Flood Risk Assessment in Lincolnshire
Contact Us
A flood risk assessment in Lincolnshire covers a county where much of the low ground stays dry only because of a sea wall, an embanked river or a pumping station. The coast runs from the Wash at Boston round Gibraltar Point and north to the Humber. Inland, the Witham, the Welland, the Trent and the Ancholme carry rain off the Wolds and the limestone ridge. Our consultants write flood risk assessments in Lincolnshire for planning applications, house and land purchases, lenders and insurers, and prepare the sequential and exception tests and surface water drainage strategies that the county's councils ask for alongside them.
Greater Lincolnshire, the ceremonial county, has three councils with flood duties: Lincolnshire County Council across seven districts, and the unitary North Lincolnshire and North East Lincolnshire councils on the Humber bank. A site in Lincoln, Grantham, Spalding, Louth, Sleaford, Gainsborough, Stamford or Horncastle meets one county drainage approach and one of four local plans, while Brigg, Barton-upon-Humber and Immingham answer to a unitary council. Boston, Mablethorpe, Skegness, Grimsby and Scunthorpe each have a page of their own, linked further down.
On the night of 31 January 1953 the sea killed 43 people on the Lincolnshire coast. Sixty years later, on 5 December 2013, a surge that reached 5.2 metres at Immingham, 70 centimetres above its 1953 height there, flooded 607 homes and 121 businesses in the county, most of them in Boston.
Phone 01293 214444 or email enquiries@unda.co.uk with the site address and a short note of what you plan to build or buy.
What areas of Lincolnshire are prone to flooding?
Lincolnshire floods in five different ways, and which one matters depends on the ground under the site: the open North Sea coast, the Wash and its reclaimed fens, the Witham valley through Grantham and Lincoln, the tidal Trent and the Humber bank, and the chalk Wolds and limestone edge where streams rise fast and groundwater comes up through the fields.
| Landscape | Places | Main source of flooding | Example Environment Agency warning area |
|---|---|---|---|
| The North Sea coast | Mablethorpe, Sutton on Sea, Chapel St Leonards, Skegness | Tide and surge, held back by the sea wall and by sand pumped onto the beach | Far extent of tidal flooding from the Lincolnshire coastline |
| The Wash and the Fens | Boston, Spalding, Holbeach, Wainfleet All Saints | Tide up the Haven and the Welland, rivers held between banks, and pumped drains | Pinchbeck and the West of Spalding; Wider area at risk around Thorpe St Peter and Wainfleet All Saints |
| The Witham valley | Grantham, Lincoln, Washingborough, and Sleaford on the Slea | The Witham and its tributaries, with Sincil Dyke and the Great Gowts Drain inside Lincoln | Watercourses in the Lincoln area; River Witham in Grantham |
| The Trent and the Humber | Gainsborough, Scunthorpe, Barton-upon-Humber, Immingham | The tidal Trent and the Humber estuary | River Trent at Gainsborough; Tidal flooding of low-lying areas from New Holland to Immingham Dock |
| The Wolds and the limestone | Louth, Horncastle, Market Rasen, Bourne, Barrow upon Humber | Short, steep rivers (the Lud, Bain, Waring and Rase) and groundwater | Areas near the River Lud in Louth; Groundwater flooding in Barrow Upon Humber and Barton Upon Humber |
The Environment Agency's Lincolnshire and Northamptonshire area issues every warning above except those for the Trent, which its East Midlands area handles past Gainsborough and Scunthorpe down to Alkborough Flats. Our live river levels map shows whether the Witham, the Welland or the Trent is running high today, read straight from the agency's gauges.
Looking up a site on the Lincolnshire map
Enter a Lincolnshire postcode in the map below to see the river and sea flood zone, the surface water risk and the reservoir layer at that spot. Our flood risk map works the same way for anywhere in England. It is the quickest answer for anyone after a Lincolnshire flood map or flood risk map, but it cannot tell you a floor level, whether a pumping station kept running, or what happens if a bank gives way.
