Flood Risk & Drainage Requirements for the Royal Borough of Windsor and Maidenhead

Contact Us
A line drawing of the UK map with three points linked to icons: a factory, a house, and a river. A warning symbol and a person in a hard hat holding a clipboard appear on the right side.

The Royal Borough of Windsor and Maidenhead (RBWM) decides flood risk and drainage against Policy NR1 (Managing Flood Risk and Waterways) of its Borough Local Plan, adopted on 8 February 2022. NR1 asks for a sequential test on all development in areas at risk of flooding unless the site is allocated, and the validation requirements the council adopted on 5 February 2026 extend that test to land at moderate or high surface water risk. The same list asks for a drainage strategy with every new or replacement home, a single house included.

This page sets out what the Royal Borough and the bodies it consults require on flood risk and drainage, policy by policy, and what our reports contain to meet each requirement. It covers the whole council area: Maidenhead, Windsor and Eton, Ascot and the Sunnings, and the Thames-side parishes from Hurley and Cookham down to Datchet, Old Windsor, Horton and Wraysbury. Nine neighbourhood plans apply alongside the Borough Local Plan. Several have flood policies stricter than NR1. Other councils are listed on our local authority requirements page.

The Royal Borough, the Environment Agency and Thames Water: who decides what

Windsor and Maidenhead is a unitary council, so one authority is both the planning authority and the Lead Local Flood Authority. The case officer and the drainage officer work for the same council, and the drainage response on a major scheme is a statutory consultation. No internal drainage board covers any part of the borough.

BodyRoleWhat it decides or is consulted on
Royal Borough of Windsor and MaidenheadLocal planning authorityValidates against its National and Local Validation Requirements, adopted 5 February 2026, then decides the application against the Borough Local Plan, any made neighbourhood plan and Chapter 18 of the NPPF
Royal Borough of Windsor and Maidenhead (flood risk and SuDS officers)Lead Local Flood AuthorityStatutory consultee on surface water drainage for major development; a non-statutory consultee on non-major schemes, with standing advice possible up to five homes and its own response on six to nine; consents works to ordinary watercourses
Environment AgencyStatutory consulteeRiver flooding in Flood Zones 2 and 3 on the Main Rivers, among them the Thames, the Colne Brook and The Cut; work on or near a Main River may need an environmental permit from the Agency
Thames WaterSewerage undertakerSewer connections and treatment capacity, which Policy IF7 makes a planning matter
Internal drainage boardNoneNo board district in the borough; ordinary watercourse consent comes from the council

Two details of that drainage role affect a submission. The guidance for major schemes says the Royal Borough "is not a statutory consultee in respect of groundwater", yet "applicants should consider and mitigate against any potential impacts of groundwater on the management of surface water". And ordinary watercourse consent is a separate approval under the Land Drainage Act 1991, needed even where planning permission is already in place; our guides to main rivers and ordinary watercourses and to ordinary watercourse consent explain the difference.

Policy NR1 and the Royal Borough's other flood and drainage policies

Six policies of the Borough Local Plan 2013-2033, adopted 8 February 2022, deal with flood risk and drainage, and eleven more are in the neighbourhood plans for Horton and Wraysbury, Datchet, Old Windsor, Maidenhead, Cookham, Eton, Windsor, and Hurley and the Walthams. Each is part of the development plan. A scheme in Datchet answers both NR1 and DAT10. The dates in the last column are when the Borough Council adopted or made each plan.

