Flood Risk & Drainage Requirements for East Lindsey District Council

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

East Lindsey District Council decides flood and drainage cases under Policies SP16 to SP19 of the East Lindsey Local Plan Core Strategy, adopted in July 2018, with Lincolnshire County Council advising on surface water as Lead Local Flood Authority. Inside the Coastal Zone, where East Lindsey Policy SP17 applies, the council expects every relevant flood risk assessment to test the site as if the sea defences were not there, and wants a flood warning and evacuation plan in every case.

Below are the four Local Plan policies that deal with flood risk, and what our reports do to meet each. The page then covers the Annex 2 tests for the Coastal Zone, the 2017 Strategic Flood Risk Assessment and what the council asks for at submission. Last come Lincolnshire County Council's drainage standards and the drainage boards, whose consent sits outside planning altogether. To talk through a site in East Lindsey, call 01293 214444 or email enquiries@unda.co.uk.

The Coastal Zone: what East Lindsey now expects behind the sea defences

The Coastal Zone is the area covered by the Environment Agency's Coastal Flood Hazard Maps, and the 2017 SFRA puts about 38% of the district at risk of coastal flooding. The maps show a breach of the sea defences in a 0.5% annual chance tide in 2115, banded from Danger for All down to Low hazard. A site well inland of the promenade can still sit in the zone.

The council's guidance on determining applications in the Coastal Zone says there is no viable approach yet to funding defence improvements that keep pace with climate change beyond 2040. Within the 75 to 100 year life of most new development, it adds, parts of the zone are likely to be undefended from regular tides. It states that relevant applications "will need to be accompanied by a site-specific Flood Risk Assessment (FRA)", that each assessment "must consider the undefended scenario", and that "In all circumstances a Flood Warning and Evacuation Plan (FWEP) will be required."

Two further points shape the submission. Without an updated assessment "the Council will be unable to determine applications positively", and the Environment Agency's advice must be addressed but "will not be, of itself, determinative". The council's December 2024 coastal strategy report records that the coastal plain relies on its defences to hold back high tides on around 14 days a month, and that the Environment Agency is seeking approval to keep nourishing the beaches until most of the engineered defences reach the end of their useful life in 2040. An assessment that stops at the defended flood map no longer answers the council's question.

For a site in the zone our flood risk assessments use the undefended and breach scenarios for the development's lifetime, set floor levels and refuge accordingly, and include a site-specific evacuation plan. Our article on sea level rise and coastal flooding sets out the longer outlook.

District, county, Environment Agency and drainage boards: who decides what in East Lindsey

BodyRoleWhat it decides or is consulted on
East Lindsey District Council (ELDC)Local planning authorityRegisters and decides the application against SP16 to SP19 and Annex 2; applies the sequential test; judges surface water on minor schemes under SP16
Lincolnshire County CouncilLead Local Flood Authority and highway authorityStatutory consultee on surface water for major development (10 or more homes or 1 hectare and above); regulates ordinary watercourses outside drainage board areas
Environment AgencyStatutory consulteeAdvises on Flood Zones 2 and 3, the tidal coast and main rivers such as the Steeping; flood risk activity permits for works near a main river or sea defence
Lindsey Marsh Drainage BoardInternal drainage boardByelaw consent for any increase in surface water or treated foul flow into its network, and for building within nine metres of a board-maintained watercourse; consents on the county's behalf in its extended area
Witham Fourth and Witham Third boardsInternal drainage boardsThe same kind of byelaw consent in the fens around Coningsby and Wainfleet and along the Witham
Anglian WaterWater and sewerage companySewer capacity and connections; SP16 allows a surface water connection to a sewer only in exceptional circumstances

Lincolnshire County Council's own flood risk management page lists the county as a statutory consultee for all major developments. It also says internal drainage boards act as its agents for ordinary watercourses in their areas, which makes the drainage board, not the county, the first call for most watercourse works on the marsh and in the fens. Our explainers on the Lead Local Flood Authority's role, on how a planning authority handles flood risk and SuDS and on why internal drainage boards matter for planning go into each regime.

East Lindsey shares the county's drainage regime with Boston Borough Council and South Holland District Council, whose pages cover the South East Lincolnshire Local Plan. Every council we cover is listed on our local authorities hub.

