Wiltshire Council decides flood risk and drainage under Core Policy 67 (Flood Risk) of the Wiltshire Core Strategy, adopted on 20 January 2015, which asks all new development to cut the rate of its rainwater runoff. It is also the Lead Local Flood Authority, and its drainage team wants groundwater measured before it accepts a soakaway or a buried tank. Monitoring runs from 1 November to 31 May, and on a major full application the results have to go in with the submission.

The plan is older than it was meant to be. Councillors voted on 19 May 2026 to withdraw the Wiltshire Local Plan Review from examination, so the 2015 Core Strategy, whose plan period ends in 2026, carries on as the starting point for decisions. A new Wiltshire Local Plan began under the 2026 plan-making rules on 30 June 2026 and has no draft policies yet. This page sets out what Wiltshire Council requires for flood risk and drainage today. It covers the adopted policies, the 1 September 2025 validation checklist, the drainage team's standards and the national tests in the August 2026 National Planning Policy Framework (NPPF). Each comes with what our reports contain to meet it.

Who decides flood risk and drainage on a Wiltshire Council application?

Wiltshire Council has been a unitary authority since April 2009, so one council is the planning authority, the Lead Local Flood Authority and the highway authority for the whole county outside Swindon. Swindon Borough Council is a separate unitary with its own plan and its own drainage team. The council's new Local Plan also leaves out the part of Wiltshire inside the New Forest National Park, where the National Park Authority prepares its own plans and decides applications.

BodyRoleWhat it decides or is consulted on
Wiltshire Council (planning)Local planning authorityDecides the application against the Core Strategy, the site allocations plans, any made neighbourhood plan and the NPPF; checks it against the Local Validation Checklist; applies the sequential test
Wiltshire Council (drainage team)Lead Local Flood AuthorityStatutory consultee on major development; comments on smaller schemes where it is consulted; reviews the surface water drainage strategy and the groundwater monitoring; consents works to ordinary watercourses
Environment AgencyMain rivers and flood zonesThe Level 1 SFRA lists it as statutory consultee for certain development in Flood Zones 2 and 3 and for works within 20 metres of a main river; works on or near a main river may also need a flood risk activity permit from the Environment Agency
Wessex Water, Thames Water, Southern Water and Veolia Water ProjectsSewerage undertakersNot statutory consultees. The drainage team expects the undertaker's approval in principle before an application proposes surface water to a combined sewer
Internal drainage boardNone in WiltshireThe SFRA's table of risk management authorities names no board; the council regulates ordinary watercourses itself

That last row has a practical edge. The council is the land drainage authority, and its Betterment Strategy says land drainage consent is needed to discharge into an ordinary watercourse or to work within 8 m of one. The consent application costs £50 per structure, lasts 12 months unless the council says otherwise and is issued to the landowner, not the agent. It sits alongside planning permission and does not come with it; our guide to ordinary watercourse consent explains how the two fit together. If the drainage team objects to an application, start with our note on responding to an LLFA objection.

Wiltshire's adopted flood and drainage policies

Three policies in the Core Strategy set the flood, drainage and water requirements, and made neighbourhood plans add their own in some towns. The table pairs each with what our reports put in front of the case officer. The sections below it quote the wording.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
Core Policy 67Flood RiskSequential test evidence for development proposed in Flood Zones 2 and 3; measures to reduce the rate of runoff and improve infiltration in all new developmentShow no lower-risk site is available where the test applies; include SuDS unless the site or its environment rules them outA flood risk assessment and, where needed, a sequential test report; a drainage strategy showing the reduced runoff rateWiltshire Core Strategy, adopted 20 January 2015
Core Policy 68Water ResourcesNo prejudice to River Basin or Catchment Management Plan targets; water efficiency in non-residential development; a groundwater risk assessment in Source Protection, Safeguard and Water Protection ZonesAssess the risk to groundwater quality through construction and operation where the site is in one of those zonesPollution hazard and treatment set out in the drainage strategy, with infiltration kept clear of the protected sourceWiltshire Core Strategy, adopted 20 January 2015
Core Policy 69Protection of the River Avon SACPollution and disturbance controls during construction and operation; a construction management plan within 20 m of the river banks; phosphate offsetting where the sewage works cannot take the loadSubmit the construction management plan; show phosphorus neutrality for new overnight accommodation in the catchmentSurface water and foul drainage strategies that state the discharge route and the phosphorus position the council's ecologist will checkWiltshire Core Strategy, adopted 20 January 2015
Policy 3 (Melksham)Flood Risk and Natural Flood ManagementMitigation and suitable construction methods in places with known flooding; less runoff and SuDS; support for natural flood managementShow how flood risk is mitigated, in proportion to the schemeAn assessment and drainage strategy tested to the 1 in 100 year storm plus climate change, as the plan's supporting text asksJoint Melksham Neighbourhood Plan 2, made 4 August 2025
Policy 15 (Salisbury)Construction and development management for projects affecting the River Avon SACRiparian development to protect the SAC under Core Policy 69 and the plan's paragraph 201Near the Avon and its tributaries in the River Park zones: no increase in surface water or groundwater flood risk, and betterment on runoffA drainage strategy showing runoff control better than the pre-development rateSalisbury Neighbourhood Development Plan, made 3 March 2025
Policy GI1 (Chippenham)Protecting and Enhancing BiodiversityBlue infrastructure retained; any SuDS created to be multi-functionalUse SuDS that also serve wildlife or amenityAbove-ground SuDS features proposed where the layout allowsChippenham Neighbourhood Plan, made 29 May 2024

