sewerage undertaker | Not a statutory consultee on drainage but owns the public sewers; SSP2 says Anglian Water accepts a surface water connection to a foul sewer only in exceptional circumstances |
| Internal drainage board | None named | Neither the council's flooding pages nor the Joint Core Strategy name a drainage board in North Northamptonshire; ordinary watercourses are regulated by the council |
For ordinary watercourses the council's land drainage consent page is specific: works on, over, under or near an ordinary watercourse within 9 metres of the landward toe of the bank need written consent before they start, retrospective consent is not available, and the charge is £50 for each structure or temporary works notice. A new outfall or culvert for a housing site therefore needs its own consent alongside planning permission. Our explainer on ordinary watercourse consent covers what the application usually involves.
North Northamptonshire's Local Plan flood and drainage policies
Every application is tested against the Joint Core Strategy, which covers all four former districts. A second layer depends on the address: the Kettering Site Specific Part 2 Local Plan, the Kettering Town Centre Area Action Plan, the East Northamptonshire Local Plan Part 2, the Part 2 Local Plan for Corby or the Wellingborough Local Plan Part 2. The table pairs each flood or drainage policy with what our reports put in front of the case officer, and the sections below quote the wording.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| JCS Policy 5 | Water Environment, Resources and Flood Risk Management | A sequential approach to all forms of flooding for site selection and site layout; a 1% (1 in 100) standard with climate change unless local studies show higher; SuDS from the outset wherever practicable; water supply and wastewater infrastructure in place by occupation | Show the layout puts vulnerable uses on the lowest-risk land; size drainage so existing neighbours face no extra flood risk | A flood risk assessment covering every source, with the in-site sequential approach shown on the layout; a drainage strategy sized to the 1 in 100 year event plus climate change | Joint Core Strategy, adopted 14 July 2016 |
| JCS Policy 20 | The Nene and Ise Valleys | Clause (g): identify opportunities for floodplain and river re-naturalisation, de-culverting within urban areas and river habitat improvements | Riverside schemes in the two valleys should not close off those opportunities | Where a watercourse crosses the site, the assessment and drainage strategy record whether de-culverting or a riverside buffer is achievable | Joint Core Strategy, adopted 14 July 2016 |
| SSP2 Policy NEH1 | Local Flood Risk Management | "Development should contribute towards reducing the risk of flooding where appropriate": regard to the SFRA and Surface Water Management Plan, contributions to their flood projects, and regard to the Flood Toolkit and Local Standards; an FRA at 1 ha or more in Flood Zone 1, for all proposals in Flood Zones 2 and 3 and for all proposals in a critical drainage catchment | Where appropriate, have regard to the SFRA and SWMP, and show how the proposal has had regard to the Flood Toolkit and the Local Standards; meet the stricter surface water requirements in a critical drainage catchment however small the scheme | A flood risk assessment that cites the SFRA and Surface Water Management Plan findings for the site and a drainage strategy that shows its working against the Local Standards | Kettering Site Specific Part 2 Local Plan, adopted 1 December 2021 |
| KTCAAP Policy 14 | Flood and Surface Water Management | Development in the town centre plan area to follow the 2010 Level 2 SFRA and not increase flood risk elsewhere; an FRA for all development in Flood Zones 2 and 3a; named sites at surface water risk "will only be considered after the production of the Surface Water Management Plan and Green Infrastructure Strategy", with a Slade Brook catchment-scale FRA where proposals come forward ahead of those publications | Use the town centre SFRA's Slade Brook modelling; join an integrated SuDS scheme where possible | An assessment built on the Royal Haskoning Slade Brook model, with flow routes and the catchment-scale case set out | Kettering Town Centre Area Action Plan, July 2011 |
| ENLP2 Policy EN36 | Former Rushden and Diamonds FC Stadium site, Nene Park, Diamond Way, Irthlingborough | Flood-compatible employment, leisure or tourism use in line with the current flood zone; "Appropriate flood risk mitigation measures" | Match the use to the Flood Zone 3 constraint and evidence the mitigation | Vulnerability and flood zone set out against Annex F, with access, floor levels and compensatory storage where the land is raised | East Northamptonshire Local Plan Part 2, adopted 7 December 2023 |
| ENLP2 Policy EN37 | Riverside Hotel, Station Road, Oundle | Redevelopment for listed uses with "Appropriate flood mitigation measures, including appropriate access and egress arrangements" | Show a safe route out of a site the plan says is mostly in Flood Zone 3 | An assessment that maps the dry access route and, where it is not dry, a flood warning and evacuation plan | East Northamptonshire Local Plan Part 2, adopted 7 December 2023 |
Requirements checked November 2026.