PolicyTitleWhat it requiresYour obligationHow Unda meets itSource and date
NR1Managing Flood Risk and WaterwaysFlood risk assessment in Flood Zones 2 and 3 and on Flood Zone 1 sites of 1 ha or more; sequential test for all development in areas at risk unless allocated; only water-compatible uses and essential infrastructure in the functional floodplain; no loss of flood flow or storage; SuDS; 8 m buffer to main riversShow the site is safe, sequentially justified and no worse for anyone elseAn assessment that answers each of the ten parts, with a separate sequential test where part 2 appliesBorough Local Plan 2013-2033, adopted 8 February 2022
SP2Climate ChangeAll development to minimise surface water runoff in the drainage layout and, where possible, build in resilience to higher river flood levelsDesign for the climate over the life of the schemeClimate change allowances applied to river levels and rainfall, with resilience measures specifiedBorough Local Plan 2013-2033, adopted 8 February 2022
QP2Green and Blue InfrastructureParticular attention to blue infrastructure, which can include restored water features and SuDSTreat drainage as part of the landscapeA drainage strategy that leads with surface featuresBorough Local Plan 2013-2033, adopted 8 February 2022
QP4River Thames CorridorWithin the corridor on the Policies Map, an undeveloped 8 metre buffer on both sides of a main river, where appropriateKeep buildings and hard surfaces back from the bankBuffer distances measured from top of bank on the site planBorough Local Plan 2013-2033, adopted 8 February 2022
EP5Contaminated Land and WaterNo unacceptable harm to groundwater quality, Source Protection Zones included, or to surface water qualityShow infiltration will not carry pollution to the aquiferInfiltration checked against ground conditions and treatment stages set outBorough Local Plan 2013-2033, adopted 8 February 2022
IF7UtilitiesAdequate water supply and sewerage capacity on and off site; phasing conditions where capacity is shortContact Thames Water early and report the answerA foul drainage section or strategy recording the capacity responseBorough Local Plan 2013-2033, adopted 8 February 2022
NP/SUSTDEV 02Management of the Water Environment (Horton and Wraysbury)No support for development in Flood Zones 2 and 3 apart from one-for-one replacement houses and extensions up to permitted development limitsCheck the flood zone before anything elseFlood zone confirmed against site levels at the outsetHorton and Wraysbury Neighbourhood Plan, made 23 June 2020
DAT10Flooding, Drainage and Water Efficiency (Datchet)All sources of flood risk; SuDS that avoid infiltration; a drainage condition in areas at risk; 105 litres per head per dayAbove-ground drainage and water-efficient homesA strategy that stores water at the surface, with foul drainage coveredDatchet Neighbourhood Plan, made 27 June 2023
OW5Flooding and Drainage (Old Windsor)No added flood risk anywhere in the catchment; surface and foul drainage details approved before work startsExpect a pre-commencement drainage conditionSurface and foul drainage detailed enough to discharge the conditionOld Windsor Neighbourhood Plan, made 17 December 2019
OW6SuDS Design and Management (Old Windsor)No increase on existing runoff; above-surface water management; a maintenance planHold runoff at or below the existing rateExisting and proposed runoff rates and a maintenance scheduleOld Windsor Neighbourhood Plan, made 17 December 2019
BI-2Managing Flood Risk and Sustainable Drainage Systems (Maidenhead)In Flood Zones 2 and 3 and on Flood Zone 1 sites over 1 ha: no surcharge of foul drainage, no harm to neighbouring land, no reliance on pumps up to the 1 in 100 year eventA gravity solutionGravity outfalls proved by levels, with the foul network checkedMaidenhead Neighbourhood Plan, made 21 April 2026
SS-1bWaterway Corridor development (Maidenhead)At least an 8 m green buffer on either bank; no increase in flood risk; no harm to flow or levelsSet back from the Maidenhead waterwaysChannel capacity and levels assessed where banks or bed are affectedMaidenhead Neighbourhood Plan, made 21 April 2026
C-EN3aFlood risk (Cookham)Assessments to cover the drainage and water disposal profile of the site and area, and climate changeA locally informed assessmentLocal drainage routes and flood history in the assessmentCookham Neighbourhood Plan, made 9 September 2025
C-EN3bSustainable Drainage Systems (SuDS) (Cookham)Major development: no foul surcharge, no harm to neighbouring land, no pumping up to the 1 in 100 year eventA gravity solution on major schemesAs for Maidenhead Policy BI-2Cookham Neighbourhood Plan, made 9 September 2025
EN3Flooding (Eton and Eton Wick)No increase in maximum flood levels within adjoining propertiesShow neighbours are no worse offFloodplain storage and flow routes checked against the neighbouring plotsEton and Eton Wick Neighbourhood Plan, made 25 September 2018
WAT 01Flooding and water supply policy (Windsor)Development safe from flooding with no increase elsewhere; foul and surface water kept separate; SuDS supportedSeparate systemsSeparate foul and surface water layoutsWindsor Neighbourhood Plan, made 29 June 2021
Env 2Climate Change, Flood and Water Management (Hurley and the Walthams)No increase in flood risk elsewhere; SuDS supportedNo off-site impactRunoff held to existing rates or betterHurley and the Walthams Neighbourhood Plan, made 12 December 2017

Requirements checked November 2026, against the Borough Local Plan, the nine made neighbourhood plans, the validation requirements adopted on 5 February 2026, the 2017 and 2018 Strategic Flood Risk Assessments and the council's two SuDS guidance notes.

