Flood Risk & Drainage Requirements for Lewisham
Contact Us
Greenfield runoff is a requirement in Lewisham, not a target: Policy SD8 (Sustainable drainage) of the Lewisham Local Plan 2020 to 2040, adopted on 16 July 2025, says development "must achieve greenfield runoff rates", where the London Plan 2021 only asks schemes to aim for them. Policy SD7 (Minimising and managing flood risk) asks for a flood risk assessment with every major scheme, even in Flood Zone 1. SD8 also requires a drainage strategy for any scheme inside one of the borough's nine Critical Drainage Areas, whatever its size.
Lewisham Council is the local planning authority and also the Lead Local Flood Authority, so the drainage comments on an application come from inside the same council that decides it. The north of the borough sits behind the tidal walls of the Thames and Deptford Creek, and the River Ravensbourne, the Quaggy and the Pool run through Lewisham, Catford, Lee and Bell Green. This page sets out what the Lewisham requirements for flood risk and drainage are today, which document each one comes from and its date, and how our reports answer each one. It also flags where the council's own web guidance has not caught up with the 2025 plan.
Who decides flood and drainage questions on a Lewisham application
With no county tier in London, the borough holds both the planning and the local flood roles, and Lewisham has no internal drainage board. The Environment Agency and Thames Water are consulted, and the Mayor of London comes in on the largest schemes.
| Body | Role | What it decides or is consulted on |
|---|---|---|
| London Borough of Lewisham | Local planning authority | Decides the application against SD7, SD8, SD9, QD9 and LNA4, the London Plan and Chapter 18 of the NPPF; validates it against the local lists |
| London Borough of Lewisham | Lead Local Flood Authority | Comments on drainage strategies and surface water, groundwater and ordinary watercourse risk; approves SuDS; holds the Local Flood Risk Management Strategy 2022 to 2027 |
| Environment Agency | Statutory consultee | Advises on the tidal Thames, Deptford Creek and the Ravensbourne, Quaggy and Pool main rivers, on breach and defence matters, and on infiltration where groundwater could be affected (SD8 C); issues permits for work near main rivers and defences |
| Thames Water | Sewerage undertaker | Responds on connections to its separate and combined sewers; SD8 F bars new surface water connections to the foul sewer |
| Mayor of London | Strategic planning authority | Can direct on referable applications under the London Plan, including SI 12 and SI 13 |
| Royal Borough of Greenwich | Neighbouring planning authority | Decides sites on the Greenwich side of Deptford Creek, which forms the boundary; a site crossing it goes to both councils |
Policies SD7, SD8 and SD9: Lewisham's Local Plan rules on flooding, drainage and rivers
Since 16 July 2025 every Lewisham application has been tested against the Lewisham Local Plan 2020 to 2040, adopted by Full Council that day after the Inspectors' report of June 2025. It replaced four documents at once: the Core Strategy (2011), the Site Allocations Local Plan (2013), the Development Management Local Plan (2014) and the Lewisham Town Centre Local Plan (2014). The plan's schedule of replaced policies says Core Strategy Policy 10 (Managing and reducing the risk of flooding) was replaced by SD7 and SD8, and Core Strategy Policy 11 (River and waterways network) was replaced by SD9. DM Policy 34 (Thames Policy Area and Deptford Creekside) was replaced by SD9 and LNA4, and DM Policy 24 (Biodiversity, living roofs and artificial playing pitches) was replaced in part by SD8. A report written to the old codes needs updating before it goes in.