North Northamptonshire Joint Core Strategy Policy 5 (Water Environment, Resources and Flood Risk Management): the area-wide test
Policy 5 applies to every application in North Northamptonshire and asks for two things at once: development kept out of higher-risk land through a sequential approach, and drainage that leaves neighbours no worse off. It opens: "Development should contribute towards reducing the risk of flooding and to the protection and improvement of the quality of the water environment." (Joint Core Strategy, adopted 14 July 2016, page 54.)
Clause (a) carries the sequential approach into the site itself: "Development should, wherever possible, be avoided in high and medium flood risk areas through the application of a sequential approach considering all forms of flooding for the identification of sites and also the layout of development within site boundaries". The phrase "all forms of flooding" reaches past the flood zones. A site wholly in Flood Zone 1 can still have a surface water flow path or a culverted brook across it, and the layout is expected to keep the homes off it.
Clause (b) sets the design standard: "Development should meet a minimum 1% (1 in 100) annual probability standard of flood protection with allowances for climate change unless local studies indicate a higher annual probability, both in relation to development and the measures required to reduce the impact of any additional run off generated by that development to demonstrate that there is no increased risk of flooding to existing, surrounding properties". Clause (c) adds that development "should be designed from the outset to incorporate Sustainable Drainage Systems wherever practicable", and clause (f) that development "will only be permitted where it can be demonstrated that adequate and appropriate water supply and wastewater infrastructure is available (or will be prior to occupation)."
The supporting text adds detail. Paragraph 3.59 asks developers to show how their schemes are informed by the SFRAs, the Surface Water Management Plans and the Northamptonshire Local Flood Risk Management Strategy, and paragraph 3.63 says: "Flood storage measures will be required in the Nene corridor and the upstream catchments of the Slade Brook and River Ise and Willow Brook to enable future growth to be facilitated. These schemes include the Slade Brook flood storage reservoir at Glendon Hall and Weldon flood storage reservoir enlargement." Paragraph 3.52 sets a presumption against non-mains foul drainage unless mains drainage is shown not to be reasonable.
To meet Policy 5, our flood risk assessment works through rivers, surface water, groundwater, sewers and reservoirs for the site, places the more vulnerable parts of the scheme on the lowest-risk ground, and sets floor levels against the 1 in 100 year flood with the current climate change allowance. The drainage strategy then shows the runoff rate and storage that keep existing properties no worse off, with SuDS chosen at layout stage, not added afterwards.
Kettering Policy NEH1 (Local Flood Risk Management): critical drainage catchments
Policy NEH1 of the Kettering Site Specific Part 2 Local Plan, adopted on 1 December 2021, applies only in the former Kettering borough and goes further than the national triggers. It ends: "A site-specific flood risk assessment will be required in the following circumstances: For proposals of 1 hectare or over within Flood Zone 1; For all proposals within Flood Zones 2 and 3; and For all proposals within a Critical Drainage Catchment area as identified in the Surface Water Management Plan."
The third bullet is Kettering's own. The 2018 Kettering Surface Water Management Plan ranked Kettering Town (on the Slade Brook), Desborough South (on the Ise) and the Eastbrook Culvert as the critical drainage catchments needing the strictest control, and paragraph 8.9 of the plan says that "stricter requirements on surface water drainage proposals for sites located in areas draining into the CDCs will be required for all development schemes". The Surface Water Management Plan itself is available only on request from the council.
The policy opens: "Development should contribute towards reducing the risk of flooding where appropriate, it should:" Its three bullets follow, and the third asks schemes, where appropriate, to "Have regard to the Flood Toolkit and Local Standards and Guidance for Surface Water Drainage in Northamptonshire, and demonstrate how the proposal has had regard to these documents". Paragraph 8.9 also warns that applications discharging surface water to foul sewers are unlikely to be supported. Our Kettering assessments therefore name the catchment the site drains to, say how the drainage meets the stricter standard, and cite the Local Standards clause by clause. Read more about critical drainage areas in planning.