Policies SP16 to SP19: the East Lindsey Core Strategy flood policies

Four strategic policies decide most flood cases: Policy SP16 for inland flood risk, and Policies SP17, SP18 and SP19 for the coast (Core Strategy, adopted July 2018). Chapter 10 gives the Coastal Zone its own rules, and Annex 2 sets out in advance which uses there are treated as passing the sequential test, which the plan says takes that exercise out of the application process for those uses.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
Policy SP17Coastal East LindseySequential and exception tests as set out in Annex 2; adequate flood mitigation for all relevant development in 19 named coastal settlementsShow the scheme fits Annex 2, passes the exception test and is safe for its lifetimeA flood risk assessment testing the undefended scenario, with the exception test evidence and an evacuation planCore Strategy pp89-90 and Annex 2, July 2018
Policy SP18Coastal HousingNew homes in the Coastal Zone limited to listed categories; no ground floor sleeping accommodation; flood mitigation as the Environment Agency advisesConfirm the scheme falls in a permitted category before relying on the flood caseFloor levels, refuge and mitigation set against the Environment Agency's advice, with the policy category statedCore Strategy pp90-91, July 2018
Policy SP19Holiday AccommodationNo ground floor sleeping in coastal hotels, B&Bs and holiday conversions; caravan and chalet occupancy limited to 15 March to 31 OctoberPlan layout and occupancy around the policy and the flood seasonA flood risk assessment and evacuation plan for the site's occupiers, aligned with the occupancy periodCore Strategy pp94-95, July 2018
Policy SP16Inland Flood RiskInland flood zones: commercial-integrity sequential test for business uses, strict housing tests, no ground floor sleeping without mitigation, surface water and foul disposal shown for all new developmentShow the sequential case, the surface water route and the foul routeA flood risk assessment with the sequential test, and a drainage strategy that follows the hierarchy and explains any sewer connectionCore Strategy pp83-84, July 2018

Requirements checked November 2026.

Policy SP17 (Coastal East Lindsey): the Annex 2 tests

Policy SP17 makes the Annex 2 tests the starting point for development on the coast. Clause 4 reads "Development will need to demonstrate that it satisfies the Sequential and Exception Test as set out in Annex 2 of this Plan" and clause 5 adds that "All relevant development will need to provide adequate flood mitigation" (Core Strategy, adopted July 2018). It names 19 settlements. Among them are Skegness, Mablethorpe, Sutton on Sea, Trusthorpe, Ingoldmells, Chapel St Leonards and the Saltfleetbys.

Annex 2 lists the uses treated as having passed the sequential test in the Coastal Zone: essential infrastructure, water-compatible uses, holiday accommodation, employment, community buildings, social housing, housing for identified vulnerable people and older people with a care need, and housing on blighted brownfield land. Market housing is not on that list. Listed uses still face the exception test; the annex treats part 1 (wider sustainability benefits) as met for them, and every other scheme completes the council's sustainability appraisal form. In all cases the annex asks for a site-specific assessment covering "all forms of flooding to and from the development".

Officers look first at whether the use fits Annex 2. Then they and the Environment Agency look at depth and hazard in a breach, safe refuge above the flood level, and how occupiers would get out before a surge; an Environment Agency objection on any of those is hard to answer once the layout is fixed. Our reports set out the Annex 2 category, the breach depths and hazard rating at the site for the development's lifetime, the floor and refuge levels that follow, and the warning and evacuation arrangements the council's coastal guidance now asks for.

Policy SP18 (Coastal Housing): which homes the coast can take

Policy SP18 limits new housing on the coast to a short list and keeps bedrooms off the ground floor. Clause 4 reads "Housing will not be permitted with ground floor sleeping accommodation" and clause 5 says "Flood mitigation should be provided as per the advice of the Environment Agency" (Core Strategy, adopted July 2018).

Three kinds of scheme qualify. A permitted site can return with a better layout or flood mitigation, as long as the number of homes does not rise. Open market housing is allowed on disused brownfield sites in towns, large and medium villages after 12 months of marketing for community, economic or leisure use. Affordable or specialist housing is allowed in towns and large villages where a local need is shown. A scheme outside those categories can fail on principle however good its flood case. Our assessments state which category applies, then show the first floor sleeping level, the refuge and the mitigation the Environment Agency is likely to ask for.