| Policy | Title | What it requires | Your obligation | How Unda meets it | Source and date |
|---|---|---|---|---|---|
| Policy SD7 | Minimising and managing flood risk | Sequential approach; no increase in risk from any source; an undeveloped setback from rivers; a site-specific FRA in Flood Zones 2, 3a and 3b, for all majors in Flood Zone 1 and wherever another source puts the site at risk; a Flood Emergency Response Plan where appropriate | Submit an FRA proportionate to the risk, covering all sources and climate change over the lifetime of the scheme, and drawing on the SFRA and the Local Flood Risk Management Strategy | A site-specific flood risk assessment built on the Lewisham SFRA, breach data and EA model outputs, with the tests and an emergency plan where the site needs them | Local Plan 2020 to 2040, adopted 16 July 2025 |
| Policy SD8 | Sustainable drainage | Greenfield runoff rates; the London Plan drainage hierarchy; a drainage strategy for majors and for any development in a Critical Drainage Area; permeable surfaces; no surface water to the foul sewer | Show the greenfield rate, the storage for the 1 in 100 year storm plus climate change and the route each part of the site drains to, with a SuDS Management Plan | A surface water drainage strategy to SD8 and the council's SuDS guide, with greenfield rates, storage volumes, exceedance routes and a management plan | Local Plan 2020 to 2040, adopted 16 July 2025 |
| Policy SD9 | Lewisham's waterways | No harm to how a watercourse functions; an undeveloped buffer agreed with the council and the EA; no deterioration in water quality; enhancement where possible | Keep the buffer clear of permanent structures (the supporting text gives 8 m from a main river and 5 m from an ordinary watercourse unless agreed otherwise); address the River Corridor Improvement Plan SPD | We map the main river and ordinary watercourse edges, the buffer and any defence assets in the FRA so the layout is tested before it is fixed | Local Plan 2020 to 2040, adopted 16 July 2025 |
| Policy LNA4 | Thames Policy Area and Deptford Creekside | Schemes on the Thames and the Creek keep flood defences stable and look at setting them back; no encroachment into the river or foreshore | Show defence condition and access, and how the scheme leaves room for future raising | The FRA records defence levels, breach hazard and the setback, and links them to SD7 A(d) on raising the Thames walls | Local Plan 2020 to 2040, adopted 16 July 2025 |
| Policy QD9 | Building alterations, extensions and basement development | Every basement scheme needs a Basement Impact Assessment; no increase in flood risk and users safe from all sources; safe access and egress for habitable basements | Cover groundwater, surface water and sewer flooding as well as structure in the Basement Impact Assessment | The flood and groundwater content of the assessment: SFRA groundwater mapping, surface water depths and the threshold and pumping arrangements | Local Plan 2020 to 2040, adopted 16 July 2025 |
| Policy SI 12 | Flood risk management (London Plan) | Flood risk minimised and mitigated and residual risk addressed; development set back from flood defences; Thames Estuary 2100 measures supported | Address residual risk behind the defences and leave access for their maintenance and raising | Residual and breach risk set out with the TE2100 position for the site | London Plan 2021, March 2021 |
| Policy SI 13 | Sustainable drainage (London Plan) | Aim for greenfield runoff rates and manage runoff close to source through the six-step drainage hierarchy | Work down the hierarchy and justify each step not taken | The drainage strategy walks the hierarchy in order before any sewer connection is proposed | London Plan 2021, March 2021 |
| Policy GHR5 (draft) | Flood risk and drainage (Draft London Plan 2026) | Draft only: consultation closed 15 October 2026, examination in 2027 | None yet: SI 12 and SI 13 still apply | Reports note the draft and its stage; decisions rest on SI 12 and SI 13 until the new plan is adopted | Draft London Plan 2026, published 27 July 2026, updated 11 September 2026 |
Requirements checked November 2026.
Policy SD8 (Sustainable drainage): greenfield rates as a requirement
SD8 makes greenfield runoff a requirement for development in Lewisham, and it asks for a drainage strategy with every major scheme and with any scheme, large or small, in a Critical Drainage Area. Part B reads: "Development proposals must achieve greenfield runoff rates and ensure that surface water runoff is managed as close to its source as possible, in line with the London Plan drainage hierarchy." London Plan Policy SI 13 only says development "should aim to" reach the same rates. The difference is one word, and it decides whether a brownfield scheme can stop at a partial cut.
The plan's supporting text adds that runoff must be stored on site for the 1 in 100 year critical storm with an allowance for climate change, and that the drainage strategy should include a SuDS Management Plan for long-term maintenance. Lewisham's Surface Water Management Plan identifies nine Critical Drainage Areas, many of them in the London Plan Opportunity Areas and across the south of the borough. Only where greenfield rates or SuDS are shown not to be feasible does part D allow a fallback: runoff cut "as much as reasonably practical" and water quality improved. Part E says impermeable surfacing, front gardens and car parks included, will be refused unless it is unavoidable. Part F bars new surface water connections to the foul sewer.