Kettering Town Centre Area Action Plan Policy 14 (Flood and Surface Water Management)
Policy 14 of the Kettering Town Centre Area Action Plan (July 2011) remains part of the development plan for central Kettering. Its part B says that "All new development within Flood Zones 2 and 3a will: Require an appropriate Flood Risk Assessment (FRA) at the planning application stage, commensurate with the level of flood risk posed to the site." Part A asks all development in the plan area not to "increase flood risk elsewhere, either through increased surface runoff or impacts on flood flow routes" and, where possible, to adopt an integrated SuDS scheme.
Part C names New Residential Quarter sites 1, 2, 3, 5, 6, 7, 10 and 11 and Station Quarter sites 1, 2 and 10 as potentially at intermediate or high surface water risk, and says development on them "will only be considered after the production of the Surface Water Management Plan and Green Infrastructure Strategy". Should proposals on that land come forward ahead of those publications, "FRAs will need to demonstrate how flooding and surface water management have been assessed at the Slade Brook catchment scale." The evidence behind it is the Kettering Level 2 SFRA by Royal Haskoning (2010), which modelled the Slade Brook through the town and found that strategic storage upstream of the railway culvert could protect the allocated sites. A catchment-scale case of that kind usually needs hydraulic modelling as well as a desk assessment.
East Northamptonshire Policy EN36 (Former Rushden and Diamonds FC Stadium site, Nene Park, Diamond Way, Irthlingborough) and Policy EN37 (Riverside Hotel, Station Road, Oundle)
The East Northamptonshire Local Plan Part 2, adopted on 7 December 2023, has no general flood policy and leaves that to Policy 5. Two of its site policies contain flood clauses. In both cases the land is mostly in Flood Zone 3. Policy EN36 asks for "Flood compatible employment use such as tourism, cultural or leisure related development in accordance with the current EA flood zone status" and "Appropriate flood risk mitigation measures" at Nene Park. Policy EN37 asks the Riverside Hotel scheme in Oundle for "Appropriate flood mitigation measures, including appropriate access and egress arrangements".
Both clauses come down to the same evidence: the vulnerability class of the proposed use against Annex F of the NPPF, finished floor levels above the design flood, and a route out of the site. Where the route crosses flooded land, the assessment says so and a flood warning and evacuation plan sets out what occupiers do.
Joint Core Strategy Policy 20 (The Nene and Ise Valleys): de-culverting and river corridors
Policy 20 is a green infrastructure policy, but clause (g) asks development to "Identify opportunities and proposals for floodplain and river re-naturalisation, de-culverting within urban areas and river habitat improvements." It is one reason a culvert on a town site in Kettering, Corby or Wellingborough is rarely treated as a fixed constraint. Our assessments record the condition of any culvert on or next to the site and whether opening it is realistic. See what a culvert is and why councils resist new ones.
Corby and Wellingborough Part 2 plans, what the Joint Core Strategy replaced, and the new Local Plan
The Part 2 Local Plan for Corby, adopted on 29 September 2021, has no stand-alone flood policy. Its employment land section says some allocated sites may be at risk from surface water or groundwater flooding and that a site-specific flood risk assessment would be required, and two housing policies carry drainage points: Policy H2 asks for SuDS to be considered towards the south-west of the Maple House site, and Policy H3 asks for full surface water drainage details to be agreed before work starts at Station Road. The Wellingborough Local Plan Part 2, adopted on 26 February 2019, states that it does not repeat the Joint Core Strategy's core policies, so Policy 5 is the general flood test in the former borough; an allocated site should also be checked against its own site policy.
Policy 5 replaced three older flood policies in July 2016: Corby Policy P5(C) (Water Quality and Water Resources), Wellingborough Policy G2 (Flood Protection) and Policy 7 (Flood Risk) of the East Northamptonshire Rural North, Oundle and Thrapston Plan (RNOTP 7), all listed in Appendix 3 of the Joint Core Strategy. A decision notice citing any of them predates the current plan.