Policy NR1 (Managing Flood Risk and Waterways): the sequential test, the floodplain and the 8 metre buffer

Policy NR1 supports development in Flood Zones 2 and 3, on Flood Zone 1 sites of a hectare or more and in the other cases national policy lists, only where a flood risk assessment shows that risk from every source is acceptable. Part 2 sets the locational test: "The sequential test is required for all development in areas at risk of flooding, except for proposed developments on sites allocated in this Plan or in a made Neighbourhood Plan which accord with the provisions of those Plans so far as material to the application" (Borough Local Plan, chapter 12). The same part says "Only water compatible uses and essential infrastructure development will be supported in the area defined as functional floodplain".

Allocation spares a site the sequential test but leaves the exception test in place. Part 7 applies the exception test "including on sites allocated in the development plan", and the plan's proformas for allocations partly in Flood Zones 2 and 3 ask the assessment to show that the test can be passed and that a safe evacuation route can be provided. Part 5 then lists what no scheme may do, alone or cumulatively: "impede the flow of flood water", "reduce the capacity of the floodplain to store water", or "increase the number of people, property or infrastructure at risk of flooding". For a house in the floodplain that means level-for-level compensation and open flow routes, shown with figures.

Part 9 asks development near rivers, culverted ones included, to "retain or provide an undeveloped 8 metre buffer zone alongside main rivers and, where practicable and appropriate, ordinary watercourses", measured from the top of the bank on both sides. The supporting text says the buffer "will be strictly applied for main rivers" and more flexibly for ordinary watercourses. Part 10 safeguards land for "the proposed River Thames Scheme and the flood relief channel from Datchet to Wraysbury".

Officers read NR1 with the borough's Strategic Flood Risk Assessment, whose requirement pages warn that failure to meet them "will result in refusal of the planning application". Our assessments for Royal Borough sites take the ten parts in turn: the flood zone and the functional floodplain line, flood levels with climate change, compensation volumes, the buffer, access and escape, and the sequential and exception tests as separate reports where parts 2 and 7 call for them. Our article on the functional floodplain explains what the Flood Zone 3b line means for a site.

Policy SP2 (Climate Change) and Policy QP2 (Green and Blue Infrastructure): drainage in every scheme

Policy SP2 puts a drainage duty on all development, small schemes outside the floodplain included. Its clause 1(d) says "All development shall minimise the impact of surface water runoff from the development" through its drainage system, and should "where possible incorporate mitigation and resilience measures for any increases in river flooding levels as a result of climate change" (Borough Local Plan 2013-2033, adopted 8 February 2022). Policy QP2 adds that proposals should "pay particular attention to the provision of blue infrastructure", which "could include" restored water features and SuDS. The council's Sustainability SPD, adopted on 24 July 2024, turns SP2 into a submission item: a surface water drainage scheme that follows the SuDS hierarchy wherever buildings or hardstanding reduce the permeable area of a site. We size that scheme to the site, from a rain garden and permeable paving on a single plot to a full strategy on a major one.

Policy QP4 (River Thames Corridor): the buffer along the Thames

Policy QP4 applies inside the River Thames Corridor drawn on the Policies Map. Where appropriate, proposals there must "retain or provide an undeveloped 8 metres buffer zone on both sides of a main river measured from the top of the river bank at the point at which the bank meets the level of the surrounding land" (Borough Local Plan 2013-2033, adopted 8 February 2022). It repeats NR1's buffer in a policy about the river's character and access, so a riverside scheme can be refused on QP4 even where the flood case is made. We plot the buffer on the survey before the layout is fixed.

Policy EP5 (Contaminated Land and Water) and Policy IF7 (Utilities): groundwater and sewer capacity

Policy EP5 supports development only where "proposals will not cause unacceptable harm to the quality of groundwater, including Source Protection Zones, and do not have a detrimental effect on the quality of surface water" (Borough Local Plan 2013-2033, adopted 8 February 2022). That affects soakaways over the chalk north of Maidenhead and the Thames gravels. Policy IF7 deals with sewers. Proposals "must demonstrate that adequate water supply and sewerage infrastructure capacity exists both on and off site to serve the development", and where capacity is short the council will phase occupation by condition. Our drainage strategies record the Thames Water response and set out the treatment stages ahead of any discharge to ground; the soakaway ground conditions map gives a first view of what the geology allows.

Horton and Wraysbury Policy NP/SUSTDEV 02 (Management of the Water Environment): almost no new building in Flood Zones 2 and 3

No flood policy in the borough is stricter than this one. In the two parishes, development "within the areas shown within Flood Zones 2 and 3 as shown on the Environment Agency's Flood Maps will not be supported apart from the one for one replacement of houses and extensions to existing houses up to the limit allowable under the permitted development rights" (Horton and Wraysbury Neighbourhood Plan, made 23 June 2020). The plan's reasoning accepts new development on land above the 1 in 1,000 year flood level, its "Dry Islands", where residents would have a safe route out. Our first step on a Wraysbury or Horton site is therefore a levels check against the Environment Agency's modelled flood levels, because the answer decides whether an application is worth making.