Requirements checked November 2026.

Wiltshire Core Policy 67 (Flood Risk): the sequential test and runoff from every scheme

Core Policy 67 does two jobs: it tells applicants in Flood Zones 2 and 3 how to evidence the sequential test, and it puts a drainage duty on every development whatever its size or flood zone. The drainage sentence reads: "All new development will include measures to reduce the rate of rainwater run-off and improve rainwater infiltration to soil and ground (sustainable urban drainage) unless site or environmental conditions make these measures unsuitable." (Wiltshire Core Strategy, adopted 20 January 2015)

Note what that sentence does not say. It has no threshold of ten homes, no floorspace test and no flood zone. A single house in Flood Zone 1 is caught. The council's supporting text adds that it expects every development to be able to cut the quantity of runoff, and that the applicant should explain why if slowing or treating the water is not practical on the site.

On location, the policy says development proposed in Flood Zones 2 and 3 "will need to refer to the Strategic Housing Land Availability Assessment when providing evidence to the local planning authority in order to apply the sequential test in line with the requirements of national policy and established best practice". The supporting text asks for "clear evidence that no lower risk alternative sites are available". The land availability assessment is still the council's suggested source of comparison sites, but national policy has moved since 2015, and the search area and the exemptions now come from NPPF policy F5 (covered further down).

Under this policy the drainage team looks for a runoff rate lower than the existing one and for infiltration that has been tested, not assumed. Planning officers look for a sequential test that compares real alternative sites. Our flood risk assessment sets the flood zone, the other sources of flooding and the floor levels against the SFRA. Where the test applies, a separate sequential test report compares the alternatives. The drainage strategy then shows the reduced rate with the calculations behind it.

Wiltshire Core Policy 68 (Water Resources): groundwater protection and water efficiency

Core Policy 68 protects the groundwater that, in the Core Strategy's words, several settlements rely on for drinking water. Its main test reads: "Development proposals within a Source Protection Zone, Safeguard Zone or Water Protection Zone must assess any risk to groundwater resources and groundwater quality and demonstrate that these would be protected throughout the construction and operational phases of development." (Wiltshire Core Strategy, adopted 20 January 2015)

The policy also says development must not prejudice the targets of the relevant River Basin or Catchment Management Plan, and it requires water efficiency measures in non-residential schemes. For drainage the consequence is direct: a soakaway that suits the flood risk case can still fail this policy if it sends untreated runoff into a source protection zone. Our drainage strategies state the zone, score the pollution hazard and show the treatment before water reaches the ground.

Wiltshire Core Policy 69 (Protection of the River Avon SAC): the 20 m rule and phosphate

Core Policy 69 applies to the Hampshire Avon, a chalk river designated as a Special Area of Conservation (SAC). Its catchment, the Core Strategy says, covers over half the county. The policy asks for measures during construction and operation to prevent pollution and disturbance, and it sets a fixed trigger: "All development within 20m of the river banks should submit a construction management plan to the local planning authority to ensure measures proposed during construction are satisfactory." (Wiltshire Core Strategy, adopted 20 January 2015)

The second half of the policy reaches further. Where extra sewage "cannot be accommodated without measures to offset phosphate loading", development must take proportionate measures to show no adverse effect on the SAC. In practice that is nutrient neutrality. The validation checklist asks for a completed nutrient calculator with every application that adds overnight accommodation in the Hampshire Avon, River Test, River Lambourn or Somerset Levels and Moors catchments. The council's phosphorus and nitrogen mitigation page describes its Hampshire Avon arrangements as interim. It warns that phosphorus credits are scarce in the Upper Till, the Upper and Mid Bourne, the Upper Avon headwaters and the Upper Wylye around Warminster, and tells applicants there to contact the council before going further. Our overview of nutrient neutrality in planning explains the calculation. A foul drainage strategy matters here. The same page says a discharge of less than 2 cubic metres a day to ground, through a septic tank or package treatment plant with a drainage field, may fall below the threshold for needing phosphorus offsetting.