A new North Northamptonshire Local Plan (2024-2045) is being prepared under the 2026 plan-making Regulations and will replace the Joint Core Strategy and all four Part 2 plans. The council published its notice of intention on 27 April 2026, ran a scoping consultation from 20 May to 1 July 2026 and published its Gateway 1 self-assessment on 14 October 2026. Its timetable schedules consultation on the proposed content and evidence for January to February 2027, the proposed plan for October to December 2027, examination from September 2028 and adoption in March 2029. No draft flood or drainage policies have been published, and the evidence base page lists no new flood risk study yet, so the policies above remain the ones applications are decided against.
Made neighbourhood plans also form part of the development plan, and the council says it has over 100 town and parish councils. We have not reviewed every made plan for flood clauses, so check the council's neighbourhood planning page for the parish your site is in.
Which of North Northamptonshire's plans applies to your address?
Send us the site and the scheme and we will tell you whether Policy 5 alone applies or NEH1, Policy 14 or a site policy adds to it. Get a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.
Start a QuoteWhen a North Northamptonshire site needs an FRA, a sequential test or a drainage strategy
North Northamptonshire Council has not published a local validation list. Its supporting documents page, last updated on 19 May 2023, lists a flood risk assessment among the documents an application may need and links to the GOV.UK guidance, so the national triggers in NPPF policy F4 and the local plan policies above decide what is needed. The council's planners and flood risk page says officers screen every application at validation for flood risk from rivers, groundwater and surface water, so an application that ignores a mapped surface water flow path can still stall at registration. Our guide to applications invalidated for flood risk or drainage explains how that happens.
| Trigger | Flood risk assessment | Sequential and exception tests | Drainage and other consents |
|---|---|---|---|
| Development of any kind in Flood Zones 2, 3a and 3b | Required (NPPF F4(1)); also required by Policy NEH1 in the former Kettering borough and, in Flood Zones 2 and 3a, by Policy 14 in the Kettering town centre plan area | Sequential test unless NPPF F5(2) exempts the scheme; exception test where Annex F table 3 requires it | SuDS wherever practicable under Policy 5(c); drainage strategy for the LLFA on major development |
| Flood Zone 1 site of one hectare or larger | Required (F4(2)(a); also NEH1 in the former Kettering borough) | Sequential test only where part of the site is at risk from another source, now or in the future; no exception test in Flood Zone 1 | Drainage strategy to the Local Standards |
| Flood Zone 1 land identified in an SFRA or the Flood Map for Planning "as being at risk of flooding from any source, whether now or in the future" | Required (F4(2)(c)) | Sequential test unless F5(2) exempts the scheme, including F5(2)(b)(ii) where risk is from surface water only and occupiers stay safe without increasing flood risk elsewhere | SuDS under Policy 5(c) |
| Land "identified by the Environment Agency as having critical drainage problems" | Required (F4(2)(b)) | As the row above | As above |
| Any proposal in a critical drainage catchment of the Kettering Surface Water Management Plan | Required by Policy NEH1, whatever the size of the scheme | As the F4(2)(c) row | Stricter surface water requirements for all development draining to the catchment (SSP2 paragraph 8.9) |
| Named town centre sites at intermediate or high surface water risk (KTCAAP Policy 14 C), which the policy says "will only be considered after the production of the Surface Water Management Plan and Green Infrastructure Strategy" | Where proposals come forward ahead of the Surface Water Management Plan and Green Infrastructure Strategy, an FRA assessed at Slade Brook catchment scale | As above | Contribution to town centre flood and surface water management |
| Extending a home in Flood Zone 2 or 3, or adding under 250 m² to a non-residential building there | Required, proportionate to the works (F4 still applies) | Exempt from the sequential test (F5(2)(c)), so no exception test (F6(2)(a)) | None listed beyond Policy 5(c) |
| Change of use | Required where an F4 trigger applies | Exempt from the sequential test unless the new use is a caravan, camping or chalet site, or a mobile home or park home site | As above |
| Major development (10 or more homes, a housing site of 0.5 ha or more where numbers are not known, 1,000 m² of floorspace or a site of 1 ha or more) | Where one of the rows above applies | Where a flood risk row applies | LLFA consulted; drainage strategy assessed against the Local Standards; in the former Corby borough, discharge limited to 2 l/s/ha (standard L4) |
| Outline application for a phased development | Where a flood risk row applies | Where a flood risk row applies | A site-wide Drainage Strategy that every reserved matters application must follow (Local Standards section 3.4) |
| Works affecting flow in an ordinary watercourse, or within 9 m of its bank | Not triggered by this alone | Not applicable | Ordinary watercourse land drainage consent from the council before work starts |
The sequential and exception tests need their own report wherever a North Northamptonshire site triggers them, because the search for other sites is evidence a flood risk assessment does not contain. The Joint Core Strategy's supporting text (paragraph 3.58) repeats the national test, and paragraph 3.60 adds the sequential approach within the site. A surface-water-only site can fall outside the sequential test under F5(2)(b)(ii), as our note on the surface water exemption explains; the assessment has to show occupiers will be safe for the lifetime of the development without increasing flood risk elsewhere.