Policy SP19 (Holiday Accommodation): caravans, chalets and hotels

Policy SP19 governs the holiday trade on the coast. It supports hotels and bed and breakfasts in coastal settlements only without ground floor sleeping accommodation. It asks that hotel conversions to flats "demonstrate they will be safe from the risk of flooding", bars further caravans between Ingoldmells and Addlethorpe, and limits occupancy of caravan, log cabin, chalet, camping and touring sites to 15 March to 31 October (Core Strategy, adopted July 2018). The plan's reason: November to March carries the highest risk of flood events.

National policy classes holiday caravans as a more vulnerable use, allowed in the flood zone only with a specific warning and evacuation plan. The council's flood risk guidance for caravan sites (February 2015) asks applicants to evidence the community benefits the exception test needs. For a holiday park our flood warning and evacuation plans set out triggers, routes and responsibilities for staff and guests, alongside the site flood risk assessment.

Policy SP16 (Inland Flood Risk): the Wolds valleys and the fens

Policy SP16 covers flood risk away from the coast, where the main threat is the rivers and drains running off the Wolds and through the fens. Clause 6 reads "All new development must show how it proposes to provide adequate surface water disposal, including avoiding impacting on surface water flow routes or ordinary watercourses", and clause 7 allows a surface water connection to a sewer only "in exceptional circumstances where it can be demonstrated that there are no feasible alternatives" (Core Strategy, adopted July 2018).

The policy has eleven clauses, and several go beyond national policy. Business, leisure and commercial uses pass the sequential test where moving to a safer site would undermine the commercial integrity of an existing area. Housing in an inland flood zone is supported only on run-down brownfield sites after 12 months of marketing, and without ground floor bedrooms unless mitigation can be designed in. Identified flood storage areas are off limits. Every scheme must show its foul water treatment and disposal, and clause 11 requires a site-specific flood risk assessment where national policy calls for one.

The supporting text names Louth, Horncastle, the Witham floodplain and the larger fen drains as the places most at risk. Our flood risk assessments set out the sequential case in the terms SP16 uses. Our drainage strategies work down the hierarchy, record why each higher option was ruled out and show the foul route, so the exceptional circumstances clause 7 asks for are argued, not assumed. Our guide to the sequential and exception tests explains the national tests behind SP16 and Annex 2.

The East Lindsey Local Plan 2044 and reorganisation

No replacement flood policy has been published. The council's partial Local Plan review reached Regulation 18 Issues and Options in 2021 and went no further. The new East Lindsey Local Plan 2044 is now being prepared, and the Planning Policy Committee on 25 June 2026 heard that it had moved into its early commencement stage, with evidence studies being commissioned. Until a draft appears, SP16 to SP19 stand, read with the August 2026 NPPF.

Local government reorganisation adds a second unknown. The government decided in July 2026 to replace the Lincolnshire districts and county with two unitary councils, subject to legislation and expected from April 2028, then paused reorganisation plans for review on 7 September 2026. Our explainer on reorganisation and flood risk planning covers what tends to carry over to a successor council.

Site in East Lindsey's Coastal Zone?

The council now wants the undefended scenario tested and an evacuation plan with every relevant application. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Start a Quote

Coastal, inland or fen: which East Lindsey sites need which report

Which reports an East Lindsey application needs depends first on whether the site is in the Coastal Zone, then on the flood zone and the scheme's size. National policy sets the triggers in Chapter 18 of the NPPF; the council's Annex 2 changes how the sequential test works on the coast. You can check the zone for a postcode on our flood risk map.