Joint Melksham Neighbourhood Plan 2, Policy 3 (Flood Risk and Natural Flood Management)

Policy 3 of the Joint Melksham Neighbourhood Plan 2 asks proposals in Melksham and Melksham Without to show how flood risk is mitigated, in proportion to their scale, nature and location. It states: "Development proposals in locations with known flooding issues should include appropriate mitigation and construction methods, and, where appropriate, contributions towards wider catchment projects." (Joint Melksham Neighbourhood Plan 2, made 4 August 2025)

The policy adds that the approach should reduce rainwater runoff and include sustainable drainage systems. Its supporting text asks for a drainage strategy that deals with the 1 in 100 year storm plus climate change, and identifies the South Brook catchment as a priority area for surface water flooding. A site draining towards the South Brook should expect the drainage team to read the strategy with that in mind.

Salisbury Neighbourhood Development Plan Policy 15 (Construction and development management for projects affecting the River Avon SAC)

Policy 15 of the Salisbury plan ties riverside development in the city back to Core Policy 69. It reads: "Riparian development will ensure protection of the River Avon SAC in accordance with Wiltshire Core Strategy Core Policy 69 or other relevant local plan policy and paragraph 201 (below)." (Salisbury Neighbourhood Development Plan, made 3 March 2025)

Paragraph 201 is where the drainage content sits. For development near the Avon and its tributaries inside the River Park and its interface zone, it says the development "should not increase surface water or groundwater flood risk" and that "Betterment of surface water run-off control should be achieved over pre-development run-off." The plan's design policy also asks for a 25-year management scheme for any flood management works. So a riverside scheme in Salisbury has to show betterment twice over, once to the city's plan and once to the drainage team.

Chippenham Neighbourhood Plan Policy GI1 (Protecting and Enhancing Biodiversity), and the plans with no flood policy

The Chippenham Neighbourhood Plan has no flood risk policy of its own. The nearest clause sits in Policy GI1: "Retain blue infrastructure and where sustainable drainage systems (SuDS) are being created these should be multi-functional". (Chippenham Neighbourhood Plan, made 29 May 2024) A buried tank on its own is hard to square with that clause where a basin or swale could do the same job. The plan's Green Corridors policy also lists flood protection among the functions that development in or next to a corridor must not compromise.

The Warminster Neighbourhood Plan (made 23 November 2016) contains no flood or drainage policy, and the Malmesbury Neighbourhood Plan deals with flooding only through the requirements for its allocated sites. Wiltshire has many more made plans than the five we read for this page, so check the council's list of made neighbourhood plans for your parish before assuming Core Policy 67 is the only local test.

What the Core Strategy replaced, and the new Wiltshire Local Plan

Core Policy 67 replaced Policy U2 (Surface Water Disposal) of the 2004 West Wiltshire District Plan when the Core Strategy was adopted in January 2015, and Core Policy 68 replaced that plan's Policy U4 (Groundwater Source Protection Areas) along with Policy G3 of the Salisbury District Local Plan. Appendix D of the Core Strategy lists every district policy it replaced or saved, and older decision notices still cite the earlier codes.

The Local Plan Review that was meant to succeed the Core Strategy was submitted for examination on 28 November 2024 and withdrawn by a vote of Full Council on 19 May 2026; the formal notice is dated 22 May 2026. The council's withdrawal page says the Core Strategy's policies "are not automatically out of date for the purposes of decision making and will continue to guide development". The draft flood policy in the withdrawn plan carries no weight.

The council gave notice of a new Wiltshire Local Plan on 30 June 2026, held a scoping consultation from 2 to 30 September 2026 and published its Gateway 1 self-assessment on 31 October 2026, which starts the 30 months allowed for preparing the plan. Its timetable puts consultation on proposed content in April and May 2027, the proposed plan in March to May 2028, submission on 31 October 2028 and a decision on adoption on 30 April 2029. The Gateway 1 self-assessment warns that the local elections in May 2029 may affect that last date. No draft policies exist, so nothing in the new plan changes the flood or drainage position yet.

Is Core Policy 67 the only test your Wiltshire site faces?