Four former districts' SFRAs, the Level 1 studies released on request
North Northamptonshire has no single strategic flood risk assessment. The council's planners and flood risk page, last updated on 29 August 2023, lists the former districts' studies, and the newest of them dates from 2020. Several are not online: applicants have to email the council for them, which adds time before an assessment can start.
Above the district studies sits the North Northamptonshire Flood Risk Management Study Update, a "Final Report" dated March 2012, written by URS and "Prepared for: North Northamptonshire Joint Planning Unit". Its stated purpose is "to provide a technical evidence base that will underpin the emerging replacement Joint Core Strategy (JCS) for North Northamptonshire", and paragraph 3.56 of the Joint Core Strategy cites it. It updates the 2007 study by the Environment Agency and Royal Haskoning, which the planning unit describes this way: "The four existing Strategic Flood Risk Assessments of the Districts have been combined to create an overall flood risk management strategy within North Northamptonshire." The 2012 report reviews the district SFRAs, tests the spatial options for the Joint Core Strategy and sets out policy recommendations, priority flood storage projects and an action plan. It is a strategy built on the district SFRAs, not a substitute for them: the flood zone evidence for an individual site is still in the former district's study.
- Corby. Level 1 SFRA main report, strategic and site maps (February 2019) and a site map addendum (March 2019), all available on request only. The Local Standards record very significant infiltration constraints across 37% of the former Corby borough, the highest share in the county.
- East Northamptonshire. Level 1 SFRA (appendices dated February 2020) available on request; the Level 2 SFRA is online, with 2012 figures for Rushden Lakes, Rushden town centre sites and the Finedon Road Stream in Irthlingborough, including pluvial modelling.
- Kettering. Level 1 SFRA (2019) and a Level 2 study of Duck End, Cranford (November 2019) on request; the 2010 town centre Level 2 SFRA online. Policy NEH1 asks development, where appropriate, to have regard to the SFRA and any updates to it.
- Wellingborough. The BCW SFRA Update 2017 (February 2017) and its maps are online.
- New Local Plan. No North Northamptonshire-wide SFRA has been published for the plan being prepared to 2045. NPPF policy F1 expects the new plan to be informed by an up-to-date SFRA; none is listed on the plan's evidence base page yet.
For an applicant the gap matters because NPPF policy F5(3) makes the SFRA and the Flood Map for Planning the evidence base for the sequential test, and F4(2)(c) triggers an assessment on land an SFRA shows at risk from any source. Pre-2022 SFRAs may define Flood Zone 3b on an older return period than Annex F now uses, so we read each study's definition against the current national one. We request the study for the former district at the start of a job, compare it with the Environment Agency's current mapping on our flood risk map, and say in the report which source we relied on and why.
The LLFA's drainage standards for North Northamptonshire sites
As LLFA, North Northamptonshire Council still works from guidance written for the whole county before 2021. Its surface water planning page, updated on 3 June 2024, says that all major applications must show sustainable drainage, that the council is a statutory consultee on them, and that if it is not satisfied that SuDS would be inappropriate where a piped system is proposed, it may object. The detail sits in the county Local Standards.