Datchet Policy DAT10 (Flooding, Drainage and Water Efficiency), Old Windsor Policy OW5 (Flooding and Drainage) and Policy OW6 (SuDS Design and Management)

Datchet and Old Windsor both write the high water table into policy. Policy DAT10 asks that SuDS "will be effective and will avoid infiltration", allowing for "above-surface water management on site taking account of the underlying geology and sporadically high ground water table affecting parts of Datchet" (Datchet Neighbourhood Plan, made 27 June 2023). It also supports keeping existing flood bunds and caps water use in new homes at 105 litres per head per day, with up to 5 litres more for outdoor use. Policy OW6 uses near-identical words about the "seasonally high ground water table affecting parts of Old Windsor" and says drainage "must not add to the existing site run off" (Old Windsor Neighbourhood Plan, made 17 December 2019).

Both plans also fix the planning condition. Under Policy OW5, permission should be subject to a condition that no development starts until the surface and foul water drainage schemes are approved, and that nothing is occupied until they are built; residential extensions without extra bedrooms or bathrooms are the only exception. DAT10 applies the same condition in areas at risk of flooding. For sites in Datchet and Old Windsor we write the drainage strategy so the later condition can be cleared from it, with storage at the surface and the foul route shown.

Maidenhead Policy BI-2 (Managing Flood Risk and Sustainable Drainage Systems) and Policy SS-1b (Waterway Corridor development); Cookham Policy C-EN3a (Flood risk) and Policy C-EN3b (Sustainable Drainage Systems (SuDS))

The two newest plans share a test that rules out pumped drainage. Policy BI-2 covers Maidenhead schemes in Flood Zones 2 and 3 and Flood Zone 1 sites of more than a hectare, and Policy C-EN3b covers major development in Cookham. Each asks the applicant to show "adequate water drainage infrastructure to serve the development, without surcharge of foul drainage", no adverse flood impact on "adjoining, upstream or downstream land", and that "mechanical pumping is not required in order to prevent flood impact, in the event of up to and including a 1 in 100 year event" (Maidenhead Neighbourhood Plan, made 21 April 2026; Cookham Neighbourhood Plan, made 9 September 2025). On flat ground beside the Thames a gravity outfall can be hard to find, so we test levels to the outfall before a layout is drawn.

Policy SS-1b protects the town-centre waterways in Maidenhead: development on either bank is "expected to retain or provide at least an 8m buffer zone of green space", and proposals affecting the channel must show they do not increase flood risk or alter flow or levels. Cookham's Policy C-EN3a asks that any flood risk assessment covers "the drainage and water disposal profile of the site and neighbourhood area" and the "current and future impacts of climate change".

Eton Policy EN3 (Flooding), Windsor Policy WAT 01 and Hurley and the Walthams Policy Env 2 (Climate Change, Flood and Water Management)

Three older plans are briefer. Eton and Eton Wick's Policy EN3 says "Development should not result in an increase in maximum flood levels within adjoining properties", and supports reopening culverted reaches (Eton and Eton Wick Neighbourhood Plan, made 25 September 2018). Windsor's Policy WAT 01 wants development "made safe from flooding" and adds that "Drainage on site should separate foul and surface water flows" (Windsor Neighbourhood Plan, made 29 June 2021). Policy Env 2 for Hurley and the Walthams states that "Development must not increase flood risk elsewhere" (Hurley and the Walthams Neighbourhood Plan, made 12 December 2017). The Ascot, Sunninghill and Sunningdale plan of 2014 has no flood policy of its own, so NR1 and SP2 apply on their own in Ascot. In Windsor and Eton our assessments report the effect on neighbouring plots explicitly, since EN3 makes that the test.

The new Local Plan for Windsor and Maidenhead: started in October 2026

A new Local Plan is in preparation and will in time replace the Borough Local Plan. It has no draft policies yet. The council gave notice of its intention to start on 24 June 2026, ran a scoping consultation and call for sites from 30 July to 13 September 2026, and published its Gateway 1 self-assessment on 27 October 2026, which started the 30-month plan-making period under the new system. The published timetable shows consultation on plan content and evidence from 16 September to 28 October 2027, a Proposed Local Plan consultation from 1 June to 27 July 2028, submission on 30 November 2028 and adoption on 29 April 2029.