Behind the sea wall and the river banks, large parts of the coastal plain and the Fens still sit in Flood Zone 3, because the zones are drawn as if the defences were not there. A defended site still needs its residual risk tested; our explainers on flood zones 1, 2 and 3 and residual flood risk set out how. Surface water has a separate layer, and groundwater has no national map at all; the county council set up Project Groundwater to understand it.
Three flood authorities and nine planning authorities: who decides in Lincolnshire
The district or unitary council decides the planning application, and one of three lead local flood authorities reviews the drainage: Lincolnshire County Council for the seven districts, and North Lincolnshire and North East Lincolnshire councils for their own areas. The seven districts plan through four local plans, two of them shared, so a flood risk assessment in Lincolnshire is tested against one of six bodies of local policy, each backed by its own Strategic Flood Risk Assessment.
| Planning authority | Plan in force | Flood and drainage policy | Strategic Flood Risk Assessment |
|---|---|---|---|
| City of Lincoln, North Kesteven and West Lindsey | Central Lincolnshire Local Plan, adopted 13 April 2023; a review began in October 2025 | S21 Flood Risk and Water Resources, with S12 on water efficiency | Levels 1 and 2, March 2022 |
| Boston Borough and South Holland District | South East Lincolnshire Local Plan 2011-2036, adopted 8 March 2019 | Policy 4, Approach to Flood Risk | South East Lincolnshire SFRA, 2017 study |
| East Lindsey District | East Lindsey Local Plan Core Strategy, adopted July 2018 | SP16 Inland Flood Risk, SP17 Coastal East Lindsey and SP18 Coastal Housing | East Lindsey SFRA, March 2017 |
| South Kesteven District | South Kesteven Local Plan 2011-2036, adopted 30 January 2020; review draft February 2024 | EN5 Water Environment and Flood Risk Management | South Kesteven SFRA, with a revised assessment and water cycle study in preparation for the review |
| North Lincolnshire Council (unitary) | Core Strategy, adopted June 2011, with saved 2003 policies; its 2020-2038 replacement was withdrawn in October 2024 | CS19 Flood Risk, and saved DS16 Flood Risk | North and North East Lincolnshire SFRA, June 2022 |
| North East Lincolnshire Council (unitary) | North East Lincolnshire Local Plan 2013-2032, adopted 22 March 2018; its replacement's pre-submission draft is out for consultation from 30 September to 12 November 2026 | Policy 33 Flood risk and Policy 34 Water management, with draft Strategic Policy 8 in the replacement | The same joint SFRA, with breach mapping for Immingham, Grimsby and Cleethorpes |
On 16 July 2026 the government chose to replace the county council and its seven districts with two unitary councils from April 2028: an enlarged Lincoln and a Lincolnshire council. North and North East Lincolnshire were left as they are. On 7 September 2026 it paused that decision, with the other areas confirmed in July, for a review, and the May 2027 elections go ahead on today's boundaries. Until a final decision is made the authorities above remain in charge; our article on council reorganisation and flood risk explains what would move across. National policy sits in chapter 18 of the NPPF, summarised in our NPPF flood risk guidance.
What Lincolnshire County Council expects of surface water
On major schemes, ten or more homes or a site of a hectare or more, Lincolnshire County Council is a statutory consultee on drainage, and it reviews the drainage strategy as lead local flood authority and highway authority together. Its standards are set out in the county's roads and sustainable drainage approach for developers, 2021 edition, to which the Central Lincolnshire plan also refers applicants:
- Greenfield rates. On a greenfield site, peak runoff in the 1 in 1 and 1 in 100 year storms may never exceed the greenfield rate; on previously developed land it should come as close to that rate as is reasonably practicable and never exceed the existing rate.
- Allowances. The simple approach adds 40% to the 1 in 100 year, six-hour rainfall; applying the uplift to the storage volume afterwards is not accepted. Ten per cent is added to the hard surfaces for urban creep, and storage must empty within 48 hours.