| Requirement | North Northamptonshire standard and source |
|---|---|
| Status of the guidance | Local Standards and Guidance for Surface Water Drainage in Northamptonshire, version 1.3, August 2016 (updated September 2017), written by the former county LLFA and hosted by West Northamptonshire Council. The document calls itself a material planning consideration because the Local Flood Risk Management Strategy refers to it as policy. The council's developers page asks applicants to request it |
| Which schemes | The local L standards are those the LLFA uses "to assess the drainage implications of Major planning applications". Below that threshold, the council's developers page says a drainage assessment may still be required where a site is not otherwise at flood risk, and Policy 5(c) applies to all development |
| Greenfield discharge | Standard L2: the greenfield runoff rate is agreed with the LLFA, the Environment Agency, the sewerage undertaker, any drainage board and the Canal and River Trust where they have an interest, taking account of the 1 in 1, 1 in 30 and 1 in 100 year events with climate change. Standard L3: any higher rate needs evidence and agreement |
| Corby | Standard L4: "In the borough of Corby, major development should limit discharge to 2l/s/ha, as set out in the Corby Water Cycle Strategy." |
| Brownfield discharge | Greenfield rates are strongly encouraged. As a minimum, brownfield sites reduce discharge by 40% from the existing runoff or the pipe-full capacity of the existing system, whichever is lower; the guidance links this to climate change (see the current allowances). Standard L5 asks for evidence where greenfield rates cannot be met |
| Minimum flow rate | The guidance states that "the minimum limit of 5l/s does not apply in Northamptonshire", relying on filtration and maintenance to control blockage |
| Volume and long-term storage | Additional runoff volume is infiltrated where possible; otherwise it is stored and released at QBAR or 2 l/s/ha, whichever is greater (the "complex" option), or all events are limited to QBAR (the "simple" option) |
| Urban creep | Standard L7: residential schemes add 10% to the impermeable area in all calculations |
| Infiltration testing | To BRE Digest 365 (2016) and CIRIA Report 156; infiltration features no deeper than 2.0 m below ground with an invert at least 1.0 m above the highest recorded groundwater (L13); storage half-empty within 24 hours (L10) |
| Freeboard and exceedance | Standard L12: at least 300 mm freeboard on surface storage; no flooding of the site in a 1 in 30 year storm, or of buildings or vulnerable utility plant in a 1 in 100 year storm, except in areas designed to hold or convey water (non-statutory standards S7 and S8); exceedance flows routed away from buildings and access routes (L8) |
| Climate change | Appendix G applies the Environment Agency allowances of February 2016. The current climate change allowances were last updated on 27 May 2022 and are the ones a 2026 strategy should use |
| National Standards | NPPF policy F8 asks for SuDS designed to the 2025 National Standards for Sustainable Drainage Systems. The Local Standards predate them and are built on the March 2015 non-statutory standards; North Northamptonshire Council has published no statement on how it applies the National Standards |
Two points in the standards bite on North Northamptonshire sites in particular. Infiltration is the preferred discharge route, but the Local Standards record very significant infiltration constraints on 15% of the former Kettering and East Northamptonshire districts, 17% of Wellingborough and 37% of Corby, mostly in the valleys but with larger areas on higher ground around eastern Corby. A soakaway test early in the job decides whether the scheme needs storage and a watercourse outfall instead; our BRE 365 infiltration rate calculator and ground conditions and soakaway map give a first view. Second, major schemes in the former Corby borough are held to 2 l/s/ha under standard L4 whatever the greenfield calculation gives, and the attenuation storage is sized to that limit.
One statement on the council's developers page needs care. It says all new development in the Upper Nene catchment must be designed for a 0.5% (1 in 200) flood with climate change. The Local Standards limit that standard (L1) to the Upper Nene "through and upstream of Northampton", which lies in West Northamptonshire, so most North Northamptonshire sites, which drain to the Nene downstream of Northampton, are designed to the 1% standard of Policy 5. We confirm the catchment for any site near the western boundary. The council also offers a paid technical flood advice service at £84 an hour for pre-application drainage discussions.
Where the scheme needs a pre-commencement drainage condition, the same standards are applied when the condition is discharged, and a drainage strategy that already answers them shortens that stage.
Chapter 18 of the August 2026 NPPF beside North Northamptonshire's older plans
National flood policy is now Chapter 18 of the National Planning Policy Framework, published on 17 August 2026. Policy F4 sets when an assessment is needed, F5 and F6 the sequential and exception tests, F7 the safety tests and F8 sustainable drainage. Every North Northamptonshire plan above was written to an earlier Framework: the Joint Core Strategy's footnote still refers to paragraphs of the 2012 version, and the council's planners page still refers to Section 10 of an earlier NPPF. Our NPPF guidance page and the summary of the August 2026 changes set out what moved.