TriggerFlood risk assessmentSequential testException testDrainage strategy, consents
Any site in the Coastal Zone (SP17 settlements and the hazard map)Yes: undefended scenario and a flood warning and evacuation planTreated as passed for Annex 2 uses; market housing not listedPart 1 met for Annex 2 uses; others use the council's appraisal form; part 2 in every caseUnder SP16, and to county standards on major schemes
Inland site in Flood Zone 2 or 3Yes (NPPF F4; SP16 clause 11)Yes, unless exempt; business uses may rely on SP16's commercial-integrity testWhere Annex F table 3 requires itSurface water and foul route shown under SP16
Flood Zone 1, one hectare or moreYes (F4)Only if the site is at risk from another sourceRarelyYes: major development for the county
Flood Zone 1 at risk from surface water or another source in the SFRA or Flood Map for PlanningYes (F4)Yes, unless the layout keeps all built development out of the risk (F5)Not for surface water risk aloneUsually
Major development (10 or more homes, or 1 hectare and above)Depends on zoneDepends on zoneDepends on zoneYes: the county is statutory consultee
Householder extension, small non-residential extension, change of useYes in Flood Zones 2 and 3Not required, except a change of use to a caravan, camping or chalet site, or to a mobile home or park home siteNot requiredShow surface water disposal under SP16
Discharge to a board drain, or building within nine metres of oneAs aboveAs aboveAs aboveByelaw consent from the drainage board
Works in an ordinary watercourse outside a board areaAs aboveAs aboveAs aboveLand drainage consent from Lincolnshire County Council

Three gaps follow directly from these rules: a coastal assessment that relies on the defences, a sequential test argued for a use Annex 2 already covers, and a drainage strategy with no board consent in view. Our article on planning applications invalidated on flood and drainage grounds covers the common gaps.

The 2017 East Lindsey SFRA and the council's validation page

East Lindsey's Strategic Flood Risk Assessment dates from March 2017 and is still the version the council publishes. It sets the Coastal Zone by the Environment Agency's Coastal Flood Hazard Maps for the 2115 scenario and describes the defences from Mablethorpe to Skegness. It also records the standards the Lindsey Marsh board aims for: 1 in 75 years (1.3%) in urban areas and 1 in 10 years for farmland (SFRA Part 1, March 2017).

A new SFRA is overdue. The council's December 2024 coastal strategy report records a long delay in preparing it, given the need to model new flood risk data. None had been published by November 2026. Until it is, our assessments read the 2017 study alongside the current Flood Map for Planning and the Environment Agency's newer coastal data, because the same council report notes that funding for the annual beach nourishment was only in place until 2027, and a study that predates that position cannot carry a coastal site on its own. Our explainer on what a strategic flood risk assessment does covers how planners use one.

East Lindsey has no adopted local validation list. Its validation page sets out the national requirements and then lists "Flood Risk and Drainage Assessments" among the additional information an application may need, "although not a formal validation requirement". In practice the policy is the trigger, not the checklist. An application in the Coastal Zone or an inland flood zone that arrives without an assessment cannot be determined positively under SP16, SP17 and the coastal guidance.

Lincolnshire County Council's drainage standards and the drainage boards

Lincolnshire County Council tests surface water on major schemes against its 2021 design approach for development roads and sustainable drainage, read with its 2020 specification. We found no county statement adopting the National Standards for Sustainable Drainage published in June 2025, so the 2021 document remains the county's published basis. The Framework's policy F8 separately asks for SuDS designed to the National Standards. The 2021 standards, as they apply here:

  • Greenfield sites. Peak runoff for the 1 in 1 and 1 in 100 year events never above the greenfield rate (S2); volume held to greenfield for the 1 in 100 year, 6 hour event where practicable (Design Approach, 2021).
  • Previously developed sites. As close to the greenfield rate as reasonably practicable, and never above the rate before redevelopment (S3).
  • Discharge to the sea. Where a system discharges to a water body that can take uncontrolled flows, such as the sea or a large estuary, the peak and volume controls need not apply (S1), which matters for some frontage sites.
  • Climate change and creep. Plus 40% on peak rainfall intensity, or plus 25% with sensitivity tests proving no unacceptable risk at 40%, traceable to the Environment Agency allowances; 10% added for urban creep.
  • Flooding on site. None on any part of the site in a 1 in 30 year event, and none in buildings in a 1 in 100 year event; systems drain down within 48 hours.
  • Infiltration and groundwater. Tests to BRE 365 in pits filled three times, using the worst rate; borehole tests are not accepted; a 1 metre gap to the highest recorded groundwater, with 12 months of records where possible.
  • Outfalls. Surface water never to a foul sewer; the county notes typical drainage board pump discharge rates of 1.4 l/s/ha in the fens.