Until a draft appears, NR1 and the neighbourhood plan policies remain the tests, and a new plan will need new flood evidence: the current assessments date from 2017 and 2018. Policy NR1 itself took over from Policy F1 of the 1999 Local Plan, whose saved policies the Borough Local Plan superseded on adoption in February 2022. Older decision notices and the Horton and Wraysbury plan still refer to the former policy.

Is your site in a Royal Borough flood zone or a neighbourhood plan area?

Send us the address and the scheme. We will tell you which of NR1, the neighbourhood plan policies and the validation requirements apply, and which reports the council will ask for. Get a no-obligation, free quote. One of our experienced flood risk consultants will get back to you within 60 minutes.

Start a Quote

Which reports the Royal Borough asks for, scheme by scheme

Up to three reports can be needed. A flood risk assessment shows the development is safe and harms nobody else; a sequential test asks whether a lower-risk site is reasonably available; a drainage strategy shows where the rainwater goes. The council's validation requirements were adopted on 5 February 2026, so they are current and an application missing a listed item cannot be made valid. The table sets them beside NR1, the neighbourhood plans and national policy. Check the zone first on our flood risk map or the Flood Map for Planning.

TriggerFlood risk assessmentSequential and exception testsDrainage evidence
Any proposal in Flood Zone 2 or 3, minor development and changes of use includedRequired (validation requirements; NR1 part 1; NPPF policy F4)Sequential test for all development unless the site is allocated and the scheme accords with the plan (NR1 part 2), the work is minor development as the Environment Agency defines it, or it is a change of use other than to a caravan, camping, chalet, mobile home or park home site. Exception test where Annex F table 3 requires it: highly vulnerable uses in Zone 2, more vulnerable uses in Zone 3a, essential infrastructure in Zones 3a and 3bDrainage strategy if the scheme includes a new or replacement home or is major; site levels and finished floor levels to Ordnance Datum
Land in Flood Zone 1 where the site reaches one hectareRequired (NR1 part 1; F4; the validation requirements say "exceeding 1 hectare")Sequential test if any of the site is at risk from surface water or another source; the exception test never applies in Flood Zone 1SuDS strategy if major
Flood Zone 1 land at medium or high risk from surface water, groundwater or another sourceRequired (validation requirements; F4 where the land is mapped as at risk)Sequential test in areas of moderate and high surface water flooding (validation requirements), unless the assessment shows the scheme meets one of the F5 exemptions below; no exception testAs set by the size of the scheme
Functional floodplain (Flood Zone 3b)RequiredOnly water-compatible uses and essential infrastructure are supported (NR1 part 2); essential infrastructure must pass the exception testDrainage that still works in a flood
Any new or replacement dwelling, one house includedAs set by the flood zoneAs set by the flood zoneDrainage Assessment or SuDS Strategy (validation requirements)
Major development as the 2015 procedure order defines it (10 or more homes, a housing site of 0.5 ha where the number is not known, 1,000 m² of floorspace, or any site of 1 ha)As set by the flood zone and site areaAs set by the flood zoneSuDS strategy answering each National Standard, with the CIRIA template; the Lead Local Flood Authority is a statutory consultee
House extension in Flood Zone 2 or 3 (householder application)Required, following the Environment Agency's standing advice for minor extensionsNot required: F5 exempts householder developmentSite levels and finished floor levels drawing
Basement or swimming poolAs set by the flood zone; a basement dwelling is highly vulnerable under Annex FAs set by the flood zoneSite levels and cross sections; a Basement Impact Assessment where applicable
Building or hardstanding that reduces the permeable areaAs set by the flood zoneAs set by the flood zoneSurface water drainage scheme following the SuDS hierarchy (Sustainability SPD)
Within 8 m of a main river or, where practicable, an ordinary watercourseAs set by the flood zoneAs set by the flood zoneUndeveloped buffer (NR1 part 9; QP4); environmental permit from the Environment Agency or ordinary watercourse consent from the council for works to the channel
Flood Zone 2 or 3 in Horton or WraysburyRequiredNew building not supported; replacement houses and extensions within permitted development limits only (NP/SUSTDEV 02)As set by the scheme

The sequential test is where NR1 and national policy differ. NR1 exempts only allocated sites, while NPPF policy F5 also exempts householder development, non-residential extensions with a footprint under 250 m² and most changes of use, and the council's validation requirements broadly follow the national list. F5 adds two cases an assessment can prove: that no built development, access or escape route would be on land at risk from any source now or in future, or, where surface water is the only risk, that the layout keeps occupiers safe for the lifetime of the development without increasing flood risk elsewhere. Our note on the surface water exemption explains how that second case is made.