The sequential test is where the gap shows. Policy F5(1) says the area to which the test is applied "should not be greater than the anticipated catchment of the development in terms of its likely occupiers or users". The search is set by that catchment, not by the council's boundary. F5(2) exempts allocated sites that were tested when the plan was made, and sites where an assessment shows that no built development within the site boundary, "including access or escape routes, land raising or other potentially vulnerable elements", would be at risk from any source now and in the future. Kettering's Part 2 plan sequentially tested all 29 sites promoted to it, so its allocations fall within that first exemption.
Annex A of the Framework says local plan policies "materially inconsistent" with its decision-making policies should be given "very limited weight" unless examined and adopted against it, while other policies "should not be given reduced weight simply because they were adopted prior to the publication of this Framework" (Annex A). Neither Policy 5 nor Policy NEH1 sets an exemption looser than F4 to F6, and NEH1's critical drainage catchment trigger goes further than F4. The flood risk and coastal change guidance, last updated on 17 September 2025, and our article on the Gladman judgment and the sequential test cover how the catchment is set in practice.
Flood risk across North Northamptonshire: the Nene, the Ise and culverted brooks
Most of North Northamptonshire drains to the River Nene, with the Ise, Harpers Brook, Alledge Brook, Slade Brook and Willow Brook as its main tributaries; part of the northern area drains to the River Welland (Joint Core Strategy, paragraphs 3.47 and 3.48). The towns grew over their streams, so much of the risk comes from culverts and surface water, not from open floodplain.
Storm Bert showed both. The Willow Brook reached its highest recorded level, 4.51 m, at the Weldon flood storage reservoir gauge on 24 November 2024, and the council's Section 19 report on Stratfield Way in Kettering found that Slade Brook's capacity was exceeded on 25 November 2024, flooding five buildings internally; the brook's capacity had also been exceeded in a 2020 incident. The Slade Brook gauge in Kettering shows property flooding as possible above 1.26 m and the River Ise at Barford Bridge peaked at its record 1.90 m on 23 December 2020. The council publishes its Section 19 flood investigations by year; reading the ones near a site is part of our desk study.
Each town has its own area page: flood risk assessment in Kettering covers the Slade Brook and the town centre culverts, the Corby page the Willow Brook and the culverted streams of the new town, and the Wellingborough page the Ise and Nene confluence and the Swanspool Brook. The Northamptonshire county page covers both unitary councils. Live readings for the Nene and its tributaries are on our live river levels map. Rushden, Raunds, Thrapston, Oundle, Desborough, Rothwell and Burton Latimer have no area page yet; for those, this page and the river pages are the place to start.
What each of our reports does for a North Northamptonshire Council application
A flood risk assessment, a sequential test and a drainage strategy answer three different questions: whether the site is safe, whether it should be there at all, and where its water goes. Applications to North Northamptonshire Council often need more than one, and the rows below say why for each.
- Every source, one report. Policy 5 asks for a sequential approach to "all forms of flooding", so our flood risk assessment works through rivers, culverts, surface water, groundwater and reservoirs for the site.
- Planning applications. NEH1 (in the former Kettering borough), Policy 14 (in the Kettering town centre plan area) and NPPF F4 each set triggers, and a flood risk assessment for planning answers whichever apply to the address.
- Buying in Kettering, Corby or Oundle. The council's Section 19 reports record homes flooded from brooks, culverts and surface water in recent storms, and our flood risk survey for property purchase reports on the building before exchange.
- Sites in Flood Zones 2 and 3. Policy 5 and paragraph 3.58 of the Joint Core Strategy apply the national tests, and a sequential and exception test report sets the search area to the scheme's catchment under NPPF F5(1).
- Major schemes. The LLFA assesses majors against the county Local Standards, and our drainage strategy works through them standard by standard.
- Runoff rates and storage. A surface water drainage strategy sets the greenfield or 2 l/s/ha limit, the 10% urban creep and the storage the Local Standards require.
- Pre-commencement conditions. Corby Policy H3 is one example of drainage details agreed before work starts; discharge of drainage conditions prepares what the council needs to sign the condition off.
- Reading the national tests against old plans. Every local plan here predates the August 2026 Framework, and our NPPF guidance and advice sets out where Chapter 18 now governs.