On the marsh and in the fens a high water table often rules out infiltration, so most schemes discharge to a board drain. The Lindsey Marsh board's consent rules bar building within nine metres of a board-maintained watercourse without consent. They also require consent for any work that increases surface water or treated foul flow into its network. That consent is separate from planning permission and can be refused after it. The Witham Fourth board covers the fens from Boston north to Coningsby and Wainfleet. Our ordinary watercourse consent explainer covers works in a watercourse.

Our drainage strategies run the county's calculations with the climate change and creep allowances shown, set infiltration aside only on test or groundwater evidence, and size attenuation to the rate the receiving board drain can take, after working down the SuDS hierarchy. Where the county objects, our article on resolving an LLFA objection sets out the usual route. Early checks can use our ground conditions and soakaway map, the BRE 365 infiltration rate calculator and our drainage calculators; our note on the 2025 National Standards for SuDS sets out the national rules.

National policy behind the East Lindsey requirements

The council applies its policies alongside Chapter 18 of the National Planning Policy Framework, published on 17 August 2026. Policy F4 sets when a site-specific flood risk assessment is needed, F5 the sequential test and its exemptions, and F6 the exception test in Flood Zones 2 and 3. F7 sets the conditions for safe development, including safe access and escape as part of an agreed emergency plan. F8 asks for sustainable drainage to the National Standards, with LLFA advice on major schemes. Policy F9 adds a test for development in areas likely to face tidal inundation over the next century, alongside which the council's own coastal guidance sits. The government's flood risk and coastal change guidance, revised in September 2025, explains how those tests are applied; our note on the September 2025 guidance update covers what changed for surface water.

Our summary of what the August 2026 NPPF changed for flood risk and drainage and our note on climate change allowances for planning set out the national position in more depth.

Tidal surges, the Steeping and the Wolds rivers: East Lindsey's flood risk in brief

The largest risk is on the coast. The county council records that the 1953 surge hit Mablethorpe, Sutton on Sea and Skegness hardest (Lincolnshire County Council, January 2023). In December 2013 a surge flooded the road and nearby homes at Trusthorpe, where the Environment Agency later upgraded the land drainage outfall. Our area pages for flood risk assessment in Skegness and flood risk assessment in Mablethorpe cover each resort, and the wider county is on our Lincolnshire page.

Inland, the Steeping, the Lymn and the rivers draining the Wolds carry the fluvial risk. In June 2019 the River Steeping relief channel breached at Wainfleet; the county's Section 19 report records 88 affected properties across East Lindsey and about 580 homes evacuated, affecting some 1,000 people. The banks had not been known to breach before. Defended, pumped land of this kind keeps a residual risk that an assessment has to address, and river levels can be followed on our live river levels map.

Groundwater and surface water matter across the flat marsh and fen, where water tables sit close to the surface. Our article on groundwater flood risk in planning applications explains how it is assessed, and the county's groundwater warning trials are described in why Lincolnshire is trialling a new approach to flood warnings.

Reports we prepare for applications to East Lindsey District Council

Each service below is tied to the policy, guidance or county standard that calls for it. Three are often confused: a flood risk assessment asks whether the site is safe, a sequential or exception test whether the scheme should be there at all, and a drainage strategy where the rain that falls on it goes.

  • Every source. Annex 2 asks for an assessment of "all forms of flooding", which here means the sea, rivers, surface water and groundwater: our flood risk assessment service covers each source.
  • Coastal Zone and flood zones. The council's coastal guidance and SP16 clause 11 require a site-specific report: a flood risk assessment for planning, with the undefended scenario on the coast.
  • Buying on the coast. Mortgage and conveyancing searches flag homes behind the defences from Mablethorpe to Skegness: a flood risk survey for property purchase assesses the actual building.
  • Location justified. Inland schemes need the sequential test, and coastal schemes the Annex 2 exception test: our sequential and exception test reports make the case.
  • Surface water and foul. SP16 clauses 6 and 9 ask every scheme to show both routes: a drainage strategy sets them out.
  • County standards. Major schemes go to Lincolnshire County Council against its 2021 standards: a surface water drainage strategy gives the rates, volumes and board outfall.
  • After permission. Drainage conditions often ask for final calculations and board consent: we prepare the discharge of drainage conditions submission.
  • Evacuation. The coastal guidance asks for a plan in every relevant case, and holiday caravan sites need one under national policy: a flood warning and evacuation plan.
  • Undefended scenario. Testing the coast without its defences can need breach or overtopping levels beyond the published maps: flood modelling supplies them.
  • High water table. The county asks for a 1 metre gap to the highest recorded groundwater and 12 months of readings where possible: our groundwater assessments supply those readings.
  • Foul capacity. SP16 clause 9 asks how foul water will be treated, including off-mains sites in rural parishes: a foul drainage strategy answers it.
  • Commercial land on the coast. Holiday parks and businesses in the Coastal Zone face the post-2040 defence question: a due diligence flood risk assessment informs a purchase or loan.
  • After Wainfleet. The 2019 Steeping breach affected 88 properties across the district: a flood risk assessment for insurance gives brokers site-specific evidence.
  • National policy. Every East Lindsey decision applies NPPF Chapter 18 alongside the Core Strategy: our NPPF guidance and advice explains it for a scheme.