- Where the water goes. Infiltration first, then a watercourse, then a surface water sewer or highway drain, and a combined sewer last; never the foul sewer. The guidance warns that more than half of developments end up needing a positive outfall, so a soakaway cannot be assumed.
- Groundwater. The base of any infiltration feature sits at least a metre above the highest recorded groundwater, and test pits are filled three times with the slowest result used.
- Fen outfalls. Where a drain is pumped by a drainage board, discharge is typically limited to 1.4 litres a second per hectare, the guidance's figure for board pumps.
- When it overflows. Exceedance routes stay inside the site where possible, with flow no deeper than 100 mm and no faster than 3 metres a second.
North Lincolnshire works to its own Local SuDS and Flood Risk Guidance of April 2017 and North East Lincolnshire to the 2025 national standards for sustainable drainage. A soakaway is worth checking early with our ground conditions and soakaway map, and our note on why lead local flood authorities object lists the gaps that most often send a strategy back.
Draining a Lincolnshire site to a fen dyke or a soakaway?
Ten homes or a hectare brings the lead local flood authority in, and a drainage board's consent may follow. Send the site details and one of our experienced flood risk consultants will come back within 60 minutes with a free, no-obligation fixed fee.
Start a QuoteLincolnshire's flood record, from Louth in 1920 to January 2025
The county council can investigate when a single property floods inside, and its reports, with the Environment Agency's, give Lincolnshire a long written record. Six events show the range: a cloudburst on the Wolds, two North Sea surges, a breached fen river, a named storm and a winter flood on frozen ground.
- 29 May 1920, Louth. More than four and a half inches of rain fell on the River Lud's catchment; a surge about 14 feet high swept into the town, 23 people died, 50 houses were destroyed beyond repair and 800 people were left homeless (Louth Town Council).
- 31 January 1953, the coast. The county council records 43 deaths, with the worst of it at Mablethorpe, Sutton on Sea and Skegness and water up to two miles inland; our account of the 1953 North Sea flood follows the surge along the east coast.
- 5 December 2013, the tidal surge. The county's own report counts 607 homes and 121 businesses flooded, most of them in Boston, with more than 200 people helped to leave their homes; our explainer on storm surges compares 2013 with 1953.
- 12 June 2019, Wainfleet. More than 150 mm of rain in two days overtopped and eroded a bank of the Steeping's relief channel; the county's investigation report records 88 properties flooded inside and about 580 homes evacuated, and RAF helicopters dropped ballast into the breach.
- 18 to 21 October 2023, Storm Babet. Between 55 and 93 mm fell at county stations; the council's November 2023 count was 605 properties flooded inside, some still to be confirmed, with 147 Section 19 reports commissioned.
- 6 and 7 January 2025, the South Forty Foot Drain. Rain on frozen ground flooded 36 homes in Boston and 15 in Billingborough; at Hubberts Bridge the drain rose 0.428 m above its modelled 1 in 1,000 level including climate change, and no river warning covered the homes affected (Environment Agency review).
Our guide to Section 19 flood reports explains when a flood is investigated and what the report must cover. For an assessment, a dated local event is evidence that a source is real even where the national map shows little.
Sea walls, sand and the 2040 horizon on the Lincolnshire coast
North of Gibraltar Point the Lincolnshire coast is a low plain that relies on a sea wall and on sand that the Environment Agency pumps onto the beaches each year. That nourishment has run from Mablethorpe to Skegness since 1994, at about 400,000 cubic metres a year. The agency's Saltfleet to Gibraltar Point strategy says the work reduces flood risk to 20,000 homes, 1,700 businesses, 24,500 static caravans and 35,000 hectares of farmland.
- Two shoreline plans. The Flamborough Head to Gibraltar Point plan, completed in 2010, covers the Humber mouth and the open coast; The Wash plan covers the frontage south of Gibraltar Point.