- Groundwater. The council's developers page asks for groundwater in the assessment where properties have flooded from it or the planning authority flags a risk, often with a conceptual groundwater model, which our groundwater flood risk assessment provides.
- Culverted brooks and catchment-scale cases. KTCAAP Policy 14 asks for Slade Brook catchment-scale assessment on named sites where proposals come forward ahead of the Surface Water Management Plan and Green Infrastructure Strategy, and flood modelling gives levels where the national maps stop at the culvert.
- Riverside redevelopment. Policy EN37 asks for safe access and egress at the Riverside Hotel in Oundle, and a flood warning and evacuation plan covers sites where the route out floods.
- Wastewater capacity. Policy 5(f) requires wastewater infrastructure before occupation and paragraph 3.52 resists non-mains drainage, both answered by a foul drainage strategy.
- Larger non-residential buildings. Joint Core Strategy Policy 9 asks schemes of 1,000 m² or more of non-residential floorspace to meet BREEAM very good, subject to viability, which needs a BREEAM flood risk assessment for the flood credit.
- Employment land. Corby's Part 2 plan flags surface water and groundwater risk on some allocated employment sites, and a due diligence flood risk assessment sets that out for a buyer or lender.
Unda Consulting Limited, which prepares these reports, is a CIWEM Business Partner, and the consultants who write them for North Northamptonshire sites are chartered. Other council pages are listed on our local authorities hub, and our explainer on how SFRAs, LLFAs and local planning authorities fit together gives the background.
North Northamptonshire flood and drainage questions, answered
What does North Northamptonshire Joint Core Strategy Policy 5 require on flood risk?
Policy 5 (Water Environment, Resources and Flood Risk Management), adopted in July 2016, asks for a sequential approach to all forms of flooding when choosing sites and laying them out, a minimum 1% (1 in 100) standard of protection with climate change unless local studies show a higher one, SuDS designed in from the outset wherever practicable, and proof that water supply and wastewater infrastructure will be in place before occupation. It applies across all four former districts.
Where do I get the SFRA for a site in Corby, Kettering or Rushden?
From the council. The Level 1 SFRAs for Corby (February 2019), Kettering (2019) and East Northamptonshire (February 2020) are released on request by email, as is the Kettering Surface Water Management Plan. The Wellingborough 2017 update, the Kettering town centre Level 2 SFRA (2010) and the East Northamptonshire Level 2 figures (2012) can be downloaded from the planners and flood risk page.
Does a Kettering scheme in a critical drainage catchment need a flood risk assessment?
Yes. Policy NEH1 of the Kettering Site Specific Part 2 Local Plan requires a site-specific flood risk assessment for all proposals within a critical drainage catchment identified in the 2018 Surface Water Management Plan, as well as for sites of 1 hectare or more in Flood Zone 1 and all proposals in Flood Zones 2 and 3. The plan also applies stricter surface water requirements to every scheme draining to those catchments.
Is there a North Northamptonshire local validation list for flood risk?
No local list has been published. The council's supporting documents page lists a flood risk assessment as a document some applications need and points to the national guidance, so NPPF policy F4 and the local plan policies set the triggers. Officers still screen each application at validation for river, groundwater and surface water risk.
What discharge rate will the LLFA accept from a brownfield site?
The county Local Standards strongly encourage greenfield rates. As a minimum, a brownfield site should cut its discharge by 40% from the existing runoff or the existing pipe-full capacity, whichever is lower, and evidence is needed for anything above greenfield. In the former Corby borough, major development is limited to 2 litres per second per hectare. The 5 litres per second minimum used elsewhere does not apply in Northamptonshire.
Is a flood risk assessment needed in Flood Zone 2 in North Northamptonshire, even for an extension?
Yes, for any development. NPPF policy F4 asks for a site-specific assessment in Flood Zones 2, 3a and 3b, and Policy NEH1 says the same in the former Kettering borough. It should be proportionate: a home extension needs a short assessment of floor levels and flood resilience, and householder development is exempt from the sequential test under policy F5, and so from the exception test. New homes in Flood Zone 2 face the sequential test unless one of the F5 exemptions applies.
Waiting on an SFRA from the council?
Send us the site address now and we will request the right former-district study and start on the national data while it arrives. Get a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.