The council's SuDS guide checks that the greenfield calculation uses the site's actual soils, that the storage volumes on the drawings match the hydraulic calculations and that a maintenance plan is in place. A brownfield scheme that offers only a percentage cut on the existing rate, without first showing why greenfield cannot be reached, does not meet part D. Our drainage strategies start from the greenfield rate and only move off it with a feasibility case the LLFA can check.
Policy SD7 (Minimising and managing flood risk): what the assessment must cover
SD7 sets when an FRA is needed in Lewisham and what it must contain. Part B reads: "A site specific Flood Risk Assessment (FRA) will be required for all development proposals within Flood Zone 2, 3a and 3b, all major development in Flood Zone 1, and elsewhere in the Borough where development may be at risk of other sources of flooding."
The assessment must be proportionate, take account of all sources on and off site, allow for climate change over the lifetime of the development and have regard to the latest SFRA and the Local Flood Risk Management Strategy. Part C covers schemes that pass the sequential and exception tests: the most vulnerable uses on the lowest-risk parts of the site, no net loss of flood storage, no harm to flow routes, and residual risk mitigated, safe access and egress included. Part D asks for a site-specific Flood Emergency Response Plan where appropriate. Part A(d) asks riparian owners to survey flood defences and, on the Thames, to raise them in line with the TE2100 plan.
The supporting text adds two rules that sit outside the policy wording. Riverside buffers of 16 m on tidal rivers and 8 m on fluvial rivers are sought, or another distance agreed with the council and the Environment Agency. Sites allocated in the plan that passed the council's Site Allocations Sequential and Exception Tests Paper (2023) do not repeat the sequential test unless the proposed use differs from the allocation. Our flood risk assessments for Lewisham sites are set out in the order SD7 lists, with the breach and residual risk behind the defences treated as part of the assessment and not left to a separate note.
Policy SD9 (Lewisham's waterways): buffers and the River Corridor Improvement Plan
SD9 protects how Lewisham's rivers function, and on a site next to a main river or ordinary watercourse it asks for "an undeveloped buffer zone with an adequate set back distance from the watercourse, as agreed with the Council and the Environment Agency". The supporting text gives 8 m from a main river and 5 m from an ordinary watercourse unless the council and the Environment Agency agree otherwise, and it treats culverts as flood defences, with deculverting to be investigated.
The figures in SD9's text and those in SD7's text are not the same: SD9 gives 8 m from any main river, while SD7 gives 16 m where the river is tidal. On the Thames and Deptford Creek we plan to the 16 m figure until the council and the Agency agree something else. SD9 B(a) also points applicants to the River Corridor Improvement Plan SPD, adopted on 25 November 2015, which sets guidance for development along every river in the borough. Work on or near a main river or flood defence may also need an environmental permit from the Environment Agency, which is a separate consent from planning.
Policy LNA4 (Thames Policy Area and Deptford Creekside): defences on the waterfront
LNA4 applies along the Thames and Deptford Creek in the North Area, and its flood clause asks schemes to keep the defences stable and to look for chances to set them back. Part B(d) reads: "Maintaining the stability of the flood defences and investigating opportunities to retreat flood defences", and part B(e) resists encroachment into the creek, river or foreshore. Part B(f) keeps room for the established boating community on Creekside. Our assessments on these sites record the defence crest, its condition and owner, the breach hazard behind it and the space kept for future raising.
Policy QD9 (Building alterations, extensions and basement development): basements and flooding
QD9 requires a Basement Impact Assessment with every basement proposal and lets one go ahead only if it will not increase flood risk and keeps users safe from every source. Part G reads: "Proposals for basement development must include a Basement Impact Assessment." Part H(c) requires that the basement "Will not result an increase to flood risk whilst ensuring users of the development will be safe from all sources of flooding", and part J asks for safe access and egress where a basement holds habitable rooms. The Level 1 SFRA records areas of elevated groundwater around Deptford that could flood property below ground level, and it notes basement dwellings among the homes the Surface Water Management Plan found at risk from surface water. Our basement flood advice and groundwater work supply the flood half of the assessment.
Policy SI 12 (Flood risk management): the London Plan layer on residual risk
SI 12 of the London Plan 2021 sits alongside SD7 and is the source of the residual risk test. Part C reads: "Development proposals should ensure that flood risk is minimised and mitigated, and that residual risk is addressed." It also asks development next to flood defences to protect them and leave access for maintenance and raising. In north Lewisham that means a report has to deal with what happens if the Thames or Creek wall is breached or overtopped, as well as with the defended flood zone. Our assessments for sites behind the walls report the breach depth and hazard from the Environment Agency's model and the refuge or escape route that follows from it.