Where the test does apply, the validation requirements say the area of search "should be agreed with the Local Planning Authority prior to submission, as part of a pre application submission". F5 says the area should be no greater than the anticipated catchment of the development, so the search is sized to the scheme and not automatically to the whole borough. Applications that arrive without a listed item are held as invalid, and our guide to flood and drainage invalidations covers the usual gaps.

RBWM's drainage standards for major and non-major schemes

The Royal Borough publishes two guidance notes, both written around the 2025 National Standards for sustainable drainage that NPPF policy F8 now cites: the SuDS Major Design Guidance and the SuDS Non-Major Design Guidance. Neither is dated. Where they are silent, the National Standards apply as written.

  • Rainwater reuse comes first. The borough is in a water-stressed area, so the guidance says Priority 1 of the runoff hierarchy, collection for non-potable use, "will always be required" on major schemes (Standard 1). Our piece on rainwater harvesting within SuDS shows how it is sized.
  • No private water into highway drains. "New private surface water drainage will not be allowed to discharge into a highway drainage system", and the council will not use its own powers to secure a discharge route across third-party land for an applicant.
  • Discharge rates. Rates "should be limited to the lowest achievable rate for the designed storm event". For most sites where development increases the volume of runoff, the allowable rate is the 1 in 2 year (50% annual exceedance probability) rate, and on brownfield sites the council expects the relaxation factor in the National Standards to apply "in exceptional circumstances" only (Standard 3).
  • Storage. Above-ground storage is preferred, and tanks, crates or oversized pipes have to be justified. Long-term storage must infiltrate or leave at no more than 2 l/s/ha, and nothing up to the 1 in 100 year rainfall event may leave the site uncontrolled (attenuation).
  • Infiltration evidence. Infiltration test results are expected with the application, or a reasoned explanation and a desk study of ground conditions where testing is not yet possible. Each soakaway needs a table giving its levels, the area drained, the design storm, the climate change allowance, the factor of safety, the infiltration rate and the depth to the highest recorded groundwater. The BRE 365 infiltration calculator turns trial pit readings into a rate.
  • What a major submission contains. Each National Standard addressed in turn, a non-technical summary, the CIRIA SuDS Strategy template, an exceedance route plan with levels, and a maintenance plan showing who is responsible for what (evidence required).
  • Non-major schemes. For one to nine homes the drainage team is advisory. The first 5 mm of rainfall is managed on site unless the scheme infiltrates, soakaways need 1 m between their base and the highest recorded groundwater, and discharge is held "as close as possible to the greenfield rate" (Standards 2 and 3).

Neither note sets a climate change percentage, so rainfall uplifts come from the Environment Agency's climate change allowances, last updated on 27 May 2022; the 2017 flood assessment's reference to a climate change uplift of "20-40%" predates them. Showing the highest recorded groundwater level can mean a winter of monitoring, and our guide to groundwater monitoring for planning explains how to programme it. If the drainage team objects, a revised strategy that answers each point is the usual route, as our article on responding to an LLFA objection describes.

The 2017 and 2018 Strategic Flood Risk Assessments and what they add to NR1

The borough's Strategic Flood Risk Assessment is in two parts: a Level 1 report dated June 2017 and a Level 2 report with the sequential and exception testing of the plan's sites, dated April 2018. Both were written for the Borough Local Plan and neither has been updated since. NR1 part 1 names the Level 1 report as the definition of the flood zones, so its flood zone maps have the policy behind them. Our explainer on strategic flood risk assessments covers how these studies are used in general; the points below are specific to this one.

  • Functional floodplain at 1 in 20. The Level 1 report draws Flood Zone 3b on the modelled 5% annual probability (1 in 20 year) flood for the Thames, Colne and Loddon. National policy in Annex F now normally starts from the 3.3% (1 in 30 year) flood, so a site outside the borough's line can still be functional floodplain on current modelling.
  • No 1 in 20 year outline. Where none exists, the report says to treat the whole 1 in 100 year extent as functional floodplain until a site-specific assessment shows otherwise.
  • "Zone 3b Developed". Existing building footprints inside the 1 in 20 year extent are mapped separately, but the report says the land around them forms flow paths and storage that "must be protected".
  • Floor levels. Finished floors at least 300 mm above the 1 in 100 year flood level with climate change, in Flood Zones 2 and 3.
  • Compensation and footprint. In Flood Zone 3, compensation storage at least 5% greater than the volume lost, level for level, and a building footprint on redevelopment at least 5% smaller than the existing one.
  • Basements. The report says basements in flood-affected areas "should be discouraged".