Send us the address and the scheme and we will tell you which policies, checklist triggers and drainage standards apply. Get a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour.

Start a Quote

What the 1 September 2025 validation checklist asks for

The council's Local Validation Checklist took effect on 1 September 2025 and is linked from its application page. It is under two years old, so its local items can be enforced at registration. The flood risk assessment has its own entry for householder, full and outline applications, and drainage has one for full, outline and reserved matters applications. Each entry ends with the same trigger, "When requested by the Lead Local Flood Authority", which gives the drainage team room to ask for more.

TriggerFlood risk assessmentSequential and exception testsDrainage and other documents
Householder scheme in Flood Zone 2 or 3A proportionate assessment, or the council's completed householder formHouseholder development is exempt from the sequential test under NPPF policy F5None listed
Householder scheme, or a non-domestic extension under 250 m², where groundwater may be within 0.5 m of the surface or the site is inside the 1 in 1,000 year surface water extentThe council's householder and minor extensions form asks for the form in these cases as wellExempt as aboveNone listed
Full or outline application in Flood Zone 2 or 3RequiredSequential test unless NPPF policy F5 exempts the scheme; exception test where Annex F of the NPPF requires itSurface water drainage strategy if the scheme is major or meets the two-dwelling trigger below
A site of 1 ha or more lying wholly in Flood Zone 1RequiredSequential test only if part of the site is at risk from another sourceAs above
A smaller Flood Zone 1 site changing to a more vulnerable use where surface water, groundwater, drains or a reservoir could affect itRequiredChanges of use are exempt under F5 unless the new use is a caravan, camping, chalet, mobile home or park home siteAs above
Land the Environment Agency has identified as having critical drainage problemsRequired by the checklist, though the SFRA records no such areas in Wiltshire at presentNot triggered by this aloneAs above
Land the SFRA shows at increased flood risk in futureRequiredSequential test unless exemptAs above
Any major application (10 or more homes, a housing site of 0.5 ha or more where the number is not known, 1,000 m² of floorspace or a site of 1 ha or more)Where one of the rows above appliesWhere a flood risk row appliesSurface water drainage strategy with the council's completed SuDS Detailed Technical Checklist
Two or more new homes, or a change of use to two or more, at risk from ordinary watercourses, surface water or groundwaterWhere one of the rows above appliesWhere a flood risk row appliesSurface water drainage strategy with the completed technical checklist
Reserved matters on a major scheme or one meeting the two-dwelling triggerCarried from the outlineCarried from the outline"Drainage Details" with the completed technical checklist
More overnight accommodation in the Hampshire Avon, River Test, River Lambourn or Somerset Levels and Moors catchmentsNot triggered by this aloneNot applicableA completed nutrient neutrality calculator for the catchment

The two-dwelling row changes small schemes most. It pulls infill plots into a full drainage submission wherever the mapping shows local flood risk. The technical checklist behind it is a spreadsheet with a column for each application stage. It asks for greenfield rates worked out by two methods, BRE 365 soakaway tests at the depth of the proposed feature, peak winter groundwater, a plan of exceedance routes and, on major schemes, a matrix of compliance with the National SuDS Standards. Without it the council can decline to validate the application. Our article on applications invalidated over flood risk and drainage covers what registration teams reject most often.

The householder form is short, and many owners can complete it themselves. It offers three routes: floor levels no lower than the existing house with resilience measures such as sockets at least 400 mm above the floor; floor levels 300 mm above the known or modelled 1 in 100 year flood level, shown on a plan in metres above Ordnance Datum; or works limited to a loft conversion, boundary wall, hard standing or new roof and windows. The form warns that without it or a site-specific assessment "your application will be invalid", and that the drainage team may still ask for a fuller report. Our guide to extending a house in a flood zone explains when that happens.

One caution about the checklist's own wording. It tells applicants to use the Environment Agency's climate change guidance "last updated in February 2016". The allowances were in fact last updated on 27 May 2022, and an assessment built on anything older will not stand up to the drainage team's or the Environment Agency's review.

The drainage team's standards: betterment, soakaways and groundwater

Wiltshire Council sets its surface water standards in the Drainage and Betterment Strategy of June 2024, which it calls a living document, and in seven shorter technical notes published on its development and planning information page. The notes are undated (the files were created in August 2025) and most say they formalise the strategy. They do not always match it. Where they differ we work to the stricter figure and say so in the report. Neither document mentions the 2025 National Standards for sustainable drainage systems, which NPPF policy F8 now expects every scheme to follow. The council's SuDS Detailed Technical Checklist does. Its sheet for major schemes says: "All drainage systems must comply with the National SuDS Standards, unless the Wiltshire Council Standard provides a stricter level of restriction." It also tells applicants to expect to provide a matrix showing how they have complied with the standards in full. A strategy for a Wiltshire site therefore answers both sets of rules.