Policy SI 13 (Sustainable drainage): the hierarchy SD8 relies on
SI 13 supplies the six-step drainage hierarchy that SD8 refers to: rainwater use, infiltration, attenuation in green features, discharge to a watercourse, then a surface water sewer and only then a combined sewer. Part B reads: "Development proposals should aim to achieve greenfield run-off rates and ensure that surface water run-off is managed as close to its source as possible." Our drainage strategies take each step of the hierarchy in turn and say why any step is not used before a sewer connection is proposed.
Is your Lewisham site in a Critical Drainage Area or behind the Thames wall?
We will check the flood zone, the drainage area and the SD7 and SD8 triggers before the layout is fixed. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.
Start a QuoteNo new Lewisham Local Plan yet, but a new London Plan is on the way
Lewisham is not preparing a replacement Local Plan. Its Local Development Scheme, approved by Mayor and Cabinet on 28 January 2025 and in force from 11 February 2025, programmes no review of the 2025 plan. It says a review is likely, possibly after the Mayor's new London Plan, but will not fully commence within the scheme's period. We found no notice of intention to start a plan under the 2026 plan-making regulations on the council's planning policy pages. The same scheme programmed a revised River Corridor Improvement Plan SPD for adoption in 2026, but the council's SPD page still holds the 2015 version.
The bigger change is London-wide. The Draft London Plan 2026 was consulted on from 16 July to 15 October 2026, with examination due in 2027 and adoption expected early in 2028. Its flood content sits in draft Policy GHR5 (Flood risk and drainage) and draft Policy GHR9 (Clean and healthy waterways). Until adoption, SI 12 and SI 13 remain the London policies a Lewisham application is decided against; once adopted, the new plan replaces the 2021 London Plan as a whole.
What Lewisham's validation lists ask for on flood risk and drainage
Lewisham's planning validation requirements page still serves the lists headed "Planning validation requirements from October 2022": a major applications list, a minor applications list and a householder list. They are more than two years old, so their local items count as the council's published guidance and not as grounds to refuse registration. They cite the London Plan but predate the 2025 Local Plan and the August 2026 NPPF. The council still expects the reports they name. Our post on why applications are made invalid covers the usual flood and drainage gaps.
Replacement lists were out for consultation from 1 to 29 September 2026 on the council's draft validation requirements page. The drafts tie each item to the 2025 plan and to the NPPF letters, ask for a statement on how the national SuDS standards are met, and the draft minor list adds a Lewisham SuDS proforma for drainage strategies in a Critical Drainage Area. They had not been adopted when we checked in November 2026.
| Report | Trigger | Where the requirement comes from |
|---|---|---|
| Flood risk assessment | Any site in Flood Zone 2, 3a or 3b; every major scheme in Flood Zone 1; any site at risk from surface water, groundwater, sewers or reservoirs | SD7 B; NPPF F4; 2022 major and minor lists (FZ2/3, surface water risk, 1 ha+ in FZ1) |
| Householder flood form | Extensions in Flood Zone 2 or 3, or where surface water risk is shown | 2022 householder list: the Environment Agency's standard householder form |
| Sequential test | New development in Flood Zone 2 or 3 or at risk from another source, unless an F5 exemption applies (allocated site already tested, no built development in the risk area, householder or small non-residential extension, most changes of use) | NPPF F5; SD7 explanation on allocated sites |
| Exception test | Where Annex F, table 3 calls for it after the sequential test; not where no sequential test is required; never in Flood Zone 1 | NPPF F6; SD7 C |
| Drainage strategy | Every major scheme, and any scheme in one of the nine Critical Drainage Areas | SD8 B |
| SuDS strategy on the major list | Every application made on the major checklist | 2022 major list, item 40 |
| Flood Emergency Response Plan | Where appropriate under SD7 D (the plan's examples include raised floors with flood risk remaining in the 0.1% AEP event); the 2022 lists ask for one where safe, dry escape cannot be provided | SD7 D; 2022 major and minor lists (Flood Evacuation Management Plan) |
| Basement Impact Assessment | Any new or extended basement | QD9 G |
| River Impact Study | Sites next to or close to the Ravensbourne, Pool, Thames, Quaggy or Deptford Creek, or an ordinary watercourse the LLFA designates | 2022 major and minor lists |
| Internal drainage board consent | Never: no board covers Lewisham | Council flood management page |
Drainage strategy in Lewisham: the LLFA's standard
As Lead Local Flood Authority, Lewisham reviews drainage against SD8 and its SuDS Design and Evaluation Guide, prepared for the council by McCloy Consulting and Robert Bray Associates in 2018. The council's flood management page, published on 11 September 2026, still points developers to that guide. It works through concept, outline and detailed stages and gives a checklist for each.