East Lindsey flood and drainage: what applicants ask

What does East Lindsey Policy SP17 (Coastal East Lindsey) require?

Policy SP17 of the East Lindsey Core Strategy (July 2018) applies to 19 coastal settlements, including Skegness, Mablethorpe and Sutton on Sea. It requires development to satisfy the sequential and exception tests as set out in Annex 2 of the plan, and all relevant development to provide adequate flood mitigation. Annex 2 lists the uses treated as passing the sequential test; market housing is not among them.

When does East Lindsey District Council need a flood risk assessment?

For any relevant development in the Coastal Zone, where the council's guidance says the assessment must consider the undefended scenario. Inland, sites in Flood Zones 2 and 3 need one under Policy SP16 and NPPF policy F4, householder extensions included. In Flood Zone 1 the trigger is a site of a hectare or more, or land at risk from another source such as surface water.

What does Policy SP16 (Inland Flood Risk) ask of a planning application?

Policy SP16 asks every new development to show adequate surface water disposal without harming flow routes or ordinary watercourses, using SuDS, and to show how foul water will be treated. It allows a surface water connection to a sewer only in exceptional circumstances, keeps ground floor bedrooms out of inland flood zones unless mitigation can be designed in, and does not support development in identified flood storage areas.

Is Lindsey Marsh Drainage Board consent needed as well as planning permission?

Often. The board's byelaws require its consent to build within nine metres of a board-maintained watercourse and for any work that increases surface water or treated foul flow into its network. The consent is separate from planning permission and can be refused after permission is granted, so the drainage strategy should be sized to what the board drain can take.

What discharge rate does Lincolnshire County Council accept in East Lindsey?

Its 2021 design approach says peak runoff from a greenfield site must never exceed the greenfield rate for the 1 in 1 and 1 in 100 year events, and a previously developed site must come as close to greenfield as practicable and never exceed its existing rate. Storage includes a 40% climate change allowance, or 25% with sensitivity testing, and 10% for urban creep.

Does a site behind the sea defences still count as at risk in East Lindsey?

Yes. The Coastal Zone is drawn from the Environment Agency's hazard maps for a breach of the defences, and the council's coastal guidance says parts of the zone are likely to be undefended from regular tides within the lifetime of most new development. Assessments there must test the undefended scenario and include a flood warning and evacuation plan.

How is a flood risk assessment for an East Lindsey site priced?

Each quote is a fixed fee based on the site, its flood zone, whether it is in the Coastal Zone and which consents the drainage needs. To get a free, no-obligation quote, call 01293 214444 or email enquiries@unda.co.uk; one of our consultants will get back to you within 60 minutes.

Draining to a Lindsey Marsh or Witham board drain?

We size the scheme to the county's 2021 standards and to what the board will consent, before the layout is fixed. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes, with a fixed quote within the hour. Call 01293 214444 or email enquiries@unda.co.uk.

Start a Quote

For a scheme anywhere in East Lindsey, from the Coastal Zone to the Wolds and the fens, call 01293 214444 or email enquiries@unda.co.uk. Unda Consulting Limited's chartered consultants prepare flood risk assessments, sequential and exception tests and drainage strategies for applications across England. Reports for applications to East Lindsey District Council come from Unda Consulting Limited, a CIWEM Business Partner.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.