- East Lindsey's Coastal Zone. The district's guidance for the Coastal Zone says the Environment Agency is likely to be unable to support new development with a lifetime beyond 2040, asks every assessment there to consider the undefended scenario, and requires an evacuation plan in all cases.
- The Wash frontage. The Boston Barrier gate on the Haven has been fully working since December 2020; the completed scheme is designed to protect about 14,000 homes and 800 businesses.
- The Humber mouth. Cleethorpes and Grimsby face both the estuary and the open sea, with their own warning areas and North East Lincolnshire as both planning and drainage authority.
Our guides to sea defences and shoreline management plans explain hold-the-line policy and why beach recharge has to be renewed every year.
Pumped land: the Fens and Lincolnshire's drainage boards
South and east of Lincoln, much of the county is reclaimed fen that stays dry only because internal drainage boards lift water into embanked rivers. The Environment Agency's Fens 2100+ programme covers five Lincolnshire catchments, the Steeping, East and West Fen, the Lower Witham, the South Forty Foot Drain and the Lower Welland, and its evidence puts 87% of the wider Fens below 3.9 metres above Ordnance Datum.
- A board for most low ground. Lindsey Marsh (the largest in England), Witham Fourth, Black Sluice, Welland and Deepings, South Holland and the Witham boards around Lincoln cover the county; Ancholme, North East Lindsey and the Scunthorpe and Gainsborough board cover the north (board list).
- Consents planning does not give. Discharging to a board's drain, or building close to one, needs the board's byelaw consent, and works in the channel can need its section 23 consent too. Separately, Central Lincolnshire's S21 keeps buildings 8 metres back from a watercourse and 16 metres from a tidal one.
- A strip beside every drain. Lindsey Marsh's byelaws bar building, structures or planting within nine metres of a watercourse the board maintains, open or piped, so a layout on the coastal plain has to leave that strip clear.
- Drains under pressure. January 2025 brought record levels on the South Forty Foot Drain, and Fens 2100+ expects 31% of the area's flood assets to be past their design life by 2040.
Our articles on internal drainage boards, ordinary watercourse consent and the limits of Fens 2100+ cover the consents and the long-term outlook.
The tidal Trent and the Humber bank
The Trent is tidal from Cromwell Weir in Nottinghamshire past Gainsborough to the Humber, and the Fossdyke joins it at Torksey from the Witham at Lincoln. On the estuary's south bank, North Lincolnshire and North East Lincolnshire share one Strategic Flood Risk Assessment, prepared with the Environment Agency in June 2022, that runs from Crowle to Cleethorpes.
- Storage at Alkborough. North Lincolnshire's Core Strategy records Alkborough Flats as the first area created to store floodwater under the Humber Flood Risk Management Strategy, with Flixborough Grange and land near Goxhill Haven named as further candidates.
- Groundwater at Barton. Barton-upon-Humber and Barrow upon Humber have an Environment Agency groundwater flood warning area, and both are trial communities in the county's Project Groundwater.
- Humber 2100+. The agency's July 2026 tidal risk report puts about 500,000 people in areas at tidal risk around the estuary, and says more than £1bn is needed by 2046 to maintain the defences.
- Port and industrial land. Immingham and the Humber bank carry tidal warnings from New Holland to Pyewipe, and the 2022 SFRA maps breach depths and hazards for Immingham, Grimsby and Cleethorpes.
The River Trent page follows the river from the Midlands to Trent Falls, and our article on why Lincolnshire is trialling a new approach to flood warnings describes the groundwater project.