- Greenfield rate first. SD8 B requires it; the guide calculates it from the site's actual soils, not from regional maps alone.
- Volume as well as rate. The guide prefers "Approach 1": discharge varying with the greenfield rate between the 1 in 1 and 1 in 100 year events, with the extra volume from development released at no more than 2 litres per second per hectare. A single Qbar rate ("Approach 2") is accepted only where Approach 1 is shown to be unachievable.
- Storage. Runoff stored on site for the 1 in 100 year critical storm with an allowance for climate change (SD8 supporting text).
- Climate change. The guide's table gives the 2016 national figures, central 20% and upper end 40% for 2070 to 2115. Since 10 May 2022 the Environment Agency's allowances have been set by management catchment, and our strategies use the current figures for the catchment, with the guide's sensitivity check where the council asks for it.
- Urban creep. An allowance of up to 10% on private impermeable areas for housing, falling as density rises, and nil for flats; commercial schemes agree it with the LLFA.
- Infiltration. Tests at the depth of the proposed feature, BRE 365 or the CIRIA 156 method (with C753 factors of safety), with the Environment Agency consulted where infiltration could affect groundwater (SD8 C). Our BRE 365 infiltration rate calculator and ground conditions and soakaway map give a first read.
- National Standards. NPPF Policy F8 says SuDS should follow the National Standards for Sustainable Drainage Systems (2025). SD8's supporting text still refers to the older non-statutory standards, and the council has published no statement of its own on the new ones; our guide to the 2025 National Standards shows what a strategy now has to evidence.
For a scheme in a Critical Drainage Area, expect officers to ask for the surface water flow routes across the site as well as the outfall. The September 2026 draft lists would add a SuDS proforma at that point. Our surface water drainage strategy work for Lewisham starts with a topographic survey and the council's Critical Drainage Area boundaries.
The Lewisham SFRA: Level 1 (2019), Level 2 (2020) and the 2023 addendum
Lewisham's Strategic Flood Risk Assessment comes in three parts, all by or based on AECOM's work. The Level 1 SFRA is dated 12 October 2018, with its final revision issued on 8 April 2019, which is why the Local Plan calls it the "Level 1 SFRA (2019)". The council's evidence base page files it under archived studies, but no newer Level 1 has replaced it and the plan still relies on it. The Level 2 SFRA of December 2020 assessed 82 site allocations, with a Level 2 guidance document of the same month. A Stage 2 addendum of February 2023 added four more sites.
- Functional floodplain. The Level 1 SFRA draws Flood Zone 3b at the 1 in 20 year (5% AEP) flood, from the Environment Agency's Ravensbourne model plus the flood storage areas: Ladywell Fields, parts of Lewisham town centre and the Chinbrook Meadows storage area on the Quaggy. NPPF Annex F now normally uses the 3.3% (1 in 30) event, so a site near the 3b edge is checked against both.
- Breach behind the defences. In the Environment Agency's Thames breach model, flooding in the 2005 epoch is limited to land next to Deptford Creek and between the river and the A200; by 2100 it covers much of the borough's northern tip, with large areas rated a danger for all.
- Climate change on the Ravensbourne. The SFRA notes that the 70% upper-end allowance had not been modelled for the Ravensbourne; developers are told to ask the Environment Agency for model data.
- Groundwater. No widespread groundwater flooding is recorded, but the SFRA flags elevated groundwater around Deptford that could reach property below ground level.
- Floor levels. The Level 2 guidance asks for finished floors at least 300 mm above the 1% AEP flood plus climate change.
The Greater London Authority's London Regional Flood Risk Assessment, Part 1, March 2026, is newer than any of these. It puts 56% of Lee Green town centre and 45% of Lewisham town centre in areas at high flood risk from all sources, among the highest shares in London. SI 12 tells plan-makers to use it, and an FRA in either centre should say how the site sits against it.