RequirementWiltshire Council standard and source
Discharge hierarchyRainwater reuse first, then infiltration, a mix of infiltration and a watercourse, a watercourse, a surface water sewer or highway drain, and a combined sewer last (Betterment Strategy, section 1). A highway drain is a last resort and needs a CCTV survey to the outfall and a hydraulic model of the drain
Greenfield discharge rateThe discharge rates note prefers the greenfield 1 in 1 year rate for every event up to the 1 in 100 year storm with climate change. Failing that, at least 30% betterment on the matching greenfield rate for each event from the 1 in 2 year (QBAR) to the 1 in 100 year, with long-term storage released at no more than 2 l/s/ha. The June 2024 strategy states the 30% betterment from the 1 in 1 to the 1 in 100 year event
Brownfield discharge rateThe same principles as a greenfield site. Where that cannot be done, as close to the greenfield 1 in 1 year rate as feasible and at least 30% betterment on the existing rate (discharge rates note)
Discharge volumeRunoff volume in the 1 in 100 year, 6 hour event should never exceed the greenfield volume for that event (Betterment Strategy, sections 2.1 and 3.9)
StorageAttenuation for all storms up to the 1 in 100 year event plus climate change, half empty within 24 hours of a 1 in 30 year storm plus climate change or able to hold a following 1 in 10 year storm; kept out of Flood Zones 2 and 3 where possible (Betterment Strategy, section 3)
Climate change allowanceThe Environment Agency's current peak rainfall allowances. The 2024 SFRA's table of those allowances gives an upper end figure of 45% for the 1% AEP storm to the 2070s in the two Avon catchments and 40% in the Kennet
Urban creepA 10% allowance added to the storage calculation, which the strategy applies to new dwellings as well (Betterment Strategy, section 3)
Infiltration testingBRE 365 with three consecutive fills in each pit at the location, depth and head of the proposed feature, using the lowest rate; a likely minimum acceptable rate of 1 x 10⁻⁶ m/s; not into made ground (Betterment Strategy, section 1.2)
Soakaway sitingBase at least 1 m above peak winter groundwater; 5 m from buildings, and up to 20 m on chalk where dissolution features may form (Betterment Strategy, section 1.2)
Groundwater monitoringBetween 1 November and 31 May, at no more than 3 m from each proposed feature with at least three points on a small site. The two documents give different borehole depths: the groundwater monitoring note asks for at least 1 m below the base of the feature, and the June 2024 strategy (section 8.5.1) for no less than 2 m below it, so we specify the deeper
Modelling inputsFEH and FSR rainfall compared and the more conservative used; runoff coefficients of 0.75 in summer and 0.84 in winter; no allowance for incidental storage in the network; storms up to 2,880 minutes (Betterment Strategy, section 3)
Exceedance and levelsFlow routes for storms beyond the 1 in 100 year event plus climate change kept on site; at least 300 mm freeboard in basins; finished floors at least 150 mm above surrounding ground (technical checklist)
Adoption and recordsThe council does not adopt SuDS except where they drain a road it adopts, so the checklist asks for a maintenance programme naming who is responsible; as-built drawings, photographs and CCTV surveys follow construction (Betterment Strategy, section 10)

The greenfield row is where a Wiltshire strategy differs most from one written for a neighbouring county. Many councils accept the greenfield rate event for event. Wiltshire asks for less. Its later note prefers the lowest greenfield rate of all for every storm, which means more storage and a larger share of the layout given over to it. The strategy is blunt about the consequence, saying the drainage team "will not accept statements that there is insufficient space for SuDS or that SuDS have not been utilised due to cost". Our climate change and urban creep calculator shows what the uplifts do to an impermeable area before the storage is sized.

Minor schemes get a lighter version, for a practical reason. A flow control small enough to hit the 1 in 1 year rate on a small site tends to block. So the strategy asks minors to limit discharge to the greenfield rate as a minimum, add the 10% for urban creep and use unlined permeable paving where hard surfaces are needed. Infiltration testing is still expected wherever water is sent to a single soakaway. The guide to BRE 365 testing explains the three-fill method, and the BRE 365 infiltration rate calculator turns pit readings into the rate the council wants to see.