Lincoln, Grantham, Louth and the towns without a page of their own
Lincoln, the county's only city, sits where the Witham cuts through the limestone ridge, and the Environment Agency warns for the Witham, Sincil Dyke and the Great Gowts Drain together across the Lincoln area. On the city's western edge the Western Growth Corridor plans about 3,200 homes. The Central Lincolnshire plan allowed it only with drainage and flood risk solutions guided by an agreed flood risk assessment and water management plan, and most of the site gained permission in January 2022.
| Town | Main watercourses | Environment Agency warning area | Planning authority |
|---|---|---|---|
| Lincoln | Witham, Sincil Dyke, Great Gowts Drain, Fossdyke | Watercourses in the Lincoln area | City of Lincoln (Central Lincolnshire plan) |
| Grantham | Witham, Mow Beck, Barrowby Stream | River Witham in Grantham | South Kesteven |
| Stamford and Bourne | Welland; Bourne Eau | River Welland in Stamford; Bourne Eau in Bourne | South Kesteven |
| Sleaford | Slea and Ninefoot River | River Slea and Ninefoot River in Sleaford | North Kesteven |
| Spalding | Welland and Glen | Pinchbeck and the West of Spalding | South Holland |
| Louth | Lud and the Louth Canal | Areas near the River Lud in Louth | East Lindsey |
| Horncastle | Bain and Waring | River Bain in Horncastle; River Waring in Horncastle | East Lindsey |
| Wainfleet All Saints | Steeping and the Wainfleet Relief Channel | River Steeping in Wainfleet All Saints | East Lindsey |
| Market Rasen | Rase | River Rase from Market Rasen to Bishopbridge | West Lindsey |
| Gainsborough | Tidal Trent | River Trent at Gainsborough | West Lindsey |
| Brigg | Ancholme and the Old River Ancholme | Wider area at risk from the River Ancholme and the Old River Ancholme in Brigg | North Lincolnshire |
| Barton-upon-Humber | Humber, Butts Drain, groundwater | Groundwater flooding in Barrow Upon Humber and Barton Upon Humber | North Lincolnshire |
| Immingham | Humber | Wider area at risk of tidal flooding from Immingham to Pyewipe | North East Lincolnshire |
Louth and Horncastle sit where Wolds streams leave the hills, so rain arrives fast, as it did on the Lud in 1920. Sleaford's urban extension is allowed by the plan on condition that its layout keeps vulnerable uses away from the Slea's flood risk.
Fen plot, coastal chalet or extension: when a flood risk assessment in Lincolnshire is required
Policy F4 of the NPPF is the starting point: an assessment for development in Flood Zone 2 or 3, for any site of a hectare or more in Flood Zone 1, and for land shown at risk from another source. Lincolnshire's plans add their own rules on top.
| Proposal | Is an assessment needed? | Why |
|---|---|---|
| New homes on Flood Zone 2 or 3 land in any Lincolnshire district | Yes | F4 and the local flood policy apply, and the sequential test follows unless the scheme is exempt |
| Any scheme on a Flood Zone 1 site of one hectare or more | Yes | F4, and the site counts as major for the drainage authority's review |
| Ten or more homes anywhere in the county council's area | A drainage strategy, reviewed by the county | The county's design approach treats ten homes or one hectare as major development |
| Building in South Kesteven where flooding has been recorded from any source | Yes | EN5 asks for one in areas known to have flooded, including from critical drainage |
| New homes or holiday accommodation in East Lindsey's Coastal Zone | Yes, with an evacuation plan | The undefended scenario is tested and an evacuation plan is required in every case |
| A householder extension on Zone 2 or 3 land | Usually a short form | The Environment Agency's standing advice covers minor extensions |
| Building within 8 metres of a watercourse, or 16 metres of a tidal one, in Central Lincolnshire | Not on its own, but the layout changes | S21 keeps that strip free for maintenance access |
| Draining into a board's drain anywhere in the Fens | Board consent alongside planning | Byelaw consent is separate from the planning decision |
Our guide to the sequential and exception tests explains how the area of search is set and when the second test applies.
What we prepare for Lincolnshire sites, and why each is asked for
Which report a Lincolnshire site needs depends on what could flood it and who has asked: a planning officer, the drainage authority, a lender or an insurer. Unda is a CIWEM Business Partner; our consultants are chartered, and a senior consultant checks and signs each report before it is issued.