The Level 1 study is nine years old. It predates the Environment Agency's current climate change allowances, so we request the Agency's current modelled levels for the site before any floor level is fixed. And the council's Local Flood Risk Management Strategy dates from 2014; a draft strategy for 2026 to 2041 went out to consultation until 12 July 2026 and had not been adopted when this page was checked. The council's Section 19 flood investigation reports hold the dated local records an assessment should cite.

How Chapter 18 of the NPPF sits beside Policy NR1

National policy is in Chapter 18 of the August 2026 NPPF. Policy F4 says when a site-specific assessment is needed; in Flood Zone 1 that covers sites of one hectare or more, land with critical drainage problems, and land a strategic assessment or the Flood Map for Planning shows to be at risk from any source now or in future. F5 sets the sequential test and its exemptions, F6 the exception test, F7 the safety tests and F8 the requirement for SuDS built to the National Standards. The planning practice guidance on flood risk, last updated on 17 September 2025, fills in the method, and our summary of the August 2026 changes lists what changed.

NR1 was written against an earlier Framework. It differs from Chapter 18 in two places. It applies the exception test to allocated sites, where F6 would not repeat a test already applied at plan-making unless the flood risk has grown significantly or the use has become more vulnerable. And its sequential test wording has none of the F5 exemptions. A decision must follow the development plan unless material considerations indicate otherwise, and the Framework is one such consideration, so we set out both positions in the report and say which the scheme relies on. For the tests themselves, see our guide to the sequential and exception tests.

Thames, Jubilee River and groundwater: flood risk across the Royal Borough in brief

The River Thames forms the borough's northern and eastern edge, and the Borough Local Plan counts major floods in 1894, 1947 and 2014. The Jubilee River, the 11.6 km relief channel opened in 2002, is part of a flood alleviation scheme that lowers the risk to about 3,000 properties in Maidenhead, Windsor, Eton and Cookham; the Environment Agency says the scheme "is not designed to reduce flood risk to communities upstream or downstream of the scheme". Whether it moves the problem to Datchet and Wraysbury is the subject of our article on the Jubilee River and downstream flood risk.

From Datchet downstream the developed floodplain is undefended. In January 2024 the council recorded 94 properties flooded inside across the borough, most of them in Hurley, Bisham, Cookham, Datchet, Wraysbury and Old Windsor (Section 19 report). The channel NR1 safeguards between Datchet and Wraysbury was dropped from the River Thames Scheme in July 2020, and the Environment Agency's Datchet to Hythe End project is looking for other ways to protect about 2,500 properties; our piece on the River Thames Scheme follows the main scheme downstream. In the east the Colne Brook, an arm of the River Colne, adds a second main river to Horton and Wraysbury.

Away from the river the sources are rain and groundwater. Storms in September 2024 flooded 40 Maidenhead properties internally, with Boyn Hill and Furze Platt worst hit, and the Thames gravels let groundwater rise behind defences and under gardens. Our guide to groundwater flood risk in planning applications covers the evidence, and the live river levels map shows the Thames gauges. Across the river the rules change: Taplow and Marlow fall to Buckinghamshire Council, and below Wraysbury the Thames passes into Spelthorne. The wider county is on our Berkshire page.

Flood and drainage reports for a planning application to the Royal Borough

We have prepared flood risk assessments and drainage strategies for planning applications to the Royal Borough of Windsor and Maidenhead, and each one is scoped against NR1, the neighbourhood plan for the parish and the council's SuDS guidance. Reports for applications to the Royal Borough come from Unda Consulting Limited, a CIWEM Business Partner, and are written by chartered consultants. A flood risk assessment, a sequential or exception test and a drainage strategy are separate documents answering separate questions, and the council may ask for one, two or all three.