Why the monitoring season decides the programme

Groundwater sets the timetable on a Wiltshire site more than any other requirement. The strategy says the drainage team can ask for monitoring results on any major development, any site in Flood Zone 2 or 3, and any site near springs, wells, watercourses or known groundwater flooding. For a major full application the results "must be provided when the application is submitted". For an outline, twelve months of data must support the reserved matters if the winter peak has not been established.

The monitoring note tightens this. Readings have to show that the peak has been reached and that levels have then fallen continuously for two months. If they do not, the drainage team will ask for a full twelve months. Boreholes started in February can miss the peak, and that costs a year. Results the team considers incomplete or poor are rejected, and the strategy says an objection then stands until the information arrives. The monitoring brief therefore belongs in the first conversation about a site, and our article on groundwater monitoring delays shows how the season interacts with a planning programme. The ground conditions and soakaway map gives a first view of whether infiltration is likely before any pit is dug.

The council has also written a note for solar farms and battery storage. It asks for a flood risk assessment and a drainage strategy with every solar farm, panels set above the predicted flood depth plus 0.6 m freeboard in Flood Zones 2 and 3 or 0.3 m in surface water flood areas, and battery storage placed outside Flood Zones 2 and 3 and areas at high risk of surface water flooding, or shown to be protected where that cannot be done. A separate note says the team is generally opposed to culverting ordinary watercourses and sets a hierarchy that starts with reopening existing culverts.

The Wiltshire SFRA: what the 2024 study adds to the national maps

The Wiltshire Council Level 1 Strategic Flood Risk Assessment was prepared by JBA Consulting and issued in its final version in November 2024. It replaced the 2019 study, which still ranks in search results and should not be used. The council's SFRA page lists the main report and appendices A to S.

  • Flood Zone 3b. The SFRA defines the functional floodplain as land flooding at a 3.3% AEP (1 in 30 years) where a detailed model gives that outline, and uses 2% or 1% AEP outlines as a stand-in on some rivers, including the Chippenham and Trowbridge models. Outside the modelled reaches it treats all of Flood Zone 3a as a conservative proxy and expects a site-specific assessment to define the real extent.
  • Groundwater. Appendix G maps groundwater emergence from JBA's 5 m dataset. The study says most of Wiltshire has some degree of groundwater flood risk and names Marlborough, Pewsey, Salisbury and Warminster among the higher-risk areas, but it is explicit that the mapping "should not be used in place of local groundwater monitoring".
  • Surface water and climate change. Appendices E and F show the surface water flood extents and how they grow with climate change, and appendices P and Q do the same for river flooding.
  • Canals. The Kennet and Avon Canal and the Wilts and Berks Canal are mapped as flood sources. The study records 17 overtopping incidents and eight breaches on the Kennet and Avon Canal.
  • Critical drainage areas. None. The SFRA states that there are currently no critical drainage areas identified in the council's area.
  • Floor levels. Finished floors should be 600 mm above whichever is highest of average ground level, the adjacent road and the 1% AEP river flood level with climate change. The SFRA allows 300 mm where the flood level is known with confidence, and says habitable basements should not be permitted in Flood Zone 3.

A Level 2 SFRA followed in February 2025. It examined sites proposed for allocation in the Local Plan Review and recommends finished floors 600 mm above the 1% AEP flood level with climate change. The plan it supported has been withdrawn, but the document is still published and its site sheets still rank in search results for individual sites. An SFRA is a planning-stage study and cannot settle the risk to one plot; our explainer on strategic flood risk assessments sets out the limits. Where the SFRA leaves Flood Zone 3b undefined, the assessment may need flood modelling to draw it.

NPPF Chapter 18 and the sequential test on Wiltshire sites

Chapter 18 of the National Planning Policy Framework, published on 17 August 2026, is a material consideration in every decision and is eleven years newer than the Core Strategy. Policy F4 requires a site-specific assessment for every proposal in Flood Zones 2, 3a and 3b. In Flood Zone 1 it requires one for sites of a hectare or more, for land the Environment Agency has identified as having critical drainage problems, and for land that an SFRA or the Flood Map for Planning shows at risk from any source, now or in future. The flood risk map is a quick way to see which of those applies to an address.