- Every source, including the drain. In Lincolnshire the water that floods a building often comes from a board's drain or rising groundwater rather than the river on the map, so our flood risk assessment works through each source in turn.
- Applying for permission. From a Lincoln infill plot to a Humber bank warehouse, a flood risk assessment for planning is written to the council's own policy, whether S21, Policy 4, SP17, EN5, CS19 or Policy 33, and to chapter 18 of the NPPF.
- Before you exchange. Lenders and searches flag coastal, fen and riverside houses across the county, and a flood risk survey for property purchase tells you what that flag means for the building itself.
- Why build here? With so much of the Fens and the coastal plain in Flood Zone 3, a sequential and exception test often decides whether new homes can be approved at all.
- Drainage evidence. Depending on where the site lies, the county council, North Lincolnshire or North East Lincolnshire reviews the drainage strategy behind an application.
- Runoff held to greenfield. A surface water drainage strategy shows how a Lincolnshire scheme keeps peak runoff at or below the greenfield rate, with 40% added to the rainfall and 10% to the hard surfaces.
- After the decision. Where a permission carries a drainage condition, discharge of drainage conditions supplies the calculations, layouts and maintenance plan the council needs before it can sign it off.
- Renewal after a flood. Storm Babet put water inside about 605 Lincolnshire properties in October 2023, and a flood risk assessment for insurance gives a broker evidence about the building rather than the postcode.
- Land and commercial deals. On the Humber bank's port and industrial land, or in the Coastal Zone where 2040 is the planning horizon, due diligence sets out the flood position before a purchase completes.
- Employment schemes. For offices and units such as those planned on about 20 hectares of employment land in Lincoln's Western Growth Corridor, a BREEAM flood risk assessment supports the flood credits.
- Off the mains. Central Lincolnshire's S21 accepts a non-mains system only once a public sewer connection is shown not to be feasible, which a foul drainage strategy demonstrates for a rural plot.
- Rising water. With a groundwater warning area at Barton-upon-Humber and the county's one-metre clearance rule for soakaways, a groundwater assessment establishes how high the water table gets.
- When the map falls short. In January 2025 the South Forty Foot Drain rose above its modelled 1 in 1,000 level, and flood modelling tests a Witham, Welland or Trent site where the national mapping is not enough.
- Coastal homes. East Lindsey requires a flood warning and evacuation plan with every application in its Coastal Zone.
Boston, Grimsby, Skegness and the county's other pages
Five Lincolnshire places have pages that go further into their own rivers, defences and policies, and four neighbouring pages sit just across the county boundary:
- The Wash. Boston on the tidal Haven, with Boston Borough Council's requirements and those of South Holland set out separately.
- The east coast. Mablethorpe and Skegness, both in the district covered by East Lindsey's flood and drainage requirements.
- The Humber bank. Grimsby, which also covers Cleethorpes, and Scunthorpe beside the tidal Trent.
- Over the boundary. Nottinghamshire up the Trent, Hull across the Humber, Peterborough beyond the Welland and Norfolk on the far side of the Wash.
Who to call when Lincolnshire floods
Dial 999 if floodwater puts anyone's life at risk, and 105 if it has cut the power. Otherwise, the body to call depends on where the water came from and which council area the property is in.