How Chapter 18 of the August 2026 NPPF applies to a Lewisham scheme
National flood policy now sits in Chapter 18 of the National Planning Policy Framework. Policy F4 sets when an assessment is needed, F5 the sequential test, F6 the exception test, F7 site safety and F8 sustainable drainage. Lewisham's 2025 plan was written to the earlier Framework, and three points matter for an application here. The Planning Practice Guidance on flood risk, last updated on 17 September 2025, sits alongside it.
- Assessments in Flood Zone 1. F4 asks for an FRA in Flood Zone 1 on sites of 1 ha or more, land with critical drainage problems and land the SFRA or the Flood Map shows at risk now or in the future. SD7 goes further and adds every major scheme in Zone 1, so a 12-home scheme on a 0.3 ha Zone 1 site still needs one in Lewisham.
- The size of the search. F5 caps the sequential test's area of search at the development's anticipated catchment, so a search is sized to the scheme's likely occupiers or users and not automatically to the whole borough. F5(2) exempts sites allocated after testing at plan stage, which matches SD7's supporting text. Our note on the surface water exemption explains the F5(2) carve-out for sites at risk only from surface water, and our reports state which exemption applies before any search starts.
- Drainage to the National Standards. F8 asks for SuDS designed to the 2025 National Standards and, for major schemes, account taken of the LLFA's advice. In Lewisham that advice is SD8 and the 2018 guide.
The exception test under F6 applies only in Flood Zones 2, 3a and 3b and only where Annex F calls for it, and never where no sequential test is needed. Our page on NPPF guidance and advice sets out the chapter in full.
Tidal walls, three rivers and town-centre surface water: flood risk across Lewisham
The River Thames forms the borough's northern edge, and the River Ravensbourne becomes the tidal Deptford Creek north of Deptford Bridge for about a kilometre before it meets the Thames. Both are walled. The Environment Agency's Thames Estuary 2100 plan puts Lewisham in the Wandsworth to Deptford and Greenwich policy units, both under policy P5: further action to reduce risk, with defence owners to raise the walls where needed by 2050 and councils to plan their riverside by 2030. Our Thames Barrier explainer covers the system that protects them. Our neighbouring council pages for Greenwich, across the Creek, and Wandsworth, in the same TE2100 unit, set out their own rules.
Inland, the borough covers most of the Ravensbourne's catchment, with the Quaggy, the Pool and Kyd Brook joining it before Deptford Creek. The SFRA records the September 1968 flood along all three rivers, worst around Lewisham Shopping Centre, Ladywell Fields and University Hospital Lewisham, and the Local Flood Risk Management Strategy still calls it the last major flood on the Ravensbourne; our Great Flood of 1968 article tells that story. The council and the Environment Agency have since reworked stretches of the Ravensbourne and Quaggy with improved defences and landscaped flood storage, so current Environment Agency model outputs carry more weight than the historic outlines. River levels at gauged sites are on our live river levels map.
Surface water is the more widespread risk. The council's Local Flood Risk Management Strategy 2022 to 2027 and the earlier Surface Water Management Plan record street and property flooding after intense rain, and the nine Critical Drainage Areas follow those flow paths. Our flood risk map shows the flood zones and surface water extents for any Lewisham postcode, and the Deptford flood risk assessment page covers the riverside wards in more detail. Thames Water runs a mix of separate and combined sewers across the borough, which is why SD8 F keeps surface water out of the foul system.
Reports for a Lewisham planning application, matched to each requirement
Each row names the Lewisham policy or document behind the report. We prepare flood risk assessments and drainage strategies for applications to Lewisham Council, and the work for Lewisham schemes comes from Unda Consulting Limited, a CIWEM Business Partner whose consultants are chartered. An FRA asks whether the site is safe, a sequential test asks whether it should be there at all, and a drainage strategy shows where the rainwater goes: in Lewisham one application often needs all three.
- Every source, on and off site. SD7 B asks for all sources to be assessed, so our flood risk assessment covers the tide, the three rivers, surface water, groundwater and sewers for each Lewisham site.
- The planning submission. A flood risk assessment for planning set out in SD7's order, with SFRA breach data for sites behind the Thames and Creek walls.