Policy F5 sets the sequential test and limits it. The area searched "should not be greater than the anticipated catchment of the development in terms of its likely occupiers or users", so Core Policy 67's reference to the county's land availability assessment does not make a county-wide search the default. Annex A of the Framework says development plan policies that are materially inconsistent with its decision-making policies should be given very limited weight unless they were examined and adopted, or made, against this Framework. Where part of Core Policy 67 or a neighbourhood plan policy is materially inconsistent with F4, F5 or F6, that part carries very limited weight and the Framework's version is the one to meet. Parts that are only different, or that go further, still apply. F5 exempts sites allocated in the development plan and tested at that stage, householder development, non-residential extensions with a footprint under 250 m², and changes of use other than to a caravan, camping, chalet, mobile home or park home site. Two further exemptions depend on the assessment. One covers a site where no built development, access route or land raising would sit on land at risk from any source. The other covers a site at risk from surface water only, where the layout keeps occupiers safe for the development's lifetime without increasing risk elsewhere. Our guide to the sequential and exception tests walks through each step, and a separate piece covers the surface water exemption.

The Wiltshire SFRA was written against an earlier Framework and goes further than F5 and F6 in two places. For the sequential test it treats land inside the 0.1% AEP surface water extent as a high-risk zone, and it maps a groundwater zone from the emergence data and the Environment Agency's groundwater flood alert areas. It also says the council expects development in areas at risk of surface water, groundwater or reservoir flooding "to follow the same requirements as those laid out in Parts (a) and (b) of the NPPF's Exception Test". Under policy F6 the exception test itself applies only in Flood Zones 2, 3a and 3b. A Flood Zone 1 site with a surface water flow path is therefore not subject to the formal test. The case officer may still ask for the two things it covers: the wider benefits of the scheme, and evidence that it will be safe for its lifetime.

Policy F8 asks that sustainable drainage follows the National Standards and that major schemes take account of the Lead Local Flood Authority's advice. Our summaries of the August 2026 NPPF changes and the 2025 National Standards set out what changed, and the Planning Practice Guidance on flood risk, last updated on 17 September 2025, remains the working guidance on how the tests are applied.

Chalk, clay and two Avons: flood risk across the council area

Wiltshire drains three ways, and the policies above follow that geography. The Hampshire Avon and its tributaries (the Wylye, Nadder, Bourne and Ebble) meet at Salisbury, where the council says the River Park scheme protects more than 350 properties from river flooding and Core Policy 69 applies to almost any riverside site. The Bristol Avon runs through Malmesbury, Chippenham and Melksham to Bradford on Avon. The River Kennet rises on the chalk north of Avebury and flows east through Marlborough, and the upper River Thames crosses the north of the county at Cricklade.

Storm Bert in November 2024 showed what the Bristol Avon can do. The council called it "the worst flooding in Chippenham and Melksham since the 1960s" and logged more than 220 reports of flooding across the county. Groundwater is the slower hazard. In February 2026 the council warned that about 100 properties near Salisbury Cathedral were at risk from rising groundwater, and the SFRA lists Warminster, Marlborough and Pewsey beside Salisbury as places where groundwater risk is higher. The live river levels map shows the gauges on each of these rivers.

Each of those towns has its own page covering the flood history, defences and local evidence in detail, and the county overview is on our flood risk assessment Wiltshire page. Trowbridge, Devizes, Marlborough, Bradford on Avon, Calne and Royal Wootton Bassett fall under the same council policies described here.

How our reports answer Wiltshire Council's flood and drainage requirements

We prepare flood risk assessments, sequential tests and drainage strategies for applications to Wiltshire Council, each written to Core Policy 67, the validation checklist and the drainage team's current standards. They are three separate reports. An assessment establishes whether the site is safe, a sequential test compares it with other available land, and a drainage strategy shows where the water goes and at what rate.