| Body | Handles | Contact |
|---|---|---|
| Lincolnshire County Council | Lead local flood authority for the seven districts: surface water, groundwater, ordinary watercourses and flood investigations, plus road drainage | Report a flood on FixMyStreet or on 01522 782082 |
| North Lincolnshire and North East Lincolnshire councils | Planning and lead local flood authority duties in their own areas | North Lincolnshire 01724 297000; North East Lincolnshire flooding, flood risk questions 01472 324351 |
| Environment Agency | Main rivers, sea and tidal defences, flood warnings (Lincolnshire and Northamptonshire area; East Midlands for the Trent) | Warnings in force in Lincolnshire; Floodline 0345 988 1188 |
| Flood warning service | Free calls, texts or emails when a warning is issued for your address | Sign up for flood warnings |
| Anglian Northern Regional Flood and Coastal Committee | Flood and coastal funding for Lincolnshire's rivers and coast; the county council holds three seats and North East Lincolnshire one | Anglian Northern RFCC |
| Trent Regional Flood and Coastal Committee | Funding on the Trent side of the county, where North Lincolnshire shares a seat with the county council | Trent RFCC |
| Lincolnshire Resilience Forum | Emergency planning for the county council's area | Lincolnshire Resilience Forum |
| Humber Local Resilience Forum | Emergency planning for North and North East Lincolnshire, with Hull and the East Riding | Humber LRF flooding advice |
| Anglian Water | Public sewers and sewer flooding | Report a problem; 03457 145 145 |
| Internal drainage boards | Water levels, pumped drains and byelaw consents in drained districts | Find the board for a site |
| Project Groundwater | Free text or email alarms from sensors on ordinary watercourses in trial communities | County project page |
Questions Lincolnshire clients ask before instructing
Why does the fee for a flood risk assessment in Lincolnshire vary so much between sites?
It depends on the flood zone, the sources involved and what is planned, so a garden extension in Louth costs far less than a fen-edge housing scheme that needs breach analysis or modelling. We quote a fixed fee for each site, free and without obligation, within 60 minutes of receiving the address and drawings.
Does Lincolnshire County Council review the drainage on a site in Grimsby or Scunthorpe?
No. North East Lincolnshire and North Lincolnshire are unitary councils, so each acts as both planning authority and lead local flood authority for its own area. The county council reviews drainage only in the seven districts from West Lindsey and East Lindsey down to South Kesteven and South Holland.
My Lincolnshire site sits behind a sea wall or a river bank. Why is it still treated as Flood Zone 3?
Flood zones show the land as if no defence were there, so a defended site keeps its zone. The assessment then tests what happens if the defence is overtopped or breached during the building's lifetime. In East Lindsey's Coastal Zone the council also asks for the undefended scenario to be tested.
Can surface water from a Lincolnshire scheme go into a fen dyke instead of a soakaway?
Often it has to, because the county council expects more than half of sites to need a positive outfall. If the dyke belongs to a drainage board, the board's consent is needed alongside planning permission, and the discharge is limited to what its pumps can take, typically about 1.4 litres a second per hectare.
How can I find out whether a Lincolnshire house has flooded before?
Start with the seller's property information form and the search results, then look at our postcode map and the county council's published flood investigations. A pre-purchase survey goes further, checking the building's levels, its drainage and the warnings that cover it before you exchange.
Can a homeowner in Lincolnshire write the flood risk assessment for an extension themselves?
For a minor extension in Flood Zone 2 or 3, the Environment Agency's standing advice lets a householder complete a short form, including floor levels and flood resistance measures. Anything larger, such as a new house or a change to a more vulnerable use, needs a site-specific assessment.
What should I send to get a quote for a site in Lincolnshire?
The address or a location plan, a line on what is proposed, any drawings, and the council's letter or condition if one has been issued. With those, we can tell you which reports the scheme needs and send a fixed fee within 60 minutes.
Will the 2028 council changes alter what a Lincolnshire application needs?
Not for now. The July 2026 decision to create two unitary councils was paused for review on 7 September 2026, so the current district councils, the county council and their policies stay in place. If the change goes ahead, the drainage duties would pass to the new councils on the date they take over.
Exchange or submission date coming up in Lincolnshire?
Tell us the address and what is planned. One of our experienced flood risk consultants will reply within 60 minutes with the reports the site needs and a fixed fee, free and without obligation.
Start a QuoteWhichever of Lincolnshire's three flood authorities covers your site, the first conversation costs nothing: call 01293 214444 or email enquiries@unda.co.uk.