- Buying in the floodplain. A flood risk survey for property purchase for homes near the Ravensbourne and Quaggy or behind the tidal walls, where the 1968 outlines and today's maps differ.
- Windfall sites in Zones 2 and 3. A sequential and exception test sized to the scheme's catchment under F5, for sites the 2023 allocations paper did not test.
- SD8's drainage strategy. A drainage strategy for every major scheme and every scheme in a Critical Drainage Area, built on greenfield rates and the London Plan hierarchy.
- Runoff and storage figures. A surface water drainage strategy with the Approach 1 volume calculation the council's 2018 guide prefers.
- After permission. Discharge of drainage conditions where Lewisham attaches SuDS, management plan or verification conditions.
- Basements and Deptford groundwater. A groundwater assessment for QD9 basement schemes and sites where the SFRA flags elevated groundwater.
- SD7 D's emergency plan. A flood warning and evacuation plan where safe dry escape is not available behind the defences.
- Recorded flooding of homes. An insurance flood risk assessment for owners in streets the SFRA and LFRMS record as flooded.
- Creekside and North Area land. Commercial due diligence for industrial and mixed-use land on Deptford Creek and the Thames, much of it in Flood Zone 3 behind the walls.
- Chapter 18 in plain terms. NPPF flood risk guidance and advice where a scheme turns on F4, F5 or F6.
SD7, SD8 and the validation lists: common Lewisham questions
What does Lewisham Local Plan Policy SD7 (Minimising and managing flood risk) require?
SD7, in the Local Plan adopted on 16 July 2025, asks every scheme to follow a sequential approach, add no flood risk from any source and keep an undeveloped setback from rivers. It requires a site-specific flood risk assessment in Flood Zones 2, 3a and 3b, for every major scheme in Flood Zone 1 and wherever another source puts the site at risk. Where appropriate it also asks for a Flood Emergency Response Plan and, for riparian owners, a survey and repair of flood defences, including raising the Thames walls in line with the TE2100 plan.
Does a Lewisham application in Flood Zone 2 need a flood risk assessment?
Yes. SD7 B and the council's validation lists both ask for one with any application in Flood Zone 2. A householder extension can use the Environment Agency's standard householder form, which the 2022 householder list names. New homes or other development in Zone 2 also need the sequential test unless an NPPF F5 exemption applies.
Does a small scheme in Lewisham need a drainage strategy?
It does if the site is in one of the nine Critical Drainage Areas named in Lewisham's Surface Water Management Plan. SD8 B asks for a drainage strategy with every major scheme and with any development in a Critical Drainage Area, whatever its size. Outside those areas a minor scheme still has to meet SD8's greenfield runoff and permeable surfacing rules.
Is the sequential test needed on an allocated Lewisham site?
Usually not. The council tested its allocations in the 2023 Site Allocations Sequential and Exception Tests Paper, and both SD7's supporting text and NPPF F5 exempt allocated sites tested at plan stage. SD7's supporting text adds that the exemption falls away if the proposed use differs from the allocation, and under NPPF F6 an exception test applied at plan stage has to be repeated if flood risk has risen significantly since.
Which validation list does Lewisham use for flood risk and drainage?
The lists headed "Planning validation requirements from October 2022" are still the ones on the council's website. Replacement lists were consulted on from 1 to 29 September 2026 and had not been adopted when we checked in November 2026. Because the 2022 lists are over two years old, their local items are guidance, but the council still expects the reports they name.
Does Lewisham have an internal drainage board?
No. Lewisham sits outside every drainage board district. The council handles ordinary watercourses and surface water as Lead Local Flood Authority, and the Environment Agency covers the Thames, Deptford Creek and the Ravensbourne, Quaggy and Pool main rivers. For advice on a site, call 01293 214444.
Applying to Lewisham before the new validation lists arrive?
We will tell you which reports SD7, SD8 and the current lists call for on your site, so nothing is missing at registration. Get a no-obligation, free quote, with a fixed quote within the hour.
Start a QuoteTo talk through a Lewisham site, call 01293 214444 or email enquiries@unda.co.uk. Our local authorities hub lists the other councils whose rules we set out in the same way, and our London page covers the capital's boroughs. The local planning authority and Environment Agency explainers set out who does what in any London application, and our residual flood risk note explains the breach question behind the Thames wall.