  • Planning applications. The validation checklist asks for an assessment in Flood Zones 2 and 3, on sites of a hectare or more and on smaller sites changing to a more vulnerable use: a flood risk assessment for planning covers every source the SFRA maps.
  • Buying a property. The SFRA puts most of the county at some risk of groundwater emergence, and a standard search will not explain what that means for one house. Our flood risk survey for property purchase reports on the building itself before exchange.
  • Site choice. Core Policy 67 asks for evidence that no lower-risk site is available, and the SFRA extends the question to surface water and groundwater: a sequential and exception test report defines the catchment under NPPF policy F5 and compares the alternatives.
  • Runoff on every scheme. Core Policy 67 applies its runoff duty to all new development: a drainage strategy shows the measures a single dwelling or a small commercial unit needs.
  • Majors and the two-dwelling trigger. The checklist requires the council's technical spreadsheet with these applications: a surface water drainage strategy supplies the greenfield rates by both methods, the 30% betterment and the storage calculations it asks for.
  • After permission. Groundwater results, final calculations and as-built records are what the drainage team asks for at conditions stage. Our discharge of drainage conditions service supplies them in the form the Betterment Strategy sets out.
  • Scoping a site. The draft allocations in the Local Plan Review fell away when it was withdrawn, so promoted land now has to make its own case. A flood risk assessment at the outset shows whether the flood and drainage tests can be met before money goes into the layout.
  • High water tables. The monitoring note requires November to May readings and a 1 m clearance below every infiltration feature: our groundwater flood risk assessments set the monitoring brief and interpret the results.
  • Undefined floodplain. Outside its modelled reaches the SFRA uses Flood Zone 3a as a proxy for 3b and expects applicants to refine it. Flood modelling produces the 3.3% AEP outline and the flood level the floor heights are set from.
  • Off-mains sites in the Avon catchment. Core Policy 69 and the nutrient rules turn on where foul water goes: a foul drainage strategy sets out the treatment plant, the drainage field and the daily discharge.
  • Solar and battery schemes. The council's technical note asks every solar farm for an assessment and a drainage strategy with freeboard on the panels: see flood risk assessments for solar farms.
  • National policy questions. The SFRA and the Betterment Strategy both cite a Framework that has since been replaced: our NPPF guidance and advice explains how Chapter 18 applies to a Wiltshire site.

Unda Consulting Limited, the firm behind every report described on this page, is a CIWEM Business Partner, and our consultants are chartered. We work from the council's published documents and quote each one with its date, so the case officer and the drainage team can check the source. Pages for other councils are listed on our local authorities page, and sites behind the Salisbury defences should also read our guide to residual flood risk. To talk a site through with a consultant, call 01293 214444 or email enquiries@unda.co.uk.

Questions about Wiltshire Council's flood and drainage rules

What does Wiltshire Core Policy 67 (Flood Risk) require?

Core Policy 67 of the Wiltshire Core Strategy, adopted on 20 January 2015, has two parts. Development proposed in Flood Zones 2 and 3 must provide evidence for the sequential test, referring to the council's land availability assessment. And all new development, of any size and in any flood zone, must include measures to reduce the rate of rainwater runoff and improve infiltration unless site or environmental conditions make them unsuitable.

Is the Wiltshire Core Strategy still in force after the Local Plan Review was withdrawn?

Yes. Full Council voted to withdraw the Local Plan Review on 19 May 2026, and the council has said the Core Strategy's policies are not automatically out of date and remain the starting point for decisions. A new Wiltshire Local Plan passed Gateway 1 on 31 October 2026. The council's timetable does not expect it to be considered for adoption until 30 April 2029, and no draft policies have been published.

What discharge rate will Wiltshire Council accept from a greenfield site?

Less than greenfield. The council's June 2024 Drainage and Betterment Strategy asks for 30% betterment on pre-development rates for every storm from the 1 in 1 year to the 1 in 100 year event. Its later technical note goes further and prefers the greenfield 1 in 1 year rate for all events up to the 1 in 100 year storm with climate change. Infiltration comes first in both documents, so the rate matters only where soakaways are not viable.

When does Wiltshire Council want groundwater monitoring results?

For a major full application, with the submission. The council's guidance asks for monitoring between 1 November and 31 May, showing the peak and then two months of continuously falling levels, or a full twelve months if that cannot be shown. On an outline permission, twelve months of data must support the reserved matters where the winter peak has not been established. Smaller schemes are advised to monitor through the same season wherever a soakaway is proposed.

Does Wiltshire Council ask for a flood risk assessment with a house extension?

It does in Flood Zone 2 or 3, and the council's householder form asks for the same where groundwater may be within 0.5 m of the surface or the site is inside the 1 in 1,000 year surface water extent. Most owners can use the form in place of a full report, choosing between matching existing floor levels with resilience measures and raising floors 300 mm above the 1 in 100 year flood level. An application without the form or an assessment is invalid.

Does Swindon follow Wiltshire Council's drainage standards?

No. Swindon Borough Council is a separate unitary authority and its own Lead Local Flood Authority, with its own Local Plan and flood policy. Wiltshire Council's Core Strategy, validation checklist and Betterment Strategy apply everywhere else in the county, including Royal Wootton Bassett and Cricklade on Swindon's edge, apart from the area inside the New Forest National Park, where the National Park Authority is the planning authority.

Wiltshire's groundwater season opened on 1 November

Boreholes that go in now can record this winter's peak instead of waiting for the next one. Tell us about the site for a no-obligation, free quote: one of our experienced flood risk consultants will get back to you within 60 minutes. Call 01293 214444 or email enquiries@unda.co.uk.

Start a Quote

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.