  • Every site at risk. NR1 part 1 supports development only where risk from all sources is shown to be acceptable, which starts with a flood risk assessment matched to the site.
  • Flood Zones 2 and 3. The validation requirements ask for an assessment on every proposal here, changes of use included, so the application needs a flood risk assessment for planning before it can be made valid.
  • Buying beside the Thames. Before exchange on a house in Datchet, Old Windsor, Wraysbury or Cookham, a flood risk survey for property purchase looks at the building, its levels and its flood history.
  • Testing the location. NR1 part 2 asks for the test on all unallocated sites at risk and part 7 keeps the exception test for allocations, so our sequential and exception test reports are written as separate documents.
  • One home or more. The validation requirements ask for drainage evidence with every new or replacement dwelling, so even a single plot needs a drainage strategy.
  • Major schemes. The drainage team wants each National Standard answered, rainwater reuse included, in a surface water drainage strategy built on the CIRIA template.
  • After permission. Policies OW5 and DAT10 write a pre-commencement drainage condition into Old Windsor and Datchet permissions, and we prepare the submissions for the discharge of drainage conditions.
  • National policy. NR1 predates Chapter 18, and our NPPF guidance explains how policies F4 to F8 apply where the two differ.
  • Groundwater. The council expects applicants to deal with groundwater though it is not consulted on it, and Datchet and Old Windsor steer drainage away from infiltration, so a groundwater flood risk assessment supports many reports here.
  • Modelled levels. Where the 2017 assessment has no 1 in 20 year outline it leaves the functional floodplain line to the applicant, and flood modelling is how that line is drawn.
  • Evacuation. NR1 parts 2 and 6 ask for a site evacuation plan where appropriate, and the plan's floodplain allocations need a safe route: a flood warning and evacuation plan sets it out.
  • Sewer capacity. Policy IF7 asks for proof of sewerage capacity and OW5 conditions the foul scheme, which a foul drainage strategy provides.
  • Homes that have flooded. With 94 properties flooded inside in January 2024, owners facing higher premiums can commission a flood risk assessment for insurance.

Windsor and Maidenhead flood and drainage requirements: applicants' questions

What does RBWM Policy NR1 (Managing Flood Risk and Waterways) require?

Policy NR1 of the Borough Local Plan, adopted on 8 February 2022, asks for a flood risk assessment in Flood Zones 2 and 3 and on Flood Zone 1 sites of a hectare or more. It requires a sequential test for all development in areas at risk unless the site is allocated, and supports only water-compatible uses and essential infrastructure in the functional floodplain. Schemes must not impede flood flow or reduce floodplain storage, should use SuDS, and should keep an undeveloped 8 metre buffer beside main rivers.

Does one new house in the Royal Borough need a drainage strategy?

Yes. The validation requirements the council adopted on 5 February 2026 ask for a Drainage Assessment or SuDS Strategy with all new and replacement dwellings, as well as all major non-residential applications. On a scheme of up to five homes the drainage team may reply with standing advice, but it looks more closely where the site is at high risk of surface water flooding or near recorded property flooding.

Can I build a new house in Flood Zone 2 or 3 in Wraysbury or Horton?

Almost certainly not. Policy NP/SUSTDEV 02 of the Horton and Wraysbury Neighbourhood Plan, made on 23 June 2020, does not support development in Flood Zones 2 and 3 apart from one-for-one replacement houses and extensions within permitted development limits. The plan accepts new homes on land above the 1 in 1,000 year flood level where there is a safe route out, so the first job is to establish the site levels.

Where does the Royal Borough draw the functional floodplain?

On the 1 in 20 year flood. The Level 1 Strategic Flood Risk Assessment of June 2017 defines Flood Zone 3b as land flooding in the modelled 5% annual probability event on the Thames, Colne and Loddon, and treats the whole 1 in 100 year extent as functional floodplain where no such outline exists. Existing building footprints are mapped as "Zone 3b Developed". National policy now normally starts from the 1 in 30 year flood, so current modelling should be checked as well.

Is the council's drainage team consulted on schemes of fewer than ten homes?

Yes, as a non-statutory consultee. The Non-Major Design Guidance says the Lead Local Flood Authority may give standing advice on applications of up to and including five dwellings and will give its own response on six to nine. It expects the first 5 mm of rainfall managed on site where the scheme does not infiltrate, 1 m between the base of a soakaway and the highest recorded groundwater, and discharge as close as possible to the greenfield rate.

When will the new Local Plan replace the Borough Local Plan?

The council plans to adopt it on 29 April 2029. Preparation formally started on 27 October 2026, consultation on plan content and evidence is due from 16 September to 28 October 2027, and the Proposed Local Plan is due for consultation from 1 June 2028. No draft flood or drainage policies have been published, so Policy NR1 and the neighbourhood plans remain the tests for applications made now.

Need NR1, the SuDS guidance and the validation list answered in one submission?

Tell us the site, the scheme and where the application has got to, from a first sketch to a drainage condition. We will scope the reports the Royal Borough and its drainage team will want. Get a no-obligation, free quote, with a fixed quote within the hour.

Start a Quote

Call 01293 214444 or email enquiries@unda.co.uk with the address and a sketch of the proposal. One of our experienced flood risk consultants will get back to you within 60 minutes.

Get a no-obligation, free quote

If you need a quote or to discuss your requirements in more detail contact one of our experienced Flood Risk and Drainage Consultants.

Call +44 (0) 1293 214444, email enquiries@unda.co.uk or fill in the form below

  • This field is for validation purposes and should be left unchanged.